0% found this document useful (0 votes)
37 views6 pages

LT Panel Test Reports

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views6 pages

LT Panel Test Reports

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

SKYLINE ELECTRICALS

# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST REPORT

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad


DESCRIPTION OF
PACKAGE : SITC OF ELECTRICAL WORKS LT PANEL
EQUIPMENT/JOB :
REVISIONS : ITEM : FLOOR LT PANEL
DATE : 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS

1 Panel Installation as per drawing and line & level,Alignmant of panel,


Clearace between Wall/Partition. √
2 ACB, MCCB, MCB etc. makes as per drawing. √
3 Rating of Components as per drawing. √
4 The Size and general assembly as per the drawing. √
5 Check Name plate details of the Panel. √
Check Cable tag indicating incoming and outgoing cable details are
6 √
provided.
7 Glanding is properly done and all glands are earthed √
8 Dressing of cable & wire inside Panel. √
9 Busbars are properly tightent. √
10 Terminations are properly done and all terminals are tight. √
11 Crimping is properly done. √
12 Earthing of Panel is properly done. √
13 inside and outside Panel is properly done. √
14 Check busbar sizes are as per appoved drawing. √
15 IR VALUES √
INSULATION RESISTANCE IN MEGA OHMS

RY YB BR RN YN BN RE YE BE NE
100

100

100

100

100

100

100

100

100

100

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS
SKYLINE ELECTRICALS
# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST REPORT

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad


DESCRIPTION OF
PACKAGE : SITC OF ELECTRICAL WORKS LT PANEL
EQUIPMENT/JOB :
REVISIONS : ITEM : FLOOR UPS PANEL
DATE : 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS

1 Panel Installation as per drawing and line & level,Alignmant of panel,


Clearace between Wall/Partition. √
2 ACB, MCCB, MCB etc. makes as per drawing. √
3 Rating of Components as per drawing. √
4 The Size and general assembly as per the drawing. √
5 Check Name plate details of the Panel. √
Check Cable tag indicating incoming and outgoing cable details are
6 √
provided.
7 Glanding is properly done and all glands are earthed √
8 Dressing of cable & wire inside Panel. √
9 Busbars are properly tightent. √
10 Terminations are properly done and all terminals are tight. √
11 Crimping is properly done. √
12 Earthing of Panel is properly done. √
13 inside and outside Panel is properly done. √
14 Check busbar sizes are as per appoved drawing. √
15 IR VALUES √
INSULATION RESISTANCE IN MEGA OHMS

RY YB BR RN YN BN RE YE BE NE
100

100

100

100

100

100

100

100

100

100

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS
SKYLINE ELECTRICALS
# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST REPORT

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad


DESCRIPTION OF
PACKAGE : SITC OF ELECTRICAL WORKS LT PANEL
EQUIPMENT/JOB :
REVISIONS : ITEM : EMG. UPS PANEL
DATE : 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS

1 Panel Installation as per drawing and line & level,Alignmant of panel,


Clearace between Wall/Partition. √
2 ACB, MCCB, MCB etc. makes as per drawing. √
3 Rating of Components as per drawing. √
4 The Size and general assembly as per the drawing. √
5 Check Name plate details of the Panel. √
Check Cable tag indicating incoming and outgoing cable details are
6 √
provided.
7 Glanding is properly done and all glands are earthed √
8 Dressing of cable & wire inside Panel. √
9 Busbars are properly tightent. √
10 Terminations are properly done and all terminals are tight. √
11 Crimping is properly done. √
12 Earthing of Panel is properly done. √
13 inside and outside Panel is properly done. √
14 Check busbar sizes are as per appoved drawing. √
15 IR VALUES √
INSULATION RESISTANCE IN MEGA OHMS

RY YB BR RN YN BN RE YE BE NE
100

100

100

100

100

100

100

100

100

100

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS