0% found this document useful (0 votes)
44 views10 pages

UPS DB Test Reports

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views10 pages

UPS DB Test Reports

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

SKYLINE ELECTRICALS

# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST FORM

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad

PACKAGE : SITC OF ELECTRICAL DESCRIPTION OF DISTRIBUTION BOARDS


WORKS EQUIPMENT/WORK
REVISIONS ITEM : UPS DB-1
DATE 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS
1 DB installation as per dawing with line & level. √
2 MCB, ELCB,RCBO,DB etc.,make as per approved list of makes. √
3 Rating of Components as per drawing. √
4 Incomer and Outgoing Cable are as per schedule. √
5 Check for vents and paint damage. √
6 Check hinges / Closure of doors. √
7 Glanding and terminations of cables. √
8 Body earthing of Distribution Board. √
9 Dressing of wire inside DB. √
10 Termination in MCB, ELCB,RCBO etc.,properly done. √
11 Neutral terminals as required as per drawing and tightness of
terminals. √
12 Earthing as required as per drawing and tightness of terminals √
13 Crimping of cable lugs done properly. √
14 Inside and outside DB is cleaned properly. √

VOLTAGE READING IN VOLTS


RY YB BR RN YN BN RE YE BE NE

397 398 397 230 229 230 230 230 229 0.4

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS
SKYLINE ELECTRICALS
# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST FORM

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad

PACKAGE : SITC OF ELECTRICAL DESCRIPTION OF DISTRIBUTION BOARDS


WORKS EQUIPMENT/WORK
REVISIONS ITEM : UPS DB-2
DATE 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS
1 DB installation as per dawing with line & level. √
2 MCB, ELCB,RCBO,DB etc.,make as per approved list of makes. √
3 Rating of Components as per drawing. √
4 Incomer and Outgoing Cable are as per schedule. √
5 Check for vents and paint damage. √
6 Check hinges / Closure of doors. √
7 Glanding and terminations of cables. √
8 Body earthing of Distribution Board. √
9 Dressing of wire inside DB. √
10 Termination in MCB, ELCB,RCBO etc.,properly done. √
11 Neutral terminals as required as per drawing and tightness of
terminals. √
12 Earthing as required as per drawing and tightness of terminals √
13 Crimping of cable lugs done properly. √
14 Inside and outside DB is cleaned properly. √

VOLTAGE READING IN VOLTS


RY YB BR RN YN BN RE YE BE NE

397 397 398 229 229 230 230 230 229 0.4

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS
SKYLINE ELECTRICALS
# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST FORM

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad

PACKAGE : SITC OF ELECTRICAL DESCRIPTION OF DISTRIBUTION BOARDS


WORKS EQUIPMENT/WORK
REVISIONS ITEM : UPS DB-3
DATE 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS
1 DB installation as per dawing with line & level. √
2 MCB, ELCB,RCBO,DB etc.,make as per approved list of makes. √
3 Rating of Components as per drawing. √
4 Incomer and Outgoing Cable are as per schedule. √
5 Check for vents and paint damage. √
6 Check hinges / Closure of doors. √
7 Glanding and terminations of cables. √
8 Body earthing of Distribution Board. √
9 Dressing of wire inside DB. √
10 Termination in MCB, ELCB,RCBO etc.,properly done. √
11 Neutral terminals as required as per drawing and tightness of
terminals. √
12 Earthing as required as per drawing and tightness of terminals √
13 Crimping of cable lugs done properly. √
14 Inside and outside DB is cleaned properly. √

VOLTAGE READING IN VOLTS


RY YB BR RN YN BN RE YE BE NE

397 398 398 229 229 230 229 230 229 0.4

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS
SKYLINE ELECTRICALS
# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST FORM

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad

PACKAGE : SITC OF ELECTRICAL DESCRIPTION OF DISTRIBUTION BOARDS


WORKS EQUIPMENT/WORK
REVISIONS ITEM : UPS DB-4
DATE 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS
1 DB installation as per dawing with line & level. √
2 MCB, ELCB,RCBO,DB etc.,make as per approved list of makes. √
3 Rating of Components as per drawing. √
4 Incomer and Outgoing Cable are as per schedule. √
5 Check for vents and paint damage. √
6 Check hinges / Closure of doors. √
7 Glanding and terminations of cables. √
8 Body earthing of Distribution Board. √
9 Dressing of wire inside DB. √
10 Termination in MCB, ELCB,RCBO etc.,properly done. √
11 Neutral terminals as required as per drawing and tightness of
terminals. √
12 Earthing as required as per drawing and tightness of terminals √
13 Crimping of cable lugs done properly. √
14 Inside and outside DB is cleaned properly. √

VOLTAGE READING IN VOLTS


RY YB BR RN YN BN RE YE BE NE

397 398 397 229 229 230 230 230 229 0.4

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS
SKYLINE ELECTRICALS
# 1-112-566, 4th Floor, Sai Boda's Nilayam, Maharshi Marg, Near Shilpa Park, Kondapur,
Hyderabad - 500 084

FINAL COMMISSIONING TEST FORM

PROJECT : M/s. Genpact India Private Limited Phase-2 Hafeezpet Hyderabad

PACKAGE : SITC OF ELECTRICAL DESCRIPTION OF DISTRIBUTION BOARDS


WORKS EQUIPMENT/WORK
REVISIONS ITEM : UPS DB-5
DATE 21.02.2020 LOCATION : SECOND FLOOR - ELECTRICAL ROOM

Sl.No ITEM DESCRIPTION CHECKED BY


SKYLINE REMARKS
1 DB installation as per dawing with line & level. √
2 MCB, ELCB,RCBO,DB etc.,make as per approved list of makes. √
3 Rating of Components as per drawing. √
4 Incomer and Outgoing Cable are as per schedule. √
5 Check for vents and paint damage. √
6 Check hinges / Closure of doors. √
7 Glanding and terminations of cables. √
8 Body earthing of Distribution Board. √
9 Dressing of wire inside DB. √
10 Termination in MCB, ELCB,RCBO etc.,properly done. √
11 Neutral terminals as required as per drawing and tightness of
terminals. √
12 Earthing as required as per drawing and tightness of terminals √
13 Crimping of cable lugs done properly. √
14 Inside and outside DB is cleaned properly. √

VOLTAGE READING IN VOLTS


RY YB BR RN YN BN RE YE BE NE

398 397 398 230 229 239 230 230 229 0.4

REMARKS / COMMENTS

NAME : NAME : Siddu


SIGNTURE : SIGNTURE :
FOR FOR SKYLINE ELECTRICALS