0% found this document useful (0 votes)
24 views7 pages

Quantity Survey Task

Uploaded by

althamynt10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views7 pages

Quantity Survey Task

Uploaded by

althamynt10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

STR FOUNDATION PC

Type Structural Material Foundation Thickness Volume


PC 300 KYN-PC 300 94.08 m³
PC 100 KYN-PC 100 3.72 m³
Total = 97.80 m³

STR Stair
Type Volume
STAIR 180 Ground 2.58 m³
Grand total: 1 2.58 m³

STAIR FRAME
Type Cut Length Volume
B(300X500) 2250 0.34 m³
Stair starter 1200 0.32 m³
Total=: 2 0.66 m³

WALL Foundation to Ground


Type Count Width Volume
W200 1 200 0.30 m³
W250 27 250 66.34 m³
W300 5 300 11.68 m³
Grand total: 33 78.32 m³

3D FOOTING COLUMNS FOUNDATION TO GROUND


1 Type Location b h Length Volume
No. Description Date

C1 (300X500) A-4 300 500 3950 0.56 m³


GROUND BEAM C1 (300X500) A-5 300 500 3950 0.56 m³
Type Count Cut Length Volume C3 (300X600) A-6(-300) 300 600 3950 0.67 m³
GB1 (300X600) 20 175 ... 4835 6.570 C1 (300X500) A-7 300 500 3950 0.56 m³
GB2 (300X800) 5 3850 ... 5825 5.487 C1 (300X500) A-9 300 500 3950 0.56 m³
GB3 (200X600) 9 975 ... 10525 4.263 C10 (300X1100) B(-3350)-9 300 1100 3950 1.22 m³
Total=: 34 16.320 C12 (300X1300) C(3150)-8 300 1300 3750 1.37 m³
C14 (400X1000) C(3300)-5 400 1000 3750 1.32 m³
C1 (300X500) B(-3250)-4 300 500 3950 0.53 m³
STR FOUNDATION RC C2 (300X500) C-1(700) 300 500 3950 0.53 m³
Foundation C2 (300X500) C-2 300 500 3950 0.53 m³ Owner
Type Location Length Width Volume C16 (400X1500) E-2 400 1500 3650 1.99 m³
Thickness
C9 (300X1000) F(-903)-1 300 1000 3950 1.11 m³
F4 (3950X3050X800) (B-C)-5 3950 3050 800 9.64 m³
C7 (300X850) H-1 300 850 3950 0.96 m³
F4 (3950X3050X800) (B-C)-8 3950 3050 800 9.64 m³
C5 (300X750) H-3 300 750 3950 0.83 m³ KAYAN ACADEMY
F1 (1600X1400X600) C-1 1600 1400 600 1.34 m³
C4 (300X600) I-4 300 600 3950 0.67 m³
F1 (1600X1400X600) C-2 1600 1400 600 1.34 m³
F5 (4150X3350X900) E-2 4150 3350 900 12.51 m³
C11 (300X1250) I-5 300 1250 3950 1.39 m³ VILLA PROJECT
C15 (400X400) I(550)-6 400 400 3950 0.61 m³
F5 (4150X3350X900) E-5 4150 3350 900 12.51 m³ Project number 1000
C8 (300X1000) G-5 300 1000 3850 1.08 m³
F3 (3150X2550X700) E-7 3150 2550 700 5.62 m³
C3 (300X600) F-7 300 600 3950 0.71 m³ Date 22/04/2025

4/24/2025 12:08:36 PM
F2 (2600X2100X700) E-(5-6) 2600 2100 700 3.82 m³
C1 (300X500) F-9 300 500 3950 0.56 m³ Drawn by Yasmine
ELEVATOR FOOTING ELEVATOR FOOTING N/A N/A N/A 13.20 m³
C6 (300X850) E-7 300 850 3850 0.98 m³
F5 (4150X3350X900) G-3 4150 3350 900 12.51 m³ Checked by ABD ALLAH
C3 (300X600) E-6(-1350) 300 600 3850 0.65 m³
F3 (3150X2550X700) G-5 3150 2550 700 5.62 m³
C13 (400X1300) E-5 400 1300 3650 1.67 m³ 001-FOUNDATION QUANTITY
SS600 STRIP FOOTING 27600 25500 600 74.23 m³
C10 (300X1100) D-9 300 1100 3950 1.29 m³ SURVEY
Total = 162.00 m³
Grand total: 25 22.92 m³
Scale
3D GROUND FLOOR
1
COL Ground to First STR FLOOR
Type Location Length Volume Type Default Thickness Area Volume No. Description Date
C1 (300X500) A-4 3400 0.47 m³ RAMP 1 4 m² 1.08 m³
C1 (300X500) A-5 3400 0.47 m³ SS 133 133 3 m² 0.36 m³
C1 (300X500) A-7 3400 0.47 m³ WALL Ground to First SS 133 133 6 m² 0.78 m³
C1 (300X500) A-9 3400 0.47 m³ SS 150 150 1 m² 0.11 m³
Type Count Width Volume
C1 (300X500) B(-3250)-4 3400 0.47 m³ SS 150 150 2 m² 0.28 m³
C1 (300X500) F-9 3400 0.47 m³ W250 3 250 5.54 m³ SS 160 160 17 m² 2.79 m³
C2 (300X500) C-1(700) 3400 0.49 m³ W300 1 300 1.42 m³ SS 160 160 19 m² 3.04 m³
C2 (300X500) C-2 3400 0.49 m³ Grand total: 4 6.96 m³ SS 180 180 9 m² 1.59 m³
C3 (300X600) A-6(-300) 3400 0.57 m³ SS 200 200 30 m² 6.08 m³
C3 (300X600) F-7 3400 0.61 m³ SS 240 240 356 m² 85.33 m³
C3 (300X600) E-6(-1350) 3400 0.57 m³ STR Stair GROUND STAIR FRAME GROUND SS 240 240 92 m² 21.83 m³
C4 (300X600) I-4 3400 0.57 m³ Type Volume Type Cut Length Volume SS 280 280 2 m² 0.53 m³ Owner
C5 (300X750) H-3 3400 0.71 m³ total =: 12 123.79 m³
STAIR 180 2.34 m³ B(300X500) 2250 0.34 m³
C6 (300X850) E-7 3400 0.87 m³
Grand total: 1 2.34 m³ Total=: 1 0.34 m³
C7 (300X850) H-1 3400 0.85 m³
KAYAN ACADEMY
C8 (300X1000) G-5 3400 0.95 m³ STR BEAMS
C9 (300X1000) F(-903)-1 3400 0.95 m³ STAIR LANDING Ground to First
C10 (300X1100) B(-3350)-9 3400 1.10 m³
Type Count Cut Length Volume VILLA PROJECT
C10 (300X1100) D-9 3400 1.12 m³ Type Area Volume B(200/300X700) 1 2250 0.292
SS 180 3 m² 0.54 m³ B(300X500) 1 3900 0.398 Project number 1000
C11 (300X1250) I-5 3400 1.19 m³
C12 (300X1300) C(3150)-8 3400 1.23 m³ total =: 1 0.54 m³ B(300X640) 2 3400 ... 3720 0.513 Date 22/04/2025

4/24/2025 12:03:31 PM
C13 (400X1300) E-5 3400 1.64 m³ B(300X700) 8 1600 ... 6124 3.517
Drawn by Yasmine
B(300X800) 4 2803 ... 8819 3.203
C14 (400X1000) C(3300)-5 3400 1.26 m³ RAMP QS B(300X900) 1 6775 0.854 Checked by ABD ALLAH
C15 (400X400) I(550)-6 3400 0.54 m³
Type volume Ramp volume Total=: 17 8.776
C16 (400X1500) E-2 3400 1.90 m³ 002-GROUND FLOOR
Ramp 2 1.32 m³ 1.32 m³
Grand total: 25 20.45 m³ QUANTITY SURVEY
Scale
3D FIRST FLOOR
1

WALL First to Second COL First to Second


Type Count Width Volume Type Location Length Volume STR FLOOR No. Description Date
W250 3 250 5.54 m³ C1 (300X500) A-4 3400 0.47 m³
Type Default Thickness Area Volume
W300 1 300 1.42 m³ C1 (300X500) A-5 3400 0.47 m³
SS 160 160 19 m² 3.00 m³
Grand total: 4 6.96 m³ C1 (300X500) A-7 3400 0.47 m³
SS 180 180 5 m² 0.93 m³
C1 (300X500) A-9 3400 0.47 m³
SS 240 240 363 m² 87.08 m³
C1 (300X500) B(-3250)-4 3400 0.47 m³
SS 280 280 2 m² 0.66 m³
C1 (300X500) F-9 3400 0.47 m³
total =: 4 91.67 m³
C2 (300X500) C-1(700) 3400 0.49 m³
STR Stair FIRST C2 (300X500) C-2 3400 0.49 m³
Type Volume C3 (300X600) A-6(-300) 3400 0.57 m³
STAIR 180 2.34 m³ C3 (300X600) F-7 3400 0.61 m³
Grand total: 1 2.34 m³ C3 (300X600) E-6(-1350) 3400 0.57 m³
C4 (300X600) I-4 3400 0.57 m³ Owner
C5 (300X750) H-3 3400 0.71 m³

STAIR FRAME FIRST


C6 (300X850) E-7 3400 0.87 m³ STR BEAMS
C7 (300X850) H-1 3400 0.82 m³
Type Count Cut Length Volume
Type Cut Length Volume C8 (300X1000) G-5 3400 0.95 m³ KAYAN ACADEMY
B(300X500) 2250 0.34 m³ C9 (300X1000) F(-903)-1 3400 0.95 m³ B(200X400) 5 500 ... 800 0.240
B(300X500) 3 3400 ... 3900 1.132
Total=: 1 0.34 m³ C10 (300X1100) B(-3350)-9 3400 1.04 m³
B(300X700) 17 600 ... 5000 7.056
VILLA PROJECT
C10 (300X1100) D-9 3400 1.05 m³
C11 (300X1250) I-5 3400 1.19 m³ B(300X700) 2 4000 ... 4400 1.981 Project number 1000
Arch1
C12 (300X1300) C(3150)-8 3400 1.23 m³ Date 22/04/2025
B(300X700) 2 3000 0.307

4/24/2025 12:03:43 PM
C13 (300X1300) E-5 3400 1.23 m³
Arch12 Drawn by Yasmine
STAIR LANDING First to Second C14 (300X1000) C(3300)-5 3400 0.95 m³
B(300X800) 8 450 ... 7300 6.843
C15 (400X400) I(550)-6 3400 0.51 m³ Checked by Checker
Type Area Volume C16 (300X1500) E-2 3400 1.42 m³
Total=: 37 17.560
SS 180 3 m² 0.54 m³ 003-FIRST FLOOR QUANTITY
Grand total: 25 19.04 m³
total =: 1 0.54 m³ SURVEY
Scale
3D SECOND FLOOR
1

WALL Second to Third COL Second to third STR FLOOR No. Description Date
Type Count Width Volume Type Location Length Volume Type Default Thickness Area Volume
W250 3 250 5.54 m³ C1 (300X500) A-4 3400 0.47 m³ SS 140 140 8 m² 1.07 m³
W300 1 300 1.42 m³ C1 (300X500) A-5 3400 0.47 m³ SS 160 160 4 m² 0.58 m³
Grand total: 4 6.96 m³ C1 (300X500) A-7 3400 0.47 m³ SS 160 160 20 m² 3.13 m³
C1 (300X500) A-9 3400 0.47 m³ SS 180 180 3 m² 0.57 m³
C1 (300X500) B(-3250)-4 3400 0.47 m³ SS 180 180 2 m² 0.27 m³
STR Stair Second C1 (300X500) F-9 3400 0.47 m³ SS 180 180 2 m² 0.33 m³
C2 (300X500) C-1(700) 3400 0.49 m³ SS 240 240 375 m² 90.09 m³
Type Volume C2 (300X500) C-2 3400 0.49 m³ SS 280 280 2 m² 0.66 m³
STAIR 180 2.34 m³ C3 (300X600) A-6(-300) 3400 0.57 m³ total =: 8 96.71 m³
Grand total: 1 2.34 m³ C3 (300X600) F-7 3400 0.61 m³
C3 (300X600) E-6(-1350) 3400 0.57 m³
Owner
C5 (300X750) H-3 3400 0.71 m³
STAIR FRAME SECOND C6 (300X850) E-7 3400 0.87 m³ STR BEAMS
Type Cut Length Volume C7 (300X850) H-1 3400 0.82 m³
Type Count Cut Length Volume KAYAN ACADEMY
C8 (300X1000) G-5 3400 0.95 m³
B(300X500) 2250 0.34 m³ B(200/300X700) 1 2250 0.292
C9 (300X1000) F(-903)-1 3400 0.95 m³
Total=: 1 0.34 m³ B(200X400) 5 500 ... 800 0.240 VILLA PROJECT
C10 (300X1100) B(-3350)-9 3400 1.04 m³
B(300X700) 15 600 ... 7287 6.815
C10 (300X1100) D-9 3400 1.05 m³ Project number 1000
B(300X700) Arch1 12 3300 ... 7148 11.835
C11 (300X500) H(-300)-5 3400 0.47 m³
B(300X700) Arch12 13 3000 ... 3350 2.012 Date 22/04/2025

4/24/2025 12:03:56 PM
STAIR LANDING Second to Third C12 (300X1300) C(3150)-8 3400 1.23 m³
B(300X800) 2 2796 ... 6397 1.516 Drawn by Yasmine
C13 (300X1300) E-5 3400 1.23 m³
Type Area Volume C14 (300X1000) C(3300)-5 3400 0.95 m³
B(300X800) Arch3 1 6800 1.676
Checked by ABD ALLAH
SS 180 3 m² 0.54 m³ B(300X800) Arch32 1 6600 0.307
C16 (300X1500) E-2 3400 1.42 m³
total =: 1 0.54 m³ Grand total: 23 17.26 m³
Total=: 50 24.693 004-SECOND FLOOR QUANTITY
SURVEY
Scale
3D THIRD FLOOR
1 No. Description Date

WALL Third to Roof COL Third to Roof STR FLOOR


Type Count Width Volume Type Location Length Volume Type Default Thickness Area Volume
W250 3 250 5.53 m³ C1 (300X500) A-4 3400 0.47 m³ SS 160 160 25 m² 4.03 m³
W300 1 300 1.41 m³ C1 (300X500) A-5 3400 0.47 m³ SS 180 180 7 m² 1.17 m³
Grand total: 4 6.94 m³ C1 (300X500) A-7 3400 0.47 m³ SS 240 240 352 m² 84.41 m³
C1 (300X500) A-9 3400 0.47 m³ SS 280 280 2 m² 0.66 m³
C1 (300X500) B(-3250)-4 3400 0.47 m³ total =: 4 90.28 m³
STR Stair Third C1 (300X500) F-9 3400 0.47 m³
C3 (300X600) A-6(-300) 3400 0.57 m³
Type Volume
C3 (300X600) F-7 3400 0.61 m³
Owner
STAIR 180 2.34 m³
C3 (300X600) E-6(-1350) 3400 0.57 m³
Grand total: 1 2.34 m³
C5 (300X300) H-3 3500 0.29 m³
C6 (300X850) E-7 3400 0.87 m³ KAYAN ACADEMY
C7 (300X850) H-1 3500 0.83 m³
STAIR FRAME THIRD C8 (300X1000) G-5 3400 0.94 m³ STR BEAMS
VILLA PROJECT
Type Cut Length Volume C9 (300X1000) F(-903)-1 3400 0.94 m³
Type Count
Cut
Volume
B(300X500) 2250 0.34 m³ C10 (300X1100) B(-3350)-9 3400 1.04 m³ Length Project number 1000
Total=: 1 0.34 m³ C10 (300X1100) D-9 3400 1.04 m³ B(200X400) 5 500 ... 800 0.240 Date 22/04/2025
C11 (300X500) H(-300)-5 3400 0.47 m³

4/24/2025 12:04:09 PM
B(300X700) 25 600 ... 7150 12.632
C12 (300X1300) C(3150)-8 3400 1.22 m³ Drawn by Yasmine
B(300X800) 3 2803 ... 6887 2.674
C13 (300X1300) E-5 3400 1.22 m³
STAIR LANDING Third to Roof C14 (300X1000) C(3300)-5 3400 0.94 m³
B(300X800)
Arch3
1 7287 2.207 Checked by ABD ALLAH

Type Area Volume C16 (300X800) E-2 3400 0.75 m³ Total=: 34 17.753
005-THIRD FLOOR QUANTITY
SS 180 3 m² 0.54 m³ Grand total: 21 15.13 m³ SURVEY
total =: 1 0.54 m³ Scale
No. Description Date

3D ROOF FLOOR
1

COL Roof to UR
Type Location Length Volume
C6 (300X850) E-7 3100 0.74 m³ STR FLOOR STR BEAMS
C8 (300X600) G(-600)-5 3100 0.52 m³
Type Default Thickness Area Volume Type Count Cut Length Volume
Owner
C13 (300X1300) E-5 3100 1.13 m³
SS 180 180 19 m² 3.50 m³ B(200/300X700) 1 2250 0.279
PC (300X600) C(1350)-5 3100 0.53 m³
SS 260 260 369 m² 95.88 m³ B(200X400) 5 500 ... 800 0.240
PC (300X600) C(1500)-8(-800) 3100 0.53 m³
Grand total: 5 3.44 m³
total =: 2 99.38 m³ B(300X700) 16 600 ... 5500 7.091 KAYAN ACADEMY
B(300X700) 2 3600 ... 3800 1.619
Arch1
B(300X800) 2 6397 ... 7300 2.197
VILLA PROJECT
B(450X700) 1 8100 1.478 Project number 1000
WALL Roof to UR B(450X900) 1 7600 2.060
Date 22/04/2025

4/24/2025 12:04:22 PM
Total=: 28 14.966
Type Count Width Volume Drawn by Yasmine
W250 3 250 5.48 m³
Checked by ABD ALLAH
Grand total: 3 5.48 m³
006-ROOF FLOOR QUANTITY
SURVEY
Scale
3D UPPER ROOF FLOOR
1
No. Description Date

STR FLOOR
Type Default Thickness Area Volume STR BEAMS
SS 120 120 6 m² 0.66 m³ Type Count Cut Length Volume
SS 180 180 44 m² 7.89 m³ B(300X700) 10 300 ... 7700 6.358
SS 200 200 56 m² 11.14 m³ B(300X1000) 1 2300 0.469
total =: 3 19.69 m³ Total=: 11 6.827 Owner

KAYAN ACADEMY
VILLA PROJECT
Project number 1000
Date 22/04/2025

4/24/2025 12:04:35 PM
Drawn by Yasmine
Checked by ABD ALLAH

007-UPPER ROOF FLOOR


QUANTITY SURVEY
Scale

You might also like