600
+15,000
Fifth floor
Floor finished in ceramic
tiles with a matching 100mm
3,000
Railing to detail
skirting in a matt finish
2,400
sample to approval
+12,000
Fourth floor 600
3,000
2,400
+9,000
Third floor
600
+6,000
Second floor
600
3,000
to Architect's approval
+3,000
First floor
600
3,000
S.Eng's detail
+0
Ground floor
600
3,000
2,400
-3,000
Basement one
600
2,400
-6,000
Basement two
8 7 6
STEEL PLATE
GLASS FIN
CABLE
Horizontal Mullion ANCHOR
Double Glazing
Tempered and Laminated Vertical Mullion
+15,000 VOID MULLION
20
20
26
26
Ninth floor
600
600
600
600
HORIZONTAL RAIL
494
494
3,000
26
26
2,400
2,400
2,400
2,400
SPANDRAL PANEL
VOID
787
787
600
600
600
2,740
2,740
26
26
3,000
493
493
2,400
2,400
2,400
2,400
GLASS
26
26
788
Seventh floor
600
600
600
600
PC 0.10
ROUTEL
SPIDER
FITTING
26
26
20
20
3,000
SILICON
2,400
2,400
2,400
2,400
SEALANT
VOID
+15,000
Sixth floor CURTAIN WALL CONNECTION DETIAL
600
600
600
600
2,400
2,400
2,400
2,400
600
600
600
3,000
3,000
3,000
3,000
2,400
2,400
2,400
2,400
600
600
600
600
600
Planter to detail
200mm thick coral block walling
finished in 3 coats silk paint on
33,000
3,000
3,000
2,400
2,400
2,400
2,400
2,400
to Architect's approval
Railing to detail
VOID
+9,000 +9,000
Third floor Third floor
600
600
600
600
600
600
3,000
2,400
2,400
2,400
2,400
2,400
toughned glass
600
600
600
600
600
3,000
21,000
2,400
2,400
2,400
2,400
2,400
2,400
600
600
600
600
600
3,000
2,400
2,400
2,400
2,400
2,400
+0 +0
Ground floor Ground floor
600
600
600
600
600
600
VOID
3,000
3,000
2,400
2,400
2,400
2,400
2,400
2,400
-3,000 -3,000
Basement one
600
600
600
600
600
600
Basement one
3,000
3,000
2,400
2,400
2,400
2,400
2,400
2,400
Retaining wall
to detail
-6,000 -6,000
Basement two
Basement two
8 10
600
600
+12,000
Fourth floor
3,000
2,400
2,400
2,400
+9,000
Third floor
600
600
600
3,000
2,400
2,400
2,400
600
600
3,000
2,400
2,400
2,400
600
600
18,000
3,000
2,400
2,400
600
600
3,000
2,400
2,400
2,400
-3,000
Basement one
3,000
3,000
3,000
3,000
-6,000
Basement two
P-12
CAST IRON PIPE ENCASED
IN 150mm CONCRETE INSPECTION CHAMBERS WITHIN BUILDING TOBE CAD FILE :
FITTED WITH HEAVY
DUTY DOUBLE SEAL AIR TIGHT COVERS PC MAC