Bridge Works
Bridge Works
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
Br-FOUNDATION
131
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
3(A) Dewatering for ---(a/b/c/d/e)--- in---(i/ii/iii)---
including diversion of stream providing
cofferdam, bunds etc. as may be necessary
for foundation and other parts of work and
bailing out and / or pumping out water below
the actual initial natural water level during
execution of all items of construction as
required ( from start of that particular
component till completion of bridge )
including all leads and lifts etc. Complete
Note: All items of construction i.e.excavation,
bedding,( soling & PCC ) and concreting of
that structure upto natural water level.
132
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
3(B) Dewatering on BHP basis by using water
pump---i/ii/iii---including diversion of streams,
providing earthen bunds coffer dam etc.
complete as may be necessary for foundation
and other parts of the work and bailing out
and pumping out water, during and after
excavation as required (The item include
dewatering for excavation upto foundation
level, filling foundation and sub structure
masonry above water level)( Prior approval of
S.E.is necessary )
BR-4 Spec. No. BR-4 Page No.104-105
( i )By using 3 Horse power pump. Hour 39.00 30.00
( ii )By using 5 to 9 Horse power pump. Hour 55.00 30.00
( iii )By using 10 to 19 Horse power pump. Hour 73.00 30.00
133
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
6 Providing & laying in situ------------ controlled
reinforced cement concrete of trap metal for
raft slab including "V" haunches, formwork,
scaffolding, compaction by vibrating, finishing
curing etc. complete. (excluding
reinforcement).
BR-5 Spec. No. BR-5 Page No.105 & MoRT&H
cl.1500,1700&2100
a)RCCM-20 Cu.M. 3513.00 263.00
b)RCCM-25 Cu.M. 3606.00 263.00
c)RCCM-30 Cu.M. 3617.00 263.00
d)RCCM-35 Cu.M. 3629.00 263.00
134
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
10 Providing fabricating, launching, floating and
grounding in position steel curbs for wells
with necessary steel bracings and steel
cutting edges as shown in the detailed
drawings etc. Complete as directed by
Engineer in charge.
BR-8 Spec. No. BR-8 Page No.108 M.T. 50171.00 5271.00
11 Providing fabricating and setting out mild
steel cutting edges for reinforced cement
concrete well curbs as shown on the detailed
drawings etc. Complete
Spec. No. As directed by Engineer in charge M.T. 47465.00 2724.00
12 Providing steel anchor dowell at base of the
well including drilling holes up to 2.50m.depth
in rock placing the dowells in position and
effectively grouting the holes (4no.of
32mm.dia.steel rod of 4 m. each ) etc.
complete
BR-16 Spec. No. BR-16 Page No.120 each of 4309.00 360.00
1 set
135
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
16 Providing and laying in situ cement concrete
grade --------of trap metal in the hollow of the
steel curb including compaction by vibrating
& curing etc. complete.
BR-9 Spec. No. BR-9 Page No.109
a)PCC M-10 Cu.M. 2287.00 406.00
b)PCC M-15 Cu.M. 2591.00 406.00
c)PCC M-20 Cu.M. 2668.00 406.00
136
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
II) Using Batching plant,transit mixer and
concrete pump.(RMC)
a)RCCM-20 Cu.M. 3449.00 32.00
b)RCCM-25 Cu.M. 3613.00 32.00
c)RCCM-30 Cu.M. 3707.00 32.00
d)RCCM-35 Cu.M. 3934.00 32.00
BR-18 Spec. No. BR-18 Page No.122, MoRT&H-304 Cu.M. 452.00 83.00
137
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
22 Providing and laying in situ------- of
trap/granite / quartzite / gniess metal for
reinforced cement concrete well / pile caps
including necessary formwork compaction by
vibrating finishing and curing etc. complete.
(Excluding reinforcement)
BR-24 Spec. No. BR-24 Page No.124,MoRT&H-
1200,1500&1700
I) Using Concrete Mixer
a)RCCM-20 Cu.M. 3503.00 264.00
b)RCCM-25 Cu.M. 3779.00 264.00
c)RCCM-30 Cu.M. 3918.00 264.00
d)RCCM-35 Cu.M. 3969.00 264.00
138
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
BR-14 Spec. No. BR-14 Page No.113,MoRT&H-
sec.1200
a) 4 m dia well R.M. 29430.00 3180.00
b) 5 m dia well R.M. 34130.00 3180.00
c) 6 m dia well R.M. 50820.00 3180.00
d) 7 m dia well R.M. 65120.00 3180.00
e) 8 m dia well R.M. 84740.00 3180.00
f) 10 m dia well R.M. 102850.00 3180.00
24 Providing & laying in situ---------Controlled
reinforced cement concrete of
trap/granite/quartzite/ gneiss metal for cut of
walls including formwork,scaffolding,
compaction by vibrating, finishing, curing etc
complete. (excluding reinforcement).
BR-5 Spec. No. BR-5 Page No.105
a)RCCM-20 Cu.M. 2578.00 264.00
b)RCCM-25 Cu.M. 2735.00 264.00
c)RCCM-30 Cu.M. 2813.00 264.00
d)RCCM-35 Cu.M. 3126.00 264.00
BR-57
Deleted
of approved size for appron etc. complete as
directed by Egineer in Charge.
Spec.No.BR-57 Page No.151,MoRT&H-2503 Cu.m. - -
loose
Deleted
rocks including removing and stacking the
material and disposing
unserviceable materials as directed etc.
complete.
the
139
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
k) 825 mm dia R.M. - -
l) 900 mm dia R.M. - -
n) 975 mm dia R.M. - -
m) 1000 mm dia R.M. - -
o) 1050 mm dia R.M. - -
p) 1100 mm dia R.M. - -
q) 1200 mm dia R.M. - -
r) 1500 mm dia R.M. - -
140
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
28 Providing M-35 R.C.C. cast in situ bored piles
each of load capacity as per design and of
specified diametre or as directed, placed
through steel shell sunk to the required depth
through all strata except rock, excluding
provision of reinforcement including placing
concrete by tremie arrangement compaction
of concrete and withdrawal of steel shell etc.
complete.
BR-21 Spec.No.BR-21,P-124,MoRT&H-
1100,1600,&1700
a) 450 mm dia R.M. 1327.00 291.00
b) 475 mm dia R.M. 1375.00 302.00
c) 500 mm dia R.M. 1474.00 314.00
d) 525 mm dia R.M. 1572.00 325.00
e) 550 mm dia R.M. 1731.00 338.00
f) 600 mm dia R.M. 1921.00 366.00
g) 625 mm dia R.M. 2024.00 379.00
h) 650 mm dia R.M. 2178.00 394.00
I) 750 mm dia R.M. 2560.00 459.00
j) 800 mm dia R.M. 2775.00 496.00
k) 825 mm dia R.M. 2902.00 515.00
l) 900 mm dia R.M. 3674.00 575.00
m) 975 mm dia R.M. 3972.00 642.00
n) 1000 mm dia R.M. 4341.00 665.00
o) 1050 mm dia R.M. 4772.00 711.00
p) 1100 mm dia R.M. 5309.00 762.00
q) 1200 mm dia R.M. 6282.00 870.00
r) 1500 mm dia R.M. 9066.00 1249.00
Deleted
including fabricating, cutting the M.S. sheet to
required diametre and shape, welding the
joints and driving with the help of required
machineries including all materials labours
and lifts etc. complete.
141
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
30 Providing and cutting bending, hooking,
laying in position and tying Mild steel / HYSD
/ TMT bars for reinforcement as per detailed
drawings for R.C.C.work.
BR-35,49. Spec.No. BR35P.134, BR.49P.143, &
MoRT&H-1600
BR-SUB-STRUCTURES
142
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
II) Using Batching plant,transit mixer and
concrete pump.(RMC)
a)PCCM-25 Cu.M. 3586.00 32.00
b)PCCM-30 Cu.M. 3718.00 32.00
143
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
II) Using Batching plant,transit mixer and
concrete pump.(RMC)
a)RCCM-20 Cu.M. 3386.00 32.00
b)RCCM-25 Cu.M. 3731.00 32.00
c)RCCM-30 Cu.M. 3782.00 32.00
d)RCCM-35 Cu.M. 3854.00 32.00
144
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
36 Providing and laying in situ controlled -------of
trap/granite /quartzite/gniess metal for
R.C.C.caps over piers and abutments
including necessary sacffolding,formwork,
compacting by vibrating,finishing and curing
etc. complete (excluding reinforcement)
BR-29 Spec. No. BR-29 Page No.129
I) Using Concrete Mixer
a)RCCM-20 Cu.M. 3808.00 264.00
b)RCCM-25 Cu.M. 3950.00 264.00
c)RCCM-30 Cu.M. 4089.00 264.00
d)RCCM-35 Cu.M. 4170.00 264.00
145
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
38 Providing and laying in situ--------of
trap/granite/quartzite/ gniess metal for
reinforced cement concrete block below the
bearing including necessary scaffolding,
formwork, compaction by vibrating, finishing
and curing etc. complete (excluding
reinforcement)
BR-30 Spec. No. BR-30 Page No.130
Deleted
line and level POT-PTFE Polytetra Flura
Ethylear bearing suitable for biaxial
movement as per drawing and BS: 5400
Sections 9.1 & 9.2
Spec.-MoRT&H 2000 & 2200
a) fixed type R.M. - -
b) free type R.M. - -
146
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
44 Providing and laying weep holes of 100 mm
diameter AC/PVC pipes as per drawing for
abutment returns, return walls etc. Complete.
Spec. - As directed by Engineer-In-Charge. R.M. 81.00 20.00
45 Providing trap/ granite/ quartzite / gneiss
rubble filling behind the abtuments, returns or
wings
BR-57 Spec. No. BR-57 Page No.151 Cu.M. 314.00 32.00
BR-SUPER-STRUCTURES
46 Providing and laying in situ---I / II
reinforcement cement concrete-- a to h -of
trap/granite/quartzite/gneiss metal for R.C.C.
work in solid slab,/ T-beam & slab / Box
girder and balanced cantilever, including
centering,formwork, scaffolding, ramming,
vibrating finishing in cement plaster and
curing etc. complete (excluding
reinforcement) Height upto 5.00.mt.from the
lowest bed level.
Note: a) Solid slab i) 5% for height above
5.00 mtr. to 10.00 mtr. ii) 10 % for height
above 10.00 mtr., b) T-beam & slab i) 5%
upto 5.00mtr. height ii) 10% for height
5.00mtr. to 10.00mtr. iii) 15% for height above
10.00mtr.and c) Box girder and balanced
cantilever i) 20% upto 5.00mtr. height ii) add
25 % for height 5.00mtr. to 10.00mtr. iii) 30%
for height above 10.00mtr. d) Add 30% on
basic rate for spat 30 mtr. to 50 mtr. for creek
bridge. e) Add 75% on basic rate for span 50
mtr. & above for creek bridge.
147
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
II) Using Batching plant,transit mixer and
concrete pump.(RMC)
a)RCCM-25 Cu.M. 4652.00 33.00
b)RCCM-30 Cu.M. 4864.00 33.00
c)RCCM-35 Cu.M. 4935.00 33.00
d)PSCM-40 Cu.M. 5883.00 36.00
e)PSCM-45 Cu.M. 6301.00 36.00
f)PSCM-50 Cu.M. 6370.00 36.00
g)PSCM-55 Cu.M. 7357.00 36.00
47 Providing and laying in situ ---------cement
concrete of trap / granite / quartzite / gneiss
metal for R.C.C. work including formwork,
centering ramming, vibrating, finishing and
curing complete for main/cross girder
diaphragms arch etc.complete.(excluding
reinforcement) Height upto 5.00.
Note:i) 5% for height above 5.0 m & upto 10.0
m
ii) add 10% for height above 10.00 m
148
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
48 Providing and casting special grade -------- in
controlled cement concrete of specified
strength for prestressed concrete work for
main girder including slab, cross girder, box
girder etc. including centering & scaffolding
or launching including necessary plant and
machinery for the job shuttering, vibrating,
curing, finishing etc. complete.Height upto 5
meter.(excluding reinforcement)
Note:i) add 20% upto 5.00 m. height ii) add
25% for height 5.00m. to 10 m. iii) add 30%
for height above 10.00 m. iv) add 30% on
basic rate for span 30 m. to 50 m. for creek
bridge. v) add 75% on basic rate for span 50
m. & above for creek bridge.
149
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
50 Providing and laying of an elastomeric slab
seal expansion joint,catering to right or skew
(less than 20 deg.) moderately curved with
maxmimum horizantal movement upto
50mm., etc. complete as per approved
drawings and specifications to be installed by
manufacturer/ supplier or their authorised
representative ensuring compliance to the
manufacturer's instructions for installation. (
for road work & bridge work).
MoRT&H 260 Spec.No. MoRT&H clause 2606 R.M. 17220.00 577.00
Deleted
indigenous fabricated anchorage system for
fixing the deck for movement of +/- 35mm
(total 70mm) as per MORT&H specification
under supervision of specilised manufacturer.
Spec.:MoRT&H 2600 Edition 2001 R.M. - -
54 Providing and laying in situ-----of
trap/granite/quartzite/ gniess metal including
compacting,finishing,curing and filling in
joints with bitumen etc. complete for wearing
course 8 cm thick (excluding reinforcement)
BR-47 Spec. No. BR-47 Page No.140,MoRT&H-2702.
150
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
55 Providing bitumen mastic wearing coat
excluding tack coat etc. complete as per
drawing and technical specification (with lead
of material 5 km)
Spec. No: MoRT&H 515&2702
a) 25mm Sq.M. 440.00 61.00
b) 20mm Sq.M. 341.00 49.00
c) 12mm Sq.M. 204.00 30.00
56 Providing vent holes in the slab and wearing
course with iron grill at the top and
galvanised iron pipe at bottom as per
drawing.
BR-48 Spec. No. BR-48 Page No.142 No. 290.00 32.00
57 Providing galvanised iron 100 mm diameter
water spout as per drawing (length of water
spouts 600 mm)
BR-55 Spec. No. BR-55 Page No.150 No. 385.00 80.00
58 Providing and laying in situ cement concrete
of trap metal for haunch filling including
compacting curing etc. complete.
BR-45 Spec. No. BR-45 Page No.139
a)M-10 Cu.M. 2323.00 240.00
b)M-15 Cu.M. 2497.00 240.00
59 Providing trap rubble filling over haunches
and arches including hand packing etc.
BR-46 Spec.l No.
t BR-46 Page No.140 Cu.M. 414.00 160.00
60 Providing and laying in position 90 cm thick
flexible stone mat as per standard drawing
consisting of 45cm.thick trap rubble
soling,22.50cm. thick over size metal layor of
100mm to 150mm metal, 11.30cm thick layor
of 80mm to 100mm over size metal,and
11.20cm. thick layor of 40mm size metal with
blindage of hard murum for rubble soling &
over size, soft murum for size metal
layor,consolidation 15 cm to 23 cm soling,
consolidation of 80 mm to 100mm, 100mm to
150mm over size metal in two layers and
consolidation of 40mm size metal layers in
single layer with watering etc. complete.
(including lead of 50 mt)
Spec. No. As directed by Engineer-in Charge Sq.M. 473.00 72.00
151
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
61 Providing and laying in situ cement concrete
of trap / granite / quartzite/ gniess metal
including compacting, finishing, curing and
filling in joints with bitumen complete for
approach slab (excluding reinforcement)
BR-47 Spec.No.BR47Page No.140,MoRT&H-
1500,1600,1700& 2704
a)M-20 Cu.M. 3209.00 264.00
b)M-25 Cu.M. 3507.00 264.00
c)M-30 Cu.M. 3634.00 264.00
d)M-35 Cu.M. 3699.00 264.00
e)M-40 Cu.M. 3765.00 264.00
62 Providing R.C.C.parapet with (15x 60cm)-------
-cement concrete of trap/ granite / quartzite /
gneiss metal,cast in situ precast panels as
per the detailed drawing including
reinforcement, scaffolding , centering,
formwok, compating, finishing and curing etc.
complete.
Deleted
precast panels as per the detailed drawing
including
scaffolding,centering,
reinforcement,
formwok,compating,
finishing and curing etc.complete.
BR-51(a) Spec. No. BR-51 (a) Page No.144
a)M-15 R.M. - -
b)M-20 R.M. - -
c)M-25 R.M. - -
d)M-30 R.M. - -
e)M-35 R.M. - -
f)M-40 R.M. - -
152
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
64 Providing R.C.C. parapet , concrete with
Deleted
R.C.C railing of SANCHI type as per detailed
drawing and design.
BR-51(a) Spec. No. BR-51 (a) Page No.144
a)M-20 R.M. - -
b)M-25 R.M. - -
c)M-30 R.M. - -
d)M-35 R.M. - -
e)M-40 R.M. - -
153
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
69 Guniting surface with cement mortar, 1:3 of
30 to 50 milimetre thick (average 40
milimetre) under pressure of 2.1 to 2.80 kg.
per squre centimetre including necessary IRC
fabric (welded mesh) of 75 x 75 milimetre and
10 gauge reinforcement, forms with floating,
cutting etc complete (excluding
reinforcement)
Spec. No. As directed by Engineer-in Charge Sq.M. 487.00 65.00
Deleted
the section giving minimum 3 day
compressive strenght of 525 Kg/cm2 and
maximum epoxy consumption of 258 Kg/m3
of mortar with all materails labour equipment
etc complete
Spec. No. As directed by Engineer-in Charge Cu.M. - -
Deleted
applying the tackcoat of epoxy as directed
and giving minimum 3 days compressive
strength of 525 Kg/cm2 and maximum epoxy
consumption of 214 Kg/m3 of concrete
including necessary formwork with all
materials, labour, centering equipment etc
complete as directed.
Spec. No. As directed by Engineer-in Charge Cu.M. - -
72 Providing epoxy coating in two coats with
primer for the stone or concrete surfaces
Deleted
including cleaning by sand blasting, brushing,
cost of the materials, machinery equipment,
scaffolding labour etc complete as directed.
Spec. No. As directed by Engineer-in Charge Sq.M. - -
154
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
73 Providing and injecting epoxy grout including
strutting of cracked in surfacs including
Deleted
cleaning by sand blasting, brushing cost of
the materials, machinery equipment,
scaffolding labour etc complete as directed.
Spec. No. As directed by Engineer-in Charge Kg. - -
74 Providing and applying approved quality
Deleted
epoxy paint for surface of well, pier abutment
between L.T.L to 0.90 metre above H.F.L
Spec. No. As directed by Engineer-in Charge Sq.M. - -
75 Providing and applying epoxy paint to
Deleted
superstructure including
complete.
scaffolding etc
Deleted
raft and in box return including compaction
etc. complete.
Spec. No. As directed by Engineer-in Charge Cu.M.
78 Providing rubble mound of selected trap - -
rubble each rubble stone not less than 60
Deleted
Kgt. for abutments, foundation including
machinery and compaction laying in layer as
per detailing drawing and specification
Spec. - As directed by Engineer-In-Charge. Cu.M.
155
BR
Rate for the year
Item No.& 2008-2009
Description of items Unit
Item code Completed Labour
Rate Rate
79 Providing Sump pit in hard strata in wells as - -
Deleted
diercted or as shown in drawing including
shoring and strutting as necessary and
disposing of excavted stuff
Spec. No. As directed by Engineer-in Charge Cu.M.
156