The document is a Saudi Aramco Inspection Checklist for the repair and touch-up of coatings, detailing acceptance criteria and requirements for various aspects of the coating process. It includes guidelines on personnel qualifications, weather conditions, surface preparation, and quality control documentation. Additionally, it references several standards and safety requirements necessary for compliance during coating applications.

Uploaded by

Vignesh Msd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views6 pages

Saic H 2032

The document is a Saudi Aramco Inspection Checklist for the repair and touch-up of coatings, detailing acceptance criteria and requirements for various aspects of the coating process. It includes guidelines on personnel qualifications, weather conditions, surface preparation, and quality control documentation. Additionally, it references several standards and safety requirements necessary for compliance during coating applications.

Uploaded by

Vignesh Msd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

#

SAUDI ARAMCO ID/PIEU-31-Jul-2022 - REV.2022.07.00 (Standards Cutoff - July 31,2022) Rev 81 31-Jul-22
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Repair and/or Touch-up of Coatings SAIC-H-2032 31-Jul-22 COAT -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General requirements

Saudi Aramco Paint Data Sheet for the coating system (APCS) applied is
provided.
NOTES: Fill in the required information for
Existing Coating System: _______________________
Coating System for Touch-up/Repair: _____________
*Cleanliness Level for Touch-up/Repair: ________________ SAES-H-101V &
( *Refer to the applicable APCS for ) ________________
A1
( cleanliness requirement based on ) SAES-H-001 Para
( area of repair. ) 4 & APCS Sheets
Wet film thickness/Coat : ____________
Reqd. DFT(Prime):_________/ Reqd. DFT (Full Coat):________
Recoat interval (Min / Max):________/________ at Steel Temp10 ºC
________/________ at Steel Temp 30 ºC
________/________ at Steel Temp 50 ºC

Personnel involved in protective coating activities has been qualified and SAEP-316,
A2
certified to perfom their task. Para. 5.1

Compressed air for blasting used is not contaminated with oil, moisture,
SAES-H-001,
A3 debris, etc. This is determined by performing a blotter test.
Para. 6.5.1

Paint material for touch-up is supplied by the same Manufacturer


SAES-H-001,
A4 (Different brands may be used if approved by CSD).
Para.9.2.4
Note: Thinner used is supplied or approved by the paint manufacturer.)

If paint mat'l or coating system used for repair/ touch-up is different from
SAES-H-001,
A5 original applied coating system, paint material for touch-up meets Over
Para. 7.4
Coating Compatibility Chart per Attachment 1.

B Weather Conditions for Painting

Paint shall not be applied if one or more of the following conditions exist
(unless paint is specifically formulated for averted condition):
a) Substrate temperature is less than 10°C of the temperature
limit given in the applicable Saudi Aramco Data Sheet SAES-H-001 Para
B1
b) Substrate temperature is more than the temperature limit 9.2.1
given in the applicable Saudi Aramco Data Sheet.
c) Substrate temperature is less than 3°C above the dew point.

Saudi Aramco: Company General Use


# Saudi Aramco: Company General Use
#

Paint shall not be applied during adverse weather conditions such as, but
not restricted to following:
1) Wind is strong enough to blow sand, salt spray or other
foreign matter onto the surface being painted. SAES-H-001 Para
B2
2) Wind is 9.2.1
strong enough to cause dry spay or otherwise seriously
disturb the spray pattern when application is by spray gun.
3) Rain

C Repair of Coatings for Immersion Service

Necessary safety requirements specified in SAES-H-102 are provided


such as: SAES-H-001 Para
A) High intensity flood or spotlights are installed in vessels, tanks, and 6.5.3
C1
other poorly illuminated locations for visibility. Para 8.1.5
B) Continuous forced ventilation is operated throughout the paint Para 5.2
application and curing period while coating inside Tanks & Vessels.

All coated areas near to the defective area are protected by covering with SAES-H-001 Para
C2
heavy duty textile or fabric adhesive tape. 9.4.1
SAES-H-001 Para
C3 Defective area are first cleaned by solvent or detergent wash.
9.6.2

Areas less than 0.1 m², are grinded to a rough metal surface using at SAES-H-001 Para
least an 80 grit disc sander. Alternatively spot blast to bare steel. Feather 9.6.3 Para
C4
edge the coating at least 50 mm beyond bare metal. Dust and debris are 9.6.6
removed by brush or vacuum.

Areas greater than 0.1 m², are blast clean to obtain the metal surface pre
SAES-H-001
treatment originally specified. Feather edge the coating at least 50 mm
C5 Para 9.6.4
beyond bare metal. Dust and debris are removed by brush or vacuum.
Para 9.6.6

Coating is applied by brush for areas less than 0.1 m² and by spray for
SAES-H-001 Para
C6 areas greater than 0.1 m² to the original specification except that the first
9.6.6
coat of a multi-coat system shall be thinned by 15%.

The coating shall be holiday tested when fully cured. Any defects shall be SAES-H-001 Para
C7
repaired. 9.6.7

D Repair of Coatings for Atmospheric Service

Repair of atmospheric coatings is conducted following the


recommendations of surface preparation and application requirements SAES-H-001 Para
D1
given in the applicable APCS and the manufacturer's technical data 9.6
sheet.

Final DFT of the repair coating is measured per SAIC-H-2031. DFT


SAES-H-001 Para
D2 conforms with the specific requirement of the respective APCS noted in
9.3.5
Item A1.

E QC Documentation

Inspection & Testing for repair of coating are recorded in QC Form SATR- SAES-H-001,
E1
H-2006. (Quality Plan, SATIP-H-100-01) Para. 10.2
REMARKS:

ATTACHMENTS:
1 - Over coating Compatibility Chart of SAES-H-001 (2 Pages)
REFERENCE DOCUMENTS:
1. SAES-H-001, Coating Selection and Application Requirements for Industrial Plants and Equipment (23 May 2019)
2. SAES-H-102: Safety requirements for Coating Applications (29 October 2017)
3. SAES-H-101V, Approved Saudi Aramco Data Sheets – Paints and Coatings, ( 16 October 2017 )
4. SAEP-316, Performance Qualification of Coating Personnel (31 July 2016)
5. Steel Structures Painting Council, SSPC-PA 1, June 1996
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative

Saudi Aramco: Company General Use


# Saudi Aramco: Company General Use
#

Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


# Saudi Aramco: Company General Use
#

SAUDI ARAMCO ID/PIEU-31-July-2019 - REV.2019.07.00 (Standards Cutoff - July 31,2019) Rev.2019.07.00 31-Jul-19
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Repair and/or Touch-up of Coatings SAIC-H-2032 15-Dec-19 COAT -
Attachment 1 - Overcoating Chart of SAES-H-001 (Page 1 / 2)

Saudi Aramco: Company General Use


#

Attachment 1 - Overcoating Chart of SAES-H-001 (Page 2 / 2)

Saudi Aramco: Company General Use


#

Saudi Aramco: Company General Use

You might also like