The document outlines the specifications and details for a multi-story building, including dimensions for various floors and materials used such as SS316 handrails and toughened glass. It includes construction notes, fire safety requirements, and architectural details for walls, ceilings, and finishes. The project emphasizes compliance with structural engineering standards and fire safety regulations.

Uploaded by

Joan Katama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Selected Partials Upscaled

The document outlines the specifications and details for a multi-story building, including dimensions for various floors and materials used such as SS316 handrails and toughened glass. It includes construction notes, fire safety requirements, and architectural details for walls, ceilings, and finishes. The project emphasizes compliance with structural engineering standards and fire safety regulations.

Uploaded by

Joan Katama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

900mm high SS316 hand rail

40 infilled in 10mm thick


toughned glass

600
+15,000
Fifth floor
Floor finished in ceramic
tiles with a matching 100mm

3,000
Railing to detail
skirting in a matt finish

2,400
sample to approval

+12,000
Fourth floor 600
3,000

2,400

+9,000
Third floor
600

Curtain wall connection to detail


Soffit ceiling plastered and
painted with silk-vinyl
3,000

paint to archs approval


2,400

+6,000
Second floor
600

Curtain wall connection to detail


200mm thick coral block walling
finished in 3 coats silk paint on
21,000

3,000

12mm steel float trowel render


2,400

to Architect's approval

+3,000
First floor
600
3,000

Curtain wall connection to detail 150 mm thk slab to


2,400

S.Eng's detail

+0
Ground floor
600
3,000

2,400

-3,000
Basement one
600

3,138 8,000 8,000 4,978


3,000

2,400

-6,000
Basement two

8 7 6

PARTIAL DETAIL 01 SCALE 1:50

STEEL PLATE

H04 White Plaster H02

GLASS FIN

CABLE
Horizontal Mullion ANCHOR
Double Glazing
Tempered and Laminated Vertical Mullion
+15,000 VOID MULLION
20

20
26

26

Ninth floor
600

600

600

600

HORIZONTAL RAIL
494

494
3,000

26

26
2,400

2,400

2,400

2,400

SPANDRAL PANEL

VOID
787

787

+15,000 FIN SUPPORTED GLASS


Eigth floor GLAZING
600

600

600

600

2,740

2,740
26

26
3,000

493

493
2,400

2,400

2,400

2,400

GLASS
26

26

Interlocking Pavement 0.04 ROUTEL


2400x900mm Hard wood
VOID mvule door to schedule
Mortar
+15,000 Sand 0.06 GLASS
788

788

Seventh floor
600

600

600

600

PC 0.10
ROUTEL

SPIDER
FITTING
26

26
20

20
3,000

SILICON
2,400

2,400

2,400

2,400

SEALANT

VOID
+15,000
Sixth floor CURTAIN WALL CONNECTION DETIAL
600

600

600

600

SPIDER FITTING DETAIL


3,000

2,400

2,400

2,400

2,400

VOID Curtain wall structure


+15,000 connection to detail +15,000
Fifth floor Fifth floor
600

600

600

600
3,000

3,000

3,000

3,000
2,400

2,400

2,400

2,400

Floor finished in ceramic


tiles with a matching 100mm 150 mm thk slab to
skirting in a matt finish S.Eng's detail
+12,000 VOID sample to approval +12,000
Fourth floor Fourth floor
600

600

600

600

600

600

Planter to detail
200mm thick coral block walling
finished in 3 coats silk paint on
33,000
3,000

3,000

12mm steel float trowel render


2,400

2,400

2,400

2,400

2,400

2,400

to Architect's approval
Railing to detail

VOID
+9,000 +9,000
Third floor Third floor
600

600

600

600

600

600

Curtain wall connection to detail


Soffit ceiling plastered and 900mm high SS316 hand rail
painted with silk-vinyl
3,000

3,000

40 infilled in 10mm thick


paint to archs approval
2,400

2,400

2,400

2,400

2,400

2,400

toughned glass

+6,000 VOID +6,000


Second floor Second floor
600

600

600

600

600

600

Floor finished in ceramic


tiles with a matching 100mm
skirting in a matt finish
sample to approval
3,000

3,000
21,000
2,400

2,400

2,400

2,400

2,400

2,400

200mm thick coral block walling Railing to detail


finished in 3 coats silk paint on

+3,000 VOID 12mm steel float trowel render


to Architect's approval +3,000
First floor First floor
600

600

600

600

600

600

Soffit ceiling plastered and


150 mm thk slab to painted with silk-vinyl
3,000

3,000

S.Eng's detail paint to archs approval


2,400

2,400

2,400

2,400

2,400

2,400

+0 +0
Ground floor Ground floor
600

600

600

600

600

600

VOID
3,000

3,000
2,400

2,400

2,400

2,400

2,400

2,400

-3,000 -3,000
Basement one
600

600

600

600

600

600

Basement one
3,000

3,000
2,400

2,400

2,400

2,400

2,400

2,400

Retaining wall
to detail

-6,000 -6,000
Basement two
Basement two

8 10

PARTIAL DETAIL 02 SCALE 1:50 PARTIAL DETAIL 03 SCALE 1:50


600

600

600

+12,000
Fourth floor
3,000
2,400

2,400

2,400

900mm high SS316 hand rail


40 infilled in 10mm thick
toughned glass

+9,000
Third floor
600

600

600
3,000
2,400

2,400

2,400

Curtain wall connection to detail Soffit ceiling plastered and


painted with silk-vinyl
paint to archs approval
+6,000
Second floor
600

600

600
3,000
2,400

2,400

2,400

200mm thick coral block walling


finished in 3 coats silk paint on
12mm steel float trowel render
Railing to detail to Architect's approval
+3,000
First floor
600

600

600
18,000

3,000

Curtain wall connection to detail


2,400

2,400

2,400

Floor finished in ceramic


tiles with a matching 100mm
skirting in a matt finish
+0 sample to approval
Ground floor
600

600

600
3,000
2,400

2,400

2,400

Entrance steps to detail 150 mm thk slab to


S.Eng's detail

-3,000
Basement one
3,000
3,000

3,000

3,000

-6,000
Basement two

PARTIAL DETAIL 04 SCALE 1:50

GENERAL NOTES FIRE FIGHTING NOTES AREAS PLOT AREA:______________


1.ALL DIMENSIONS TO BE CHECKED ON SITE. WRITTEN DIMENSIONS RULES 1.ALTERNATIVE MEANS OF LIGHTING USING SECONDARY BUILT UP AREAS:
OVER SCALED DRAWINGS. MEANS TO BE INSTALLED.
ANY DISCREPANCY IN DIMENSIONS TO BE REPORTED TOTHE ARCHITECT 2.HEAT/SMOKE DETECTORS TO BE INSTALLED. REV. DATE DESCRIPTION BY PROJECT : DRAWING TITLE : SCALE:
BEFORE PROCEEDING. 3.BREAK-GLASS FIRE ALARM SYSTEM TO BE INSTALLED.
2.DEPTH AT FOUNDATION TO BE DETERMINED ON SITE ALL FOUNDATIONS 4.4500LTR WATER TANK WITH A BOOSTER PUMP TO BE FLOOR AREA ( M 2)
MIXED USE DEVELOPMENT SELECTED DETAILS AS SHOWN
R.C. COLUMNS PROVIDED.
AND R.C. WORKS TO STRUCTURAL ENGINEERS' DETAIL. 5.1x9LTR WATER/CO2 AT EACH FIRE POINT TO BE PROVIDED.
3.HEAVY DUTY POLYTHENE SHEETING AND TERMITE TREATMENT TO BE 6.1x10KG DRY POWDER AT EACH FIRE POINT TO BE PROVIDED. DRAWING NO: PROJECT NO: REV NO:
PROVIDED 7.FIRE NOTICE AND FIRE EXIT SIGNS AT STRATEGIC POSITIONS PLOT NO: ROAD:
UNDER GROUND FLOORSLAB. DPC TO BE THREE PLY BITUMINOUS FELT LAID TO BE PROVIDED. 12 12 -------
----- DEDAN KIMATHI AVENUE ROAD
UNDER ALL WALLS. 8.1000 GALLON WATER FOR FIRE FIGHTING TO BE PROVIDED.
4. P.V DENOTES PERMANENT VENTILATION. F.L DENOTES FANLIGHT ABOVE. 9.1 NO. 4.5KG FIRE EXTINGUISHER AND 1 NO. BLANKET TO BE
5. ALL WALLS TO BE REINFORCED WITH HOOP IRON AT EVERY ALTERNATIVE PROVIDED.
COURSE. 10.SPRINKLER SYSTEM TO BE INSTALLED IN THE PARKING. LOCATION: TOWN: DRAWN BY: CHECKED BY : DATE :
6. ALL SANITARY WORKS TO BE EXECUTED IN ACCORDANCE WITH M.O.H. 11.6 NO. HYDRAULIC HOSE REELS 30 METRES LONG WITH
MOMBASA MOMBASA SAYYIDA FAHIM 04-May-25
RULES AND REGULATIONS. OPEN
7. ALL DRAINS UNDER BUILDING, DRIVEWAY, AND PARKING TO BE 150mm SHUT OFF JET NOZZLE TO BE PROVIDED.

P-12
CAST IRON PIPE ENCASED
IN 150mm CONCRETE INSPECTION CHAMBERS WITHIN BUILDING TOBE CAD FILE :
FITTED WITH HEAVY
DUTY DOUBLE SEAL AIR TIGHT COVERS PC MAC