PM 1

The document discusses various project management techniques, including PERT and CPM, highlighting their purposes, features, and benefits. It also covers demand forecasting techniques, project life cycle phases, and the generation and evaluation of project ideas. Additionally, it emphasizes the importance of critical analysis and technical analysis in ensuring project feasibility and efficiency.

Uploaded by

Khushi Kalyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views9 pages

PM 1

The document discusses various project management techniques, including PERT and CPM, highlighting their purposes, features, and benefits. It also covers demand forecasting techniques, project life cycle phases, and the generation and evaluation of project ideas. Additionally, it emphasizes the importance of critical analysis and technical analysis in ensuring project feasibility and efficiency.

Uploaded by

Khushi Kalyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

PERT AND CPM:

PERT (Program Evaluation and Review Technique)


• Purpose: PERT is a statistical tool used for planning and controlling projects. It focuses on
analyzing the time required to complete each task and identifies the minimum time needed
to complete the entire project.
• Features:
o It deals with uncertain activity durations by considering three estimates: Optimistic
Time (O), Most Likely Time (M), and Pessimistic Time (P).
o Calculates the expected time using the formula: $$T_e = \frac{O + 4M + P}{6}$$.
o Useful for projects with high levels of uncertainty, such as research or development
tasks.
Benefits:
o Helps identify critical activities and potential delays.
o Provides flexibility in scheduling and planning.
CPM (Critical Path Method)
• Purpose: CPM is a deterministic tool that focuses on finding the longest sequence of
dependent activities (critical path) required to complete a project. It’s used for projects with
predictable activity durations.
• Features:
o Activities are classified as critical or non-critical.
o The critical path represents the sequence of tasks with no slack—delays in these
tasks will delay the project.
o Task durations are fixed, and CPM calculates the earliest and latest start and finish
times for each activity.
• Benefits:
o Enables optimization of time and resources.
o Clearly defines the timeline for project execution.Key Differences Between PERT and CPM
Aspect PERT CPM
Focus Time estimation under uncertainty Fixed, predictable timelines
Activity Duration Variable, probabilistic Deterministic
Application Research, development Construction, manufacturing
In summary, both PERT and CPM are vital tools in project management that help with scheduling,
monitoring, and completing projects effectively. PERT is ideal for projects with uncertain durations,
while CPM is better suited for tasks with clear timelines.
Let me know if you need a deeper dive into any aspect!
DEMAND FORECASTING TECHNIQUES
Demand forecasting is a critical process for predicting future customer demand for a product or
service. It enables businesses to make informed decisions regarding inventory, production, pricing,
and resource allocation. Below is an explanation of various demand forecasting techniques:
1. Qualitative Techniques
These methods rely on expert judgment, opinions, and intuition rather than numerical data. They
are
useful when historical data is limited or unavailable.
• Delphi Method: A structured approach where experts provide forecasts independently. Their
opinions are consolidated and refined through multiple rounds until a consensus is reached.
• Market Research: Surveys, focus groups, and interviews are used to gather consumer insights
and predict demand.
• Expert Judgment: Forecasting based on the knowledge and experience of industry experts.
2. Quantitative Techniques
These methods use historical data and statistical models to generate forecasts. They are suitable
for
data-rich environments.
• Time Series Analysis:
o Identifies patterns in historical data (e.g., trends, seasonality).
o Techniques include moving averages, exponential smoothing, and autoregressive
models.• Regression Analysis:
o Examines the relationship between demand and influencing factors (e.g., price,
income, advertising).
o Helps identify how changes in these factors affect demand.
• Econometric Models:
o Complex statistical models that incorporate multiple variables and their interactions
to forecast demand.
3. Causal Techniques
These methods establish a cause-and-effect relationship between demand and specific factors,
such
as economic indicators or market conditions.
• Leading Indicators: Uses external factors (e.g., stock market trends, GDP growth) to predict
demand.
• Input-Output Analysis: Examines the flow of goods and services within an economy to
estimate demand.
4. Machine Learning Techniques
With advancements in technology, machine learning algorithms are increasingly used for demand
forecasting.
• Neural Networks: Analyze complex, non-linear relationships in data to make accurate
predictions.
• Decision Trees: Break down data into smaller subsets and use rules to forecast demand

• .PROJECT MANAGEMENT TECHNIQUES


Project management techniques are essential tools and methodologies used to plan, execute, and
complete projects efficiently. Here’s a detailed explanation suitable for a 15-mark response:
1. Work Breakdown Structure (WBS)
• Purpose: Divides the project into smaller, manageable tasks.
• Method: Creates a hierarchical structure where deliverables are broken down into tasks and
subtasks.
• Benefit: Ensures every aspect of the project is accounted for, making it easier to allocate
resources and monitor progress.
2. PERT (Program Evaluation and Review Technique)
• Purpose: Manages projects with uncertain activity durations.
• Method: Calculates expected time for tasks using three estimates: optimistic, pessimistic,
and most likely times.
• Benefit: Identifies critical activities and potential delays, ensuring flexibility.
3. Critical Path Method (CPM)
• Purpose: Identifies the longest sequence of tasks required to complete the project.
• Method: Determines critical and non-critical activities based on fixed task durations.
• Benefit: Optimizes project timeline and resource allocation.
4. Gantt Charts
• Purpose: Visual representation of project schedules.
• Method: Uses bars to show start and end dates of tasks.
• Benefit: Simple and intuitive tool for tracking progress and deadlines.
5. Kanban Method
• Purpose: Focuses on workflow management and continuous improvement.• Method: Tasks are
represented as cards on a board, which moves through various stages
(e.g., To Do, In Progress, Done).
• Benefit: Enhances productivity by visualizing workflow and limiting work in progress.
6. Agile Project Management
• Purpose: Provides flexibility to accommodate changes in dynamic environments.
• Method: Breaks the project into smaller iterations or sprints, delivering increments of value.
• Benefit: Encourages collaboration and continuous improvement.
7. Earned Value Management (EVM)
• Purpose: Measures project performance in terms of scope, schedule, and cost.
• Method: Uses metrics like Planned Value (PV), Earned Value (EV), and Actual Cost (AC) to
evaluate progress.
• Benefit: Helps in early identification of deviations and ensures project stays on track.
8. Risk Management
• Purpose: Identifies and mitigates potential risks in the project.
• Method: Creates a risk register, assessing likelihood and impact of each risk.
• Benefit: Minimizes uncertainties and ensures successful project delivery.
TECHNICAL ANALYSIS
Technical analysis is a methodology used in financial markets to evaluate securities and make
trading
decisions by analyzing statistical trends gathered from historical price movements and trading
volumes. Here's a detailed explanation, suitable for a 15-mark response:
Definition and Purpose
• Technical analysis focuses on identifying patterns, trends, and signals from past market
behavior to predict future price movements.
• It is widely used in stock markets, forex, commodities, and cryptocurrencies for short-term
and long-term trading decisions.Key Principles of Technical Analysis
1. 2. 3. Market Discounts Everything: All known information about a security (economic, political,
and psychological factors) is reflected in its price.
Prices Move in Trends: Price movements follow identifiable trends, which can be upward,
downward, or sideways.
History Tends to Repeat Itself: Historical patterns and behaviors in the market are likely to
reoccur due to human psychology.
Tools and Techniques
1. Charts:
o Line Chart: Simplest form, connects closing prices over time.
o Bar Chart: Shows opening, closing, high, and low prices for a given time period.
o Candlestick Chart: Visual representation of price movements with information on
bullish and bearish trends.
2. Indicators:
o Moving Averages (MA): Smoothens price data to identify trends.
o Relative Strength Index (RSI): Measures the momentum of price movements and
identifies overbought or oversold conditions.
o Bollinger Bands: Indicates price volatility and overbought/oversold levels.
o MACD (Moving Average Convergence Divergence): Shows the relationship between
two moving averages and signals buy/sell opportunities.
3. Patterns:
o Head and Shoulders: Predicts reversal trends.
o Triangles (Ascending/Descending/Symmetrical): Indicates continuation or breakout
points.
o Double Top/Bottom: Signals potential reversals.
4. Support and Resistance Levels:
o Support: A price level where demand is strong enough to prevent further decline.
o Resistance: A price level where selling pressure prevents further rise.Advantages of Technical
Analysis
• Quick decision-making for traders due to visual representation of data.
• Effective in short-term trading where fundamental factors may not be prominent.
• Identifies entry and exit points in trades.
Limitations of Technical Analysis
• Relies on historical data, which may not guarantee future results.
• Prone to subjective interpretation of patterns and trends.
• Ineffective during events causing sudden market disruptions (e.g., geopolitical crises).
PROJECT LIFE CYCLE
The project life cycle refers to the series of stages that a project goes through from initiation to
completion. It provides a structured approach to managing projects effectively. Here’s a
comprehensive explanation for a 15-mark answer:
Phases of the Project Life Cycle
1. Initiation Phase
o Purpose: Defines the scope, objectives, and feasibility of the project.
o Activities:
▪ Conducting a feasibility study.
▪ Identifying stakeholders.
▪ Preparing a project charter or statement of work (SOW).
o Outcome: Approval to proceed with the project.
2. Planning Phase
o Purpose: Establishes a roadmap for project execution.
o Activities:
▪ Setting goals and objectives (using SMART criteria).
▪ Developing schedules (e.g., Gantt charts) and budgets.
▪ Identifying risks and creating mitigation plans.
▪ Assigning tasks and resources.o Outcome: Comprehensive project plan to guide execution.
3. Execution Phase
o Purpose: Implements the project plan to achieve the desired deliverables.
o Activities:
▪ Coordinating team members and resources.
▪ Monitoring progress through status meetings and updates.
▪ Ensuring quality control.
o Outcome: Creation of project deliverables.
4. Monitoring and Controlling Phase
o Purpose: Ensures the project stays on track in terms of scope, time, and cost.
o Activities:
▪ Tracking progress with tools like Earned Value Management (EVM).
▪ Identifying deviations from the plan and taking corrective actions.
▪ Managing changes through change control processes.
o Outcome: Successful adherence to the project plan.
5. Closure Phase
o Purpose: Formal completion and handover of the project.
o Activities:
▪ Conducting final quality checks.
▪ Delivering the final product to stakeholders or clients.
▪ Documenting lessons learned in a project closure report.
o Outcome: Project officially closed, and all deliverables handed over.
Key Benefits of the Project Life Cycle
• Provides a clear framework for managing projects systematically.
• Ensures all aspects of the project are addressed, from planning to delivery.
• Facilitates stakeholder communication and alignment.
• Helps identify risks and manage them effectively.generation of project ideas
The generation of project ideas is a vital step in project management, as it lays the foundation for
future planning and execution. It involves identifying and conceptualizing potential projects that
align
with organizational goals and solve specific problems or meet opportunities. Here’s a detailed
explanation suitable for a 15-mark answer:
Steps in Generating Project Ideas
1. Identifying Organizational Needs
o Evaluate the organization’s goals, objectives, and long-term vision.
o Assess gaps or areas requiring improvement (e.g., operational inefficiencies, market
demands).
o Align ideas with strategic priorities.
2. Scanning the Environment
o Analyze external factors such as economic trends, technological advancements,
competitor strategies, and customer needs.
o Consider opportunities arising from policy changes, new regulations, or emerging
markets.
3. Brainstorming
o Engage stakeholders, team members, and experts to generate a pool of creative
ideas.
o Use techniques such as mind mapping or free association to encourage innovative
thinking.
4. Conducting Feasibility Studies
o Assess the technical, financial, legal, and operational feasibility of ideas.
o Discard impractical ideas while focusing on viable options.
5. Market Research
o Study market demands and customer preferences.
o Analyze supply and demand gaps to identify potential areas for new projects.
6. SWOT Analysis
o Perform a Strengths, Weaknesses, Opportunities, and Threats analysis for each idea.
o Helps in determining the viability and potential success of the project.7. Benchmarking
o Learn from successful projects implemented by competitors or industry leaders.
o Identify areas of improvement by comparing practices and standards.
8. Adopting Innovative Techniques
o Explore technological solutions, automation opportunities, and creative designs to
propose cutting-edge project ideas.
Sources of Project Ideas
• Internal Sources:
o Employee suggestions and feedback.
o Observations from past projects.
o Organizational goals and mission statements.
• External Sources:
o Customer feedback and surveys.
o Industry trends and competitor analysis.
o Collaboration with partners or consultants.
Evaluation Criteria for Project Ideas
Once ideas are generated, they must be evaluated using the following criteria:
• Relevance: Does the project align with organizational objectives?
• Feasibility: Are resources available to implement the project?
• Impact: What benefits will the project bring to the organization or stakeholders?
• Cost: Is the project financially viable?
• Risk: What are the potential risks, and how can they be mitigated?

• Critical analysis
Critical analysis in project management involves the systematic evaluation of a project’s various
components to ensure that objectives are achieved effectively and efficiently. It focuses on
assessing
the project’s scope, schedule, resources, risks, and outcomes to identify areas for improvement
and
ensure successful delivery. Here's a detailed explanation suitable for a 15-mark response:
Definition
Critical analysis is the process of examining and evaluating all aspects of a project to identify
strengths, weaknesses, opportunities, and threats. It ensures informed decision-making and
continuous improvement during project execution.
Steps in Critical Analysis
1. Analyzing Project Objectives
o Evaluate whether the project’s goals align with organizational priorities and strategic
plans.
o Assess the clarity, feasibility, and specificity of the objectives.
2. Evaluating Scope and Deliverables
o Review the project scope to ensure it is well-defined and achievable.
o Validate that deliverables meet stakeholder expectations and quality standards.
3. Assessing Schedule
o Examine the project timeline and milestones to identify potential delays.
o Use tools like Gantt charts or PERT diagrams to analyze dependencies and critical
paths.
4. Resource Allocation Review
o Evaluate the allocation of resources (human, financial, and technological) to ensure
optimal usage.
o Identify overutilized or underutilized resources and adjust plans accordingly.
5. Risk Analysis
o Identify potential risks that could impact the project’s success.
o Assess the likelihood and impact of risks and implement mitigation strategies.
6. Cost and Budget Analysiso Examine budget adherence and identify any deviations.
o Analyze cost efficiency and ensure the project remains financially viable.
7. Stakeholder Feedback
o Gather inputs and feedback from stakeholders to evaluate satisfaction and address
concerns.
o Ensure communication and involvement of all key parties in the decision-making
process.
8. Performance Metrics
o Use performance indicators such as Earned Value (EV), Actual Cost (AC), and
Schedule Variance (SV) to measure progress.
o Compare planned vs. actual performance to identify gaps and areas needing
attention.
Tools and Techniques Used in Critical Analysis
• SWOT Analysis: To identify strengths, weaknesses, opportunities, and threats.
• Fishbone Diagram: To pinpoint root causes of problems.
• Earned Value Management (EVM): To assess scope, time, and cost performance.
• Critical Path Method (CPM): To identify critical activities affecting the project timeline.
• Risk Assessment Matrix: To analyze and prioritize risks.
Benefits of Critical Analysis in Project Management
1. 2. 3. 4. 5. Improved Decision-Making: Provides insights to make informed and proactive
decisions.
Risk Mitigation: Identifies potential risks early, allowing for effective mitigation strategies.
Resource Optimization: Ensures efficient use of resources for maximum productivity.
Enhanced Stakeholder Satisfaction: Regular feedback and evaluation address concerns and
align expectations.
Increased Project Success Rate: Continuous monitoring and adjustments improve the
chances of achieving project goals.

QUES- Technical Analysis of a Project


Meaning:
Technical analysis of a project means studying the technical and operational aspects of a proposed
project to check if it is practical, feasible, and efficient.

It ensures that the project can be set up and run smoothly using the right technology, equipment,
location, and process.

Factors Considered in Technical Analysis of a Project:

1. Location and Site Selection


• Choosing a suitable location for the project is very important.
• Factors include availability of raw materials, labor, transportation, power, water, and
nearness to market.
• A good location reduces cost and increases efficiency.

2. Size and Capacity of the Project


• Deciding the scale of production: small, medium, or large.
• The capacity should match the expected demand.
• Proper size ensures better use of resources and higher profitability.

3. Technology Selection
• Choosing the right technology or process for production (manual, semi-automatic, or
fully automatic).
• The technology should be cost-effective, modern, and suitable for Indian conditions.
• Also includes checking whether the technology is available locally or needs to be
imported.

4. Machinery and Equipment


• Selection of suitable machines and tools for production.
• Factors include cost, availability, installation, maintenance, and after-sales service.
• Also includes checking spare parts availability.

5. Raw Materials and Inputs


• Availability of raw materials, fuel, power, and water is essential.
• Should be available in required quantity, quality, and at reasonable prices.
• Ensures smooth and uninterrupted production.

6. Plant Layout and Design


• Refers to the physical arrangement of machines, equipment, and workspace in the
factory.
• A good layout ensures smooth workflow, safety, and minimum wastage of time and
material.

7. Environmental and Pollution Control


• The project must follow environmental laws.
• Proper arrangements should be made for waste disposal, pollution control, and eco-
friendly processes.

QUES-Technology Selection and Its Importance

Meaning:

Technology selection means choosing the most suitable technology or method of production for a
project or business.
It includes selecting machines, equipment, production methods, and software that will be used to
produce goods or services.

The main goal is to choose a technology that is cost-effective, efficient, reliable, and suitable for
local conditions.

Process of Technology Selection:

1. Identify Business Needs and Goals


• First, understand the type of product or service and the desired quality and quantity.
• Decide whether the project needs high production speed, low cost, customization, etc.

2. Study Available Technologies


• Research the different technologies available in the market.
• Compare local and foreign technologies, manual vs. automated systems, etc.

3. Evaluate Technical Suitability


• Check whether the technology is suitable for:
• The raw materials available
• Climatic conditions
• Workforce skill level
• Infrastructure (power, water, roads)

4. Cost Analysis
• Compare the initial cost, operating cost, and maintenance cost of different
technologies.
• Choose the one that gives the best value for money.

5. Reliability and Performance


• Select technology that is proven, tested, and has a track record of good performance.
• It should have less breakdowns and high productivity.

6. Availability of Spare Parts and After-Sales Service


• Technology should come with easily available spare parts and good after-sales support.
• This reduces downtime and ensures smooth functioning.

7. Environmental and Legal Factors


• The technology should follow environmental laws and produce less pollution.
• Should not harm the environment or violate any legal norms.

8. Future Upgradability
• The selected technology should be flexible and upgradable as per future needs.
• It should not become outdated quickly.

Role of Appropriate Technology

Appropriate Technology means a technology that is:


• Affordable,
• Easy to use,
• Locally available,
• Eco-friendly,
• And suitable to local social and economic conditions.

Importance of Appropriate Technology:


1. Reduces Cost – Uses local materials and labor, which saves money.
2. Easy to Operate – Can be used by workers with basic skills.
3. Eco-friendly – Causes less pollution and saves energy.
4. Promotes Local Employment – Encourages use of local resources and labor.
5. Fits with Local Conditions – Works well even with limited infrastructure.