2.3.2 Part Drawings图册
2.3.2 Part Drawings图册
Maintenance Manual
Please purchase Components of FY-50Y BOP Handling System from the manufacturer in
Periodically lubricate the device in accordance with the position displayed on the
56 0
5 74
164 0
60
A
56 45
(2 701 )
TechnicalRequir ements
1.All hydraulic components,linesand rubber hosemustbecleanedwithkerosene and dried.
2.Connect alllinesaccording to theprinciple drawing;Asfor theassembly of rubber hose with fast
4 005
coupling, male and female coupling should bemounted on each end andmarked with matching code.
3.Respectively connectthe feeding and return hosewith the pressure and oilreturn lines
ofhydraulicstation. Withdrawthe hosesunder thecontrolbox during tr ansportation.
4.The otherhosesshould be put in order,and screw thefastcouplings of two endseach otherfor
transportation.
9 10
A direction 8 FY5 0-11 .0 0 Driv en block gr oup 4
7 FY5 0-10 .0 0 Hyd raulic sy stem 1
6 FY5 0-09 .0 0 S u s pe nd in g r op e s y s tem 2
5 FY5 0-08 .0 0 Lateral block groupⅡ 2
4 FY5 0-04 .0 0 Drivin g block gr oup 4
3 FY5 0-03 .0 0 Lateral block groupⅠ 2
2 FY5 0-02 .0 0 Main bo dy 2
Connected withoilinlet hoseofdrillingrig 1 FY5 0-01 .0 0 Traveling block group 2
Unit Total
Connectedwith oilretumhoseof drillingrig Item Code Description Qty' Material weight weight Remarlks
49
GeneralAssembly FY-50Y-00
FY-50Y
BOPHandling System
Qty : 1/台
10 FYG2 70/1 80- 133 5 Oil cylind er 2 Baoji Engineering Hydraulic
ComponentsPlant
9 FY80-1 1. 00 Ho se clip set 1
FY 50-01 .00
1
2
3
4
487 .5
5
6
H8
Ø15 0 g8
H8
Ø15 0g 8
d8
Ø14 0H8
H8
Ø14 0d 8
Ø49 5
Ø56 4
38
607 .5
4 80 30 3. 75
6 73
6 FY5 0-0 1. 06A Shaf t 1
5 FY5 0-0 1. 04. 02 C op per lin er 4
4 FY5 0-0 1. 04. 01 B lock 2
Technical Requ irements 3 FY5 0-0 1. 02. 04 Shaf t 2
1 .All comp onents mu st be clean ed before 2 GB27 6-8 2 B earing 312 2
assemb ly 1 FY5 0-0 1. 02. 05 Driv en Block 2
2 .Lub ricate bearings set with 7 011 Unit Total
借 (通 ) 用 micro therm p ressure grease while Item Code Description Qty' Material weight
Remarks
件 登 记 assemb lin g th e block group.
旧底图总号
3 .Block g ro up must be rotated smooth ly Traveling block group
without any block after assembly. FY5 0-01. 00
底 图 总 号
F Y -5 0Y
标记 处数 分 区 更 改文 件 号 签 名 年 、月 、 日 B OP H an dl ing S y st em
签 字
设 计 标准化 阶 段 标 记 重 量 比 例
Q ty' : 2 / 台
日 期
审 核
1: 7
档案员 日 期
工 艺 批 准 共 张 第 张 BEHC P
FY 50-03. 00
2 48. 5
2
φ4 19
φ4 88
370 265
480
673
1
673
265
φ4 1 9
φ4 8 8
14 0 Hd 99
14 0 H9d9
2
370
26 5
480
593
2
3
1
B Technical Requirements
1.Allhydraulic components, lines
and rubber hose must be cleaned
with kerosene and dried.
2.Connect all lines according to
A C the principle drawing; As for the
assembly of rubber hose with fast
coupling, maleand female coupling
should be mounted on each end and
marked with matching code.
C direction
2 7 16 16 17 18 19 21
A direction 22 13 JB188 5-7 7 High press ure hos e set16Ⅱ-30000 2 90 °o ne end
12 JB188 5-7 7 High press ure hos e set10Ⅱ-30000 2
23 11 JB188 5-7 7 High pres sure hose10Ⅱ-620 1 90 °o ne end
10 DB10 -2- 30/3 15 Ov erflow valve 2
20 9 RVP10 -10 On e-way valve 8
8 JB188 5-7 7 High pressur e hose set10Ⅱ-1400 1
B direction 7 GB12 35- 76 O ring 12X1 .9 38
25 6 JB982 -77 Gas ket18 6
24 26 5 GB12 35- 76 O ring 24X2 .4 2
4 FD1 2FA12/B30 Balance valve 2
26 JB 18 85- 77 High pres sure hos e s et10Ⅱ-4000 1 90°o ne en d 3 JB982 -77 Gas ket22 12
25 P A 2 0. 12 .1 3 .S P 2 0 .0 2 .0 3 Fas t co up lin gNPT3/4 6 2 JB982 -77 Gas ket14 32
24 JB 18 85- 77 High pr es sure hos e s et10Ⅱ-26000 2 1 GB12 35- 76 O ring 16X2 .4 6
23 P A 1 0. 12 .1 3 .S P 1 0 .0 2 .0 3 Fas t co up lin gNPT3/8 7 Unit Total
22 JB 18 85- 77 High press ure hose set10Ⅱ-800 1 Item Code Description Qty Material weight
Remarks
21 JB 18 85- 77 High press ure hose set10Ⅱ-660 1
20 P A 1 3. 12 .1 3 .S P 1 3 .0 2 .0 3 Fas t co up lin gNPT1/2 2 Hydraulic system F Y50- 10. 00
19 JB 18 85- 77 High pr ess ure hose s et10 Ⅱ-26000 1 90°o ne en d F Y - 50 Y
18 JB 18 85- 77 High press ure hos e set16Ⅱ-26000 2 90°o ne en d 标记 处数 分区 更 改文 件号 签名 年 、月 、日 B OP H an d lin g S y s tem
17 JB 18 85- 77 High press ure hose set10 Ⅱ-1430 1 90 °o ne end 设 计 标准 化 阶 段 标记 重 量 比例 Qty' : 1/ 台
16 JB 18 85- 77 High press ure hose set10 Ⅱ-1230 4
审 核
1 :20
15 GB2 76- 82 Bearing 10 6 1 Baoji Engineering Hydraulic
共 张 第 张
14 GB3 01- 84 Bearing 82 05 1 工 艺 批 准 Components Plant
FY50/4. 8- 01. 00A
2 17
R22
3 .5 5
61.
R2
.5
23
38
R2
76
539 6 17
Ø28 1
2
1 50
旧底图总号
S uspending R ope Se t
F Y - 50 Y F Y50 -09. 00
底 图 总 号
B O P H and lin g Sy s tem
标记 处数 分 区 更 改文 件 号 签 名 年 、月 、 日
签 字
设 计 标准化 阶 段 标 记 重 量 比 例
Q ty' : 2 /Se t
日 期
1: 8
档案员 日 期
审 核
BEHC P
工 艺 批 准 共 张 第 张
FY50-04.00
392 293
12
11
Ø51
10
R 123
1
φ 1 30H 7
φ 60 h 6
Ø228
2 Ø195
3
452
175
4
210
9
5
6 8
1
2-Ø Ø60H1
7 50
78
370
Technical Requirements
1.All hydraulic components must be
cleaned before assembly 5 FY50-04.02.06 Insulation liner 1
2.Lubricate all bearings and gears with 4 GB276-82 Bearing306 1
7011 microtherm pressure grease 3 FY50-04.02.11 Bearing cover 1
while assembling. 2 FY50-04.08 Gear 1
3.All rotating parts must be rotated 1 604-1114 J2K-160 Cycloid motot 1
smoothly without any block after Item Unit Total Remarks
借 (通 ) 用 Code Description. Qty' Material weigh t
件 登 记 assembly.
旧底 图总 号 Drivin g Blo ck Grou p FY50-04.00
12 FY50-04.04.01 Driving block 2
底图 总 号 11 GB276-82 Bearing312 2
FY-50Y
标记 处数 分区 更改文件号 签 名 年、月、日 BOP Handling System
10 FY50-04.04.02 Shaft 2
签 字
9 FY50-04.02.02 Gear shaft 1 设计 标准化 阶段标记 重量 比例 Qty': 4/Set
日 期 8 GB278-82 Bearing60307 1 1 :3. 5
档 案员 日 期 7
6
FY50-04.02.04
FY50-04.02.09
Gear
Bearing box
1
1
审核
工艺 批准 共 张 第 张 BEHCP
2 93
1
φ 13 0
φ6 0
φ 18 0
2
17 5
21 0
11
φ 60H
R7 0
3 70
4 60
Technical Requirements
3 FY50 -04 .0 4. 02 s haft 2
2 GB 27 6-8 2 B earing3 12 2
1.All com pon ents mu st be cleaned bef ore 1 FY50 -01 .0 2. 05 Driv en block 2
ass emb ly U nit Total
2. Lub ricate bear ings s et with 7 011
Ite m Code Description Qty' M aterial weight Remarks
microth erm pres s ure greas e while
Driven Block Group F Y50-1 1.0 0
ass emb lin g the block g roup .
3. Block g rou p mus t be rotated sm ooth ly FY-5 0Y
with out any b lock after ass emb ly. 标记 处数 分 区 更改文件号 签 名 年、月、日 BOPHandling System
设 计 标准化 阶 段 标 记 重 量 比 例
Q ty' : 4/ 台
审 核
1:3 Baoji Engineering Hydraulic
工 艺 批 准 共 张 第 张 Components Plant
1 2 3 4 5 6 7 8 9 A direction
A 10
FY-50YMovablySpraying-proofDevice Controlboxassy
11
95 0
80 0
14
20 Technical Requirements
To o il r e turn of hy dra ulic sta ion
19 1.All hydrauliccomponents, lines and rubber hose mustbe
15 cleaned with kerosene and dried.
18 2.Connectalllines according to the principle drawing;
17 16 All fastcoupling should equipped with dust-proof cap
26 25 24 485 520 9 回油 and plug.
1 2 3 4 5 6 7
(20 45)
4-Ø3 3 2-NPT3 /8
133 5
Ø312 -0. 32
Ø30 6
Ø30 8
Ø30 6
Ø2 70
Ø1 80
0
30 5
37 0
305
370 7 W9- 180 -N90 Du st-p roo f r in g 1
6 UR18 00P20 50 B-PN Weike sealing rin g 2
5 GB34 52. 1- 92 O ring 258 X7 2
4 FR11 9 Guiding ring25X2. 5X570 2
3 GB34 52. 1- 92 O ring 150 X5. 3 2
2 FR11 9 Guiding ring25X2. 5X836 1
1 FU1 717 LO I SO 27 0X250 X12 2
Unit Total
借 (通 ) 用 Main Techn ical Data Item Code Description. Qty' Material Rem arks
件 登 记 w eight
1. Rated pr ess ure 16MPa 。
旧底图总号 2. Inn er diameter of cylind er Ø2 70m m。 Oil Cylinder FYG 270/180- 1335
底 图 总 号 3. Pis ton ro d diameter Ø1 80m m F Y - 50 Y
4. Max. r oute 13 35 mm。 标记 处数 分 区 更改文件号 签 名 年、月、日 B OP H an d l i ng S ys t e m
签 字
设 计 标准化 阶 段 标 记 重 量 比 例
Qty' ; 2 /Se t
日 期
审 核
1 : 5 B a o ji Eng i n eer in g Hy d r au lic
档案员 日 期
工 艺 批 准 共 张 第 张 Com p o nen ts P la n t
① ② ③ ③ ② ① ④
⑤ ⑤ ⑤ ⑥
审 核
1 :20 Baoji Enginee ring Hydraulic
工 艺 批 准 共 张 第 张 Compone nts Plant