0% found this document useful (0 votes)
25 views29 pages

2.3.2 Part Drawings图册

The FY-50Y BOP Handling System Maintenance Manual provides guidelines for purchasing components, detailed drawings of system components, and maintenance instructions. It emphasizes the importance of lubrication and cleanliness for hydraulic components during assembly. The manual includes technical requirements and a lubricating drawing for proper maintenance practices.

Uploaded by

tracy johnson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views29 pages

2.3.2 Part Drawings图册

The FY-50Y BOP Handling System Maintenance Manual provides guidelines for purchasing components, detailed drawings of system components, and maintenance instructions. It emphasizes the importance of lubrication and cleanliness for hydraulic components during assembly. The manual includes technical requirements and a lubricating drawing for proper maintenance practices.

Uploaded by

tracy johnson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

FY-50Y BOP Handling System

Maintenance Manual

Baoji Engineering Hydraulic Components Plant


An Enterprise Awarded with ISO9001 Quality System Certificate

President: Chen Zhao-quan Mobil: 13909175290


Add: No.2 JiangTan Rd, Baoji, Shaanxi, China Post Cord: 721008
Tel: (0917) 3390710, 3397021 Fax: (0917) 3397020
Contents
I. Guide for Purchasing

II.Component Drawing Contents

III.Guide for Maintenance


I. Guide for Purchasing

Please purchase Components of FY-50Y BOP Handling System from the manufacturer in

accordance with the drawing code, description displayed in the manual.

II.Component Drawing Contents

Item Drawing Code Description

1 FY50-00 General Assembly of BOP Handling System

2 FY50-01.00 Traveling Block Group

3 FY50-03.00 Lateral Block GroupⅠ

4 FY50-08.00 Lateral Block GroupⅡ

5 FY50-10.00 Hydraulic System

6 FY50-09.00 Suspending Assy

7 FY50-04.00 Driving Block Group

8 FY50-11.00 Driven Block Group

9 FY50-10.09.00B Control Box Assy

10 FYG270/180-1335 Oil Cylinder


III.Guide for Maintenance

Periodically lubricate the device in accordance with the position displayed on the

Lubricating Drawing. All rotation components can be rotated smoothly.

Lubricate bearings set with 7011 microtherm pressure grease

Lubricating period is stipulated in the Lubricating Drawing.

Appendix:Lubricating Drawing of FY-50Y BOP Handling System


8 1 300 ~2 000 7 6 5 4 3 2 1
6

56 0
5 74
164 0

60
A

56 45
(2 701 )

TechnicalRequir ements
1.All hydraulic components,linesand rubber hosemustbecleanedwithkerosene and dried.
2.Connect alllinesaccording to theprinciple drawing;Asfor theassembly of rubber hose with fast

4 005
coupling, male and female coupling should bemounted on each end andmarked with matching code.
3.Respectively connectthe feeding and return hosewith the pressure and oilreturn lines
ofhydraulicstation. Withdrawthe hosesunder thecontrolbox during tr ansportation.
4.The otherhosesshould be put in order,and screw thefastcouplings of two endseach otherfor
transportation.
9 10
A direction 8 FY5 0-11 .0 0 Driv en block gr oup 4
7 FY5 0-10 .0 0 Hyd raulic sy stem 1
6 FY5 0-09 .0 0 S u s pe nd in g r op e s y s tem 2
5 FY5 0-08 .0 0 Lateral block groupⅡ 2
4 FY5 0-04 .0 0 Drivin g block gr oup 4
3 FY5 0-03 .0 0 Lateral block groupⅠ 2
2 FY5 0-02 .0 0 Main bo dy 2
Connected withoilinlet hoseofdrillingrig 1 FY5 0-01 .0 0 Traveling block group 2
Unit Total
Connectedwith oilretumhoseof drillingrig Item Code Description Qty' Material weight weight Remarlks
49

GeneralAssembly FY-50Y-00
FY-50Y
BOPHandling System
Qty : 1/台
10 FYG2 70/1 80- 133 5 Oil cylind er 2 Baoji Engineering Hydraulic
ComponentsPlant
9 FY80-1 1. 00 Ho se clip set 1
FY 50-01 .00

1
2
3
4

487 .5
5
6

H8
Ø15 0 g8
H8
Ø15 0g 8

d8
Ø14 0H8

H8
Ø14 0d 8
Ø49 5

Ø56 4

38

607 .5
4 80 30 3. 75
6 73
6 FY5 0-0 1. 06A Shaf t 1
5 FY5 0-0 1. 04. 02 C op per lin er 4
4 FY5 0-0 1. 04. 01 B lock 2
Technical Requ irements 3 FY5 0-0 1. 02. 04 Shaf t 2
1 .All comp onents mu st be clean ed before 2 GB27 6-8 2 B earing 312 2
assemb ly 1 FY5 0-0 1. 02. 05 Driv en Block 2
2 .Lub ricate bearings set with 7 011 Unit Total
借 (通 ) 用 micro therm p ressure grease while Item Code Description Qty' Material weight
Remarks
件 登 记 assemb lin g th e block group.
旧底图总号
3 .Block g ro up must be rotated smooth ly Traveling block group
without any block after assembly. FY5 0-01. 00
底 图 总 号
F Y -5 0Y
标记 处数 分 区 更 改文 件 号 签 名 年 、月 、 日 B OP H an dl ing S y st em
签 字
设 计 标准化 阶 段 标 记 重 量 比 例
Q ty' : 2 / 台
日 期
审 核
1: 7
档案员 日 期
工 艺 批 准 共 张 第 张 BEHC P
FY 50-03. 00

2 48. 5
2

φ4 19

φ4 88
370 265
480
673

2 FY50 -01 .0 4. 02 C opp er lin er 4


TechnicalRequir ements 1 FY50 -03 .0 2. 01 B lo ck 2
借 (通 ) 用 1.Allcomponents must becleaned before
assembly Item Code Description Qty' Material U nit we ight Total w eight Remarks
件 登 记
2.Lubricatebearingsset with 7011
旧底图总号 microthermpressuregreasewhile Lateral block groupⅠ
F Y50 -03. 00
assembling the blockgroup. F Y -5 0Y
底 图 总 号
3.Block group must berotated smoothly 标记 处数 分 区 更改 文 件 号 签 名 年 、月 、 日 BOP Hand ling System
签 字 without any block after assembly. 设 计 标准化 阶 段 标 记 重 量 比 例
Qty ' : 2/S et
日 期
1: 5
档案员 日 期
审 核 BEHCP
工 艺 批 准 共 张 第 张
FY 50-08. 00

1
673

265
φ4 1 9

φ4 8 8
14 0 Hd 99

14 0 H9d9
2

370
26 5
480
593

2 FY5 0-0 1. 04. 02 Cop per lin er 4


1 FY5 0-0 3. 02. 01 Block 2
Technical Requirements Unit Total
借 (通 ) 用 1.All componentsmustbecleanedbefore Item Code Description Qty' Material Remarks
件 登 记
assembly weight
2.Lubricatebearingsset with 7011 Lateral block groupⅡ
旧底图总号
microthermpressure greasewhile F Y50- 08. 00
F Y -5 0Y
底 图 总 号 assembling theblock group.
3.Block group must berotated smoothly 标记 处数 分 区 更改 文 件 号 签 名 年 、月 、 日 BO P H and lin g Sy s tem
签 字
without any blockafter assembly. 设 计 标准化 阶 段 标 记 重 量 比 例
Qty' : 2 /Se t
日 期
1: 5
档案员 日 期
审 核
共 张 第 张
BEH CP
工 艺 批 准
1 15 14 13 12 11 10 2 9 8 7 6 5 4

2
3
1
B Technical Requirements
1.Allhydraulic components, lines
and rubber hose must be cleaned
with kerosene and dried.
2.Connect all lines according to
A C the principle drawing; As for the
assembly of rubber hose with fast
coupling, maleand female coupling
should be mounted on each end and
marked with matching code.

C direction
2 7 16 16 17 18 19 21
A direction 22 13 JB188 5-7 7 High press ure hos e set16Ⅱ-30000 2 90 °o ne end
12 JB188 5-7 7 High press ure hos e set10Ⅱ-30000 2
23 11 JB188 5-7 7 High pres sure hose10Ⅱ-620 1 90 °o ne end
10 DB10 -2- 30/3 15 Ov erflow valve 2
20 9 RVP10 -10 On e-way valve 8
8 JB188 5-7 7 High pressur e hose set10Ⅱ-1400 1
B direction 7 GB12 35- 76 O ring 12X1 .9 38
25 6 JB982 -77 Gas ket18 6
24 26 5 GB12 35- 76 O ring 24X2 .4 2
4 FD1 2FA12/B30 Balance valve 2
26 JB 18 85- 77 High pres sure hos e s et10Ⅱ-4000 1 90°o ne en d 3 JB982 -77 Gas ket22 12
25 P A 2 0. 12 .1 3 .S P 2 0 .0 2 .0 3 Fas t co up lin gNPT3/4 6 2 JB982 -77 Gas ket14 32
24 JB 18 85- 77 High pr es sure hos e s et10Ⅱ-26000 2 1 GB12 35- 76 O ring 16X2 .4 6
23 P A 1 0. 12 .1 3 .S P 1 0 .0 2 .0 3 Fas t co up lin gNPT3/8 7 Unit Total
22 JB 18 85- 77 High press ure hose set10Ⅱ-800 1 Item Code Description Qty Material weight
Remarks
21 JB 18 85- 77 High press ure hose set10Ⅱ-660 1
20 P A 1 3. 12 .1 3 .S P 1 3 .0 2 .0 3 Fas t co up lin gNPT1/2 2 Hydraulic system F Y50- 10. 00
19 JB 18 85- 77 High pr ess ure hose s et10 Ⅱ-26000 1 90°o ne en d F Y - 50 Y
18 JB 18 85- 77 High press ure hos e set16Ⅱ-26000 2 90°o ne en d 标记 处数 分区 更 改文 件号 签名 年 、月 、日 B OP H an d lin g S y s tem
17 JB 18 85- 77 High press ure hose set10 Ⅱ-1430 1 90 °o ne end 设 计 标准 化 阶 段 标记 重 量 比例 Qty' : 1/ 台
16 JB 18 85- 77 High press ure hose set10 Ⅱ-1230 4
审 核
1 :20
15 GB2 76- 82 Bearing 10 6 1 Baoji Engineering Hydraulic
共 张 第 张
14 GB3 01- 84 Bearing 82 05 1 工 艺 批 准 Components Plant
FY50/4. 8- 01. 00A

2 17

R22
3 .5 5
61.
R2

.5
23

38
R2

76
539 6 17

Ø28 1

2
1 50

2 S-DX2 5-1- 3/4 DXLooseningbuckle 1


1 FY50 -09 .0 2 Sus pen ding ro pe set 1
借 (通 ) 用
4 80 Item Code Description Qty' Material Unit w eight Total w eight Remarks
件 登 记

旧底图总号
S uspending R ope Se t
F Y - 50 Y F Y50 -09. 00
底 图 总 号
B O P H and lin g Sy s tem
标记 处数 分 区 更 改文 件 号 签 名 年 、月 、 日
签 字
设 计 标准化 阶 段 标 记 重 量 比 例
Q ty' : 2 /Se t
日 期
1: 8
档案员 日 期
审 核
BEHC P
工 艺 批 准 共 张 第 张
FY50-04.00

392 293

12
11

Ø51
10
R 123
1

φ 1 30H 7
φ 60 h 6

Ø228
2 Ø195
3

452
175
4

210
9
5
6 8
1
2-Ø Ø60H1
7 50

78

370

Technical Requirements
1.All hydraulic components must be
cleaned before assembly 5 FY50-04.02.06 Insulation liner 1
2.Lubricate all bearings and gears with 4 GB276-82 Bearing306 1
7011 microtherm pressure grease 3 FY50-04.02.11 Bearing cover 1
while assembling. 2 FY50-04.08 Gear 1
3.All rotating parts must be rotated 1 604-1114 J2K-160 Cycloid motot 1
smoothly without any block after Item Unit Total Remarks
借 (通 ) 用 Code Description. Qty' Material weigh t
件 登 记 assembly.
旧底 图总 号 Drivin g Blo ck Grou p FY50-04.00
12 FY50-04.04.01 Driving block 2
底图 总 号 11 GB276-82 Bearing312 2
FY-50Y
标记 处数 分区 更改文件号 签 名 年、月、日 BOP Handling System
10 FY50-04.04.02 Shaft 2
签 字
9 FY50-04.02.02 Gear shaft 1 设计 标准化 阶段标记 重量 比例 Qty': 4/Set
日 期 8 GB278-82 Bearing60307 1 1 :3. 5
档 案员 日 期 7
6
FY50-04.02.04
FY50-04.02.09
Gear
Bearing box
1
1
审核
工艺 批准 共 张 第 张 BEHCP
2 93
1

φ 13 0
φ6 0

φ 18 0
2

17 5

21 0
11
φ 60H

R7 0
3 70
4 60

Technical Requirements
3 FY50 -04 .0 4. 02 s haft 2
2 GB 27 6-8 2 B earing3 12 2
1.All com pon ents mu st be cleaned bef ore 1 FY50 -01 .0 2. 05 Driv en block 2
ass emb ly U nit Total
2. Lub ricate bear ings s et with 7 011
Ite m Code Description Qty' M aterial weight Remarks
microth erm pres s ure greas e while
Driven Block Group F Y50-1 1.0 0
ass emb lin g the block g roup .
3. Block g rou p mus t be rotated sm ooth ly FY-5 0Y
with out any b lock after ass emb ly. 标记 处数 分 区 更改文件号 签 名 年、月、日 BOPHandling System
设 计 标准化 阶 段 标 记 重 量 比 例
Q ty' : 4/ 台

审 核
1:3 Baoji Engineering Hydraulic
工 艺 批 准 共 张 第 张 Components Plant
1 2 3 4 5 6 7 8 9 A direction

A 10

FY-50YMovablySpraying-proofDevice Controlboxassy
11

To o il s upply o f hydra ulic s tai on


T P 12
13
23 22 21

95 0

80 0
14
20 Technical Requirements
To o il r e turn of hy dra ulic sta ion
19 1.All hydrauliccomponents, lines and rubber hose mustbe
15 cleaned with kerosene and dried.
18 2.Connectalllines according to the principle drawing;
17 16 All fastcoupling should equipped with dust-proof cap
26 25 24 485 520 9 回油 and plug.

9 GB12 35- 76 O r in g3 0X3. 1 4


8 DL40-d25L-4T-4C-4C M an u al m ul ti- f ol d v al ve 1
26 JB18 85-7 7 High pre ssure hos es et32 Ⅰ -30000 1
7 GB12 35- 76 O r in g2 0X2. 4 8
25 GB12 35- 76 O r in g3 5X3. 1 2
6 GB1 23 5-76 O r in g3 5X3. 1 3
24 P A 2 5 .1 2 .1 3. S P 25 .0 2 .0 3 Male coupling and protectio nNPT1 2
5 JB982 -77 Gasket3 3 8
23 J B1 885 -77 High pre ssure hos es et22 Ⅲ -30000 1
22 GB123 5-7 6 O rin g30 X3. 1 6 4 J B982 -77 Gas ket14 2
21 P A 20 .1 2 .1 3 .S P 2 0. 02 .0 3 Male coupling and prote ctiNPT3/4 2 3 GB34 52. 1-9 2 O ring5 .6 X1. 8 1
20 D u s t- p r oo f p lu g N P T3 / 8 2 2 HFJ 2-P2- 2-P-1 High press ure hose set 1
SP10. 02
19 2 1 YTN-1 00 ZT A nti- sh ock p res s ure g auge 1 40 MPa
PA1 0. 12 F e m al e c ou p lin g N P T3 /8
18 SP20 .0 2 D u s t -p r o of pl ug N P T 3/ 4 2 Item Code Descriptio n Qty' Materials U nit we ight Total w eight Remarks
17 PA2 0. 12 F e m al e c ou p lin g N P T3 /4 2
16 SP13 .0 2 D u s t -p r o of p l ug N P T 1/ 2 1 Control box assy F Y50- 10. 09. 00B
15 PA1 3. 12 F em al e c ou p li ng N P T1 /2 1 F Y -5 0Y
14 JB98 2-77 Gask et22 2 标记 处数 分 区 更 改文 件 号 签 名 年 、月 、 日 B O P Ha nd lin g S y s tem
13 SP20. 03 Protection capNPT3/4 2 设 计 标准化 阶 段 标 记 重 量 比 例
Qty' : 1/ 台
12 PA20 .1 3 Male coup lingNPT3/4 2
1: 7
11 SP1 0. 03 Protection capNPT3/8 2 审 核 B EHCP
10 工 艺 批 准 共 张 第 张
PA10 .1 3 Male couplingNPT3/8 2
FYG270/180-1600

1 2 3 4 5 6 7

(20 45)
4-Ø3 3 2-NPT3 /8
133 5

Ø312 -0. 32
Ø30 6

Ø30 8

Ø30 6
Ø2 70
Ø1 80

0
30 5
37 0

305
370 7 W9- 180 -N90 Du st-p roo f r in g 1
6 UR18 00P20 50 B-PN Weike sealing rin g 2
5 GB34 52. 1- 92 O ring 258 X7 2
4 FR11 9 Guiding ring25X2. 5X570 2
3 GB34 52. 1- 92 O ring 150 X5. 3 2
2 FR11 9 Guiding ring25X2. 5X836 1
1 FU1 717 LO I SO 27 0X250 X12 2
Unit Total
借 (通 ) 用 Main Techn ical Data Item Code Description. Qty' Material Rem arks
件 登 记 w eight
1. Rated pr ess ure 16MPa 。
旧底图总号 2. Inn er diameter of cylind er Ø2 70m m。 Oil Cylinder FYG 270/180- 1335
底 图 总 号 3. Pis ton ro d diameter Ø1 80m m F Y - 50 Y
4. Max. r oute 13 35 mm。 标记 处数 分 区 更改文件号 签 名 年、月、日 B OP H an d l i ng S ys t e m
签 字
设 计 标准化 阶 段 标 记 重 量 比 例
Qty' ; 2 /Se t
日 期
审 核
1 : 5 B a o ji Eng i n eer in g Hy d r au lic
档案员 日 期
工 艺 批 准 共 张 第 张 Com p o nen ts P la n t
① ② ③ ③ ② ① ④

⑤ ⑤ ⑤ ⑥

⑥ Suspending block 4 50 0ho ur Replacelubri catin ggrease whil emain tenance


⑤ Slip ping b lo ck 12 16 hou r
④ Line bracket 1 50 0ho ur Replacelubri catin ggrease whil emain tenance
③ Driven block 8 5 00 hou r Replacelubri catin ggrease whil emain tenance
② Driving block 8 50 0ho ur Replacelubricating greasewhile maintenance
① Reducer box 4 50 0ho ur Replacelubri catin ggrease whil emain tenance
Lubricating item Lubricating position LubricatingQty' Lubricating period Rem ark

Lubricating Drawing F Y50- 00


F Y -5 0Y
标记 处数 分 区 更 改文 件 号 签 名 年 、月 、 日 BOP Handling System
设 计 标准化 阶 段 标 记 重 量 比 例
Qty' : 1 /Se t

审 核
1 :20 Baoji Enginee ring Hydraulic
工 艺 批 准 共 张 第 张 Compone nts Plant

You might also like