The document provides a summary of the major structure status for the RVOD-05 project as of April 16, 2025, detailing the progress of various components including girder, raft, pier cap, and deck slab. It lists the scope completed for each section, with specific measurements and remarks on the status of each viaduct and other structures. Overall, the total completed work is reported alongside the remaining balance for different categories of work.

Uploaded by

anilkumarpanda98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Structure OD-05

The document provides a summary of the major structure status for the RVOD-05 project as of April 16, 2025, detailing the progress of various components including girder, raft, pier cap, and deck slab. It lists the scope completed for each section, with specific measurements and remarks on the status of each viaduct and other structures. Overall, the total completed work is reported alongside the remaining balance for different categories of work.

Uploaded by

anilkumarpanda98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RVOD-05

Major Structure Summary Status as on 16.04.2025


GIRDER
TYPE OF RAFT ABT/PIER CAP GIRDER LAUNCHING DECK SLAB
S.NO CH PCC Span CASTING REMARKS
STR
SCOPE DONE SCOPE DONE SCOPE DONE SCOPE DONE SCOPE DONE
LHS: 41 x 35.70
1 268+365 Viaduct PCC-3 82 82 82 78 320 320 320 240 80 34 CA
RHS: 39 x 35.70

2 269+395 Viaduct PCC-3 LHS: 8x35.70 9 8 9 32 32 8 COS

LHS: 9x35.70
3 270+045 Viaduct PCC-3 20 20 20 72 72 72 18 CA
RHS: 8 x 35.70
Span
4 270+252 Viaduct PCC-3 LHS: 4x35.7+1x26.6 5 5 5 1 16 12 16 4
Continuation
LHS: 9 x 35.70
5 270+475 Viaduct PCC-3 13 13 13 3 48 48 48 12 CA
RHS: 2 x 35.70 + 1X26.6
LHS: 15 x 35.70
6 270+965 Viaduct PCC-3 30 30 30 3 112 112 112 28 CA
RHS: 13 x 35.70
LHS: 12x35.70
7 271+630 Viaduct PCC-3 26 26 26 4 96 92 96 22 CA
RHS: 11x35.70 + 1x26.6
LHS: 15x35.70
8 273+495 Viaduct PCC-3 33 33 33 33 124 124 124 124 31 19 CA
RHS: 16x35.70
LHS: 37X35.70
9 279+445 Viaduct PCC-3 76 76 76 74 296 296 296 155 74 4 CA
RHS: 37X35.70
LHS: 5x35.7
10 280+560 Viaduct PCC-3 12 12 12 12 40 40 40 40 10 CA
RHS: 5x35.7
LHS: 2x25
11 281+185 MNB PCC-3 6 6 6 6 16 16 16 16 6 CA
RHS: 2x25
LHS: 3x40
12 281+690 Viaduct PCC-3 8 8 8 8 24 24 24 24 6 CA
RHS: 3x40
LHS: 2x30
13 282+140 VOP PCC-2 3 3 3 3 8 8 8 8 2 1 CA
RHS: 2x30
LHS: 3x40
14 283+440 MJB PCC-2 8 8 8 8 24 24 24 24 6 6 CA
RHS: 3x40
Total 331 330 331 233 1228 1188 1228 631 307 64
Balance 1 98 40 597 243
Balance for PCC-01 - - - - -
Balance for PCC-02 - - - - 1
Balance for PCC-03 1 98 40 597 242