JOB SAFETY ANALYSIS RECORD SHEET
SHA YBAH NGL RECOVERY PLANT DEPARTMENT
JOB SAFETY ANALYSIS RECORD SHEET
PLANT/EQUIPMENT: DEPARTMENT: Sha bah NGL Revised No./Date: Rev. A / 11.02.2023
DIVISION/UNIT: SNGL No: SNGLO:
SHAYBAH SNGL SAGPD/ DPCU Shaybah JSA NO.: 9162-HS0602-JSA-046
DESCRIPTION OF JOB/TASK: Equipment Site Testing- (test equipment e.g., instrument & Meters, Bus Duct, Protective Relay, LV switch
Rack, MCCB, ACDB, Equipment Rack, Transformer, LV circuit Breakers, MV cables, CT-PT, Main Distribution Power Panel).
Locations- B- 53- Main Pipe rack unit, B-90 - NGL Train 1 & 2.
PREPARED BY: Contrac]}" Construction Rep. REVIEW ntractor Safety Rep. REVIEWED BY: SNGL Compliance Group
DATE:
�,'1-}1 d),
\ \\'0'7,\'7,., � DATE: �t- It. 'ye.J.
REVIEWED BY: PMT Construction Rep. REVIEWED BY: PMT Safety Rep. REVIEWED BY: Operation Foreman
DATE: DATE: DATE:
REFERENCES: TOOL & EQUIPMENT REQUIRED: PPE's:
• CSM - Pa I - 01 Emergency Reporting and Response • Hand & Power Tools • Har at
• CSM - Part I - 03 Personal Protective Equipment PPE • Multimeter • Safety Glasses (dark & clear)
• CSM - Part I - 04 Work Permit System and Stop Work Authority • Megger • Safety Shoes
• CSM - Part I - 05 Isolation Lockout and Use of Hold Tags.pdf • Manlift • Electrical hand gloves
• CSM - Part I - 07 Fire Prevention • Generator • Dust Mask/ Face mask
• CSM - Part I - 08 Traffic Vehicle Safety • Tower light • Full Sleeve FRC Clothing/ E-arc
• • Testing Tools Kit • Face Shield
CSM - Part I - 11 Hand Tools and Power Tools
• Lifting gears • Ear Plug
• CSM - Part I - 12 Material Handling • Hydraulic trolley • Safety Harness with
• CSM - Part I - 13 Heat Stress • Rubber mats suspension trauma
• CSM - Part II - 02 Scaffolding • Hard stick • Apron coat
• CSM - Part II - 03 Ladders and Stepladders • Eye wash and first aid k it
• CSM - Part II - 05 Fall Protection