SAFE
SAFE
Please note, once you close this window you will no longer have
access to it.
You will receive an email with a link to your topic-level score report.
A passing score on the practice test does not guarantee a passing
score on the exam.
Scroll down to see the question-level feedback.
Interpreting the feedback:
pic Score
T roles 100%
am backlog 100%
Planning 67%
nc events 100%
ilt-in quality 0%
mpetency 100%
ow 50%
utcomes 100%
Question Feedback
Block 1: Candidate Agreement
Block 2: Instructions
Block 3: Questions
Question
Feedback 1 of 45
What is the typical timebox in which to complete a User Story?
One Iteration
One month
One year
One PI
1 out of 1
Question
Feedback 2 of 45
Which of the following design-thinking techniques helps breakdown
Features while considering the end-to-end user flow?
Story mapping
Gemba walks
Market research
Personas
1 out of 1
Question
Feedback 3 of 45
Which of the following team-level events does SAFe recommend
running on a cadence during the PI for SAFe Team Kanban Teams?
Coach Sync
PO Sync
Retrospective
System Demo
0 out of 1
Question
Feedback 4 of 45
What is one purpose of the System Demo?
To introduce new architectural designs
To identify PI Objectives
1 out of 1
Question
Feedback 5 of 45
What are the three parts of an Inspect and Adapt?
The PI System Demo, confidence vote, and ROAMing risks
1 out of 1
Question
Feedback 6 of 45
During which PI Planning activity do Business Owners assign business
value to PI Objectives?
The draft plan review
1 out of 1
Question
Feedback 7 of 45
Which of the following measures tracks progress toward achieving
desired outcomes?
Cumulative flow diagrams
Burn-down charts
1 out of 1
Question
Feedback 8 of 45
What is one dimension of the Team and Technical Agility Core
Competency?
Leading by Example
Innovation Culture
Relentless Improvement
Built-in Quality
1 out of 1
Question
Feedback 9 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on getting fast feedback on small changes?
Continuous Exploration
Release on Demand
Continuous Integration
Continuous Deployment
0 out of 1
Question
Feedback 10 of 45
Which of the following is a SAFe Lean-Agile Principle?
Precisely specify value by product
Visualize work
1 out of 1
Question
Feedback 11 of 45
During which of the following PI Planning activities does Product
Management introduce the prioritized Features to the teams for
planning?
The business context presentation
0 out of 1
Question
Feedback 12 of 45
Which of the following statements describes the Product Owner role?
Prioritizing the ART Backlog
1 out of 1
Question
Feedback 13 of 45
What is one benefit of Design Thinking?
The Solution is actionable
1 out of 1
Question
Feedback 14 of 45
Which of the following tools can be used to develop a deeper
understanding of what customers are seeing, thinking, and feeling
while interacting with the Solution?
Vision map
Story map
Empathy map
1 out of 1
Question
Feedback 15 of 45
What is one responsibility of Product Management?
Maintain the Architectural Runway
1 out of 1
Question
Feedback 16 of 45
What is one element teams present during the draft plan review?
ART PI risks
Milestones
Iteration goals
1 out of 1
Question
Feedback 17 of 45
Team B has elected to stop holding retrospective events so they can
spend more time completing Stories. Which of the following Agile
Team responsibilities is Team B over-prioritizing?
Plan the work
Deliver value
0 out of 1
Question
Feedback 18 of 45
What is one benefit of organizing around value, and reorganizing
when required?
Enabling a DevOps mindset
Building the Continuous Delivery Pipeline
1 out of 1
Question
Feedback 19 of 45
What is one way to understand current WIP in a system?
Make current work visible
Split Stories
0 out of 1
Question
Feedback 20 of 45
Which of the following SAFe Core Competencies of Business Agility
includes the built-in quality dimension?
Enterprise Solution Delivery
Organizational Agility
0 out of 1
Question
Feedback 21 of 45
What is one method for showing true progress of business outcomes?
Analyze ART metrics
1 out of 1
Question
Feedback 22 of 45
What are the four types of team topologies?
Functional requirements, product domain, technical, and
complicated subsystem
Stream-aligned, functional requirements, product domain, and
technical
Functional requirements, platform, enabling, and technical
1 out of 1
Question
Feedback 23 of 45
What is one action that occurs during Iteration reviews for SAFe Scrum
teams?
Prioritizing unplanned work
0 out of 1
Question
Feedback 24 of 45
Three members of Team C created a new workflow to speed up the
testing process. They spent an entire Iteration designing the process
but discovered, just before implementation, that the system could not
support the workflow. The rest of the team was excited to hear what
was learned from the failed experiment. Which of the following
characteristics of a high-performing Agile Team is Team C
demonstrating?
Enjoy their work and working together
Trust each other, allowing for both healthy conflict and reliance
on others
Fostering an environment for taking risks without fear of
embarrassment or punishment
Accountable to each other and the organization for reliably
completing quality work
1 out of 1
Question
Feedback 25 of 45
What is one Story component to consider when estimating size?
Dependency
Depth
Scope
Knowledge
1 out of 1
Question
Feedback 26 of 45
Which of the following activities occurs during the Inspect and Adapt
workshop?
Refining the ART backlog
1 out of 1
Question
Feedback 27 of 45
What is the primary purpose of the ART Planning Board?
To satisfy System Demo expectations by demonstrating
incremental delivery
To show sizing of the Epics in relation to each other
1 out of 1
Question
Feedback 28 of 45
Which of the following roles is responsible for prioritizing the Agile
Team Backlog?
Release Train Engineer
Product Owner
Release Manager
1 out of 1
Question
Feedback 29 of 45
What is the purpose of the Team Sync?
To identify Iteration goals
1 out of 1
Question
Feedback 30 of 45
What is one quality practice for software development?
Rapid prototyping
Continuous exploration
Refactoring
0 out of 1
Question
Feedback 31 of 45
Which of the following stakeholders primarily develops the definition
of done for the team increment?
Business Owners
Agile Teams
Solution Architect
0 out of 1
Question
Feedback 32 of 45
Which of the following statements is true about Roadmaps?
Roadmaps are commitment
0 out of 1
Question
Feedback 33 of 45
Which of the following types of Enabler Stories is used for building and
evaluating prospective Solutions alternatives?
Exploration
Infrastructure
Compliance
Architecture
1 out of 1
Question
Feedback 34 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on getting to production early for verification?
Continuous Exploration
Continuous Integration
Release on Demand
Continuous Deployment
1 out of 1
Question
Feedback 35 of 45
What is one way to address substantial rework?
Shift reviews right
1 out of 1
Question
Feedback 36 of 45
During System Demo, Team B states that the most recent release
failed because of poor version control. They share their plan for
preventing similar mistakes from happening in the future. Which of
the following SAFe Core Values is Team B demonstrating?
Siloed thinking
Visualizing work
Transparency
1 out of 1
Question
Feedback 37 of 45
During which PI Planning activity are Stories written and sequenced?
The team breakout session
0 out of 1
Question
Feedback 38 of 45
What is the product vision?
The User Stories required to meet customer needs
An explanation of the architectural runway needed to deliver
products to the customer
A set of prioritized Features
1 out of 1
Question
Feedback 39 of 45
Which of the following is both a SAFe Lean-Agile Principle and a Lean-
Thinking principle?
Connect strategy to execution
Decentralize decision-making
1 out of 1
Question
Feedback 40 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on understanding customer needs?
Continuous Exploration
Release on Demand
Continuous Deployment
Continuous Integration
1 out of 1
Question
Feedback 41 of 45
What is one benefit of Story acceptance criteria?
To provide Story details from a testing point of view
1 out of 1
Question
Feedback 42 of 45
Which of the following team-level events does SAFe recommend
running on a cadence during the PI for SAFe Scrum Teams?
Portfolio Review
Iteration Demo
Iteration Review
Portfolio Demo
1 out of 1
Question
Feedback 43 of 45
What is one way to quickly address impediments to flow?
Wait for the next Inspect and Adapt event
Raise visibility of effects outside of ART control
0 out of 1
Question
Feedback 44 of 45
During which PI Planning activity do team members commit to do
everything they can to meet the agreed-to objectives?
The draft plan review
1 out of 1
Question
Feedback 45 of 45
Which of the following statements describes the balanced Agile testing
pyramid?
Many solution tests run by internal team members and fewer
run by external testers
Many solution tests run by external testers and fewer run by
internal team members
Many small, low-level, automated tests and fewer large, manual
tests
Many large, manual tests of the end-to-end solution and fewer
small, automated tests
Not expected
Please note, once you close this window you will no longer have
access to it.
You will receive an email with a link to your topic-level score report.
A passing score on the practice test does not guarantee a passing
score on the exam.
Scroll down to see the question-level feedback.
Interpreting the feedback:
pic Score
T roles 100%
am backlog 100%
Planning 67%
nc events 100%
mpetency 100%
ow 75%
utcomes 100%
Question Feedback
Block 1: Candidate Agreement
Block 2: Instructions
Block 3: Questions
Question
Feedback 1 of 45
What is one way to address substantial rework?
Reprioritize the work
1 out of 1
Question
Feedback 2 of 45
During System Demo, Team B states that the most recent release
failed because of poor version control. They share their plan for
preventing similar mistakes from happening in the future. Which of
the following SAFe Core Values is Team B demonstrating?
Organize around value
Transparency
Siloed thinking
Visualizing work
1 out of 1
Question
Feedback 3 of 45
What is one method for showing true progress of business outcomes?
Conduct a System Demo
1 out of 1
Question
Feedback 4 of 45
What is one purpose of the System Demo?
To evaluate the full PI
To identify PI Objectives
1 out of 1
Question
Feedback 5 of 45
What is one way to understand current WIP in a system?
Pair to complete the work faster
Split Stories
1 out of 1
Question
Feedback 6 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on getting fast feedback on small changes?
Continuous Exploration
Continuous Deployment
Release on Demand
Continuous Integration
1 out of 1
Question
Feedback 7 of 45
Which of the following statements describes the balanced Agile testing
pyramid?
Many small, low-level, automated tests and fewer large, manual
tests
Many large, manual tests of the end-to-end solution and fewer
small, automated tests
Many solution tests run by external testers and fewer run by
internal team members
Many solution tests run by internal team members and fewer
run by external testers
1 out of 1
Question
Feedback 8 of 45
Which of the following is a SAFe Lean-Agile Principle?
Organize around value
Visualize work
1 out of 1
Question
Feedback 9 of 45
Which of the following statements describes the Product Owner role?
Prioritizing the ART Backlog
1 out of 1
Question
Feedback 10 of 45
Which of the following design-thinking techniques helps breakdown
Features while considering the end-to-end user flow?
Personas
Market research
Story mapping
Gemba walks
1 out of 1
Question
Feedback 11 of 45
During which PI Planning activity do Business Owners assign business
value to PI Objectives?
The team breakout session
0 out of 1
Question
Feedback 12 of 45
What is one element teams present during the draft plan review?
Planned business value
Iteration goals
Milestones
ART PI risks
0 out of 1
Question
Feedback 13 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on getting to production early for verification?
Continuous Deployment
Release on Demand
Continuous Integration
Continuous Exploration
1 out of 1
Question
Feedback 14 of 45
Which of the following is both a SAFe Lean-Agile Principle and a Lean-
Thinking principle?
Make value flow without interruptions
1 out of 1
Question
Feedback 15 of 45
Which of the following stakeholders primarily develops the definition
of done for the team increment?
Solution Architect
Agile Teams
Business Owners
1 out of 1
Question
Feedback 16 of 45
What is the product vision?
An explanation of the architectural runway needed to deliver
products to the customer
A set of prioritized Features
1 out of 1
Question
Feedback 17 of 45
Which of the following statements is true about Roadmaps?
Roadmaps provide a single planning horizon
1 out of 1
Question
Feedback 18 of 45
Which of the following activities occurs during the Inspect and Adapt
workshop?
A demo of the integrated system
1 out of 1
Question
Feedback 19 of 45
What is one benefit of organizing around value, and reorganizing
when required?
Enabling a DevOps mindset
0 out of 1
Question
Feedback 20 of 45
Which of the following team-level events does SAFe recommend
running on a cadence during the PI for SAFe Scrum Teams?
Portfolio Review
Iteration Demo
Iteration Review
Portfolio Demo
1 out of 1
Question
Feedback 21 of 45
What is one quality practice for software development?
Modeling and simulation
Rapid prototyping
Refactoring
Continuous exploration
1 out of 1
Question
Feedback 22 of 45
What is the primary purpose of the ART Planning Board?
To satisfy System Demo expectations by demonstrating
incremental delivery
To show dependencies between teams relating to the Feature
development
To show sizing of the Epics in relation to each other
1 out of 1
Question
Feedback 23 of 45
What is one benefit of Story acceptance criteria?
To provide Story details from a testing point of view
1 out of 1
Question
Feedback 24 of 45
What is one way to quickly address impediments to flow?
Review burn-down charts
1 out of 1
Question
Feedback 25 of 45
Which of the following tools can be used to develop a deeper
understanding of what customers are seeing, thinking, and feeling
while interacting with the Solution?
Story map
Empathy map
Vision map
1 out of 1
Question
Feedback 26 of 45
What is one benefit of Design Thinking?
The Solution is accountable
1 out of 1
Question
Feedback 27 of 45
During which of the following PI Planning activities does Product
Management introduce the prioritized Features to the teams for
planning?
The business context presentation
1 out of 1
Question
Feedback 28 of 45
During which PI Planning activity do team members commit to do
everything they can to meet the agreed-to objectives?
The second team breakout session
1 out of 1
Question
Feedback 29 of 45
Three members of Team C created a new workflow to speed up the
testing process. They spent an entire Iteration designing the process
but discovered, just before implementation, that the system could not
support the workflow. The rest of the team was excited to hear what
was learned from the failed experiment. Which of the following
characteristics of a high-performing Agile Team is Team C
demonstrating?
Fostering an environment for taking risks without fear of
embarrassment or punishment
Trust each other, allowing for both healthy conflict and reliance
on others
Enjoy their work and working together
1 out of 1
Question
Feedback 30 of 45
What is one action that occurs during Iteration reviews for SAFe Scrum
teams?
Evaluating current state metrics
1 out of 1
Question
Feedback 31 of 45
Which of the following roles is responsible for prioritizing the Agile
Team Backlog?
Scrum Master/Team Coach
Release Manager
1 out of 1
Question
Feedback 32 of 45
What are the three parts of an Inspect and Adapt?
Backlog refinement, confidence vote, and Problem-Solving
workshop
Backlog refinement, qualitative and quantitative measurement,
and ROAMing risks
The PI System Demo, qualitative and quantitative
measurement, and Problem-solving workshop
The PI System Demo, confidence vote, and ROAMing risks
1 out of 1
Question
Feedback 33 of 45
What is the purpose of the Team Sync?
To identify ART PI risks
1 out of 1
Question
Feedback 34 of 45
Which of the following measures tracks progress toward achieving
desired outcomes?
ART actual business value
Burn-down charts
1 out of 1
Question
Feedback 35 of 45
Which of the following SAFe Core Competencies of Business Agility
includes the built-in quality dimension?
Team and Technical Agility
Organizational Agility
0 out of 1
Question
Feedback 36 of 45
What are the four types of team topologies?
Stream-aligned, functional requirements, product domain, and
technical
Functional requirements, platform, enabling, and technical
Stream-aligned, platform, enabling, and complicated subystem
1 out of 1
Question
Feedback 37 of 45
During which PI Planning activity are Stories written and sequenced?
The draft plan review
1 out of 1
Question
Feedback 38 of 45
What is the typical timebox in which to complete a User Story?
One Iteration
One PI
One month
One year
1 out of 1
Question
Feedback 39 of 45
What is one dimension of the Team and Technical Agility Core
Competency?
Relentless Improvement
Innovation Culture
Built-in Quality
Leading by Example
1 out of 1
Question
Feedback 40 of 45
Team B has elected to stop holding retrospective events so they can
spend more time completing Stories. Which of the following Agile
Team responsibilities is Team B over-prioritizing?
Apply systems thinking
Deliver value
0 out of 1
Question
Feedback 41 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on understanding customer needs?
Continuous Integration
Continuous Exploration
Release on Demand
Continuous Deployment
1 out of 1
Question
Feedback 42 of 45
Which of the following types of Enabler Stories is used for building and
evaluating prospective Solutions alternatives?
Compliance
Architecture
Infrastructure
Exploration
1 out of 1
Question
Feedback 43 of 45
Which of the following team-level events does SAFe recommend
running on a cadence during the PI for SAFe Team Kanban Teams?
System Demo
Retrospective
Coach Sync
PO Sync
1 out of 1
Question
Feedback 44 of 45
What is one responsibility of Product Management?
Provide estimates for the Team Backlog
1 out of 1
Question
Feedback 45 of 45
What is one Story component to consider when estimating size?
Dependency
Knowledge
Depth
Scope
1 out of 1
SAFe-Practitioner Exam Dumps - PDF Questions and
Testing Engine
SAFe-Practitioner Dumps - The Sure Way To Pass Exam
NEW QUESTION 20
Which artifact shows the progress being made toward the Target work done?
Answer: D
NEW QUESTION 21
Which of the below is not part of the Continuous Delivery Pipeline?
• A. Continuous Exploration
• B. Continuous Integration
• C. Continuous Deployment
• D. Continuous Testing
Answer: D
NEW QUESTION 22
Which of the below are not part of the CALMR approach to DevOps?
• A. Measurement
• B. Authentication
• C. Culture
• D. Lean Flow
Answer: B
NEW QUESTION 23
Business Agility is the ability to compete and thrive in the digital age by quickly
responding to market changes and emerging opportunities with innovative, digitally-
enabled business solutions
• A. TRUE
• B. FALSE
Answer: A
NEW QUESTION 24
Who directs the Agile team?
• A. Scrum Master
• B. Project Manager
• C. Product Owner
• D. The Agile Team is self-organizing
Answer: D
NEW QUESTION 25
What does the Continuous Delivery Pipeline enable?
• A. Quarterly Release
• B. Release on Demand
• C. Scheduled Releases
• D. Annual Release
Answer: B
NEW QUESTION 26
Who establishes the sequence of backlog items based on program priorities, events, and
dependencies with other teams?
• A. RTE
• B. Business Owner
• C. Scrum Master
• D. Product Owner
Answer: D
NEW QUESTION 27
SAFe advocates to develop on demand and release on cadence.
• A. FALSE
• B. TRUE
Answer: A
NEW QUESTION 28
Which 2 of the below are true for NFRs (non-functional requirements)?
Answer: B,C
NEW QUESTION 29
How many dimensions does the Team and Technical Agility competency have?
• A. seven
• B. three
• C. five
• D. four
Answer: B
NEW QUESTION 30
The Team and Technical Agility competency describe the critical skills and
____________ principles and practices that high-performing Agile teams and Teams of
Agile teams use to create high-quality solutions for their customers
• A. Extreme Programming
• B. Lean-Agile
• C. DevOps
• D. SMART
Answer: B
NEW QUESTION 31
Which of the following is not a primary responsibility of the System Architect?
Answer: D
NEW QUESTION 32
Acceptance criteria provide the details of the Story from a testing point of view
• A. TRUE
• B. FALSE
Answer: A
NEW QUESTION 33
How many are the Scrum events?
• A. seven
• B. four
• C. three
• D. depends on the length of the iteration
Answer: B
NEW QUESTION 34
Which of the below are dimensions of the Team and Technical Agility competency?
Answer: A,B,D
NEW QUESTION 35
The sixth SAFe Lean-Agile principle advises to visualize and limit what?
• A. Impediments
• B. Work in Production (WIP)
• C. Working Inventory Potential (WIP)
• D. Work in Progress (WIP)
Answer: D
NEW QUESTION 36
During Iteration Planning, the Scrum Master presents the stories in order of priority and
answers clarifying questions
• A. FALSE
• B. TRUE
Answer: A
NEW QUESTION 37
Who is at the center of the Seven Core Competencies of Business Agility?
• A. The Customer
• B. The Economic Benefit
• C. The Developer
• D. The Business
Answer: A
NEW QUESTION 38
Business Rule Variations and Simple or Complex are techniques used for
Answer: C
NEW QUESTION 39
Persona is a profile of a product's typical customer.
• A. TRUE
• B. FALSE
Answer: A
NEW QUESTION 40
Latest Version: 7.0
Question: 1
In the Program Kanban some steps have work in process (WIP) limits. Why is this necessary?
Response:
A. To help Continuous Deployment
B. To enable multitasking
C. To ensure large queues are not being built
D. To keep timebox goals
Answer: C
Question: 3
Which of the below are not part of the CALMR approach to DevOps?
Visit us athttps://www.examsboost.com/test/safe-practitioner/
Response:
A. Measurement
B. Lean Flow
C. Authentication
D. Culture
Answer: C
Question: 15
During the Inspect and Adapt event, how are reflection, data collection, problem solving, and
identification of improvement actions used?
Response:
A. To increase the quality and reliability of the next PI
B. To enhance and improve the Innovation and Planning practices
C. To help the team bond and work more efficiently together
D. To evaluate better implementation steps
Answer: A
Question Feedback
Block 1: Candidate Agreement
Block 2: Instructions
Block 3: Questions
Question
Feedback 1 of 45
What is one action that occurs during Iteration reviews for SAFe Scrum
teams?
Prioritizing unplanned work
0 out of 1
Question
Feedback 2 of 45
Which of the following is a SAFe Lean-Agile Principle?
Turn mistakes into learning moments
Visualize work
1 out of 1
Question
Feedback 3 of 45
What is the purpose of the Team Sync?
To make announcements to the entire ART
1 out of 1
Question
Feedback 4 of 45
Which of the following team-level events does SAFe recommend
running on a cadence during the PI for SAFe Team Kanban Teams?
Coach Sync
PO Sync
System Demo
Retrospective
1 out of 1
Question
Feedback 5 of 45
What is the product vision?
An explanation of the architectural runway needed to deliver
products to the customer
A method for aligning to the product direction
1 out of 1
Question
Feedback 6 of 45
During which PI Planning activity do Business Owners assign business
value to PI Objectives?
The Management Review and Problem-Solving workshop
0 out of 1
Question
Feedback 7 of 45
Which of the following roles is responsible for prioritizing the Agile
Team Backlog?
Product Owner
Release Manager
1 out of 1
Question
Feedback 8 of 45
What is one quality practice for software development?
Modeling and simulation
Refactoring
Rapid prototyping
Continuous exploration
0 out of 1
Question
Feedback 9 of 45
Which of the following activities occurs during the Inspect and Adapt
workshop?
Planning the next PI
0 out of 1
Question
Feedback 10 of 45
Which of the following statements describes the balanced Agile testing
pyramid?
Many large, manual tests of the end-to-end solution and fewer
small, automated tests
Many small, low-level, automated tests and fewer large, manual
tests
Many solution tests run by external testers and fewer run by
internal team members
Many solution tests run by internal team members and fewer
run by external testers
1 out of 1
Question
Feedback 11 of 45
What is one Story component to consider when estimating size?
Depth
Knowledge
Scope
Dependency
0 out of 1
Question
Feedback 12 of 45
What is the typical timebox in which to complete a User Story?
One PI
One year
One Iteration
One month
1 out of 1
Question
Feedback 13 of 45
Team B has elected to stop holding retrospective events so they can
spend more time completing Stories. Which of the following Agile
Team responsibilities is Team B over-prioritizing?
Connect with the customer
Deliver value
1 out of 1
Question
Feedback 14 of 45
What is one way to quickly address impediments to flow?
Raise visibility of effects outside of ART control
1 out of 1
Question
Feedback 15 of 45
What is one purpose of the System Demo?
To identify PI Objectives
Question
Feedback 16 of 45
Which of the following team-level events does SAFe recommend
running on a cadence during the PI for SAFe Scrum Teams?
Portfolio Demo
Iteration Demo
Portfolio Review
Iteration Review
1 out of 1
Question
Feedback 17 of 45
Which of the following statements describes the Product Owner role?
Prioritizing the ART Backlog
1 out of 1
Question
Feedback 18 of 45
During which PI Planning activity do team members commit to do
everything they can to meet the agreed-to objectives?
The PI confidence vote
The draft plan review
1 out of 1
Question
Feedback 19 of 45
What is one dimension of the Team and Technical Agility Core
Competency?
Leading by Example
Relentless Improvement
Innovation Culture
Built-in Quality
1 out of 1
Question
Feedback 20 of 45
What are the four types of team topologies?
Functional requirements, platform, enabling, and technical
1 out of 1
Question
Feedback 21 of 45
What is the primary purpose of the ART Planning Board?
To show dependencies between teams relating to the Feature
development
To show sizing of the Epics in relation to each other
1 out of 1
Question
Feedback 22 of 45
Which of the following statements is true about Roadmaps?
Roadmaps are only adjusted at PI boundaries
1 out of 1
Question
Feedback 23 of 45
What is one way to understand current WIP in a system?
Size Stories smaller
Split Stories
1 out of 1
Question
Feedback 24 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on getting fast feedback on small changes?
Continuous Integration
Continuous Exploration
Continuous Deployment
Release on Demand
1 out of 1
Question
Feedback 25 of 45
What is one benefit of organizing around value, and reorganizing
when required?
Enabling a DevOps mindset
1 out of 1
Question
Feedback 26 of 45
Which of the following tools can be used to develop a deeper
understanding of what customers are seeing, thinking, and feeling
while interacting with the Solution?
Value Stream map
Vision map
Empathy map
Story map
1 out of 1
Question
Feedback 27 of 45
Which of the following is both a SAFe Lean-Agile Principle and a Lean-
Thinking principle?
Decentralize decision-making
1 out of 1
Question
Feedback 28 of 45
What is one responsibility of Product Management?
Own Spike Stories on the Team Backlog
Maintain the Architectural Runway
1 out of 1
Question
Feedback 29 of 45
Three members of Team C created a new workflow to speed up the
testing process. They spent an entire Iteration designing the process
but discovered, just before implementation, that the system could not
support the workflow. The rest of the team was excited to hear what
was learned from the failed experiment. Which of the following
characteristics of a high-performing Agile Team is Team C
demonstrating?
Enjoy their work and working together
Trust each other, allowing for both healthy conflict and reliance
on others
Accountable to each other and the organization for reliably
completing quality work
Fostering an environment for taking risks without fear of
embarrassment or punishment
1 out of 1
Question
Feedback 30 of 45
Which of the following measures tracks progress toward achieving
desired outcomes?
Objectives and key results
1 out of 1
Question
Feedback 31 of 45
What is one benefit of Design Thinking?
The Solution is actionable
1 out of 1
Question
Feedback 32 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on getting to production early for verification?
Continuous Deployment
Continuous Integration
Continuous Exploration
Release on Demand
1 out of 1
Question
Feedback 33 of 45
Which of the following design-thinking techniques helps breakdown
Features while considering the end-to-end user flow?
Personas
Gemba walks
Story mapping
Market research
1 out of 1
Question
Feedback 34 of 45
During which PI Planning activity are Stories written and sequenced?
The team breakout session
1 out of 1
Question
Feedback 35 of 45
During System Demo, Team B states that the most recent release
failed because of poor version control. They share their plan for
preventing similar mistakes from happening in the future. Which of
the following SAFe Core Values is Team B demonstrating?
Siloed thinking
Organize around value
Visualizing work
Transparency
1 out of 1
Question
Feedback 36 of 45
Which of the following aspects of the continuous delivery pipeline
focuses on understanding customer needs?
Continuous Deployment
Continuous Integration
Release on Demand
Continuous Exploration
1 out of 1
Question
Feedback 37 of 45
Which of the following types of Enabler Stories is used for building and
evaluating prospective Solutions alternatives?
Infrastructure
Exploration
Architecture
Compliance
1 out of 1
Question
Feedback 38 of 45
During which of the following PI Planning activities does Product
Management introduce the prioritized Features to the teams for
planning?
The Product/Solution Vision presentation
1 out of 1
Question
Feedback 39 of 45
What is one way to address substantial rework?
Gather all requirements prior to starting the work
1 out of 1
Question
Feedback 40 of 45
What is one method for showing true progress of business outcomes?
Conduct a System Demo
Discuss during PI Planning
0 out of 1
Question
Feedback 41 of 45
What is one element teams present during the draft plan review?
Planned business value
Milestones
ART PI risks
Iteration goals
0 out of 1
Question
Feedback 42 of 45
Which of the following stakeholders primarily develops the definition
of done for the team increment?
Solution Architect
Agile Teams
Business Owners
1 out of 1
Question
Feedback 43 of 45
Which of the following SAFe Core Competencies of Business Agility
includes the built-in quality dimension?
Agile Product Delivery
Organizational Agility
1 out of 1
Question
Feedback 44 of 45
What is one benefit of Story acceptance criteria?
To provide Story details from a testing point of view
1 out of 1
Question
Feedback 45 of 45
What are the three parts of an Inspect and Adapt?
Backlog refinement, qualitative and quantitative measurement,
and ROAMing risks
The PI System Demo, qualitative and quantitative
measurement, and Problem-solving workshop
Backlog refinement, confidence vote, and Problem-Solving
workshop
The PI System Demo, confidence vote, and ROAMing risks
1 out of 1