0% found this document useful (0 votes)
98 views1 page

Extract

This document is a test report on the quantitative extraction of asphalt binder from asphalt mixtures for the Qiddiya Investment Company. The report indicates a satisfactory bitumen content of 5.3%, which meets the Job Mix Formula requirements. It emphasizes that the test results are specific to the submitted sample and should not be reproduced without ACES's approval.

Uploaded by

muqeem khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views1 page

Extract

This document is a test report on the quantitative extraction of asphalt binder from asphalt mixtures for the Qiddiya Investment Company. The report indicates a satisfactory bitumen content of 5.3%, which meets the Job Mix Formula requirements. It emphasizes that the test results are specific to the submitted sample and should not be reproduced without ACES's approval.

Uploaded by

muqeem khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

28-August-2024

or stamp on the report did not indicate any accountability on ACES.


*FINAL DOCUMENT by S.Sanullah* This is an electronically generated report and does not require a signature. It's valid and verified only with the QR code shown on the top; any manual signature
CHK: S.Sanullah

TEST REPORT ON QUANTITATIVE EXTRACTION OF ASPHALT BINDER FROM ASPHALT MIXTURES

Owner Qiddiya Investment Company Report No. RH.QMR24007011


Contractor Tamimi Pre-Engineered Buildings Factory Co. Date Reported 06/08/2024
Consultant Zuhair Fayez Partnership Consultants Sample No. RH.QMS24001488
Project No. - Request No. RH.QMO24001339

Project Name Construction of 20,000 Occupants Camp Client Reference Verbal

Sample Description Plant Trial - Asphalt BWC Class "B" Sampled By ZIYARAT
Source SALEH AL RASHID Sampling Date 16/07/2024
Supplier SALEH AL RASHID Sampling Method D979/D979M − 22

Sample Location N/A Sample Size (grams) 2815.0

Test Method ASTM D2172/2172M-17e1 Sample Brt. In By ZIYARAT


APP: S.Sanullah

Test Location ACES Riyadh Date Received 16/07/2024


Lab. Location ACES Riyadh Date Tested 25/07/2024

Reviewed by A.Shaaban (RY-103)


Reported by Eng. Humam Abdu (RY-1285)
Tested By Anwar Yousef (RY-189)

1 Description of Samples as Received : "Plant Trial - Asphalt BWC Class "B

2 Bituminous Content : 1

A. Weight of Sample Before Test, (g) 2815.0

B. Weight of Sample after test, (g) 2660.6

C. Weight of Filter Paper before test, (g) 22.4

D. Weight of Filter Paper after test, (g) 25.0


3
E. Vol of extracted liquid (cm ) 3345.0

F. Vol. of Sample burnt (cm3) 100

G. Weight of Container before, (g) 90.289

H. Weight of Container+Filler, (g) 90.388

I. Increase in weight of filter paper, (g) 2.6

J. weight of filler in liquid, (g) 3.3

K. Weight of total mineral aggregate, (g) 2666.5

L. Weight of Bituminous material in sample, (g) 148.5

M. Bitumen Content, (%) 5.3

N. JMF Requirements, (%) 4.9-5.7

CONCLUSION: Satisfactory to JMF Requirements.

Notes:
*The test results represent the submitted sample only.
*Test results shall not be interpreted, reproduced or quoted in a whole or in part without prior written approval of ACES
*ACES is responsible for all information provided in the report which resulted from our activities but except for any information provided by the Customer or resulted
from activities performed by another entity.
* Decision Rule : Simple Acceptance
"End of the Report"
Materials Department Manager
Arab Company for Laboratories and Soil
ACES Riyadh

QRXL103000-TPE-TEC-MDA-CIV-02-Z00-00001 Rev.01 8 of 42

You might also like