Irrigation Project Details

The document outlines various construction projects related to irrigation and water management, detailing their estimated costs, execution tenures, and operation & maintenance periods. Key projects include the Mej Barrage, feeder systems, and the Mor Sagar Artificial Reservoir, with costs ranging from approximately Rs. 317.99 crores to Rs. 3865.11 crores. The total estimated cost for all projects is Rs. 12404.72 crores.

Uploaded by

p16shardul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views1 page

Irrigation Project Details

The document outlines various construction projects related to irrigation and water management, detailing their estimated costs, execution tenures, and operation & maintenance periods. Key projects include the Mej Barrage, feeder systems, and the Mor Sagar Artificial Reservoir, with costs ranging from approximately Rs. 317.99 crores to Rs. 3865.11 crores. The total estimated cost for all projects is Rs. 12404.72 crores.

Uploaded by

p16shardul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Estimated EMD(0.

5% of Project Tenure
der ID Name of Work
Cost(Rs.Crores) Cost)
Construction of Mej Barrage,
including all components with its Execution: 4 years
PC_440950_1 317.99 1,58,99,500
O&M for a period of 20 years on O&M: 20 years
Hybrid Annuity Model (ERCP-4)
Construction of Feeder System
from Khura Chainpura to Execution: 4 years
Jaisamand Alwar, including all O&M: 20 years
PC_441001_1 3446.00 17,23,00,000
components with its O&M for a
period of 20 years on Hybrid
Annuity Model (ERCP-09-TF-7A)
Construction of Feeder from
Isarda to Ramgarh Dam Jaipur, Execution: 4 years
including all components with its O&M: 20 years
PC_440961_1 1914.95 9,57,47,500
O&M for a period of 20 years on
Hybrid Annuity Model (ERCP-09-
TF-6
Construction of Feeder from
Isarda to Khura Chainpura to Execution: 4 years
Bandh Baretha Bharatpur, O&M: 20 years
PC_440995_1 including all components with its 2520.00 12,60,00,000
O&M for a period of 20 years on
Hybrid Annuity Model (ERCP-09-
TF-8)
Construction of Mor Sagar
Artificial Reservoir and feeder Execution: 4 years
from Bisalpur to Mor Sagar O&M: 20 years
PC_440982_1 Artificial Reservoir, including all 3865.11 19,32,55,500
components with its O&M for a
period of 20 years on Hybrid
Annuity Model (ERCP-11-09-TF-5)
Construction of Dam and
Development of Pressurized Complete Period: 3 years
Irrigation Network to irrigate the O&M: 8 years
Command Area under Andheri
Medium Irrigation Project
including Survey, Design,
AS_439437_1 340.67 1,70,34,000
Construction, Operation &
Maintenance of Dam and Piped
Network canal System. Tehsil:-
Chhabra, District:-Baran
(Rajasthan)(EPC
Turnkey Basis).
Total 12404.72