Annual Component Costs - ITC-Kolkata-II
ITC-Kolkata-II-revised occupancy and internal heat 03/10/2014
Dew Point Consultants Pvt Ltd 02:58PM
Air System Fans 3.3%
20.1% Electric Equipment
Cooling 38.8%
22.1% Lights
Pumps 5.9% 10.0% Cooling Tower Fans
1. Annual Costs
Annual Cost Percent of Total
Component (Rs) (Rs/ft²) (%)
Air System Fans 6,794,250 9.558 3.3
Cooling 80,352,464 113.033 38.8
Heating 0 0.000 0.0
Pumps 12,197,322 17.158 5.9
Cooling Tower Fans 20,635,168 29.028 10.0
HVAC Sub-Total 119,979,204 168.776 57.9
Lights 45,755,604 64.365 22.1
Electric Equipment 41,624,184 58.553 20.1
Misc. Electric 0 0.000 0.0
Misc. Fuel Use 0 0.000 0.0
Non-HVAC Sub-Total 87,379,788 122.918 42.1
Grand Total 207,358,992 291.694 100.0
Note: Cost per unit floor area is based on the gross building floor area.
Gross Floor Area ..................................... 710878.0 ft²
Conditioned Floor Area ........................... 710878.0 ft²