QUOTATION - CONFIDENTIAL
SOLAR POWER PROJECT (SPP)
PROPOSAL
UNDER KSEBSOURA SUBSIDY SCHEME
PROJECT AT A GLANCE
General
Reecco Energy India Pvt Ltd,
Empanelled Agency Contact no:+91 9562 244 099 / +91 9562 233 099
Email id : info@reecco.com
Client
Consumer number
Location
Contact No
Email ID
Project
Capacity 5 KW
Type Grid Interactive
Technical
Pennar/Rayzon/Similar Brand–All KSEB
Solar PV Modules
Approved And Based On The Availability
Type/Model Polycrystalline– 335Wp
Qty 15 Nos
10 Years Product Warranty and 25 Years Power Output
Warranty Warranty, Minimum 90% at the end of 10 years and
minimum 80% at the end of 25 years
Grid Tied Inverter Sofar/EVVO or Similar Brand Approved By KSEB
Qty 1 Nos
Warranty 5 Year Warranty
Balance Of System As Per KSEB Standard
0
Page
Reecco Energy India Pvt Ltd
PRIVATE & CONFIDENTIAL
QUOTATION - CONFIDENTIAL
ChargebleAt Actual (If Any)
Additional Work (This Quote Is Based On Flat Roof. Any Additional Structure
Work/Cable Work/Aesthetic Related Modification Shall Be At
Client’s Scope And For Chargable At Actuals.)
DETAILED TECHNICAL SPECIFICATION AND COST DETAILS
Program 5 KW Grid-Interactive Solar Power Plant.
Particulars Description
Solar Panel 5 kW- PV- Manufactured by Adani/Pennar/Renewsys
(Polycrystalline-335Wp)
IEC Compliance : Conforming IEC 61215, IEC 61730, UL 61730
10 Years Product Warranty and 25 Years Power Output Warranty
Minimum 90% at the end of 10 years and minimum 80% at the end of 25 years
Power Conditioning 5kW– Sofar/Growatt/EVVO Grid Tied Inverter
Unit (PCU) IEC Compliance : Conforming IEC 62109, IEC 61727, IEC 62116
Warranty : 5Years | Environmental protection rating : IP65
Efficiency : Maximum efficiency upto 97.40%
Operating Temperature : -25ᵒC to 60ᵒC
Remote Monitoring Facility : Available
Safety/Protection Electrical Grounding (earthing) as per IS 3043
REECCO provides high voltage protection for Panels and PCU.
Cable All with IEC standards as per MNRE Specification IEC 60227 &IEC 60502
Switches/Circuit All as per IEC/MNRE standards IEC 60447 Part I, Part II & Part III IS 60947 Part
Breakers/Connectors I, Part II & Part III
Mounting Structure Structure with adequate strength – as per MNRE Specification, which can
withstand a wind load of 150 km/hr
Solar Meter LT unidirectional meter for calculating total solar production
Installation Details All Installations are carried out supervised and monitored by qualified and
experienced Electrical Engineers. Reecco shall provide
Details of PV Module array and wiring with Drawings and Diagrams.
Determination of true south, tilting angle,
Interconnection details inside the junction/terminal boxes
Structure Installation details and drawings
Electrical Grounding as per BIS Standards
Safety Precautions displayed on the plant
Connectivity & Clearance for grid connectivity has to be obtained by the beneficiary from
Clearance from electrical Distribution Licensee (KSEBL) for getting final approval of Solar Power
Distribution Licensee Plant. Reecco shall assist in this regards.
1
Page
Reecco Energy India Pvt Ltd
PRIVATE & CONFIDENTIAL
QUOTATION - CONFIDENTIAL
Installation Cost (A)
Installation Cost (IC)- 5kW Rs. 2,28,687.60(Incl. GST)
Additional Structure Cost Customer scopre
Amount payable to company(Including GST) Rs. 2,28,687.60
Account Name Reecco Energy India Pvt Ltd
Bank Name & Branch ICICI Bank, Thodupuzha
Account Details Account Number 074405001100
IFSC Code ICIC0000744
Account Type Current Account
2
Page
Reecco Energy India Pvt Ltd
PRIVATE & CONFIDENTIAL
QUOTATION - CONFIDENTIAL
Letter of Acceptance
To,
The Director,
Reecco Energy India Pvt Ltd
Building No. IV/219, B4
Pala Road, Thodupuzha
Kerala – 685 608
Work Order Confirmation - Installation of 5Kw Solar On-Grid PV system
This refers to our pleasant meeting in respect of the above.
We have gone through this detailed proposal submitted by you in this regard
and we find the detailed terms and conditions acceptable to us.
Accordingly, we are pleased to award you the contract to install 5KW solar power
plant of the specification mentioned in this proposal document with an initial
amount to Reecco Energy India Pvt Ltd upon PO as given below.
1. Solar Power Plant Installation Cost
Rs. 2, 28,687.60 (Incl. GST)
2. Additional Structure Cost
Rs. Customer Scope
and subject to all the terms and conditions detailed in this proposal.
We look forward to receive your early confirmation and hope that you will
complete the job to our satisfaction
For
Name
Authorized Signatory
Name : Office Stamp
Designation : Date:
3
Page
Reecco Energy India Pvt Ltd
PRIVATE & CONFIDENTIAL