0% found this document useful (0 votes)
35 views4 pages

Cylinder Speed - Check

The document provides detailed procedures for testing the hydraulic system of 330D and 336D excavators, focusing on the operating speeds of the boom, stick, and bucket cylinders. It outlines specific steps to measure extension and retraction times, emphasizing the importance of proper machine configuration and relief valve pressure settings. Specifications for acceptable operating speeds are also included in the document.

Uploaded by

klaus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views4 pages

Cylinder Speed - Check

The document provides detailed procedures for testing the hydraulic system of 330D and 336D excavators, focusing on the operating speeds of the boom, stick, and bucket cylinders. It outlines specific steps to measure extension and retraction times, emphasizing the importance of proper machine configuration and relief valve pressure settings. Specifications for acceptable operating speeds are also included in the document.

Uploaded by

klaus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Service Information System Página 1 de 4

Pruebas y Ajustes
330D and 336D Excavators Hydraulic System
Número de medio -RENR9585-11 Fecha de publicación -01/09/2008 Fecha de actualización -23/09/2008

i02618446

Cylinder Speed - Check


SMCS - 5456-535-VF ; 5458-535-VF

Note: The engine speed and/or the machine configuration that is used during this test can affect the
results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for
the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks"
for the machine configurations that were used for this test.

Note: The relief valve pressure settings must be set to the relief valve pressure specification before
performing this operational check. Refer to Testing and Adjusting, "Specifications".

1. Perform the following steps in order to test the operating speed of the boom cylinders.

Ver imagen

Illustration 1 g00298498
(A) Extension test

(B) Retraction test

a. Place the machine on level ground.

b. The bucket should be empty.

c. Fully retract the bucket cylinder and the stick cylinder.

https://sis.cat.com/sisweb/sisweb/techdoc/content.jsp?calledpage=/sisweb/sisweb/med... 11/02/2009
Service Information System Página 2 de 4

d. Position the bucket on the ground. With a stopwatch, measure the time that is required
to fully extend the boom cylinders.

e. Position the boom cylinders at full extension. With a stopwatch, measure the time that is
required for the bucket to come in contact with the ground.

f. Refer to the specifications in Table 2 for the operating speed of the boom cylinders.

2. Perform the following steps in order to test the operating speed of the stick cylinder.

Ver imagen

Illustration 2 g00298558
(A) Extension test

(B) Retraction test

a. Place the machine on level ground.

b. The bucket should be empty.

c. Position the upper surface of the boom parallel to the ground.

d. Fully extend the bucket cylinder.

e. Retract the stick cylinder. With a stopwatch, measure the time that is required to fully
extend the stick cylinder.

f. Extend the stick cylinder. With a stopwatch, measure the time that is required to fully
retract the stick cylinder.

g. Refer to the specifications in Table 2 for the operating speed of the stick cylinder.

https://sis.cat.com/sisweb/sisweb/techdoc/content.jsp?calledpage=/sisweb/sisweb/med... 11/02/2009
Service Information System Página 3 de 4

3. Perform the following steps in order to test the operating speed of the bucket cylinder.

Ver imagen

Illustration 3 g00298598
(A) Extension test

(B) Retraction test

a. Place the machine on level ground.

b. The bucket should be empty.

c. Position the upper surface of the boom parallel to the ground.

d. Position the stick so that the stick is perpendicular to the ground.

e. Fully retract the bucket cylinder.

f. With a stopwatch, measure the time that is required to fully extend the bucket cylinder.

g. Position the bucket cylinder at full extension. With a stopwatch, measure the time that is
required to fully retract the bucket cylinder.

h. Refer to the specifications in Table 2 for the operating speed of the bucket cylinder.

Table 1

Cylinder Operating Speed (seconds)


Item New Rebuild Service Limit
Extension 3.8 ± 0.5 4.5 (1) 5.0 (1)

https://sis.cat.com/sisweb/sisweb/techdoc/content.jsp?calledpage=/sisweb/sisweb/med... 11/02/2009
Service Information System Página 4 de 4

Boom Retraction 2.6 ± 0.5 3.3 (1) 3.8 (1)


Extension 3.4 ± 0.5 4.0 (1) 4.5 (1)
Stick
Retraction 2.8 ± 0.5 3.5 (1) 4.0 (1)
Extension 4.4 ± 0.5 5.0 (1) 5.5 (1)
Bucket
Retraction 2.5 ± 0.5 3.2 (1) 3.7 (1)
(1) Maximum

Copyright 1993 - 2009 Caterpillar Inc. Wed Feb 11 08:31:27 EST 2009
Todos los derechos reservados.
Red privada para licenciados del SIS.

https://sis.cat.com/sisweb/sisweb/techdoc/content.jsp?calledpage=/sisweb/sisweb/med... 11/02/2009

You might also like