0% found this document useful (0 votes)
10 views17 pages

GRP Installation

The document outlines the job specification for the erection of glass reinforced plastic piping for the South Pars Gas Field Development, Phase 14, under contract POGC 653-89-35. It includes project descriptions, general statements, modifications to existing specifications, and references to applicable codes and standards. The document is the property of the National Iranian Oil Company and contains specific guidelines for construction and inspection.

Uploaded by

Canal Do MB
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views17 pages

GRP Installation

The document outlines the job specification for the erection of glass reinforced plastic piping for the South Pars Gas Field Development, Phase 14, under contract POGC 653-89-35. It includes project descriptions, general statements, modifications to existing specifications, and references to applicable codes and standards. The document is the property of the National Iranian Oil Company and contains specific guidelines for construction and inspection.

Uploaded by

Canal Do MB
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

ERECTION OF GLASS REINFORCED PLASTIC

PIPING JOB SPECIFIATION

Contract No.: POGC 653-89-35 Doc. No.: RP-14 -999 -1300- 032-I Rev.:D0 Class:1

FOR CONSTRUCTION

NATIONAL IRANIAN OIL COMPANY

SOUTH PARS GAS FIELD DEVELOPMENT


PHASE 14

TOMBAK-ONSHORE FACILITIES

DETAIL DESIGN

DOCUMENT TYPE : Project Specification


DOCUMENT TITLE : ERECTION OF GLASS REINFORCED PLASTIC PIPING JOB
SPECIFIATION
DOCUMENT NUMBER : RP-14-999-1300-032-I
SITE : TOMBAK/ SOUTH PARS GAS FIELD DEVELOPMENT,
y. . ~,/ P.-"
PERSIAN GULF, IRAN
~urL//1 ~ d(" ?ur; r~/~

I s. ~ II trIP ,~
S.A.H.
~~~~mJr
II A·H. I

D3 I 5. 5~. I _<40, "'-


H·A
~~ ~
11'-----A-R.!? ~I
D2
D1
11/, ~I I B S .M 11'------ -I
D0 26.Jan. 2011 Approve for construction IPMI S.M. A.D. M. F. P.T.B.

REV DATE DESCRIPTION


I ORIG.
I PRPD CHKD
I APPD
I
CONTRACTOR APPD

I I I I

I I I
This Document Is The Sole Property Of N.I.O.C. All Information Contained Herein May Neither Be Reproduced,Used, Disclosed, Transmitted Or In Any Way Made Public Without The Written Permission Of The N.I.O.C.
1

I I I I Page 1 of 6
ERECTION OF GLASS REINFORCED PLASTIC
PIPING JOB SPECIFIATION

Contract No.: POGC 653-89-35 Doc. No.: RP-14 -999 -1300- 032-I Rev.:D0 Class:1

TABULATION OF REVISED PAGES

Page D0 D1 D2 D3 D4 Page D0 D1 D2 D3 D4
1. X
2. X
3. X
4. X
5. X
6. X

This Document Is The Sole Property Of N.I.O.C. All Information Contained Herein May Neither Be Reproduced,Used, Disclosed, Transmitted Or In Any Way Made Public Without The Written Permission Of The N.I.O.C.

Page 2 of 6
ERECTION OF GLASS REINFORCED PLASTIC
PIPING JOB SPECIFIATION

Contract No.: POGC 653-89-35 Doc. No.: RP-14 -999 -1300- 032-I Rev.:D0 Class:1

CONTENTS

- PROJECT DESCRIPTION

- GENERAL STATEMENT

- ADDENDUM

- TEP GENERAL SPECIFICATION No. SP-TCS-178 Rev. 0

This Document Is The Sole Property Of N.I.O.C. All Information Contained Herein May Neither Be Reproduced,Used, Disclosed, Transmitted Or In Any Way Made Public Without The Written Permission Of The N.I.O.C.

Page 3 of 6
ERECTION OF GLASS REINFORCED PLASTIC
PIPING JOB SPECIFIATION

Contract No.: POGC 653-89-35 Doc. No.: RP-14 -999 -1300- 032-I Rev.:D0 Class:1

PROJECT DESCRIPTION

The South Pars gas field located 130 Km offshore shall be developed to produce 2
bscfd reservoir fluids and to transport the fluids to the mainland (TOMBAK) at a
distance of 130 Km. approximately for further treatment.

This development phase referred to as PHASE 14 will be integrated into the overall
development plan of South Pars Gas Field.

GENERAL STATEMENT

The attached TOTAL EXPLORATION PRODUCTION (TEP) General Specification


No. : SP-TCS-178 Rev.0 is confirmed as the Project Specification, except as amended
herein and renumbered/reissued as Specification No. : RP-14-999-1300-032 for
SOUTH PARS GAS FIELD DEVELOPMENT, Phase 14 Project.

This Document Is The Sole Property Of N.I.O.C. All Information Contained Herein May Neither Be Reproduced,Used, Disclosed, Transmitted Or In Any Way Made Public Without The Written Permission Of The N.I.O.C.

Page 4 of 6
ERECTION OF GLASS REINFORCED PLASTIC
PIPING JOB SPECIFIATION

Contract No.: POGC 653-89-35 Doc. No.: RP-14 -999 -1300- 032-I Rev.:D0 Class:1

ADDENDUM

The following items refer to the attached TEP General Specification No. : SP-TCS-178 REV. 0.

The clauses set out below modify or replace the existing clauses in the original
specification as noted.

GENERAL COMMENTS

 The following terms which are used in this general Job Specification are deleted and replaced by:

Engineering company by contractor: shall mean the party which has entered under a
Contract Agreement with CONTRACTOR for the design, engineering, procurement
and construction of the Onshore Facilities regarding the South Pars Gas Field
Development, Phase 14 Project.

TOTAL TEP: shall be read as COMPANY or his nominated representative.

Manufacturer: shall mean any person, firm or company which manufacture or supply
equipment or services for the performance of any item of the work.

Work: shall mean works and/or services entrusted by CONTRACTOR under the
contract with COMPANY.

GENERALLY:

All Referenced documents to ANSI should be changed to ASME, as it is described below:

Replace ANSI B16.5 shall be replaced by:

ASME B 16.5: Pipe Flanges and Flanged Fittings

Replace ANSI B31.3 shall be replaced by:

ASME B 31.3: Process Piping

The following sentence shall be added:

Effective date of all Standards shall be considered: latest revision


This Document Is The Sole Property Of N.I.O.C. All Information Contained Herein May Neither Be Reproduced,Used, Disclosed, Transmitted Or In Any Way Made Public Without The Written Permission Of The N.I.O.C.

Page 5 of 6
ERECTION OF GLASS REINFORCED PLASTIC
PIPING JOB SPECIFIATION

Contract No.: POGC 653-89-35 Doc. No.: RP-14 -999 -1300- 032-I Rev.:D0 Class:1

2. REFRENCE DOCUMENTS

2.1. CODE AND STANDARDS

The following Standard shall be added in this part:

ASME B 16.47: Large Diameter Steel Flanges-NPS 26” through NPS 60”

2.2. TOTAL CFP SPECIFICATIONS:

SP-TCS-118 shall be replaced by: RP-14-999-1300-020 Design of Glass Reinforced


Plastic Piping

SP-TCS-148 shall be replaced by: RP-14-999-6500-027

Glass Reinforced Plastic Piping Material

4. ASSEMBLY

4.2. FLANGED JOINTS

4.2.2. Loose Flanges

Replace “ANSI B 16.5” by: “ASME B 16.5 or ASME B 16.47”

4.2.3. Fixed Flanges

Replace “ANSI B 16.5” by: “ASME B 16.5 or ASME B 16.47”

7. NSPECTION AND TESTS

7.2. VISUAL INSPECTION

SP-TCS-148 shall be replaced by: RP-14-999-6500-027

Glass Reinforced Plastic Piping Material

This Document Is The Sole Property Of N.I.O.C. All Information Contained Herein May Neither Be Reproduced,Used, Disclosed, Transmitted Or In Any Way Made Public Without The Written Permission Of The N.I.O.C.

Page 6 of 6