JSA For

This document is a Job Safety Analysis Record Sheet for equipment site testing at the Shaybah NGL Recovery Plant. It outlines the job description, required tools and equipment, personal protective equipment (PPE), and references safety protocols. The document includes sections for preparation, review, and compliance by various representatives.

Uploaded by

Rech Gepitulan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views16 pages

JSA For

This document is a Job Safety Analysis Record Sheet for equipment site testing at the Shaybah NGL Recovery Plant. It outlines the job description, required tools and equipment, personal protective equipment (PPE), and references safety protocols. The document includes sections for preparation, review, and compliance by various representatives.

Uploaded by

Rech Gepitulan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

cu.lg.aw.

JI ��i
-soudi oromco
JOB SAFETY ANALYSIS RECORD SHEET

SHA YBAH NGL RECOVERY PLANT DEPARTMENT


JOB SAFETY ANALYSIS RECORD SHEET
PLANT/EQUIPMENT: DEPARTMENT: Sha bah NGL Revised No./Date: Rev. A / 11.02.2023
DIVISION/UNIT: SNGL No: SNGLO:
SHAYBAH SNGL SAGPD/ DPCU Shaybah JSA NO.: 9162-HS0602-JSA-046
DESCRIPTION OF JOB/TASK: Equipment Site Testing- (test equipment e.g., instrument & Meters, Bus Duct, Protective Relay, LV switch
Rack, MCCB, ACDB, Equipment Rack, Transformer, LV circuit Breakers, MV cables, CT-PT, Main Distribution Power Panel).

Locations- B- 53- Main Pipe rack unit, B-90 - NGL Train 1 & 2.
PREPARED BY: Contrac]}" Construction Rep. REVIEW ntractor Safety Rep. REVIEWED BY: SNGL Compliance Group

DATE:
�,'1-}1 d),

\ \\'0'7,\'7,., � DATE: �t- It. 'ye.J.


REVIEWED BY: PMT Construction Rep. REVIEWED BY: PMT Safety Rep. REVIEWED BY: Operation Foreman

DATE: DATE: DATE:


REFERENCES: TOOL & EQUIPMENT REQUIRED: PPE's:
• CSM - Pa I - 01 Emergency Reporting and Response • Hand & Power Tools • Har at
• CSM - Part I - 03 Personal Protective Equipment PPE • Multimeter • Safety Glasses (dark & clear)
• CSM - Part I - 04 Work Permit System and Stop Work Authority • Megger • Safety Shoes
• CSM - Part I - 05 Isolation Lockout and Use of Hold Tags.pdf • Manlift • Electrical hand gloves
• CSM - Part I - 07 Fire Prevention • Generator • Dust Mask/ Face mask
• CSM - Part I - 08 Traffic Vehicle Safety • Tower light • Full Sleeve FRC Clothing/ E-arc
• • Testing Tools Kit • Face Shield
CSM - Part I - 11 Hand Tools and Power Tools
• Lifting gears • Ear Plug
• CSM - Part I - 12 Material Handling • Hydraulic trolley • Safety Harness with
• CSM - Part I - 13 Heat Stress • Rubber mats suspension trauma
• CSM - Part II - 02 Scaffolding • Hard stick • Apron coat
• CSM - Part II - 03 Ladders and Stepladders • Eye wash and first aid k it
• CSM - Part II - 05 Fall Protection