TABLE OF CONTENTS
COVER PAGE S1 24/57 CONSTRUCTION NOTES AND STANDARD DRAWINGS P1 47/57 SITE DEVELOPMENT (PLUMBING PLAN)
0/57
LEGEND
TABLE OF CONTENTS S2 25/57 SITE DEVELOPMENT (ELEVATION)
A1 1/57 PLUMBING ANALYSIS AND DESIGN
S3 26/57 FOUNDATION PLAN
A2 2/57 SUMMARY OF QUANTITIES DETAIL OF STEPS P2 48/57 STORM AND SEWER LAYOUT
CONCRETE RAMP DETAIL GROUND FLOOR PLAN
A3 3/57 PERSPECTIVE MEZZANINE FLOOR PLAN
MEZZANINE FLOOR FRAMING PLAN
S4 27/57 MAINTENANCE AREA
A4 4/57 LOCATION MAP DETAIL OF VAULT
LEVEL 2 - TOWER FLOOR FRAMING PLAN GUARD HOUSE
* MAP OF THE PHILIPPINES S5 28/57
MEZZANINE CEILING FRAMING PLAN (ELEV. = 6.00 M)
* MAP OF PAMPANGA ROOF FRAMING PLAN (WAREHOUSE AREA) P3 49/57 COLD WATER LINE LAYOUT
GROUND FLOOR PLAN
A5 5/57 VICINITY MAP S6 29/57 RAFTER DETAILS (TOWER PORTION) MEZZANINE FLOOR PLAN
STRUCTURAL BAY SECTION MAINTENANCE AREA
LOT SKETCH PLAN FIRE EXIT LADDER DETAILS GUARD HOUSE
BILLBOARD DETAIL TRUSS DIAGRAM
PIT LAYOUT PLAN P4 50/57 STORM LAYOUT
A6 6/57 SITE DEVELOPMENT PLAN S7 30/57 LEVEL 2 - TOWER PLAN
PIT DETAIL
A7 7/57 GROUND FLOOR PLAN LEVEL 3 - TOWER FLOOR FRAMING PLAN LEVEL 3 - TOWER PLAN
FLOOR FINISH SCHEDULE LEVEL 4 - TOWER PLAN
WALL FINISH SCHEDULE LEVEL 4 - TOWER FLOOR FRAMING PLAN
DETAIL OF STAIR S8 31/57 LEVEL 5 - TOWER FLOOR FRAMING PLAN P5 51/57 STORM LAYOUT
TOWER ROOF FRAMING PLAN LEVEL 5 - TOWER PLAN
A8 8/57 DETAILED GROUND FLOOR PLAN LEVEL 6 - TOWER ROOF PLAN
TOILET DETAILS (MANAGERS' OFFICES) S9 32/57 STRUCTURAL DETAIL OF TOWER STAIR
SEPTIC TANK DETAILS (LARGE)
DETAIL OF VAULT (AS PER MANUFACTURER'S SPECS.) FOUNDATION PLANS - MAINTENANCE AREA GUARD HOUSE
S10 33/57 BOILER & COMPRESSOR ROOM
A9 9/57 MEZZANINE FLOOR PLAN P6 52/57 ISOMETRIC DRAWING OF SEWER & STORM LAYOUT
ROOF FRAMING PLANS - MAINTENANCE AREA GUARD HOUSE
DETAILED MEZZANINE FLOOR PLAN BOILER & COMPRESSOR ROOM SEPTIC TANK DETAILS (SMALL)
FLOOR FINISH SCHEDULE SCHEDULE OF FOOTINGS , COLUMNS & BEAMS GENERAL NOTES
WALL FINISH SCHEDULE S11 34/57
STRUCTURAL DETAILS
DETAIL OF STEPS P7 53/57 ISOMETRIC DRAWING OF WATER LINE LAYOUT
DETAIL OF RAILING S12 35/57 PERIMETER FENCE DETAIL MANHOLE DETAILS
A10 10/57 ROOF PLAN CATCH BASIN DETAILS
RAMP AND STEP DETAIL S13 36/57 PERIMETER FENCE DETAIL
EXTERNAL WALLS DETAILS PCCP DETAILS M1 54/57 PIT LAYOUT
E1 37/57 SITE DEVELOPMENT PLAN (ELECTRICAL PLAN) MACHINE LAYOUT
A11 11/57 LEVEL 2 - TOWER FLOOR PLAN LEVEL 1 - TOWER FLOOR PLAN
LEVEL 3 - TOWER FLOOR PLAN E2 38/57 GROUND FLOOR PLAN -LIGHTING LAYOUT LEVEL 2 - TOWER FLOOR PLAN
LEVEL 4 - TOWER FLOOR PLAN MEZZANINE FLOOR PLAN -LIGHTING LAYOUT LEVEL 3 - TOWER FLOOR PLAN
LEVEL 5 - TOWER FLOOR PLAN GROUND FLOOR PLAN -LIGHTING LAYOUT
LEVEL 6 - TOWER ROOF PLAN GUARD HOUSE M2 55/57 MACHINE LAYOUT
FLOOR FINISH SCHEDULE: FUTURE WEIGH SCALE CONTROL ROOM LEVEL 4 - TOWER FLOOR PLAN
WALL FINISH SCHEDULE: MAINTENANCE AREA LEVEL 5 - TOWER FLOOR PLAN
DETAIL OF TOILET (GROUND FLOOR) DETAIL OF BUCKET ELEVATORS
A12 12/57 E3 39/57 LEGEND
DETAIL OF TOILET (MEZZANINE FLOOR) (WITH THEIR HEIGHT SCHEDULES)
DETAIL OF TOILET AND TEA ROOM (LABORATORY AREA) LEVEL 2 - TOWER PLAN -LIGHTING LAYOUT
LEVEL 3 - TOWER PLAN -LIGHTING LAYOUT SECTION : GRID 6-7
DETAIL OF TOILET AND TEA ROOM (ADJACENT TO BOARD ROOM) M3 56/57
SECTION : GRID 5-6
A13 13/57 FRONT ELEVATION E4 40/57 LEVEL 4 - TOWER PLAN -LIGHTING LAYOUT SECTION : GRID 4-5
LEFT SIDE ELEVATION LEVEL 5 - TOWER PLAN -LIGHTING LAYOUT
A14 14/57 M4 57/57 FLOW DIAGRAM OF 5TPH FLOATING FISH FEED
A15 15/57 RIGHT SIDE ELEVATION E5 41/57 GROUND FLOOR PLAN -POWER LAYOUT LEGEND
MEZZANINE FLOOR PLAN -POWER LAYOUT
A16 16/57 REAR ELEVATION GROUND FLOOR PLAN -POWER LAYOUT
A17 17/57 SECTION "B" GUARD HOUSE
SECTION "A" FUTURE WEIGH SCALE CONTROL ROOM
A18 18/57 MAINTENANCE AREA
A19 19/57 PLANS, ELEVATION & SECTIONS - MAINTENANCE AREA, GUARD HOUSE
E6 42/57 LEVEL 2 - TOWER PLAN -POWER LAYOUT
PLANS, ELEVATION & SECTIONS - FUTURE WEIGH LEVEL 3 - TOWER PLAN -POWER LAYOUT
A20 20/57
SCALE CONTROL ROOM, BOILER & COMPRESSOR ROOM LEVEL 4 - TOWER PLAN -POWER LAYOUT
E7 43/57
LEVEL 5 - TOWER PLAN -POWER LAYOUT
A21 21/57 GROUND FLOOR REFLECTED CEILING PLAN
E8 44/57 LOAD SCHEDULE
CEILING FINISH SCHEDULE:
DETAIL OF CEILING E9 45/57 LOAD COMPUTATION
SLOP SINK DETAIL
E10 46/57 POWER SINGLE LINE DIAGRAM
A22 22/57 MEZZANINE REFLECTED CEILING PLAN
CEILING FINISH SCHEDULE:
REFLECTED CEILING PLANS - MAINTENANCE AREA GUARD HOUSE
FUTURE WEIGH SCALE CONTROL ROOM BOILER & COMPRESSOR ROOM
A23 23/57 SCHEDULE OF DOORS & WINDOWS
Project Title : Prepared By: Reviewed and Checked By : Recommending Approval : Approved By: Sheet Content: Sheet No. :
TABLE OF CONTENTS
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
PHILIPPINE RURAL DEVELOPMENT PROJECT
CONSTRUCTION OF AQUA FEED MILL
EDRIAN T. SITCHON
Architect
Address: Brgy. Sta. Rita, Minalin, Pampanga ENGR. EDEN M. SANTOS ENGR. EDUARDO M. RIVERA HON. EDGARDO G. FLORES
A1
Municipal Engineer Mun. Planning Development Officer Municipal Mayor
Province of Pampanga Project Location: PRC No: 8969 Validity: May 3, 2024
Municipality of Minalin
BRGY. BULAC, MINALIN, PAMPANGA
PTR No: 5299055
Issued at: City of San Fernado, Pampanga
Date Issued: 1/03/21
TIN: 124-808-096-28
01 57