LIFTING PLAN
For Trusses: MT14
22.71 Date: 12/13/2019
m
.6
39
13 - 15m
16
.5
m
m
.0
16
35
20 m
4.5-4.8 m
6m
H = 65.29 m
39.58
39.6 m
Crane
Truss Wt of Slings /
Wt of Truss/ Wt of Hook Total Load capacity at
Mark strong back FOS
Member Block (MT) given radious
No etc
(MT)
MT14 10.323 5.7 0.9 16.923 24.2 143%
88
3
R= 33.82 m
LIFTING PLAN
For Trusses: MT3
22.71 Date: 11/13/2019
m
.6
39
35
H = 62.43 m
36.72
39.6 m
Crane
Wt of Slings /
Truss Mark Wt of Truss/ Wt of Hook Total Load capacity at
strong back FOS
No Member Block (MT) given radious
etc
(MT)
MT3 (half
part north 3.1 0.5 0.9 4.5 13.6 302%
side)
68
3
R= 47.27 m
LIFTING PLAN
For Trusses: MT3
16.11 Date: 11/13/2019
m
.6
39
24
H = 62.14 m
43.04
45.8 m
70
3
R= 49.72 m
LIFTING PLAN
Lifting of 60 ton Mobile crane, SANY STC 600 to F-level slab at WEST processo Date: 12/14/2019
10 - 11m
12
m
m
.0
12
13.7 m
3.750 m
H = 42.05 m
1.45 4.2 1.35
39.05
42 m
Crane
Mob Wt of Slings /
Wt of Mob Wt of Hook Total Load capacity at
crane strong back FOS
Crane Block (MT) given radious
Model etc
(MT)
CTC600 42 1 2.1 45.1 54 120%
68.4
3
R= 17.00 m
Plant Incharge HSE Incharge Site Incharge CPLM
LIFTING PLAN
Lifting of 60 ton Mobile crane, SANY STC 600 to F-level slab at WEST processo Date: 12/14/2019
10 - 11m
12
m
m
.0
12
13.7 m
3.750 m
H = 42.05 m
1.45 4.2 1.35
39.05
42 m
Crane
Mob Wt of Slings /
Wt of Mob Wt of Hook Total Load capacity at
crane strong back FOS
Crane Block (MT) given radious
Model etc
(MT)
CTC600 42 1 2.1 45.1 54 120%
68.4
3
R= 17.00 m
Plant Incharge HSE Incharge Site Incharge CPLM
LIFTING PLAN
For Trusses: MT14
16.11 Date: 12/13/2019
m
.6
39
10
.m
m
.0
10
24
H = 54.39 m
7 Ton
35.28
39.6 m
Crane
Truss Wt of Slings /
Wt of Truss/ Wt of Hook Total Load capacity at
Mark strong back FOS
Member Block (MT) given radious
No etc
(MT)
MT14 7 0.2 0.9 8.1 10.33 128%
63
3
R= 54.15 m