TABLE OF CONTENTS
Page
4.4.3 Charger and Battery Set 12
4.4.4 Lighting Installation 13
4.4.5 Digital Multifunction Power Meter 14
4.4.6 Digital Power Analyzer 14
4.4.7 Busbar Trunking System 15
4.4.8 Equipment and Appliances 15
4.4.9 Any Other Tests that are Considered Necessary to 15
Meet the Design Intent
4.5 Assessment of Any Characteristics of Equipment Likely to have 16
Harmful Effects
4.6 Test and Inspection for Low Voltage Cubicle Switchboard 16
4.6.1 Visual Inspection 16
4.6.2 Site Test before Connection of Incoming Supply 17
4.6.3 Site Test after Connection of Incoming Supply 18
4.7 Power Energization 18
4.7.1 Notification of Completion 18
4.7.2 Preliminary Steps for Power Energization 19
4.7.3 Switch On Process 19
4.8 Calibrated Equipment 20
Annex
Annex I Testing and Commissioning Certificate on Electrical Installation
Annex II Testing and Commissioning Progress Chart for Electrical Installation
Annex III Testing and Commissioning Certificate on Low Voltage Cubicle
Switchboard (LVSB) Installation
Annex IV Testing and Commissioning Progress Chart for Low Voltage Cubicle
Switchboard (LVSB) Installation
Table of Contents EE_TCP
Page 2 of 5 2007 Edition