EXCAVATION DAILY CHECKLIST
RIYADH SEDRA PHASE 2 PROJECT
Month Location Depth Pipe Tpye
Result Column: (✓) Acceptable, (X) Unacceptable, (--- ) Not in use, ( N/A ) Not applicable
Items for Inspection 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Competent person designated for excavations, trenching and
backfilling
Geotechnical report available
Safe sequence of works and risk assessment available
Protective systems used for excavations > 1.2m
Ground support system used for trenches> 1.2m
Dewatering plan in place (where required)
Permit to dig (work) in place
Latest as-laid drawings available indicating existing buried services
Sloping of excavations & trenching cut at the angle of repose for
the ground conditions
Excavated spoil a distance away from the edge equal to the depth
of the excavation / trench
Means of access every 7.6m provided
Excavations & trenching are barricaded with warning signage
Hard barricades (with lighting) in use for excavations adjacent to
trafficked roads
Spoil located minimum 2m away from leading edges
Barricades 1.8m away from edges
Documented weekly inspection conducted by competent person
Supervisor conducts daily inspection
Daily Signature
Site Engineer sign: Safety officer sign: Safety manager: