The Greater Hyderabad Municipal Corporation has issued an Occupancy Certificate for a residential building developed by M/s. Aparna Infrahousing Pvt. Ltd., confirming that it complies with all building regulations. The building, located in Nallagandla Village, has been completed as per the sanctioned plans and is fit for occupation as of May 22, 2025. The certificate includes details such as building permit information, site area, and compliance with setbacks and height regulations.

Uploaded by

michellesuna26
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views3 pages

Calendar

The Greater Hyderabad Municipal Corporation has issued an Occupancy Certificate for a residential building developed by M/s. Aparna Infrahousing Pvt. Ltd., confirming that it complies with all building regulations. The building, located in Nallagandla Village, has been completed as per the sanctioned plans and is fit for occupation as of May 22, 2025. The certificate includes details such as building permit information, site area, and compliance with setbacks and height regulations.

Uploaded by

michellesuna26
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

OFFICE OF THE GREATER HYDERABAD MUNICIPAL CORPORATION TG-bPASS

OCCUPANCY CERTIFICATE

Application No. 002366/GHMC/1023/SLP1/2025-OC Date : 22/05/2025

Proceedings No: 1071/GHMC/SLP/2025-OC Occupancy Issued Date: 22 May, 2025


Building Permit No: 1/C20/00781/2021 Building Permit Date: 22 January, 2021
Building Commencement Notice submitted by the Applicant 01 February, 2021
Ref:
Building Completion Notice submitted by the Applicant 10 January, 2025

The Owners/Builder/Developer /Licensed Architect/Engineer / Structural Engineer have given the Building Completion
Notice that the building has been completed as per the specifications of Sanctioned Plans and it is declared that the
building conforms in all respects to the requirements of the building regulations contained under the statutory
provisions in the respective Municipal Act and Building Bye Laws/Rules issued by the Govt.
This is to certify that the building has been inspected and is declared fit for occupation.
A NAME OF THE M/s. Aparna Infrahousing Pvt. Ltd. And Others Rep. by its Authorized Signatory
OWNER/Developer Sri B.V. Sreenivasa Reddy S/o. Late B. Ramakrishna Reddy
B LOCATION OF THE PROPOSED SITE
1. Plot No. NA 2. Sanctioned Layout No. / LRS No.
3. Survey No. 264, 265, 266, 267,268, 4. Village NALLAGANDLA
269, 270, 271, 272, 279,
280, 281(P), 282(P), 283
& 284(P)
5. Mandal SERILINGAMPALLY 6. District Rangareddy

7. Locality Nallagandla Village


C DETAILS OF THE COMPLETED BUILDING
1 Building Permit / Proceedings No. 1/C20/00781/2021 Building Permit / 22 January, 2021
Proceedings Date

a Due date for completion of the building 22 January, 2027


2 b Date on which completion notice submitted 10 January, 2025
c Whether it is completed within the stipulated time YES
As per sanctioned Plan Road Widening Area(If any) Net Area
3 Site Area (m2)
103,184.84 3,507.87 97,857.59
Payment of Compounding fees calculated: 0/-
4

D BUILDING WISE DATA


Building Name Building Name BLOCK J

No. of Floors Cellar + Stilt Ground +Upper Floors


4 a As per Sanctioned Plan 3 Celler Ground Floor+26 Upper Floor
b As per Site Building Plan 3 Celler Ground Floor+26 Upper Floor
Use of the Building
5 a As per Sanctioned Plan Residential
b As per Site Building Plan Residential
Floor Area (m2)
6 a As per Sanctioned Plan 33473
b As per Site Building Plan 33473
Setbacks(m) Front Rear Side-1 Side-2
a As per Sanctioned Plan 18.00 18.02 18.21 18.31
7
b As per Site Building Plan 18.00 18.02 18.21 18.31
c Extent of deviation in % - - - -

Height (m)
8 As per Sanctioned Plan 80.94
As per Site Building Plan 80.94
i) Parking Area (m2) ii)Tot -lot area (m2)
9 a As per Sanctioned Plan 191781 9804
b As per Site Building Plan 191781 9804

RWH(Rain Water Harvesting )


10 As per Sanctioned Plan 1
As per Site Building Plan 1

To,
Smt/Sri/Kum
M/s. Aparna Infrahousing Pvt. Ltd. And
Others Rep. by its Authorized Signatory
Sri B.V. Sreenivasa Reddy S/o. Late B.
Ramakrishna Reddy
802, Astral Heights, D.No.6-3-352/2&3,

DRC No. Area (Sq. Yds) Market value

Yours Faithfully

Name : Addl. CCP (HO SLZ)


Date: 22/05/2025 3:07:13 PM
Designation : City Planner

Authority_Sign

TextToSearch

For Commissioner

GREATER HYDERABAD MUNICIPAL


CORPORATION

Copy to:
1. The Addl. Commissioner (Fin.), GHMC.
1. The Addl. Commissioner (Fin.), GHMC.
2. The Zonal Commissioner, SERILINGAMPALLY ZONE, GHMC.
3. The Dy. Commissioner, Circle 20 SERILINGAMPALLY, GHMC
with a request for assessment of PT / VLT up to date.
4. The Asst. City Planner, Circle 20 SERILINGAMPALLY, GHMC.
5. The Sub-Registrar, ______________ with a request to
release the mortgaged area.
6. The Addl. Commissioner (Revenue), GHMC with a
request for assessment of property tax at once from the
date of issue of O.C.