Actuator Manual 4 Inch
Actuator Manual 4 Inch
AND
MAINTENANCE INSTRUCTIONS
CANDOC LWCV ACTUATOR - 4 INCH BORE MANUAL COPYRIGHT © 2009 CANRIG DRILLING TECHNOLOGY LTD.
ALL RIGHTS RESERVED
Information in this document is subject to change without notice. No part of this document may be reproduced or transmitted in any form
or by any means, electronic or mechanical, for any purpose, without the express written permission of Canrig Drilling Technology Ltd.
Part: AY12221
Description: ACTUATOR ASSY, LWCV, CDTL, 8.45, HYD
Eng ID: 6
Drawing ID: AY12221 Rev No: J
Item Qty Units Part ID Eng ID Description
Part: AY12221
Description: ACTUATOR ASSY, LWCV, CDTL, 8.45, HYD
Eng ID: 6
Drawing ID: AY12221 Rev No: J
Item Qty Units Part ID Eng ID Description
Part: AY12221-1
Description: ACTUATOR ASSY, LWCV, CDTL, 8.45 x 3.06
Eng ID: 2
Drawing ID: AY12221-1 Rev No: B
Item Qty Units Part ID Eng ID Description
Part: AY12221-2
Description: ACTUATOR ASSY, LWCV, CDTL 8.45 x 3.82
Eng ID: 0
Drawing ID: AY12221-2 Rev No: A
Item Qty Units Part ID Eng ID Description
Part: AY12222
Description: GUARD ASSY, ACTUATOR, LWCV, 8.45 IN
Eng ID: 0
Drawing ID: AY12222 Rev No: A
Item Qty Units Part ID Eng ID Description
6 5 3
16.10 REF
1
7
22.14 REF
1
15.50 REF
3 5 6 3 5 6
1
10 8 9 4 5 6
2
ISOMETRIC VIEW
7
2 4 5 6
11
Part: AY12341-1
Description: KIT, INTERFACE, LWCV, 24V, 8.45 IN
Eng ID: 2
Drawing ID: AY12341-1 Rev No: C
Item Qty Units Part ID Eng ID Description
04 1.00 EA F451JSJ7080808-36.00-X-32.9 0 HOSE ASSY, 1/2, SWV STR, 45° ELL, 36.00
05 1.00 EA F451JSJS080808-37.3-X-34.5 0 HOSE ASSY, 1/2, SWV STR, SWV STR, 37.3
10 5.00 EA H15-520220-08-08 ELL 90°, MALE 1/2 ORFS, MALE 1/2 ORB
16 0.00 EA AY12221 5 ACTUATOR ASSY, LWCV, CDTL, 8.45, HYD
17 3.00 FT M21-2000-010 WIRE ROPE, 1/16" DIA
18 4.00 EA M19-3006-010 FERRULE, 1/16, OVAL, ALUMINUM
19 1.00 EA H10255 VLV, HYD, CBAL, 3:1 RATIO, SAE-8, D05
20 1.00 EA F451JSJ9080808-43.25-X-40.5 0 HOSE ASSY, 1/2, SWV STR, 90 SHT, 43.25
21 1.00 EA F451JSJ9080808-41-X-38.25 0 HOSE ASSY, 1/2, SWV STR, 90° SHT, 41
28 2.00 EA HH-0312NC-0175-GR8-W CAPSCR, HEX HD, 5/16-18UNC x 1.75, GR8,W
29 1.00 EA H25-1005-010 CLAMP, DOUBLE, 3/4 IN DIA
32 2.00 EA F451JSJ7080808-92.57-X-89.5 0 HOSE ASSY, 1/2, SWV STR, 45° ELL, 92.57
33 3.00 EA H15-520120-08-08 ADAPTER, MALE 1/2 ORFS, MALE 1/2 ORB
34 1.00 EA H15-520221-08 ELL 90°, MALE 1/2 ORFS, FEM SWV 1/2 ORFS
36 1.00 EA H10252 VLV, HYD, PRESSURE REDUCING, SAND, D03
38 15.00 FT E03-1023-010 CABLE, 4 C #16 AWG, EXANE, 600V
39 2.00 EA E04-2002-010 STRAIN RELIEF, 1/2 NPT, 0.375 - 0.500
40B 1.00 EA H10059 VLV, HYD, DIR, 3 POS, 4 WAY, 24V, D03
41B 4.00 EA H13-1036-588 0 THREADED ROD, 10-24 x 5.88 IN LG
42 4.00 EA H13-1035-01A STUDNUT, 10 - 24
46 8.00 EA E03-2000-010 CABLE TIE, 13.4 IN LG, 120 LB
49 1.00 EA H07-1010-030 CHECK VALVE
R01 1.00 EA 1028-XXX CHART, TOOL JOINT CLAMP
R02 1.00 EA H12-1002-010 MANIFOLD, TAP-IN, D03 SAE
R03 2.00 EA H22-1000-010 TEST STATION, #4 SAE
REF 1.00 EA SC10048-1 SCHEMATIC, 8.45in LWCV, NON-INT, 120 VAC
REF 1.00 EA SC10046 SCHEDULE, MAINTENANCE, LWCV
Part: AY14043
Description: KIT, ANTI-ROTATION, LWCV, 8.45IN OD
VLV
Eng ID: 0
Drawing ID: AY14043 Rev No: B
Item Qty Units Part ID Eng ID Description
Part: AY14260
Description: KIT, ANTI-ROTATION, LWCV, 750T
Eng ID: 2
Drawing ID: AY14260 Rev No: B
Item Qty Units Part ID Eng ID Description
A
7
1
2 3 4 5 6
1/8
DETAIL A
1:1 SHEET 1OF
OF1 1
DRAWN RDW 07/06/15
WELDING PROCEDURE AS PER CANRIG SPECIFICATION - ENG 704, UNLESS NOTED OTHERWISE CHECKED SEA 07/07/03
THIS PRINT AND DESIGN AND DETAIL REMOVE SHARP CORNERS AND BURRS TOLERANCE - UNLESS OTHERWISE SPECIFIED APPRV'D DAA 07/07/03 CANRIG DRILLING
SHOWN THEREON ARE THE PROPERTY CASTING ± 1/16 FABRICATING IMPERIAL FABRICATING [METRIC]
CONCENTRICITY .005 TIR 0 TO 24" ± 1/16" 0 TO 610 mm ± 1 mm
MATERIAL TECHNOLOGY LTD.
AND INVENTION OF CANRIG DRILLING
STRAIGHTNESS ± .005 IN 5 INCHES 24" to 60" ± 1/8" 610 TO 1525 ± 3 mm
TECHNOLOGY LTD.. THIS PRINT IS ± 3/16" 1525 TO 3048 ± 5 mm
SQUARENESS ± .010 IN 5 INCHES 60" to 120"
FURNISHED WITH THE UNDERSTANDING 120" to 280" ± 1/4" 3048 TO 7112 ± 7 mm
PARALLELISM ± .010 IN 5 INCHES
B 08/05/05 VM CHG ITEM 1 WAS DT16356 NOW DT16714, BRACKET NOW WORKS FOR 3" & 4" GRY SEA THAT IT IS NOT TO BE REPRODUCED
WITHOUT PERMISSION AND RETURNED
FLATNESS ± .010 or as Shown 280" & OVER ± 1/2" 7112 & OVER ± 13 mm KIT, ANTI-ROTATION, LWCV, 750T
TRUE POSITION .005 MACHINING IMPERIAL ANGULAR
-A 07/07/25 SEA CHG ITEM 2 TO 1 IN WAS 1/2 LG; ADDED ITEM 6 FLATWASHER DAA FJY UPON DEMAND. ALL RIGHTS OF DESIGN
MACHINED SURFACES 125 DECIMAL .x ± .030" MACHINING ± .1°
AND INVENTION ARE RESERVED BY FABRICATION ± .2° EST. WEIGHT SCALE PROJECT
No. Y/M/D BY REVISION CHK'D APVD CANRIG DRILLING TECHNOLOGY LTD..
MIN. RADIUS UNLESS SHOWN = 0.03 MAX.
.xx ± .015"
.xxx ± .005" 0.0 lbm 1:2 - AY14260 REV B
IF IN DOUBT......PLEASE ASK!
IF IN DOUBT......PLEASE ASK!
IF IN DOUBT......PLEASE ASK!
LWCV ACTUATOR
ASSEMBLY INSTRUCTIONS
CANDOC LWCV ACTUATOR MANUAL COPYRIGHT © 2009 CANRIG DRILLING TECHNOLOGY LTD.
ALL RIGHTS RESERVED
Information in this document is subject to change without notice. No part of this document may be reproduced or transmitted in any form
or by any means, electronic or mechanical, for any purpose, without the express written permission of Canrig Drilling Technology Ltd.
18
17
Figure 1
3) Repeat above two steps (1 & 2) for the second bearing housing.
4) Install one labyrinth ring (13) onto each of the two inner sleeves (4) ensuring
that the tapered surface is facing the side where the racks are present.
13
Figure 2
5) Place the bearing/ housing assembly onto the inner sleeve (4) and use a
rubber mallet to tap on the top of the bearing inner race until the bearing
inner race is seated on the inner sleeve.
6) Install one plug (54) and one grease fitting (20) in the bearing housing
assembly.
Revision January 2009 1 of 18
Canrig LWCV Assembly Instructions
20
Bearing/
Housing
Assembly
54
4
Figure 3
7) Grease the bearing through the grease fitting while rotating the bearing.
Visually ensure that the grease fills the bearing consistently and that no dry
areas exist in the bearing.
8) Repeat the same for the other bearing housing assembly and inner sleeve.
9) Install the Guide Sleeve (7) into the ID of the inner sleeve (4) until it is
seated on the lower shoulder and that the tab on the end of the guide sleeve
fit properly into the notch in the inner sleeve.
10) Install the plain bearing strip (19) into the ID of the inner sleeve (4) until it is
seated on top of the guide sleeve (7).
19
7
Tab
Notch
4
Lower
shoulder
Figure 4
11) Repeat step 9 & 10 for the other inner sleeve.
12) Place bearing retainer (5) on top of the bearing housing (6), ensuring that all
six holes are properly aligned with holes in the bearing housing.
16
21, 22 Note orientation
5
18
6
6
16
Figure 5
15) Repeat steps 12, 13 & 14 for the other bearing housing/ inner sleeve
assembly.
16) Install the inner sleeve/bearing housing assembly onto the mounting sleeve
(3) - slide the assembly down until the top of the bearing retainer (5) is
approximately flush with the end of the tapered portion of the mounting
sleeve.
Bearing
Housing/ Inner
Sleeve
Assembly
Note orientation of
3
rack to hole in
mounting sleeve
Figure 6
17) Turn the assembly over and repeat step 16. Use the pinion (2) to space the
racks in the approximate location- the hole in the mounting sleeve (3)
should be located between the racks at this time.
Bearing
Housing/ Inner 3
Sleeve
Assemblies
Figure 7
18) Ensure that the valve (1) is in the closed position (see Figure 9).
19) Standard valve only (see Figure 8a): Place the valve (1) vertically on the
box end. Install a retaining ring (15) into the upper groove on the OD of the
valve body. Turn the valve body over to sit on the pin end. Install the stop
ring (30) until it rests on the pin end retaining ring (15).
20) Install two o-rings (14) into the two middle o-ring grooves on the OD of the
valve body.
7.70 OD 8.45 OD
1 1
14 14
30 15
7.70 OD
Figure 8a Figure 8b
Standard 7.70 OD Valve Stepped 8.45 x 7.70 OD Valve
3.06 ID ONLY
21) Grease the o-rings prior to installing the mounting sleeve (3).
22) Note: it is important at this time to verify the timing of the valve with the
actuator. This can be done by looking at the crank socket- identify the
socket that opens the valve when it is turned counterclockwise. The upper
Notch as shown
indicates valve is
closed – assemble
actuator with valve
in this position
Figure 9
23) Standard valve only (see Figure 8a): With the valve in the closed
position, install the inner sleeve/ bearing housing assembly on the OD of the
valve body and slide it down until it is seated against the top of the stop ring
(30). Ensure that the holes in the mounting sleeve are aligned with the two
crank sockets in the valve and verify the rack location per step 22.
24) Not Applicable
Figure 10
25) Align the outer scribed grooves on the upper and lower racks with the
centerline of the crank socket.
26) Install one pinion (2) into the crank socket ensuring that the scribe lines on
the face of the pinion are aligned with the outer scribed grooves on the
racks. Move the racks towards the pinion until teeth are engaged.
Install pinion
with rack
aligned as
shown
2
Figure 11
27) Install the opposing pinion (2) into the opposite crank socket. It may be
necessary to tap on the back side of the rack to allow the insertion of the
pinion.
Caution must be exerted when installing the pinion not to damage the
rack teeth. If the pinion will not install easily into the socket, then
adjust rack positions to ease insertion. Do not hammer pinion into
place, light tapping is acceptable.
15
Figure 12
30) Install the four pinion retainers (8), two per pinion using button socket head
cap screws (34) and Nord-lock washers (53). Torque the button socket cap
screw to 31 ft-lb.
31) Install the six grease fittings (20) in the racks. Grease two shots in each
fitting.
20
8
20
34, 53
Figure 13
32) On each of the two cylinders (9), install washer (11), grommet (12), bracket
(10), washer (11), washer (31) with locknut (29) - torque to 350 ft/lbs.
10
11
12
11
31
29
Figure 14
33) Install the cylinder assembly by mounting the bracket on the rod end (10) to
the lower bearing housings (6) using ¾” x 1” long socket head cap screw
(23A) and lock washer (25) - apply anti-seize to bolts prior to installation.
Hand tighten only at this time.
34) Align the holes in the upper bracket of the cylinder assembly to the holes in
the side of the upper bearing housing.
35) Mount the upper cylinder bracket using two 1-1/4” long socket head cap
screws (23B) and lock washers (25) - apply anti-seize to bolts prior to
installation. Turn the actuator to the opposite side and mount the other
cylinder using one 1-1/4” long socket head cap screws (23B) on the left side
and one 1-1/2” long socket head cap screws (23C) on the right side and
lock washers (25). Hand tighten only at this time.
36) Torque lower bracket (10) ¾” socket head cap screws to 350 ft/lbs. Do not
torque upper cylinder bolts at this time. Safety wire bolts after tightening to
specified torque.
52
23B, 25
23B, 25
Grease fitting
this side
10 10
23A, 25
23A, 25 Plug
Cylinder this side
Assy
Cylinder
Assy
Figure 15 Figure 16
37) Install the four elbow fittings (50) into the cylinders facing inward. Install two
hydraulic tubes (48) onto the fittings (50). Ensure adequate clearance
between tube and moving parts on actuator. Temporarily install guard (47)
on actuator and ensure that the tube seats between the tabs inside the
guard- adjust tube as necessary. Tighten all fittings.
50
48
Hydraulic tubes to be
mounted on bracket
side of actuator
Figure 17
Revision January 2009 9 of 18
Canrig LWCV Assembly Instructions
38) Install 0.060 thick shim (59C) and stop plate (57) onto lower bearing
housing (6) using lock washers (53) and 3/8 hex head cap screws (58). Do
not tighten at this time. Repeat for other side.
57
53, 58
6
59
Figure 18
39) Open the valve completely. Ensure that valve is fully open by visually
inspecting bore- also inspect stops to ensure that no clearance exists
between stops and upper bearing housing. Adjust stop height as necessary
if the valve is not opening completely or the stops are not contacting the
upper bearing housing by replacing 0.060 thick shim (59C) with 0.015 thick
shim (59A) or 0.030 thick shim (59B). Tighten the 3/8” bolts to 40 ft/lbs.
Inspect valve to
ensure valve is
fully open
Inspect to
ensure valve
is resting
against stops
Figure 19
Figure 20
40) Remove socket head cap screws (23A, 23B and 23C) and lock washers
(25) from the upper cylinder bracket.
23B, 25
52
Figure 21
Figure 22
43) Close the side guards and ensure that the hydraulic tubes (48) are centered
in the tabs located inside the guards. Adjust the hydraulic tubes as
necessary. Replace the 3/8” diameter hinge pins and the four safety pins.
Check to ensure that all safety and hinge pins are properly wired.
Figure 23
44) Position the actuator on the side opposite of the hydraulic tubes. Install the
two plugs (49) on the right hand cylinder (upper and lower ports). Install the
two adapters (60) and the caps (61) on the left hand cylinder (upper and
lower ports).
45) Slide the mud deflector (55) over the box end of the valve until it seats
against the upper retaining ring (15).
55
49
60, 61
Figure 24
R02
R01
Figure 25
Alignment Pin
Hole
Figure 26
Mounting Side View
10) Install previously removed valves in reverse order as noted in step 6.
11) Install hex nuts on studs and tighten.
12) Replace solenoid on valve stack.
13) Unlock HPU, turn on and check system for leaks. Cycle LWCV actuator to
verify function.