WORK INSPECTION REQUEST - WIR
Project Name Reem Hills Villas (218), Al Reem Island, Abu Dhabi
WIR Ref.No: P0124-K00183-TGC-RV06-00-6VZM-WI-WS-002619[00]
Contract No
Request Submission
Employer Reem Hills Sole-Proprietorship LLC 01-May-25
(Date & Time)
Inspection 02-May-25
PMC Royal Development Company
(Date & Time ) 11:00AM
Engineer AECOM Middle East LLC Rev No: "00
Main Contractor Trojan General Contracting LLC WIR Submitted By: M/s.TROJAN
MEP Contractor Royal Advance Electro Mechanical Works LLC WIR Submitted To: Consultant-AECOM
Part A: By the Contractor:
B.O.Q Ref: N/A Discipline:
B.O.Q. Description of Works to be inspected and / or tested: General MCC Works
Civil Landscaping
Storm Water Architectural
Description of Works to be inspected and /or tested: Sewer Dredging
Water Highway Bridge Works
Inspection Request for Installation of high level PPR Pipes and Irrigation LRT Bridge Works
fittings with Valves & Accessories for water supply system ( Telephone MSE Wall
Signal Works Provisional Sum
Excluded TMV) in Ground Floor & Ground floor riser, as per
Electrical Other (state)
attached and highlighted drawing
Street Lighting Drainage
Works Location: Villa 126 - 6VZM Landscape Lighting Water supply system
Works Quantity: Gas Network
Drawing attached to show the location(s) Yes No Checklist attached Yes No
Attached Test Certificates Yes No
Shop Drawing Ref: As per Attached Highlighted Drawing. Method Statement Ref: RHP1P1-BW-TGC-ZZ-XX-MS-ME-00003_00
Type of Attachment: Check list ITP Ref:
Eng. Dayal Pushpakumar
(QA/QC Manager )
Date & Signature
Part B: By the Engineer:
Received by Engineer on: Date: Time: Signed by:
Engineer's Comments:
Installation of water supply valve/water hammer arrestor found not acceptable due to following
reason;
Water supply gate valve/water hammer arrestor installed with the stem in a downward
orientation, which is against the project specification reference#220523/9. The specification
allows for horizontal installation as well as manufacturers installation guidelines.
The installed gate valve/water hammer arrestor with the stem pointing downwards shows
improper installation and the risk of debris accumulation within the valve/water hammer arrestor.
Name: Ashique Date & Signature
Discipline Engineer Decision:
A - Approved
B - Approved with comments 02-05-2025
C - Revise & Resubmit
D - Rejected
Sr.Resident Engineer / Resident Engineer :
04 May 2025
Name : Sabri Gars
Date & Signature
Project : Reem Hills Villas (218), Al Reem Island, Abu Dhabi
Employer : Reem Hills Sole Properietorship LLC
Employer Project Manager : Royal Development Company
Consultant : Aecom Middle East – Abu Dhabi
Main Contractor : Trojan General Contracting LLC
MEP Contractor : Royal Advance Electro Mechanical Works LLC
CHECKLIST FOR INSTALLATION OF WATER SUPPLY PIPING SYSTEM (INCLUDING VALVES)
WIRNO.:P0124-K00183-TGC-RV06-00-
Location: Villa 126 - 6VZM Date: 30-04-2025
6VZM-WI-WS-002619[00]
Checked by Checked by
SN Items to be checked Contractor Consultant Remarks
N/A
N/A
Yes
Yes
No
No
HSE Requirements
1 All the HSE requirements are fulfilled.
QA/QC Requirements
1 Check the site is well coordinated
Check PPR Pipes & fitting & conduits,valves are free from Visible
2
damage
Pipe surface is thoroughly cleaned without traces of dust, oil,
3
grease, etc.
4 Check Size and location are as per drawing
5 Condition of the pipe and fittings,valves used are acceptable.
6 Verify the supports are provided ok
Condition of the pipe and fittings & valves after the time duration of
7
inspection are acceptable
8 Check the Joints are done Properly
9 Check the open end of pipes are sealed properly
For Final Approval
MEP Contractor Engineer MEP QA/QC Engineer Consultant Representative
Eng. Muhammad Saad Ur
Name: Eng. Abdelwahid Saeed Name: Name:
Rehman
Signature: Signature: Signature:
Date: 30/04/2025 Date: 30/04/2025 Date:
TGC/QAQC/CHK/MEP/ELECT-01 REV-00 Page 1 of 1