CONTRACT TITLE EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
DOCUMENT TITLE Criticality Rating Report for all Equipments and Packages
CLIENT COMMENTS
No. CONTRACTOR RESPONSE REMARKS
Engineer Comments
Section
Ref ID.
1 PIE0010C Revisted to specify the certification type as 10204 1. Incorporated. Please refer Table 1 Section C Sl.
type 3.1 for following items. no. 4, 7, 8. Please note that Item 9 deleted since it
is duplication of item 7.
1. Table 1 Section C Sl. no. 4, 7, 8 & 9. 2. For Table 4 section A2 Sl. No. 4, As discussed
and aligned with QatarEnergy during the criticality
2. Table 4 section A2 Sl. No. 4. rating workshop, EN 10204 Type 2.2 certificate
retained, as these items - gaskets and bolt/nuts are
3. Table 4 section G Sl. No. 1 & 3. for utility services and the same is followed in
previous projects also. Specification already
approved in AFC status.
CONTRACT TITLE: EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
DOCUMENT TITLE:
CRITICALITY RATING REPORT FOR ALL EQUIPMENTS AND PACKAGES
Page 1 of 36
CLASSIFICATION: C1 - CONTROLLED
TABLE OF CONTENTS
GENERAL ................................................................................................................................................... 3
1.1 Introduction.............................................................................................................................................. 3
BACKGROUND .......................................................................................................................................... 3
2.1 Project Objective ..................................................................................................................................... 3
2.2 Document Objective ................................................................................................................................ 3
DEFINITIONS .............................................................................................................................................. 4
3.1 Use of Language ..................................................................................................................................... 4
3.2 Definitions................................................................................................................................................ 4
3.3 Abbreviations .......................................................................................................................................... 4
REFERENCE DOCUMENTS AND STANDARDS ..................................................................................... 5
4.1 Order of Precedence ............................................................................................................................... 5
4.2 QatarEnergy Corporate Standards and Regulations .............................................................................. 5
METHODOLOGY ........................................................................................................................................ 6
5.1 General.................................................................................................................................................... 6
5.2 Evaluation Guidelines ............................................................................................................................. 6
5.3 Items Which Default to CR1 .................................................................................................................... 7
5.4 Material test Certificates as per BS EN 10204:2004. ............................................................................. 7
5.5 Other Considerations / Notes .................................................................................................................. 8
ATTACHMENTS ......................................................................................................................................... 9
6.1 ATTACHMENT 1: CRITICALITY RATING TABLES 1 TO 5 .................................................................10
6.2 ATTACHMENT 2: CRITICALITY ASSESSMENT MATRICES (APPX D OF CORP-ENG-STD-036) ..11
6.3 ATTACHMENT 3: QUALITY INTERVENTION LEVELS- QIL (APPX C OF CORP-ENG-STD-036) ...12
6.4 ATTACHMENT 4: CRITICALITY RATING DISCIPLINE WORKSHOP- ATTENDANCE SHEET ........13
Page 2 of 36
CLASSIFICATION: C1 - CONTROLLED
GENERAL
1.1 Introduction
QatarEnergy has awarded CONTRACT GC23104000, EPIC FOR NEW LPG BOTTLING PLANT
AT RAS LAFFAN to ROOTS Energy who has in turn subcontracted the Detailed Design services
for the project to Black Cat Consulting and Engineering Services W.L.L. (BCCES).
BACKGROUND
As a part of the long-term strategic planning domestic refined products supply chain for the state
of Qatar, QatarEnergy had contracted ExxonMobil to carry out a study of the overall Refined
Product Supply Chain (RPSC) system. The ExxonMobil study identified weaknesses/bottlenecks
in the existing supply chain system and provided recommendations for its improvement that will
ensure strong system resiliency for the coming period up to 2040 and beyond.
The study highlighted that the existing SAMI LPG bottling plant, which is located in Doha
industrial area is capable of handling the domestic market demand through 2040 provided that
proposed project for connecting pipeline to the NGL complex in Mesaieed Industrial City (MIC)
is implemented as planned. This pipeline project is currently under EPIC stage (by others).
However, in order to improve the supply network resiliency against potential singular point failure
of the pipeline and the existing bottling plant as well as to allow for better optimization of the
bottled LPG and LPG bulk distribution, the ExxonMobil study has recommended an additional
new LPG bottling plant and new LPG supply sources in Ras Laffan.
The proposed LPG blending and LPG bottling facilities in Ras Laffan are expected to contribute
towards resiliency of LPG bottling and bulk LPG distribution to the domestic market. The project
is considered a strategic project and vital for the sustainability of refined products supply for the
state of Qatar.
FEED for this project was executed by QatarEnergy as two packages list below:-
1. Package 1: Proposed Blending plant facilities at Station A4, including new 4.5km 8” LPG
transfer pipeline to LPG bottling plant.
2. Package 2: Proposed LPG Bottling plant at Ras Laffan.
2.1 Project Objective
The objective of this project is to install a new Liquefied Petroleum Gas (LPG) bottling plant and
associated facilities at Ras Laffan (Package 2) that will improve LPG cylinder and bulk LPG
supply resiliency in case of failure of the existing LPG bottling facility in SAMI, Doha.
2.2 Document Objective
Objective of this document is to define the materials and equipment criticality ratings in
accordance with the guidelines provided in CORP-ENG-STD-036 for this project. The criticality
rating facilitates the specification of the minimum requirements for material certification and
inspection levels at the manufacturing location. This document shall be read in conjunction with
the approved project specifications and data sheet.
Page 3 of 36
CLASSIFICATION: C1 - CONTROLLED
DEFINITIONS
3.1 Use of Language
Throughout this document, the words, “will”, “may”, “should”, “shall” and “must”, when used in
context of actions by the CONTRACTOR or the CONTRACTOR’s Agents such as suppliers,
subcontractors, and others where such works/services have been assigned, have specific
meanings as follows:
• “Will” Signifies a feature which the CONTRACTOR/SUPPLIER may assume to be
already present.
• “May” Signifies a feature, which is discretionary in the context in which it is applied.
• “Should” is used where a provision is preferred.
• “Shall” is used where a provision is mandatory by the specification.
• “Must” is used only where a provision is a statutory requirement.
3.2 Definitions
For the purpose of this specification the following definitions shall apply:
“COMPANY”, denotes QatarEnergy.
“CONTRACTOR/PURCHASER”, denotes Roots Energy and Engineering Services W.L.L.
“CONSULTANT” denotes Black Cat Consulting and Engineering Services W.L.L. (BCCES), the
organization awarded by CONTRACTOR to perform detailed engineering activities for the
project
“VENDOR/SUPPLIER”, Means the party, which manufactures and/or supplies materials,
equipment and services to perform the duties as specified by the CONTRACTOR.
“SUBCONTRACTOR” Means the party which shall perform assigned works or services as
specified by the CONTRACTOR.
“OEM” means Original Equipment Manufacturer, i.e. the party that has manufactured the
equipment to VENDOR/SUPPLIER.
“THIRD PARTY INSPECTION/CERTIFYING AGENCY”, The (independent) party, which entered
into contract with QatarEnergy or Contractor/Subcontractor for the Inspection/certification of the
project’s Material, equipment, packages, and facilities.
“INSPECTOR” CONTRACTOR Representatives or member from CONTRACTOR nominated
Agencies duly appointed in writing by CONTRACTOR to act on its behalf and authorized to carry
out inspection activities.
3.3 Abbreviations
Abbreviations Descriptions
AI ASME Authorized inspector
FI Final Inspection
FAT Factory Acceptance Test
IC Inspection Category
Page 4 of 36
CLASSIFICATION: C1 - CONTROLLED
Abbreviations Descriptions
ITP Inspection and Test Plan
MTC Material Test Certificates
NDT Non-Destructive Testing
SAT Site Acceptance Test
SWI Stage Wise Inspection
TPC Third Party Certification
TPI Third Party Inspection
Page 5 of 36
CLASSIFICATION: C1 - CONTROLLED
METHODOLOGY
5.1 General
Criticality evaluation is a formalized technique for assessing the importance of key materials,
and equipment procured for the project with respect to its design, manufacturing, construction,
installation, and the consequences of failure during use.
Based on the evaluation, it is therefore providing the guidelines for specifying the minimum
requirements for
• Materials Test Certificates.
• The extents of in-process (or manufacturing Stage wise) witnessed inspections.
The intention of this report is not to define an inspection and test plan for each equipment, rather
it is to provide the basic guidelines for further development of the ITP for each equipment or
materials in its own technical specifications by the discipline engineers.
5.2 Evaluation Guidelines
There are four levels of Criticality ratings (CR1, CR2, CR3, and CR4), where CR1 is the most
critical, and CR4 is the least critical.
With each criticality rating, the required quality intervention level (QIL) is also defined as QIL1,
QIL2, QIL3, or QIL4 which in turn defines the minimum QA/QC activities as per Appendix C of
reference [1].
There are five Tables provided in this report in Attachment 1, to include
1. Table 1: Mechanical Equipment (Static and Rotating), based on Reference [1] Appendix
D1, and D2.
2. Table 2: Instrumented Systems equipment, based on Reference [1] Appendix D3.
3. Table 3: Electrical Equipment, based on Reference [1] Appendix D4.
4. Table 4: Bulk Materials (Mechanical, Electrical, Instrument) based on reference [1]
Appendix D5.
5. Table 5: Bulk Materials Civil/Structural/Architectural based on Reference [1] Appendix
D6.
Page 6 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 7 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 8 of 36
CLASSIFICATION: C1 - CONTROLLED
ATTACHMENTS
Page 9 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 10 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 11 of 36
Table 1 - MECHANICAL EQUIPMENT -STATIC, ROTATING (Appendix D-1, D-2)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
HSE
QUALITY INTERVENTION
QUALITY INTERVENTION
DESIGN MATURITY AND
CONSEQUENTIAL LOSS
CORP-ENG-STD-036)
SR. NO. ITEM DESCRIPTION Fluid SOUR SERVICE DISCIPLINE
MANUFACTURING
(min requirement)
FLANGE RATING
SCE REFERENCE REMARKS
PO REFERENCE
PERFORMANCE
SERVICE FLUID
DEFAULT REQ.
TOTAL SCORE
DESIGN TEMP.
COMPLEXITY
RELIABILITY
EQUIPMENT
REQUIRED)
SPARE
SCE?
MTC
A MECHANICAL-STATIC
As per section 7.1 of QP-MAH-
STD-030 SCE since high stored DEP Vessel category 1 ( All
1 LPG Mounded Storage Vessels LPG NO Static 2 2 4 2 3 1 4 4 18 CR2 YES CR1 Type 3.1 QIL1 BY EPIC
energy (high volume) and four vessles)
potential for BLEVE
2 LPG Bottling Package LPG NO Static 2 2 4 2 3 3 2 3 17 CR2 NO CR2 Type 3.1 QIL2 BY EPIC Note 1
3 LPG Truck Loading/Unloading Arm Package LPG NO Static 2 2 4 2 2 1 2 2 13 CR2 NO CR2 Type 3.1 QIL2 BY EPIC Note 1
4 Closed Drain Drums LPG NO Static 1 2 4 1 1 1 2 2 11 CR3 NO CR3 Type 3.1 QIL3 BY EPIC DEP Vessel category 2
5 Instrument Air Receiver Instrument Air NO Static 1 1 1 1 1 1 2 2 8 CR4 NO CR4 Type 3.1 QIL4 BY EPIC DEP Vessel category 3
6 Mobile Diesel Fueling & Dispensing Unit Diesel NO Static 1 1 2 1 1 1 1 1 7 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
9 Nitrogen Cylinder Bank Nitrogen NO Static 1 1 1 1 1 3 1 1 8 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
10 Truck Washing Unit _ _ Static 1 1 1 1 1 4 1 1 9 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
B MECHANICAL-ROTATING
1 LPG Recovery Compressor Package LPG NO Rotating 2 2 4 2 3 4 2 1 16 CR2 NO CR2 Type 3.1 QIL2 BY EPIC Note 1
2 API Centrifugal Pumps LPG NO Rotating 2 2 4 2 2 1 2 2 13 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
4 Fire Water Pumps Package ( Pump & Diesel Engine) Fire Water NO Rotating 1 1 1 2 3 1 2 2 11 CR3 YES CR1 Type 3.1 QIL1 BY EPIC Note 1
5 Jockey pumps NO Rotating 1 1 1 2 3 1 2 2 11 CR3 NO CR3 Type 3.1 QIL3 BY EPIC Note 1
4 Chilled Water Pumps Chilled Water NO BS-MECH 1 1 1 1 1 1 1 1 6 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
7 Potable/Irrigation Water Tanks ( GRE ) Water NO BS-MECH 1 1 1 1 1 1 1 1 6 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
8 Potable/Irrigation Water Pumps Water NO BS-MECH 1 1 1 1 1 1 1 1 6 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
Note
1 For individual component wise MTC certifications within the package, please refer the relevant package specification
Page 12 of 36
Table 2 - INSTRUMENTATION SYSTEMS / EQUIPMENT (Appendix D-3)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
HSE COMPLEXITY
ENGINEERING COMPLEXITY
QUALITY INTERVENTION
OF CORP-ENG-STD-036)
DESIGN MATURITY AND
REPAIR/REPLACEMENT
CONSEQUENTIAL LOSS
MANUFACTURING
SERVICE
(min requirement)
PO REFERENCE
PERFORMANCE
SERVICE FLUID
SCE REFERENCE REMARKS
DEFAULT REQ.
TOTAL SCORE
APPLICATION
COMPLEXITY
RELIABILITY
EQUIPMENT
REQUIRED)
SPARE
COST
SCE?
MTC
1 New SCADA System - LPG Bottling Plant - - I&C 2 2 3 2 1 3 3 14 CR2 NO CR2 Type 2.2 QIL2 BY EPIC Note 1
9 Modification of Existing GDS SCADA System (Yokogawa) at Station A4 - - I&C 2 2 3 2 1 3 3 14 CR2 NO CR2 NA QIL2 BY EPIC
As per section 7.1 of QP-
10 Interposing Relay Cabinets - - I&C 2 2 2 3 1 3 3 14 CR2 YES CR1 Type 2.2 QIL1 BY EPIC Note 1
MAH-STD-030
As per section 7.1 of QP-
11 New HSSD System - - I&C 2 2 1 3 1 2 2 12 CR3 YES CR1 Type 2.2 QIL1 BY EPIC Note 1
MAH-STD-030
Note
1 For instrumentation systems, the major components shall be provided with EN 10204 - TYPE 2.2 certificates and for other componenets - EN 10204- Type 2.1 certificates.
Page 13 of 36
Table 3 - ELECTRICAL EQUIPMENT (Appendix D-4)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
HSE COMPLEXITY
MANUFACTURING COMPLEXITY
CONSEQUENTIAL LOSS
MANUFAC./SUPPLIER
SR. NO. ITEM DESCRIPTION Fluid DISCIPLINE
(min requirement)
SCE REFERENCE REMARKS
PO REFERENCE
PERFORMANCE
SC WITHSTAND
DEFAULT REQ.
TOTAL SCORE
ENG-STD-036)
RELIABILITY
EQUIPMENT
VOLTAGE
SPARE
SCE?
MTC
1 11KV Switchgear (Modification) - - ELECTRICAL 2 2 2 3 2 1 3 2 13 CR2 NO CR2 Type 2.2 QIL2 BY EPIC Note 4
2 Existing Power Managment System (PMS)(Modification) - - ELECTRICAL 2 2 2 2 2 1 3 1 11 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
3 High Voltage Switchgears - - ELECTRICAL 2 2 2 3 2 1 3 2 13 CR2 NO CR2 Type 2.2 QIL2 BY EPIC Note 4
4 Low Voltage Switchgears - - ELECTRICAL 2 3 2 2 2 1 3 2 13 CR2 NO CR2 Type 2.2 QIL2 BY EPIC Note 4
5 11/3.45kV Transformers - - ELECTRICAL 2 2 2 2 2 1 3 2 12 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
6 11/0.433kV Transformers - - ELECTRICAL 2 3 2 2 2 1 3 1 12 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
7 Emergency Diesel Generator (EDG) - - ELECTRICAL 2 3 2 3 3 1 3 2 15 CR2 YES CR1 Type 3.1 QIL1 BY EPIC Note 2
8 Neutral Earthing Resistor - - ELECTRICAL 2 2 2 2 2 1 2 1 10 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
9 Capacitor Bank - - ELECTRICAL 2 2 2 2 2 1 3 1 11 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
14 Low Voltage Distribution Boards (Hazardous) - - ELECTRICAL 2 2 3 2 2 1 3 1 12 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
15 Electrical Network Monitoring and Control System (ENMCS) - - ELECTRICAL 2 2 2 2 2 1 3 2 12 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
16 LV Bus Duct - - ELECTRICAL 2 2 2 2 2 1 3 2 12 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 4
Note
1 For Electrical items Routine test report, Type test report, FAT report, SAT report, ATEX certificate, Statuary / OEM Certificate etc. ( as applicable) shall be provided based on the area of utilization of items.
2 For EDG, mentioned Material certificates shall be provided for Casing and shaft
3 Redundant equipment/ dual bus are available. Only 1 equipment is considered to fail at a time.
4 For Electrical Equipments, the major components shall be provided with EN 10204 - TYPE 2.2 certificates and for other componenets - EN 10204- Type 2.1 certificates.
Page 14 of 36
Table 4 - MATERIALS (MECH., ELEC., INSTRUMENT) (Appendix D-5)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
MANUFACTURING
PURCHASED QTY
MINIMUM RATING
(min requirement)
MANUFACTURER
CORP-ENG-STD-
PO REFERENCE
(UPGRADED) (IF
PERFORMANCE
APPENDIX C OF
CERTIFICATION
SERVICE FLUID
INCL. DEFAULT
INTERVENTION
INTERVENTION
LEVEL (REFER
DESIGN TEMP.
TOTAL SCORE
SOUR
CALCULATED
COMPLEXITY
SR. NO. ITEM DESCRIPTION Fluid DISCIPLINE
MATERIALS
SERVICE
REQUIRED)
/ SUPPLIER
SC RATING
VOLTAGE
SCE REFERENCE REMARKS
RATING /
QUALITY
QUALITY
TYPE OF
RATING
SPARE
LEVEL
FLUID
SCE?
REQ.
MTC
A1 PIPING (PROCESS SERVICE)
1 Pipes, Fittings and Flanges LPG No Piping 3 2 1 4 1 2 1 11 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
2 Bolts and Nuts & Gaskets LPG No Piping 3 2 1 4 1 2 1 11 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
3 Manual Valves LPG No Piping 2 2 1 4 2 2 1 11 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
5 Mechanical Valves Interlock System LPG No Piping 1 2 1 4 1 2 1 9 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
6 Piping Specialty Items LPG No Piping 1 2 1 4 1 2 1 9 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
2 ON OFF Valves LPG No I&C 1 2 2 4 2 3 1 11 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
4 Control Valves/ Regulator LPG No I&C 1 2 2 4 2 3 1 11 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
5 Control Valves/ Regulator Instrument Air No I&C 1 1 1 1 2 3 1 8 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
7 Magnetic Flow Meters Potable Water No I&C 1 1 1 1 2 2 1 7 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
8 Servo Type Level Transmitters LPG No I&C 1 2 2 4 2 2 1 10 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
12 Temperature Gauges Water No I&C 1 2 1 2 1 7 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
Page 15 of 36
Table 4 - MATERIALS (MECH., ELEC., INSTRUMENT) (Appendix D-5)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
MANUFACTURING
PURCHASED QTY
MINIMUM RATING
(min requirement)
MANUFACTURER
CORP-ENG-STD-
PO REFERENCE
(UPGRADED) (IF
PERFORMANCE
APPENDIX C OF
CERTIFICATION
SERVICE FLUID
INCL. DEFAULT
INTERVENTION
INTERVENTION
LEVEL (REFER
DESIGN TEMP.
TOTAL SCORE
SOUR
CALCULATED
COMPLEXITY
SR. NO. ITEM DESCRIPTION Fluid DISCIPLINE
MATERIALS
SERVICE
REQUIRED)
/ SUPPLIER
SC RATING
VOLTAGE
SCE REFERENCE REMARKS
RATING /
QUALITY
QUALITY
TYPE OF
RATING
SPARE
LEVEL
FLUID
SCE?
REQ.
MTC
As per section 7.1 of QP-MAH-
16 F&G Detectors / Devices _ _ I&C 2 2 1 3 1 9 CR3 YES CR1 Type 2.2 QIL1 BY EPIC
STD-030
As per section 7.1 of QP-MAH-
17 Instrument and F&G Cables _ _ I&C 4 2 1 1 1 9 CR3 YES CR1 Type 2.2 QIL1 BY EPIC
STD-030
18 Flow and Restriction Orifice Plates 'LPG ,Instrument Air, No I&C 1 2 1 1 1 6 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
19 Instrument and F&G Junction Boxes _ _ I&C 1 2 1 2 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
21 Instrument Bulk Material (other than tubing) _ _ I&C 4 2 1 1 2 10 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
C TELECOM
1 Fiber Optic Cables - - Telecom 4 2 1 1 8 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 1
2 Fiber Optic Cable Accessories - - Telecom 2 1 1 1 5 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
3 Converged LAN / WLAN - - Telecom 1 1 2 1 5 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
4 Structured Cabling System - - Telecom 4 1 1 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 1
5 Closed Circuit Television System (CCTV) / ANPR - - Telecom 2 1 2 1 6 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
As per section 7.1 of QP-MAH-
6 Access Control System (ACS) - - Telecom 2 1 2 1 6 CR4 YES CR1 Type 2.2 QIL1 BY EPIC Note 1
STD-030
As per section 7.1 of QP-MAH-
7 Public Address and General Alarm (PA/GA) System - - Telecom 2 1 2 1 6 CR4 YES CR1 Type 2.2 QIL1 BY EPIC Note 1
STD-030
As per section 7.1 of QP-MAH-
8 Telephone System - - Telecom 2 1 2 1 6 CR4 YES CR1 Type 2.2 QIL1 BY EPIC Note 1
STD-030
9 GSM and Tetra System - - Telecom 2 1 2 1 6 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
10 Cyber Security - - Telecom 1 1 2 1 5 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
11 Perimeter Intrusion Detection System (PIDS) - - Telecom 4 1 2 1 8 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 1
12 Audio Visual System - - Telecom 2 1 2 1 6 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
13 Guard Patrolling System - - Telecom 2 1 2 1 6 CR4 NO CR4 Type 2.2 QIL4 BY EPIC Note 1
14 Bulk Materials - Telecommunications - - Telecom 4 1 1 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC Note 1
D ELECTRICAL
1 Power, Control and Earthing Cables - - Electrical 2 2 2 2 1 1 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
2 Electrical Bulk Materials (Hazardous) - - Electrical 2 2 2 3 2 1 1 9 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
3 Electrical Bulk Materials (Non-Hazardous) - - Electrical 2 2 2 2 1 1 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
Page 16 of 36
Table 4 - MATERIALS (MECH., ELEC., INSTRUMENT) (Appendix D-5)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
MANUFACTURING
PURCHASED QTY
MINIMUM RATING
(min requirement)
MANUFACTURER
CORP-ENG-STD-
PO REFERENCE
(UPGRADED) (IF
PERFORMANCE
APPENDIX C OF
CERTIFICATION
SERVICE FLUID
INCL. DEFAULT
INTERVENTION
INTERVENTION
LEVEL (REFER
DESIGN TEMP.
TOTAL SCORE
SOUR
CALCULATED
COMPLEXITY
SR. NO. ITEM DESCRIPTION Fluid DISCIPLINE
MATERIALS
SERVICE
REQUIRED)
/ SUPPLIER
SC RATING
VOLTAGE
SCE REFERENCE REMARKS
RATING /
QUALITY
QUALITY
TYPE OF
RATING
SPARE
LEVEL
FLUID
SCE?
REQ.
MTC
F CATHODIC PROTECTION
1 Chilled Water Piping and Accessories Water No BS 2 1 1 1 1 1 1 6 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
2 HVAC Duct Works and Accessories Air No BS 3 1 1 1 1 1 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
3 Plumbing Piping and Accessories Water No BS 2 1 1 1 1 1 1 6 CR4 NO CR4 Type 3.1 QIL4 BY EPIC
4 Drainage Piping and Accessories Water No BS 2 1 1 1 1 1 1 6 CR4 NO CR4 Type 2.2 QIL4 BY EPIC
Note
1 For Telecom Equipments/ Systems, the major components shall be provided with EN 10204 - TYPE 2.2 certificates and for other componenets - EN 10204- Type 2.1 certificates.
2 As per Clause 3.4.6 of CORP-ENG-STD-036 - Bulk quantities of SCE may be selected as an exception to inspection requirements of CR1 as agreed by the discipline engineer and Project Quality Engineer.
Page 17 of 36
Table 5 - MATERIALS- CIVIL/STRUCTURAL (Appendix D-6)
Project EPIC FOR NEW LPG BOTTLING PLANT AT RAS LAFFAN
Consultant Black Cat Consulting & Engineering Services W.L.L.
Contract GC23104000
LEVEL (UPGRADED)
MANUFACTURER /
MANUFACTURING
PURCHASED QTY
MINIMUM RATING
(min requirement)
CORP-ENG-STD-
PO REFERENCE
PERFORMANCE
APPENDIX C OF
INCL. DEFAULT
INTERVENTION
INTERVENTION
SR. NO. ITEM DESCRIPTION Fluid DISCIPLINE
LEVEL (REFER
SOUR SERVICE
TOTAL SCORE
(IF REQUIRED)
CALCULATED
COMPLEXITY
MATERIALS
SCE REFERENCE REMARKS
SUPPLIER
QUALITY
QUALITY
TYPE OF
RATING
SPARE
SCE?
REQ.
MTC
1 PEB Buildings ( Structural Steel- Load Bearings) - - Civil/Structural 4 2 2 1 9 CR2 NO CR2 Type 3.1 QIL2 BY EPIC
2 Concrete Buildings ( Structural Steel- Load Bearings) - - Civil/Structural 3 2 2 1 8 CR3 NO CR3 Type 3.1 QIL3 BY EPIC
3 Fencing and Gates ( Structural Steel Non- Load Bearings) - - Civil/Structural 2 2 2 1 7 CR3 NO CR3 Type 2.2 QIL3 BY EPIC
4 Crash Barrier ( Structural Steel Non- Load Bearings) - - Civil/Structural 1 1 1 1 4 CR4 NO CR4 Type 2.2 QIL4 BY EPIC
Page 18 of 36
Page 19 of 36
Page 20 of 36
Page 21 of 36
Page 22 of 36
Page 23 of 36
Page 24 of 36
Page 25 of 36
Page 26 of 36
Page 27 of 36
Page 28 of 36
Page 29 of 36
Page 30 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 31 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 20 of 34
Page 32 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 21 of 34
Page 33 of 36
CLASSIFICATION: C1 - CONTROLLED
Note 7: Quality Intervention Activity Matrix requirements shall be transferred to the specific
ITPs based on agreement between the Contractor and QatarEnergy.
Note 8: For default Criticality Rating of CR1, appropriate Quality Intervention Levels (QIL)
shall be determined.
Page 22 of 34
Page 34 of 36
CLASSIFICATION: C1 - CONTROLLED
Page 35 of 36
Attachment 4 – Attendance sheet
Contract: GC23104000
RFP Title: EPIC for New LPG Bottling Plant at Ras Laffan
Subject: CRITICALITY RATING REPORT FOR ALL EQUIPMENT AND PACKAGES ( RLLPGBP-0-17-0003)
- Criticality Rating Discipline Workshop.
ROOTS
20. Prasad Samuel
21. Hari Nishanth
22. ABBAS ALI