JC50D Drawworks Manual
JC50D Drawworks Manual
December , 2008
Table of Contents
General ................................................................................................................................................................ 1
1 Safety warning ............................................................................................................................................... 2
2. Introduction ................................................................................................................................................... 2
2.1 Purpose and application........................................................................................................................... 2
2.2 The DW is designed and manufactured as per following standards and specifications ....... 3
2.3 Brief operational principle ...................................................................................................................... 3
2.4 DW technical parameter .......................................................................................................................... 3
2.5 DW speed and hoisting capacity ........................................................................................................... 4
3. DW structure ................................................................................................................................................. 5
3.1 DW transmission system drawing ........................................................................................................ 5
3.2 Major components..................................................................................................................................... 6
3.3 Power and transmission system ............................................................................................................ 6
3.4 DW frame .................................................................................................................................................... 7
3.5 Drum Shaft Assembly .............................................................................................................................. 7
3.6 Transmission shaft assembly.................................................................................................................. 8
3.7 Intermediate shaft assembly ................................................................................................................... 8
3.8 Rotary Drive shaft Ass ............................................................................................................................. 9
3.9 Rotary Intermediate Shaft Assy ............................................................................................................ 9
3.10 Output Shaft Assy ................................................................................................................................. 10
3.11 Crown-block Saver (CBS).................................................................................................................. 10
3.12 Hydraulic disc brake ............................................................................................................................ 11
3.13 Pneumatic control system ................................................................................................................... 12
4 Lubrication .................................................................................................................................................... 12
4.1 Grease ......................................................................................................................................................... 12
4.2 Lubricating oil .......................................................................................................................................... 13
5 Installation of drawworks ......................................................................................................................... 14
5.1 Inspection before installation ............................................................................................................... 14
5.2 Installation and fixation of drawworks ............................................................................................. 14
5.3 Installation of pneumatic control system and lubrication system pipelines ........................... 14
5.4 Installation of motors and electrical lines ........................................................................................ 14
5.5 Cooling device of Eaton disk brake ................................................................................................... 14
5.6 Guard .......................................................................................................................................................... 14
5.7 Lubricant filling ....................................................................................................................................... 14
6. Operation of drawworks .......................................................................................................................... 15
6.1 Manipulating Control Handle .............................................................................................................. 15
6.2 Trial run of the drawworks ................................................................................................................... 16
6.3 Pressure Setting for Oil and Pneumatic Systems ........................................................................... 19
6.4 Safety operation regulations................................................................................................................. 19
7 Drawworks maintenance .......................................................................................................................... 20
7.2 Items for weekly inspection and maintenance: ............................................................................... 21
7.3 Items for monthly maintenance ........................................................................................................... 21
8 Frequent faults and eliminating .............................................................................................................. 22
9 Maintenance and adjustment ................................................................................................................... 23
9.1 Maintenance and adjustment of pneumatic tube clutch ............................................................... 23
9.2 Maintenance and adjustment of chain drive .................................................................................... 24
10 Disassembly and assembly of shaft assemblies of drawworks ................................................... 27
10.1 Dismantling, disassembly and assembly of drum shaft assembly .......................................... 27
10.2 Disassembly and assembly of transmission shaft assembly ..................................................... 28
10.3 Disassembly and assembly of intermediate shaft assembly ..................................................... 29
10.4 Removing, dismantling and assembling of rotary drive shaft ................................................. 29
10.5 Removing, dismantling and assembling of rotary intermediate shaft ................................... 30
10.6 removing, dismantling and assembling of rotary output shaft ................................................. 30
10.7 Assembly and commissioning of drawworks ............................................................................... 31
11. Dismantling and transportation of drawworks main body .......................................................... 32
11.1 Dismantle drawworks from substructure ....................................................................................... 32
11.2 Transportation of drawworks ............................................................................................................. 33
12 Chains list for JC50D drawworks ........................................................................................................ 33
13 Bearings list for JC50D drawworks.................................................................................................... 33
14 Recommended spare parts list of JC50 drawworks (one year) ................................................... 34
OPERATION MANUAL OF JC50D DRAWWORKS
General
JC50D drawworks is one of the main components for ZJ50D drilling rig. It is designed and
constructed as per related standards of SY/T5523-2002 “Drawworks for Petroleum Drilling rig” and API
Spec 7K "Specification for Drilling and Well Servicing Equipment", and can satisfy the requirement of
The manual has described the technical parameters, drive principle, structure, installation, operation,
maintenance and repair, adjustment, disassembly and transportation etc of the drawworks.
The drawworks operators should read this manual carefully before installing, and operation,
maintenance upon the manual. Without understanding related content, wrongly processed installation,
The left and right side of the drawworks is defined as when you face the drum and look from drum to
A matched spare parts list and a recommended spare parts list are attached to the manual for users to
order spare parts. If the spare parts required by users are not included in the list, please refer to drawworks
parts list.
Each drawworks has its own SN, customers need to point out the model and SN, when ordering spare
1
OPERATION MANUAL OF JC50D DRAWWORKS
JC50D Drawworks
1 Safety warning
z The personnel who are engaged in installation, operation and maintenance of the system should be
trained and qualified, and do the work with qualification certificate.
z Before installation, operation or maintenance, related workers shall read this manual and manuals
of all the other equipments of the drilling rig carefully, and perform upon the manuals.
z There must be a chief principal for installation, operation and maintenance and persons in charge
of each work, and detailed and reliable safety measures should be taken.
z All the equipments should be used strictly in accordance with their operation rules and related
safety regulations.
z When the system is running, it’s forbidden to perform maintenance and repair.
z It’s forbidden to overload the equipment.
2. Introduction
2
OPERATION MANUAL OF JC50D DRAWWORKS
3
OPERATION MANUAL OF JC50D DRAWWORKS
regulation
Weight 38560kg
4
OPERATION MANUAL OF JC50D DRAWWORKS
Lifting curve
3500
3000
Hook load kN
2500 GearⅠ
2000 Gear Ⅱ
1500 Gear Ⅲ
1000 Gear Ⅳ
500
0
0 0.5 1 1.5 2
Hook speed m/s
3. DW structure
The DW is driven directly by two 800kw DC motors via coupling. Two gears are formed by two sets
of chains between transmission shaft and intermediate shaft, another two gears are formed by two sets of
chains between intermediate shaft and drum shaft via engagement and disengagement of high/low speed
clutch. The total gears of drawworks have 4 forward gears and 4 reverse gears. Drawworks could realize
the stepless speed regulation due to the use of the DC motor drive. And the brake system of DW consists
of hydraulic disc brake and Eaton disk brake. The hydraulic disc brake is the main brake with
double-disk water cooling mode, and can carry out the service braking, parking brake and emergency
brake. The inside and outside gears of the Eaton disk brake are joined at the high speed end to the drum
shaft with keys; the brake disk of the hydraulic disc brake is connected as a whole with the drum.
5
OPERATION MANUAL OF JC50D DRAWWORKS
3)DW frame
5) Brake system: consists of hydraulic disc brake and Eaton disk brake.
6) Drum shaft assembly: consists of drum, high drum clutch and low drum clutch.
7) RT driving body: consists of input shaft, intermediate shaft, output shaft and casing.
1.Power system 2. Driving shaft assembly 3.Intermediate shaft assembly 4.Drum shaft
assembly 5.Drawworks frame 6. Brake system 7/8. Rotary drive shaft assembly
9.RT driving intermediate shaft assembly 10.Output shaft assembly
Figure 3 DW structure
6
OPERATION MANUAL OF JC50D DRAWWORKS
The DW is driven directly by two 800kw DC motors via coupling. Two gears are formed by two sets
of chains between transmission shaft and intermediate shaft, another two gears are formed by two sets of
chains between intermediate shaft and drum shaft via engagement and disengagement of high/low speed
clutch. The total gears of drawworks have 4 forward gears and 4 reverse gears.
3.4 DW frame
The JC50D drawworks framework is of wallboard welded structure. All driving chains of this
drawworks are enclosed drive. Auxiliary drive shaft and the transmission shaft assembly are installed and
fixed from one end of the drawworks framework. The drum shaft and middle shaft assembly are
respectively installed and fixed from one end of the gap of the wall.
There’s oil tank in the skid not only for the storage of lubricating oil of the whole drawworks but also
for heat dissipation.
7
OPERATION MANUAL OF JC50D DRAWWORKS
The Eaton disk brake is provided on the right end of the drum shaft. During going down, the
running speed may be controlled with opposing torque produced by the Eaton disk brake so as to reduce
the main brake weight.
1.Air guide faucet(Low speed end) 2. Emergency bolt 3.Low speed clutch (LT1170/250T)
4. Low speed chain wheel 5. Bearing seat 6.Brake disc 7.Drum 8.Drum shaft 9. High speed chain
wheel 10. High speed clutch (LT1070/200T) 11. Eaton disk brake
Figure 4 Drum shaft assembly
1.Crown toothed coupling 2.Oil slinger 3.Bearing seat 4.Chain wheel 5.Transmission shaft
6.Crown toothed coupling
Figure 5 Transmission shaft assembly
8
OPERATION MANUAL OF JC50D DRAWWORKS
1.Chain wheel Z=22 2.Bearing 3.Intermediate shaft 4.Idle chain wheel Z=50 5.Idle chain
wheel Z=38 6.Chain wheel Z=22
Figure 6 Intermediate shaft assembly
1. Bearing Seat, 2. Chain Sprocket, 3. Coupling Flange of Universal Shaft, 4. Driving shaft
Fig. 7 Rotary drive shaft Assy
9
OPERATION MANUAL OF JC50D DRAWWORKS
1. Pneumatic tube clutch 2. Bearing seat 3. Idler chain sprocket 4. Output shaft 5. Pneumatic tube
clutch
Fig. 9 Output Shaft Assy
10
OPERATION MANUAL OF JC50D DRAWWORKS
The role played by the crown block saver is that while the traveling system is going up to a preset
limit position, through its limiting device, it exerts an emergency brake to stop lifting of the traveling
system so as to avoid collision with crown block to ensure safety. The dual-insurance is used in crown
block saver for ZJ50D series drilling rig. One is an electronic saver device realized via the coder on drum
shaft combined with the electric control system for operation. The other is drawworks saver toggle valve
device. And besides we can install a steel wireline saver device on the mast upper section. This device can
limit the rising position of the traveling block. Combined usage of the three devices can ensure the safety
during the drilling.
The toggle valve of JC50D drawworks is installed above the drum and adjustable left and rightwards
axially. Its deflector rod’s length depends on how many wire-lines are wound on the drum while the
traveling block reaches the preset limit height and could be adjusted (generally, 6-7 m from raising
traveling block to the bottom of crown block beam). When the traveling block reaches the preset height
limit, the wire-line on the drum touches the deflector rod of the toggle valve, which discharges the drum
clutch and exerts, by enclosed disc brake calipers, an emergency brake to stop the drum deadly. After the
troubleshooting, turn the disk brake working clamp hand lever to the Max. brake position to lock the load,
then release the emergency brake and reset the deflector rod of the toggle valve.
Warning: Before each duty-shifting, check the sensibility of the toggle valve deflector rod,make sure
it works correctly.
After use of each time and before engagement of drum, push on the anti-collision release valve and
make the disc brake calipers be loosened, and turn the toggle valve deflector rod to vertical position.
11
OPERATION MANUAL OF JC50D DRAWWORKS
4 Lubrication
12
OPERATION MANUAL OF JC50D DRAWWORKS
The oil in oil sump: ISO VG220 industrial gear oil or Mobil SHC630 used in summer;,ISO
VG220 synthesis gear oil or Mobil SHC630 used in winter,the oil level must be at the level between
those two marks (upper mark and lower mark) of the oil dipstick.
Caution: When the drawworks is running, it’s forbidden to lubricate. Do it only when the
drawworks stops.
13
OPERATION MANUAL OF JC50D DRAWWORKS
5 Installation of drawworks
5.6 Guard
Deformation is easily caused by collision and impact during transportation and hoisting, so protect
them carefully. Perform repairing before installation if necessary.
14
OPERATION MANUAL OF JC50D DRAWWORKS
When the equipment leaves factory, lubricating oil in drawworks is drained, so after installation fill
each lubrication point with lubricating oil of proper quantity as per “4 lubrication” of this manual.
For grease points (except 800kw main motor), perform inspection for quality and quantity of
grease, feed some if the grease is not enough and replace it if the grease is polluted.
6. Operation of drawworks
Safety warnings!
To prevent personal injury, the power supply should be cut off while conducting
maintenance etc. and locking apparatus for preventing misoperation and apparent
warning signs should be available as well.
Safety warnings!
While mechanical and electric equipments are running, all safety apparatus
should be kept in good condition, including: crown block savor, safety valve of
pneumatic , hydraulic and oil system, alarm of power machine, cut-off device for
safety and brake system etc in the air, liquid and oil systems, all these safety
apparatus should be inspected in every shift to assure that they can work normally.
15
OPERATION MANUAL OF JC50D DRAWWORKS
Notice:Changing gears is strictly forbidden when the drawworks has load! Stop
running on changing gears.
2) gear lock switch
Put the operation lock gear/ unlock gear knob (or handle) to the unlock position, the pressure of the
lock gear gauge is 0, it is ok to change gear. Put the operation lock gear/ unlock gear knob (or handle) to
the lock position,observe the lock gear pressure gauge on the operation panel, when the pressure is the
same as the air source pressure, it means gear changing is completed;if the lock gear pressure is 0, it
means gear changing failed, then just release main brake a bit, lower down the empty traveling hook a
little, actuate intermediate shaft or start motors to have a lower speed running(the speed of the main
motor should be no more than 10r/min), after mobilizing the intermediate shaft or transmission shaft,
then change gears again.
3) With electric drive system, have an inter-lock check at starting bit-feed clutch and
auto-bit-feeding program.
16
OPERATION MANUAL OF JC50D DRAWWORKS
17
OPERATION MANUAL OF JC50D DRAWWORKS
discharge. Repeat the aforesaid process to charge the other clutch with air after a certain time interval,
the transfer between the two clutches will have an effect of the " time lag ".
c) Operate the brake handle to check for operation state of the working clips and safety clips in
accordance with the Operation Manual of disc Type Brake, and the running-in of the friction plates and
the brake disc shall conform to the requirements.
d) Manually handle with toggle valve of the crown-block saver (just right upper the main drum of
drawworks), at the time all the brake clips of the disc type brake shall participate in and hold tightly the
brake disc, and the main motor shall stop running.
e) Straighten the anti-bumping toggle valve and press the anti-bumping release button to make the
system be back to normal.
After the completion of all the above checks, if every actuating component controled by air valve
fulfils the action as per the requirement, it shows that the air circuit is connected properly and the valve
and its actuating component work normally.
6.2.4 Test run without load
1) Before conducting this task, inspection should be undertaken as per manuals of 800kw main
motor and electrical control system, after it’s confirmed that all things are in proper situation then the
power supply may be turned on for operation of the drawworks.
Note: during the running of drawworks, lubricating oil flows into various lubricating points
and it won’t return immediately, therefore the oil level will go down. If the oil level is lower than the
lowest limit of the oil pointer, you need to refill proper amount of lubricating oil, please note not to
let the oil level to go down too low.
2) Start the diesel engine, turn the drum high/speed clutch handle to the low speed position
(whatsoever position the handle is turned to previously, you need to turn the handle to the lower speed
position once more, this process should not be omitted).
3) Stop the machine, turn the gear shifting handle to gear I(of course you need to turn the gear lock
switch to the unlock position to release the gear lock mechanism first, after shifting you need to turn it to
locking position again to lock the gear lock mechanism).
4) After the drawworks ran for 10 to 20 minutes at the lowest speed of gear I, conduct the following
inspections:
a) If there’re phenomena like rubbing, colliding, interference etc. during the running of drawworks.
b) The pressure of lubricating oil should be stable, the lubricating effect should be fine.
c) Conduct engagement of high-speed clutch & low-speed clutch of drum respectively to inspect
conditions of running and braking.
5) Shift to gear II and reverse gear respectively, repeat the processes mentioned above.
6) Brake test: test braking as per disc brake device manual.
18
OPERATION MANUAL OF JC50D DRAWWORKS
Lubrication system
Pressure MPa
Parts
M ax . Norm. Min.
Every lubrication oil
0 .3 0.15 0.08
working point
19
OPERATION MANUAL OF JC50D DRAWWORKS
7 Drawworks maintenance
20
OPERATION MANUAL OF JC50D DRAWWORKS
Daily inspection, repair and maintenance are the important contents of maintenance. Keep safe
when you do inspection, stop running when you do repair. The following recommendations are just the
inspection items in normal conditions.
7.1 Items of inspection and maintenance for each shift
(1) Connecting pins and bolts between the drawworks and substructure should be complete and
tightened
(2) The fast line clamp seat should be tightened
(3) The fixing bolts for braking mechanism should be complete and tight.
(4) The connecting pins lock devices and split pins should be complete.
(5) The lube oil level of the gear speed reducer should be within the normal scope, lubrication oil
pump pressure conforms to requirements and all places are lubricated properly.
(6) Lubrication and temperature rising of all bearings shall be normal. Temperature rising should
not be higher than 45℃, the bearing housing temperature measured really should not be higher than 90
℃.
(7) The connection and operation of electric, pneumatic and hydraulic elements and pipeline from
the driller cabin to drawworks should be reliable.
(8) All transmission pairs should be without any abnormal noise or vibration.
(9) Check all sealing positions; there should be no seepage and leakage.
(10) Check all guards, they should be tight and reliable.
(11) The reliability test of crown block saver:(it is required to test before each shift starts).
(12) Check the clearance between brake pad and brake disc, adjust it if necessary.
(1)Check the oil supply condition of the lubrication oil pump, if the lubrication oil is clean and if
(2)Check the wearing conditions of the braking pad of the disc brake. When the thickness of the
brake pad reduces to minimum thickness regulated by disc brake manual or some other reason makes it
ineffective, it is necessary to replace the whole set of the brake pad. The newly replaced brake pad
should be fitting run (running in completely) and make its contacting area above 70%, then it can be
used.
21
OPERATION MANUAL OF JC50D DRAWWORKS
(1)Check for the engagement of chain sprockets for the main driving box and the transmission
(3)Check for the abrasion and cracking of brake disc and the friction hub of pneumatic tube
(5)Check the working condition and wearing condition of the bearing at each position.
Abnormal
noise and D. Foreign matter or fallen off part in Clear out the foreign matter or
vibration machine reinstall and retighten the fallen part.
22
OPERATION MANUAL OF JC50D DRAWWORKS
B C
Figure 12 Correction of positional accuracy of clutch
23
OPERATION MANUAL OF JC50D DRAWWORKS
According to figure 9A, one dial gauge should be installed, then rotate right part of the pair, read the
meter once after the interval of every 90°, the radial offset should not exceed 0. 5mm.
According to figure 9B, rotate left part of the pair, read the meter once after the interval of every 90°,
the axial offset should not exceed 0.2mm.
According to figure 9C, measure the vertical degree between friction hub outer round surface and
connection disc end surface. Error in full range of circle should ≦0.1mm.
Note: Materials like grease, liquid etc must not be allowed to enter the friction surface of clutch,
liquid such as grease etc shall reduce the coefficient of friction and the transferring torque, it must be
cleaned with solvent and then dry off.
24
OPERATION MANUAL OF JC50D DRAWWORKS
Measured Length
Chain Pitch Nominal Value of Length of Chain when
Number Length of Chain Abrasion Rate is 3%
of Links
mm (in) mm (in) mm (in)
38.10 1.500 16 609.6 24.00 627.86 34.719
50.80 2.000 12 609.6 24.00 627.86 24.719
The chain is allowed to be used if the abrasion elongation does not exceed the limit. Due to the
increase of the length of chain, the sagging rate is too high, 2 chain links must be removed then the chain
shall be linked again. The possible condition is: the chain cannot be linked after removing 2 links, or the
chain is too tight after being linked (without sagging rate or sagging rate is low), one transition link is
needed under this kind of circumstance; however what we need to explain in particular is that you should
do all you can to avoid the usage of transition link. The reason is that the bearing capacity of the transition
link is much lower than that of other links of the chain. If it’s really needed, the transition link with
interference fit pin should be the choice.
9.2.2 Inspection of degree of tightness of chain
To brake one chain wheel shaft and rotate the other chain wheel shaft manually to tighten the chain,
as shown in figure 14, then measure the sagging rate, please see table II for its data. (Values of tangent
length between 2 chain wheels listed in the table are not the parameters of this drawworks)
Table II Recommended value AC of displacement of midpoint of chain
Midpoint of Driving Horizontal ~ 45° Vertical ~ 45°
Device mm in mm In
25
OPERATION MANUAL OF JC50D DRAWWORKS
26
OPERATION MANUAL OF JC50D DRAWWORKS
the chain wheel on the transmission shaft; as for the section between the intermediate shaft and the drum
shaft, number of spacers can be added or reduced at the appropriate section of the intermediate shaft
assembly (or change the size of distance sleeve) to move the shaft horizontally to improve the coplanarity.
27
OPERATION MANUAL OF JC50D DRAWWORKS
away from the drawworks framework, and it's being hoisted slowly by the crane.Once the bearing seat is
completely detached from the drawworks framework, the drum shaft assembly shall be moved out from
the opening.
After being dismantled from the drawworks the drum shaft assembly shall be put on a timber floor,
and spacer should be added at proper place (it's strictly prohibited to support the drum shaft assembly
with air tube clutch).
Inspect the damaged component to determine the extent of dismantling, those parts irrelevant to this
component should be carefully protected to avoid damage and prevent foreign materials from entering.
10.1.2 Dismantling of pneumatic tube clutch
1) Dismantle pipeline and relevant fittings (pneumatic hoist etc.)
2) Dismantle connecting bolt
3) Take off the external components
4) Directly take off the friction hub
10.1.3 Dismantling of chain wheel
Chain wheel is connected to shaft by two groups of bearings, all connections between bearings and
relevant fittings are of transition fit which can be easily dismantled by using 2-jaw (or 3-jaw) screw puller
(its popular name is puller), or it can be dismantled by even knocking of wooden hammer or copper bar.
10.1.4 Dismantling of left and right bearing seats
1) Dismantle the screws on the cap of bearing seats, then by knocking with copper hammer the
bearing seats can be dismantled.
2) If the bearing or oil seal is to be replaced, the bearing should be dismantled from the shaft. The
connection between bearing and journal is of transition fit. It's recommended to use puller to dismantle it.
Bearing must be replaced if it has been damaged, and it can be dismantled by any means provided the
journal is not to be damaged; if heating is to be adopted, the speed of heating should be swift and even,
temperature at the location of installation should be checked by using temperature meter anytime, it
should not exceed 120°C, it's strictly prohibited to dismantle bearing by using gas cutting.
Caution: The connection between drum and drum shaft is tight interference fitting connection,
so it can not be dismantled.
10.1.5 Re-assembly
All components should be cleaned before assembly, fitting surface should be applied with lubricating
oil, and procedures are same as above but reversed
28
OPERATION MANUAL OF JC50D DRAWWORKS
1) Disconnect chain.
2) Dismantle coupling connected to motor (connecting bolts between inner teeth sleeves),
dismantle bolts connected to casing.
3) The transmission shaft assembly can be pushed out toward right with wireline
10.2.2 Disassembling, dismantling
1) Dismantle outer teeth sleeve, bearings, chain wheel etc.
2) Dismantle drawworks input chain wheel, right bearing cover and bearing, dismantle chain wheel.
The chain wheels and bearings are installed by the means of interference fit, they are to be dismantled by
using special puller.If heating is to be adopted, the speed of heating should be swift and even, and
temperature of shaft should be checked by using temperature meter anytime. It should not exceed 120°C.
10.2.3 Assembly
All components should be cleaned, make sure the smoothness of oil channel, and fitting surfaces
should be applied with lubricating oil, and procedure is as same as above but reverse.
29
OPERATION MANUAL OF JC50D DRAWWORKS
30
OPERATION MANUAL OF JC50D DRAWWORKS
1) Removing the mounting bolts of the bearing seat and the plugboard, lift out the overall output
shaft assy directly from the top of the casing.
2) In order not to affect the removing and assembling and the internal cleaning, the disconnected
chain shall be taken out from the casing cavity.
10.6.2 Dismantling and assembling
Carry out any part or all of the following procedures as required
1) Dismantle the press plate at the shaft end, and then the chain sprocket can be removed from the
journal. Special puller shall be necessary due to the interference fit.
2) Knock with wooden hammer (or copper bar) or pull with puller to remove bearing seat and
bearing spacer, remove the bearing seat cover for easy cleaning or bearing replacement.
3) Clean all components and replace any component needed to be replaced.
4) Assembling: assembly shall be done as the reverse sequence to that of dismantling.
31
OPERATION MANUAL OF JC50D DRAWWORKS
5) After the rotary intermediate shaft assy being reassembled and being qualified through
inspection, it should be wholly hoisted and aligned with relative mounting hole in the casing, and when
the shaft centerline is aligned with the hole centerline, push the assy to rightwards until the positioning
end of the bearing seat falls into the shaft hole in the casing, then fasten the rotary intermediate shaft
assy with the relative bolts.
6) After the rotary output shaft assy being reassembled and being qualified through inspection, it
should be wholly hoisted and aligned with relative mounting hole in the casing, and when the shaft
centerline is aligned with the hole centerline, push the assy to rightwards until the positioning end of the
bearing seat falls into the shaft hole in the casing, then fasten the rotary output shaft assy with the
relative bolts.
7) Install gear shift mechanism, oil, gas, water pipelines.
8) Install chain, if chain needs to be replaced, it should be replaced wholly.
The side plan excursion of each pair of chain wheel mentioned above should not exceed 1 mm,
otherwise it should be adjusted, and each assembled shaft should rotate flexibly while being propelled
manually.
9) Install drawworks casing shield.
10) Install hydraulic disc brake.
11) Install Eaton disk brake, locate it according to limited block and then fix it.
12) Install drawworks shield.
After passing of inspection, drawworks assembly commissioning at zero load shall be done for at
least 2 hours to test gear shift and brake, after the commissioning is passed, the final assembly of rig can
be done.
32
OPERATION MANUAL OF JC50D DRAWWORKS
33
OPERATION MANUAL OF JC50D DRAWWORKS
Anti-explosive
10 YTXB-160 1
pressure gage
34
OPERATION MANUAL OF JC50D DRAWWORKS
Translated by : Date:
35