Excavation Permit

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views2 pages

Excavation Permit

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

L&T Technology Services

PepsiCo NE_GF
D0458801-V-CE-00-HS-FOR-
Excavation Work Permit D-04588-01-01
031
Name of Contractor: Report No:
Job No: Date:
Work Description: Location :
EXCAVATION WORK PERMIT Permit No: 00001
I. WORK PERMIT DESCRIPTION
1. Date: Time Start: Time End:

2. Job Description:

3. Job Location:

II. HAZARDS AND PRECAUTIONS


Hazards PPE Electrical Isolation Authorised Electrician
Burried Cables Helmet
Buried Pipelines Safety shoe
Loose soil Gloves - Cotton
Powder driller Goggles Service Isolation Authorised Operator
Traffic Safety Harness De pressurised
Trench Collapse Sleeved Crow bar Valve Closed & Tagged
Others SCBA Line Blanked
Others precuations Process Isloation Authorised Operator
Ladder & Scaffolding Valve Closed & Tagged
Equipment Varification Line Blanked
Barricading Line Disconnected
Proper Shoring Special Precautions
Proper Shuttering

III. PERMIT ISSUE AND ACCEPTANCE


Permit Requestor
I understand the workscope, Hazards, Precautions to be taken and ensure compliance

Name Sign Date: Time:

Maintenance Department
I Certify that the above equipment is isolated from every source of electrical energy and pipelines connected to
Name Sign Date: Time:
Acceptance by Contractor:
I understand the workscope, Hazards, Precautions to be taken and ensure compliance

Name Sign Date: Time:

Permit Authoriser
I have reviewed the workscope, Hazards and precautions and authorise for proceeding the work

Name Sign Date: Time:

IV PERMIT CLOSURE
Permit Requestor
The job described in this permit has been completed, all safety devices put back, area cleared and person on
the job withdrawn

Name Sign Date: Time:

Permit Authoriser

I have reviewed the worksite, satisfied and accept for closing this permit

Name Sign Date: Time:

Remarks

Contractor LTTS Client


Representative Representative Representative
Signature:
Name:
Date:
D0458801-V-CE-00-HS-FOR-031