SAUDI ARAMCO ID/PIEU-31-Jul-2022 - REV.2022.07.00 (Standards Cutoff - July 31,2022) Rev 81 31-Jul-22
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Visual Inspection of APCS-113 Coating Systems Application SAIC-H-2050 31-Jul-22 COAT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Visual Inspection
Saudi Aramco Paint Data Sheet for the coating system (APCS) applied is
SAES-H-002V,
provided.
SAES-
A1 NOTES: Fill in the required information for
H-002 & APCS
Coating System: __________
Sheets
Reqd. DFT: __________
SAES-H-001,
A2 Finished coating shall have a uniform appearance.
Para 9.3.5 c
SAES-H-002Para
5.1.1, 5.1.2, 5.1.3
a. Carbon steel bolts and nuts that are included with the pipelines
and fittings shall be externally coated.
Para. 5.4.3 of
b. For buried service, the exposed areas of the bolts and nuts can SAES-H-002
A3
be coated with APCS-113A after permanent installation. If
frequent re-torque of the bolts and nuts are required during
inspection and maintenance, the application of a Fluoropolymer
coating system under 09-SAMSS-107 is recommended.
Finished coating is free of application related defects such as runs, sags,
SAES-H-001,
A4 drips, dry spray or foreign matter and areas showing blisters, cracks &
Para 9.3.5 b
porous.
B Dry Film Thickness (DFT) measurement:
Thickness gauge is calibrated in accordance with SSPC PA-2 SAES-H-001,
B1
(See Attachment 1) Para9.3.5 a
Only calibrated Dry Film Thickness gage shall be used to measure coating
thickness. DFT gage calibration is performed at beginning and end of the
work. SAES-H-001,
B2
Note: If gage is found to be out of calibration at the end of the work, all Para9.3.5 a
measurements made since the last calibration are suspect /voided) *
(SSPC-PA 2, Para. 4.3.3)
The number of DFT measurement readings shall be as per SSPC PA-2. SAES-H-001,
B3
Para 4.0 (See Attachment 1) Para9.3.5 a
DFT requirement specified for coating system are met:
APCS-113A (Liquid coatings) - 600 to 1000 microns
SAES-H-002
APCS-113B (Putty type) - 1000 to 1625 microns.
B4 APCS-Sheets
APCS-113E (Abrasion Resistance Liquid coatings)-1000 microns min.
Para. III
APCS-113F (Liquid Coating applied by auto rotational equipment) -
1000 microns min.
* Note: Record the measured DFT in SATR-H-2006.
Saudi Aramco: Company General Use
# Saudi Aramco: Company General Use
#
REMARKS:
ATTACHMENTS: 1. Detailed Requirements Per SSPC PA-2
REFERENCE DOCUMENTS:
1. SAES-H-001, Coating Selection and Application Requirements for Industrial Plants and Equipment (23 May 2019)
2. SAES-H-002 Internal and External Coatings for Steel Pipelines and Piping (22 February 2018)
3. SAES-H-002V Approved Saudi Aramco Data Sheets for Pipeline and Piping Coatings (7 February 2017)
Contractor Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
Saudi Aramco: Company General Use
# Saudi Aramco: Company General Use