Revised Estimate Substation
Revised Estimate Substation
12
|Providingcorrugated G.S. shee oofing including vertical
/curved surface fixed with pol mer coated I or L hooks,
bolts and nuts 8 mm diameter ith bitumen and G.I.
|limpet washers or with G.I. lim 2t washers filled with
white lead, including a coat of. proved steel primer and
twocoats of approved paint or verlapping of sheets 810.90 131690 1.6 12.1.3
1624 Sqm
complete (up to any pitch in h izontal/ vertical or curved
surfaces), excluding the cost ol urlins, rafters and trusses
and including cutting to size ai shape wherever
required.0.63 mm thick with z coating not less than
275 gm/ m?
13 Providing &fixing UV stabilise fiberglass reiniorced
plasticsheet roofing up to any tch, including fixing with
polymer coated "T' or 'L' hooks. olts &nuts 8mm dia. G.I
plain/bitumen washers compl e but excluding the cost of|
purlins, rafters, trusses etc. Th sheets shall be
manufactured out of 2400 TEX anel rovigs incorporating
minimum 0.3% ultra-violet sta liser in resin system 210 Sqm 993.15 208561.5 12.47.1
under approximately 2400 psi nd hot cured. They shall
be of uniform pigmentation an thickness without air
pockets and shallconform to I: 10192 and IS 12866.The
sheets shall be opaque or tran: 1cent, clear or pigmented,
textured or smooth as specifie 2 mm thick flat
Total
8833923.94)912482S-13
GST O18% 1590106.31) \4468.S
Estimated Value 10424030.25) o 1 4 2 66
Certificate:
l1) Certified that the estimate has been prepared
after proper survey of site.
(2) The site is free from all
hindrances.
Oversao
KKR Dy. Manager (Civil)/KKR i.0 (CIVIL) /KKR
Details of work :Renovation of E&M substation and LV section at Kakri project
M1 Nos B D
SL.nO Work Location
150 1.2 0.8 144
Excavation Trenches for duain 1
R00 0.23 69
Brickwork above plinth |Heightening Sub sation boundary outside
store room 12 0.23 2
0.23 2
18a3-68
76.362 2 72
150 0.23 1
Brickwork upto plinth Drain
|For srore room 12 0.23 3312D 66
2 0.23 1.2 1104 2 208
2 12 0.35
0.35 0.7
(0 98 ( 9
10
Misc
52.836D 3S-6
LV section 4 25 300
2 15
Room 2 7 210
2 150
Hall
42
100
3778.4
LV section 25 3 300
15 3 90
Room 5 2 210)
2 150
Hall 1 90
42
as itemn 2 100 1 200
100 200
300 0.7 420
|Misc 150
46484
False celing 2 6 60
1 30 150
210
12
sunstation Shed 1 47 752
|Scrap rOom 1 4
omfuu 3 12
2 3 2.5 15
4 2.5 20
LV Section shed 1 25 15 375
1 30 15 450
1624
20
13 Fibre glass sheet
47
14 Ridge Shed
25
35 70
142
6 47 282
15 Wind ties 150
6 25
30 180
612
21 17 252
16 Grading roof Control room
30 150
LV section
402
402
17 APP
25 1.5 937.5
19 Structural steel single section for window 25| 1
5
20 Dismantling PCC as per site requirement
10
21 Dimoslishing brickwork as per site reguirement
1.2 14.4
22 Dismantling tile 6
2 1.5
20.4
Wall tiles
4 6 0.9 21.6
PE and adajacent room
4 0.9
10 1 0.15 1.5
26 RCC Footings
upto plinth level 10 1.2 0.3 0.3 1.08
2.58
RCC above plinth level for coloums wherever required 10 0.3 0.3 1.8
27
misc 10
11.8
0.15 48
Centering and shuttering |foundation/footing 2 160
2 21 0.2 8.4
56.4
dousty09
31 Precast 1 20 0.15|
32
Concertina fencing boundary 400
33
Dismantling aluminium partion/glazing/false celing 1 6 5 30
2.5 1.5
37.5
36 PVC bend
2
39 For shutter
weight @ 4kg/m2 158.4
40 |Aluminium handle
45 Flush door 4
47 MS door handles
48 MS tower bolts
49 Urinal 3
1
western pan
52 Orrisa pan
100
53 PVC pipe 25mm
100
15mm
54 PVC pipe
55 Stop cock 25mm 10|
57 ball valve 15 mm
58 ballvalve |25 m 2