Ref: AA/RVNL/2414/21-22/4154 Date: 12.10.
2021
Chief Project Manager
Rail Vikas Nigam Limited,
7th Floor, New Administraive Building,
Central Railway, D.N. Road, CST,
Mumbai – 400 001
Tel. No.: 022-22626343
Kind Atn: Shri Anand Swaroop,
Dear Sir,
Sub: Project Management Consultancy Services for Construcion of Road bed, Major Bridges, Minor
Bridges, ROBs& RUBs including road approaches, Staion Buildings, Staf Quarters, Other Service
Buildings, HL Plaforms, COPs, FOBs, General Electriicaion & other Works related to Construcion
of New BG Line From km 78 (Excluding Yavatmal Staion) to km 157 (Near Digras Staion) of
Central Railway in Maharashtra State, India – Submission of Systems and Procedures report.
Ref: Noiicaion of Award Ltr No. RVNL/MUMBAI/YTL-NED/Package 1/PMC Date: 31.05.2021
As per Clause 5.8.1 (iii) of terms of reference (TOR) of PMC Contract Agreement, we hereby submit
Systems and Procedures report for your kind perusal.
Thanking You,
Yours faithfully,
for Aarvee associates architects engineers & consultants pvt. ltd.
(Aditya Jha)
Associate Vice President
Copy to: 1. Shri Sanjay Hanmant Kulkarni, AGM/RVNL/Nagpur – for kind informaion please.
2. Shri Vivek Pandhari Tembhurkar, Sr. DGM/RVNL/NGP – for kind informaion please.
3. Shri P. Venkateswar Reddy, RE/PMC/Package-1 – for kind informaion please.
4. Shri Devesh Kumar Chaturvedi, RE/PMC/Package-2 – for kind informaion please.
Encl: Systems and Procedures Report
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
PROJECT MANAGEMENT CONSULTANCY SERVICES
for
Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including
Road Approaches, Staion Building, Staf Quarters, Other service buildings, HL
plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras
Staion) of Central Railway in Maharashtra State, India.
SYSTEMS AND PROCEDURES
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021. Page 1
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
SYSTEMS AND PROCEDURES
DISCLAIMER
“Systems and Procedures” are prepared based on general terms of project
In case of conlict, condiions of Execuion contract agreements shall prevail. Wherever contract
agreement do not explicitly indicate speciicaion, relevant Railway speciicaions/pracices shall
apply.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021. Page 2
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
TABLE OF CONTENTS
S.No. Descripion Page No.
1 INTRODUCTION 04
2 OBJECTIVES OF QAP 05
3 QUALITY ASSURANCE 06
4 RESPONSIBILITY OF THE CONTRACTOR 09
5 QUALITY MANAGEMENT SYSTEM 12
6 LIST OF TESTS AND CHECKS FOR CIVIL WORKS 13
7 TEST PROCEDURES FOR SOIL 18
8 TEST PROCEDURES FOR THE INGREDIENTS OF CONCRETE 36
9 TEST PROCEDURES FOR CONCRETE 49
10 TEST PROCEDURES FOR BRICKS 54
11 QUALITY ASSURANCE PLANS OF CIVIL WORKS 59
12 TEST FORMATS FOR CIVIL WORKS 78
13 CHECK LISTS FOR CIVIL WORKS 106
14 PERMANENT WAY WORKS 120
15 SIGNALING AND TELECOMMUNICATION WORKS 137
16 ELECTRICAL WORKS 154
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021. Page 3
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
1. INTRODUCTION
RAIL VIKAS NIGAM LIMITED (RVNL), having its Corporate oice at 1st Floor August
Krani Bhavan, Bhikaji Cama Place, New Delhi -110066, India is a Public-Sector
Enterprise set up as a wholly owned Government Company under the provisions
of Secion 617 of Companies Act. Awarded the project for the work of Project
Management Consultancy Services for Construcion of Roadbed, Major bridges,
minor bridges, ROBs & RUBs including Road Approaches, Staion Building, Staf
Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78.0 (Excluding
Yavatmal Staion) To KM 157.0 (Near Digras Staion) of Central Railway in
Maharashtra State, India in 2 (two) Packages.
RVNL awarded the work of
1. Construcion of Road bed, Major bridges, minor bridges, ROBs & RUBs including
road approaches, Staion Buildings, Staf Quarters, Other Service Buildings, HL
Plaforms, COPs, FOBs, General Electriicaion & other Works related to
Construcion New BG Line From km 78 (Excluding Yavatmal Staion) to km 110
(Including Tapona Staion) of Central Railway in Maharashtra State, India.
2. Construcion of Road bed, Major bridges, minor bridges, ROBs & RUBs including
road approaches, Staion Buildings, Staf Quarters, Other Service Buildings, HL
Plaforms, COPs, FOBs, General Electriicaion & other Works related to
Construcion of New BG Line From km 110 (Including Tapona Staion) to km 157
(Near Digras Staion) of Central Railway in Maharashtra State, India to M/s PEL – ISC
– PRATHMESH (JV) and M/s SMSL – SRRCIPL (JV). who in future are referred to as “Contractors”
for execuion of the work.
RVNL awarded the work of Project Management Consultancy Services for Package -1 and 2 to
M/s Aarvee Associates Architects Engineers and Consultants Pvt. Ltd.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 4
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
1.1 GENERAL:
While execuion of work and its compleion as per target is of paramount importance, quality of
construcion along with safety during execuion is equally essenial.
Quality Assurance in the project ensures high quality inputs in the execuion of project using
best pracices and well-deined methodology. This is made possible through professional
aitudes, ethics, proper sequence of work, quality tests and proper documentaion and work
environment. It is essenial that every person in the organizaion has the right approach and
aitude, discipline and dedicaion towards the implementaion of maintaining this protocol to
achieve high quality output.
The project implementaion policy should recognize ‘Safety’, ‘Quality’ and ‘Timeliness’. The
‘Quality Assurance Plan’ described here under relects this objecive.
The ‘Quality Assurance Programme’ has been framed keeping in view the speciicaions of the
“Contract Agreement”, the relevant RDSO/ RVNL/ IRS/ IS/ IRC Codes & Sound Engineering
Pracices. This document deines the general quality assurance procedures common to various
construcion aciviies and also lays down the controls for ensuring quality and system for
reporing. This ‘Quality Assurance Programme’ covers the checks, inspecions and ensures
compliance with the applicable design documents. Inspecion check lists and forms to be used
for the various construcion aciviies which are enclosed in this Manual as Annexure.
1.2 DOCUMENTS/ CODES/ SPECIFICATION AND APPLICABILITY
Applicability of speciicaions, codes & condiions are to be as per Contract Agreement. The
Contractors shall provide all working drawings and documents including compleion drawings
sipulated in the Contract Agreement in prescribed number of copies to PMC and also to RVNL.
2. OBJECTIVES OF QAP
The fundamental objecives for implemening the ‘Quality Assurance Programme’ are as follows:
a) To ensure good quality materials, workmanship and beter output to the enire
saisfacion of the client.
b) To lay down procedures, well deined working methodology and sequence of work.
c) To insist system for checks and cross checks at various levels to assure the required
quality of the work/ inal product.
d) To maintain proper documentaion/ records.
e) To observe good system of reporing.
f) To deliver products and ensure that the project is completed within the sipulated ime
frame.
g) To train staf on “Quality Assurance”
h) To ensure quality consistent with safety as per the scope of work, speciicaions and
procedures by regular monitoring and checks.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 5
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
3. QUALITY ASSURANCE
Aarvee Associates Architects Engineers and Consultants Pvt. Ltd. will be referred as Project
Management Consultant (PMC) or Engineer in this Document and Project Manager Posted at
Site will be its representaive.
Quality Assurance by Project Manager of the Consultant is ensured by taking the under
menioned steps during the following stages of the contract period
a) Mobilizaion ater award of contract.
b) Construcion
c) Post construcion
3.1 MOBILIZATION AFTER AWARD OF CONTRACT
3.1.1 Posing of Personnel of the PMC as per the contract agreement of RVNL.
3.1.2 Collecion of Documents by the Project Manager:
a. Consultancy contract Agreement.
b. Construcion contract Agreement.
c. Drawings, Designs, Working Methodologies.
d. Technical books for reference such as P. way Manual. Works Manual Bridge Manual,
Signal Engineering Manual I&II, ACTM Vol 1&2 and Relevant RVNL/ IRS/ IS/ IRC
Speciicaion etc.
3.1.3 Seing up Project Oice: As per contract condiion, Secion-5 ‘Works Requirements’
a) Oice, Oice furniture, Oice equipment & Computers, Printers, Xerox m/c etc.
b) Communicaion lines: Telephone (land line and mobile), e-mail and fax.
3.1.4 Administraive Arrangements:
a) Movement of personnel, equipment and material to project sites
b) Recruitment of staf.
c) Oice & document management.
3.1.5 Others:
a) Study contract documents, drawings and speciicaions.
b) Meeing with ‘Contractor’ and draw overall plan of execuion – Draw ‘Strip Chart’ with
resource requirement.
c) Facilitate handing over of site clear of all hindrances.
d) Hand over required drawings ater proof checking where ever necessary
e) Approval of material source if necessary, sampling, tesing and passing.
f) Checking of all necessary supporing documents as required with each RAB of execuion
contractors and issuing interim payments ceriicates.
g) Approving Vendor list, quarries.
h) Ensuring tree cuing with the help of Contractor & RVNL.
i) Call for methodology and programme of work and method statements from Contractor
and approve them.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 6
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
j) Examine safety consciousness and issuing competency ceriicate
k) Guidance in seing up laboratory, batching plant etc. by contractor and approve them.
l) Tesing of materials as per Q.A. and their acceptance.
m) Call for cash low statements from contractor and approve.
n) Call for insurance pariculars from contractors and approve.
3.2 CONSTRUCTION:
3.2.1 Quality Assurance in following aciviies:
a) Contract monitoring, measurements, test checks, payments, advances, modiicaions
and variaions.
b) Monitoring Program and deployment of resources
c) Monitoring materials procurement and inventory
d) Monitoring contractor’s labour and faciliies for labour
e) Monitoring progress and reporing in prescribed formats – mile stones, review of
progress of work an0d requirement of resources, suggest correcive measures for
making up progress, if needed.
f) Quality Surveillance
g) Laboratory test and records.
h) Field Test Register.
i) Environmental Monitoring Plan monitoring and reporing in prescribed formats.
j) Safety of personnel, equipment’s, safety of train services and safety of third party.
k) Ensuring environmental protecion
l) Coordinaion and liasioning with RVNL, Railway, Commissioner of Railway Safety and
local authoriies.
3.2.2 Quality Assurance of incoming materials:
Quality assurance measures in respect of receipt and storage of materials are listed below.
a) Materials:
i. Checking quality of the construcion materials in the prescribed formats.
ii. Other materials to be used in the work should be from approved vendors and must
have the inspecion ceriicate by the authorized agencies or have test ceriicates of
the manufacturer. If considered necessary, the ‘Engineer’ will carry out his own
checks to verify the quality.
b) Storage of Materials:
A log of material deliveries to site shall be maintained by the contractor and all materials
shall be inspected on arrival. Contractor shall clearly mark the materials wherever
pracicable; idenify their origin, grade, quanity and date of delivery as per the delivery
log. This register will also contain details of issues to the work. Storage of materials must
be done as speciied in the contract documents or as per manufacturer’s instrucions or
as per relevant RVNL/ IRS/ IS/ IRC Codes & Speciicaions.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 7
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
3.2.3 Measurement and test Checks:
Project Manager of the Project Management Consultants will ensure checking of all items of
works as under.
a) Consultant:
i. Regarding measurements of works, the following shall be followed:
ii. Assistant Experts / Experts: 100% measurement will be recorded by the respecive
Expert in the ‘Measurement Book’ & ‘Level Book’ of RVNL.
iii. Resident Engineer: The RE shall carry out minimum 10% test check of all
measurements in each bill & 25% for hidden measurements & all items of supply i.e.
ballast, cement, steel etc.
iv. In case the Resident Engineer records measurements of works, the test check shall
be done by Project Manager to the same extent as menioned above.
v. Detailed procedure for diferent scenarios on measurement shall be done on
procedure order No. C/RVNL/065/2006/3/Pt.III dated 13.02.2019.
b) Client:
Client if considered necessary, may exercise regular/ surprise checks or act as per
‘Contract Agreement’ & RVNL Circulars/ Orders.
c) Quality Audit:
The Experts & Resident Engineer will carry out the quality assurance checks of the works
as prescribed. The Resident Engineer will also carry out surprise checks; his quality
assurance checks will cover-
i. Inspecion of documents,
ii. Adherence to technical speciicaions,
iii. Safety precauions,
iv. Witnessing of samples for tesing and actual tests,
v. Source approval if necessary, quality of raw materials/ ingredients and
ceriicaion thereon,
vi. Environmental management plan – implementaion,
vii. Training of project staf,
viii. Quality of work during execuion and compleion,
ix. Whenever there are deiciencies, the Project Manager will discuss his
observaions with the Resident Engineer/ Experts and contractor and get their
comments. A report will be prepared and submited to RVNL.
3.3 POST CONSTRUCTION
a) Claims and dispute resoluion
b) Ceriicate and payment.
c) New items, changes in cost /rate and variaions.
d) Compleion recommendaion, ‘as built drawings’ and statements
e) Inspecion and reciicaion during ‘Defects Liability Period’.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 8
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
f) Handing over of completed work to the Railway through RVNL.
4. RESPONSIBILITIES OF THE CONTRACTOR
4.1. REQUEST FOR INSPECTION
For every work, request for inspecion (RFI) with all informaion as per approved format shall be
furnished by the Contractor to PMC well in advance for stage execuion of works. Contractor’s
RFI addressed to PMC shall invariably contain reference number of RFI, required ime/ place for
assessment, reference to BOQ item Nos., reference to Contractor’s earlier RFI for the same item/
work, persons nominated from Contractor and with signature of authorized signatory of
Contractor. No further work shall be commenced without assessment and approval of works by
the PMC. Typical RFI format is annexed and stages of works with RFI for diferent work items are
indicated in respecive procedures.
4.2. QUALITY CONTROL LABORATORY:
a) Contractor shall establish Quality Control Laboratory at site as per sipulaion of Contract
and obtain approval of PMC for the faciliies and submit necessary Calibraion
Ceriicates for all the equipment’s.
b) Contractor shall provide personnel with adequate experience to maintain quality in the
tesing laboratory as per contract condiion.
c) Contractor shall furnish Quality Assurance Program (QAP) as a part of construcion
Methodology for approval of PMC. QAP, in addiion to random tesing, shall clearly
indicate rouine tesing, frequencies of tesing, procedures for approving various sources
of materials and acceptance criteria.
d) Contractor shall arrange for tesing of materials and works in presence of PMC wherever
sipulated.
e) Contractor shall arrange for special tests/ sampling as per direcion of PMC/ RVNL from
approved tesing laboratory.
f) Contractor shall maintain complete set of speciicaions/ codes pertaining to quality
tesing and acceptance criteria as per sipulaions of Contract.
g) Contractor shall maintain all quality records of tests/ inspecions conducted as per
formats in consultaion with PMC and provide a consolidated statement in every
monthly progress report.
4.3. STORES/ DEPOT OF CONTRACTOR :
a) Contractor shall idenify depot locaions along with PMC
b) Contractor shall prepare site drawings showing proposed locaions of depot area along the
secion and furnishing to PMC/ RVNL for their approval along with operaions proposed at
Stores
c) On accordance of approval by PMC/ RVNL, Contractor shall establish depot area including
main stores at approved locaions
d) Contractor shall make arrangements of safe custody of various materials proposed to be
secured at these depots.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 9
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
e) Contractor shall furnish systems/ procedures proposed to be followed for inward/ outward
movement materials from stores/ depot areas including indicaing personnel deployed by
the Contractor.
f) Contractor shall ensure to maintain stores ledger as per provisions of contract.
g) Contractor shall ensure stacking of various materials separately so that reconciliaion can be
taken up at any given ime.
h) Compliance to Statutory Requirements/ Laws and Bye Laws
i) Contractor shall ensure to take all necessary steps to comply various statutory requirements
including labour laws, local bye laws as speciied in contract.
j) Contractor shall furnish proof of compleion of statutory requirement to PMC for acceptance
and forwarding to RVNL.
k) Contractor shall ensure to take all insurances including indemniies and third party insurance
and provide proof of the same to PMC along with reference to condiions of contract. PMC,
ater verifying the same, shall forward to RVNL for informaion and record.
l) Contractor shall take all safety precauions at the works spot with provision of safety
equipment’s to all labour/ staf/ oicials.
4.4. CHANGES IN DRAWINGS/ CHANGES IN WORKS QUANTITIES :
a) Contractor shall at once indicate changes in quaniies/ changes in drawings occurring either
due to site condiions or decisions or variaions given by PMC/ RVNL, while inimaing
changes or variaion, Contractor shall clearly indicate authority ordering such change,
whenever applicable, with their proposal.
b) Contractor shall also inimate addiional costs, if any, on account of variaions/ changes
ordered by RVNL or arising out of site condiions within sipulated ime as per contract
condiions. PMC ater due examinaion will forward the same to RVNL for approval.
c) Contractor shall ensure that all deviaions/ variaions beyond sipulated limits of execuing
contract are taken up only ater approval of RVNL. Costs/ Duraions aspects arising out of
variaions shall be dealt with as per provisions of contract.
4.5. EXECUTION OF WORKS :
a) Contractor shall carryout all works with speciied quality and required progress. Contractor
shall ensure accuracy, safety, strict adherence to approved drawings, quality assurance and
environment protecion while execuing various works. Contractor shall provide all
assistance to PMC/RVNL in checking, inspecing and verifying various works as per provision
of contract before acceptance of works.
b) PMC shall carryout site inspecion of work, conduct / witness ield quality tesing,
observance of workmanship, quality and safety in execuion of works. PMC shall provide
imely engineering decisions wherever required. PMC shall inspect works at regular intervals
including during defect liability period.
c) Deined procedures for execuion of various works of contract are provided in contract.
Execuion, supervision and provisions made in execuion contract shall prevail wherever this
procedures difer from other contract documents.
4.6. COMMISSIONING :
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 10
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
a) On compleion of work in all respects, Contractor shall ofer the same for inal inspecion of
works by PMC/ RVNL/ Railways. Where necessary, the track may be compacted by several
passes of Dynamic Track Stabilizer/ Engine/ Material Train. Joint inspecion minutes shall be
made duly indicaing deiciencies if any found. Contractor shall indicate ime frame for
removal/ remedying of deiciencies, if any.
b) Then Process for CRS Sancion through RVNL and Railways will be done by preparing opening
documents as per ‘Rules for Opening of Railway’ by the contractor and veriied by PMC.
c) Contractor and PMC shall interact with Railways to obtain CRS sancion for ‘Opening of
Railway’.
d) The Contractor and PMC will be present during CRS inspecion to give any clariicaion, if
needed by CRS. All remedy of the CRS requiring atenion will be atended to by the
contractor in consultaion with PMC before commissioning of track.
e) Recording by TRC on commissioning and reciicaion/ remedying of defects by Contractor as
per standard procedure and direcions from PMC shall be done.
4.7. COMPLETION ESTIMATES, DRAWING AND RECORDS :
a) Contractor shall prepare and furnish the following documents and records to PMC for
scruiny and handing over to RVNL/ Railways.
b) Compleion drawing of embankments and cuing including details of special
construcion features like toe walls, breast wall, catch and side water drains, cross
secion of embankment/ cuing type of soil in sub grade and depth of blankeing
material geological features etc.
c) Compleion/ as built drawings for all minor bridges, buildings, FOBs, plaform shelters
and all miscellaneous structure.
d) As built records/ drawings for P.Way work
Verical alignment
Horizontal alignment
Recording Versine, Gauge, Cant (i.e., Super Elevaion)/ Cross Level and Rail Top
Longitudinal Proiles
Juncions including locaion, gauge, cross level, level alignment clearances,
dimensions and operaion of movable parts
Weld record plan and weld test results
De-stressing record
Electrical insulaion test results
Distance in kilometers, coordinates, ofsets of all permanent track markers
Rail inclinaion records
Pandrol Clip toe load records
Results and reports of all tests and materials, assemblies and items/ components
Results of all tests on compleion shall be submited in hard copy and electronic
format.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 11
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
e) Tesing, Inspecion and acceptance records for Signaling & Telecommunicaion and
General Electrical works as per provisions of contract.
f) Records and ceriicaion for all the compleion tests and inspecions
g) Copies of ceriicates for statutory compliances
h) Copies of inspecion ceriicates for various procurement items.
i) Project photographs covering various aspects of construcion for the enire secion.
5. QUALITY MANAGEMENT SYSTEM
5.1 GENERAL:
Quality Management System has been established and documented in this Quality Assurance
Manual, which aims at coninuous improvement in accordance with the Contractual
requirements/ obligaions.
Various processes involved in the Quality Management System shall be ideniied and
established to provide control over those processes afecing Quality. Unless otherwise stated,
each basic element of the Quality Management System as deined in this manual, shall be
applied to all construcion aciviies performed at site.
Addiional/ deviaing Quality System requirements as instructed by Consultant and/ or
applicable Naional/ Internaional Standards shall also be complied with, for such order. The
Quality Assurance Programme, as described in this manual, provides for control of material
idenity. The system also provides the control of special processes, non-conforming products,
correcive and prevenive acions, QA/ QC records and audit.
For all outsourced processes that afect the quality of the product, Consultant shall idenify and
determine the control over such processes.
5.2 DOCUMENTATION REQUIREMENT:
5.2.1. GENERAL :
As a part of the Quality System Programme, Contractor shall document the system in the
form of Standard Operaing Procedures & Quality Assurance Plan (QAP) & inspecion and
test plans including forms and formats, checklists which shall be controlled by Resident
Engineer/ Experts and maintain these procedures and instrucions (with the Forms and
Formats). Requirement and acceptance limit for acivity/ work/ funcion as per speciicaions
& codal provisions shall be outlined in the QAPs.
The Quality Management System documentaion includes the following:
a) Quality Policy Statement and Quality Objecives.
b) Quality Manual outlining the various processes.
c) Documentaion Procedures
d) The documents needed by Consultant to ensure efecive planning, operaion and
control of the processes involved in this project.
e) Work instrucions/ guidelines, where the absence of such instrucions would
adversely afect the quality of the product.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 12
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
f) Records
5.2.2. QUALITY MANUAL
Consultant has documented, and established a Quality manual that includes the applicable
scope of the Quality Management System required for this project. The documented
procedures where established have been referred in the respecive secions of this Quality
Manual.
5.2.3. CONTROL OF DOCUMENTS :
a) Consultant has established codiicaion guidelines to idenify the various types of
documents used in this Quality Management System. Separate system of codiicaion
exists for drawings and correspondence.
b) Whenever a paricular procedure undergoes any change, the same shall be reviewed
and reapproved before issue. The changes shall be ideniied through the cover page
with appropriate Revision No. and Date of Revision.
c) All the obsolete documents which are otherwise not required to be retained for any
purpose, shall be destroyed immediately ater the issue of revised version of the same
document.
5.2.4. CONTROL OF RECORDS :
d) All the records pertaining to the Quality Management System shall be ideniied through
the codiicaion number. Records can be maintained as iled hard copies and/ or on
electronic media.
e) For records that are maintained in electronic media, the user department shall take
precauions against the unauthorized use of the records.
f) The user department shall prepare the Master List of Records maintained at the
department in the prescribed format for this purpose.
6. LIST OF TESTS AND CHECKS FOR CIVIL WORKS:
Following tests shall be carried out as per frequency laid down in the relevant speciicaions in
the ield/ laboratory as speciied in contract provisions. Lab equipment’s are to be provided as
per RVNL/ RDSO Guidelines and Speciicaion. Laboratory equipment’s are to be provided as per
Annexure.
6.1. EARTHWORK:
i) Modiied heavy proctor density tests following IS: 2720- (Part –8) 1983.
ii) Grain size analysis of soil as per IS: 2720 (Part-4)1985 and Classiicaion of soil.
iii) Aterberg Limit as per IS : 2720 (Part-5) 1985
iv) Determinaion of CBR (i.e. California Bearing Raio) as per IS : 2720 (Part-16) 1987
v) Free Swell Index following IS:2720 (Part-15) 1977
vi) Determinaion of Dry Density i.e. Compacion Test by Sand Replacement method
following IS-2720 (Part - 28) 1974 (Revision-I) in case of Blankeing.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 13
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
vii) Determinaion of Dry Density i.e. Compacion Test by core cuter method following IS-
2720(Part - 29)1975 (Revision-I) in case of Earth work.
viii) Field density tests to be conducted as per IS: 2720 Part - 28 for granular soil
ix) Moisture content before compacion per IS: 2720 Part – 2-1973 (Revision2)
x) Thickness and level of layers shall be regularly checked and to be maintained as per
technical speciicaion.
6.2. AGGREGATE (Coarse & Fine) :
i) Aggregate Impact Value following IS 2386 Part IV.
ii) Gradaion of Aggregate following IS 2386 Part 1& IS 383.
iii) Combined Flakiness and Elongaion Index following IS 2386 part 1 & MOST
iv) Speciic Gravity and water Absorpion Test as per IS 2386 part III.
v) Los Angeles abrasion value test following IS 2386 Part IV, 1963.
6.3. CEMENT (PHYSICAL):
i) Consistency following IS 4031 (part4)
ii) Iniial and Final seing ime as per IS 4031 (Part 5)
iii) Compressive Strength as per IS 4031 (part 6)
iv) Fineness of Cement IS 4031 (Part-1)
6.4. FRESH CONCRETE:
Workability (Slump Test) as per IS 1199.
6.5. HARDENED CONCRETE:
i) Compressive Strength of concrete as per IS 516. Other tests like chemical analysis of
water, steel, admixture etc. are to be carried out in approved external laboratory as per
direcions of the Engineer.
ii) Permeability test wherever required as per Contract Agreement/ Engineer's decision.
6.6. Checks by Engineer
6.6.1. Checks before the start of construcion
Before the Contractor starts construcion, the competent personnel of the Engineer shall
ensure that the following requirements are fulilled:
a) The working procedures that the contractor proposes to adopt are suitable and conform
to the technical speciicaions and check lists submited.
b) That the contractor’s ield personnel have the required experience and/ or qualiicaion.
c) That the valid and latest revisions of all the technical documentaion necessary for the
construcion are available.
d) That the approved materials and equipment’s required to start the construcion are
available at the site.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 14
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
e) Ensure that the desired levels and designed ‘Safe Bearing Capacity’ (SBC) as indicated on
drawing are obtained before laying the foundaion.
f) Record of strata and levels at founding levels to be kept and indicated on compleion
drawing.
g) Ensure good quality raw materials for construcion such as water, sand, aggregates,
cement, steel etc. and that they are checked and approved for use in the project work
before they are actually used in the work.
h) Ensure good quality shutering with adequate supports are provided before concrete is
laid as per speciied grade.
6.6.2. During Construcion:
a) Ensure that the works are executed by the Contractor in accordance with contract
documents.
b) Where non-conformity occurs, the Engineer/ his representaive shall instruct the
necessary correcive acions to the ‘Contractor’.
c) The Engineer/ his representaive shall verify systemaically the implementaion of all the
correcive acions required by the Contractor.
d) If addiional checks or inspecions are found necessary, RVNL will be informed for their
necessary acion and ater RVNL’ s approval, such addiional checks or inspecions will be
carried out.
6.6.3. Bridges:
a) Check line and level. The Contractor should set out the alignment and level of the
bridges and approaches and ix reference bench marks, pillars etc. which are to be kept
undisturbed and maintained ill the compleion of works. The Engineer’s supervisory
staf shall check these alignments and reference points while periodic checks may be
made by RVNL.
b) Check quality of all construcion materials in ield as well as in external laboratories prior
to their uilizaion in the project work. Documentaion and maintenance of all such test
records shall be made by the Contractor.
c) Check availability of proper launching/ erecing equipment’s.
d) Check arrangement of shutering and scafoldings for Substructure.
e) Check of quality of concreing during pour and ater concreing.
6.6.4. Concrete:
a) Pour documents:
For each major concreing acivity, the contractor shall inform the Engineer’s authorized
representaive at least 12 hours beforehand for each concrete pour. The Contractor in his
ield record shall maintain the following details for “Concrete Pour” as per printed format.
i) Date and ime of placing concrete.
ii) Slump test results.
iii) Grade of Concrete.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 15
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
iv) Post Concrete inspecion, honeycomb, cracks etc.(Register for Dimension record & site
order book for site instrucion)
b) Prior to pouring:
i) All materials are from approved sources and quality tests performed.
ii) Sequence of pour to prevent cold joint formaion in concrete members.
iii) Suicient stocks of approved materials at site.
iv) Vibraion and Curing arrangement shall be in order and adequate.
v) Stand by vibraion equipment/pump.
vi) Stand by plant/mixer.
vii) Standby power arrangement.
c) Checks during Concreing:
i) Ensure that the shutering and their supporing arrangements are sturdy, straight.
ii) The Joints and corners shall be proper and approved sealant.
iii) The concrete cover blocks are strong, right sized and maintained during the process of
concreing.
iv) Adequate staging is made so that no labour has to walk over the reinforcement.
v) Strictly observe water cement raio and apply necessary correcion for wetness of
aggregates prior to commencement of work.
vi) The concrete mix shall be transported quickly to the locaion of pouring.
vii) Ensure adequate vibraion with needle/ external vibrator(s).
viii) Ensure inishing of concreing when the concrete is green.
d) Avoid:
i) Excess vibraion.
ii) Walking by labour over the green concrete
iii) No touching up to the inished concrete surface.
e) Curing:
i) Ensure curing unil the speciied period has elapsed, spot checks at random during day/
night to assure the surface wet condiion.
ii) If curing is not maintained, all further concreing approval shall be withheld unil the
Engineer is saisied with revised arrangement.
6.6.5. Earth work
i) Check adequacy of ield laboratories including lab, personnel of the Contractor and the
methods of tesing.
ii) Check of ield and laboratory tests for soils and compacion.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 16
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
6.6.6. Design documents:
i) Copies of the contract speciicaions, latest issue of the construcion drawings, relevant
copies of the standards (RVNL/IRS/IS/IRC) test results, all forms for quality surveillance
(in adequate copies), site instrucion books etc. should be made available at the site.
ii) The availability of the enire above documentaion at the site shall be the responsibility
of the Contractor and necessary instrucion to them shall be issued by the Engineer.
iii) All quality assurance aciviies are required to be carried out by the Contractor at his
cost and supervised/ monitored by the Engineer/ Engineer’s representaive.
6.7. Type of Checks
6.7.1. Execuion of Checks and Tests
The checks, inspecions and tests are to be carried out in conformance with the established
procedures.
i) The quality Control tests can be carried out by the Contractor at site and at their ield
laboratories.
ii) An independent agency or external laboratories,
iii) Manufacturer/ Supplier’s laboratory.
6.7.2. Test Frequencies:
Frequencies for the main tests have been suggested in this document. These shall be treated
as the minimum frequencies if nothing is speciied in contract agreement/ RVNL
Speciicaions.
6.7.3. Variaion of Test Frequencies
i) The minimum Frequencies are to be followed and these may be varied only at the
discreion of the RVNL.
ii) When results show poor compliance and inconsistency, then the frequency of the tests
may be suitably increased.
iii) When the Engineer is saisied that independent and reliable test ceriicates exist, a
reducion in test frequency may be authorized in consultaion with RVNL.
6.7.4. Evaluaion and acceptance of results:
The evaluaion of results of the checks, inspecions and tests is the responsibility of the
Engineer. Such evaluaion shall be considered for conformance and completeness of the test
with respect to the speciicaions.
6.7.5. Non-conformance:
When the results do not conform to the acceptance norms, the same shall be brought to the
noice of the Engineer and decision regarding rejecion or acceptance of the material/work
ater carrying out remedial measures shall be taken by the Engineer under advice to the
Employer.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 17
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
7. TEST PROCEDURES FOR SOIL
Note: Test Procedures for some common tests are speciied for more details, the corresponding
speciicaions (IS/IRS/RVNL) may be referred.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 18
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/01
GRAIN SIZE ANALYSIS
A) AIM:
To determine the grain size distribuion of soil.
B) SCOPE:
The grain size analysis is the process of determining properies of grain size distribuion in a
given stock of soil obtained from natural sources.
C) REFERENCE: Code IS 2720 (Part – IV) 1985 Revision- 2.
D) APPARATUS REQUIRED:
i. IS sieves-size 10mm, 4.75mm, 2.00mm 425 micron, and 75 micron.
ii. Balance sensiive to 0.01gm.
iii. Sample divider for collecing a representaive sample.
iv. Quartering shovel
v. G.I. trays
vi. Sot brush
vii. Oven to maintain a temp between 100 oC to 110oC
viii. Mechanical sieve shaker
E) SAMPLING:
The required quanity of sample is collected either from borrow area or from site.
The quanity thus collected is prepared either by quartering or by means of sample
divider.
F) PROCEDURE:
i. The sample is brought to an air – dry condiion before weighing & sieving.
ii. The dry sample of 1kg weight is then sieved with the IS sieves of sizes 10mm, 4.75mm,
2.00mm, 425 micron, 75micron by means of a mechanical sieve shaker for not less than 10
minutes. The sieves are arranged from coarser to iner size. The sieves should be clean & dry
before the test starts.
iii. Spilling & loos of soil should be avoided during the sieving process.
iv. The lumps of ine materials are broken by gentle pressure with inger against the side of sieve.
v. Then the porion retained on each sieve is weighed and the % age of passing on each sieve is
determined.
vi. Then the percentage passing is matched with the speciied limit.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 19
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
vii. While staing maximum size of aggregate even if there is 5% material coarser than the
speciied size, it is assumed to fall within the limit.
viii. Light brushing is done with a sot brush on the underside of the sieve so that sieve will not
remain blocked.
G) OBSERVATION:
As given in the atached format.
H) RESULT:
The cumulaive percentage by weight of the total sample passing each of the sieves is
reported to the nearest whole number.
The percentage by weight of the total sample passing one sieve & retained on next smaller
sieve is reported to the nearest 0.1%.
I) CONCLUSION:
Grain size analysis of soil is required to classify the soil specimen.
QAP/TP/02
LIQUID LIMIT
A) AIM:
To determine the liquid limit of soil using Casagrande’s apparatus.
B) SCOPE:
This test is used directly in speciicaions for controlling soil for use in ill. The liquid limit depends on
the amount & type of clay in a soil and forms the basis for the soil classiicaion.
Deiniion: Liquid limit is the water content at which part of soil cut by groove of standard
dimensions will low together at a distance of 12mm under the impact of 25 drops in a standard
liquid limit apparatus.
C) REFERENCE: Code IS 2720 (Part V) 1985 (Revision 2).
D) APPARATUS REQUIRED:
1. Mechanical liquid limit device (Casagrande’s apparatus) along with grooving tool.
Porcelain evaporaing dish of about 12 cm diameter.
2. Flat ground glass plate of 10mm thick & 4 5cm 2
3. Spatula.
4. Oven to maintain the temperature between 105 0C to 1100C
5. Wash botle.
6. Airight container.
7. Balance sensiive to 0.01g.
8. IS sieving 425 micron.
9. Other materials like coton waste, disilled water etc.
E) SAMPLING:
About 120 g of the sample is taken from the thoroughly mixed porion of the soil passing 425 micron
IS sieve.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 20
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
F) PROCEDURE:
a) Adjustment of the mechanical device: The liquid limit device should be clean, dry & in
good working order. The cup should fall freely & should not have too much side play at its hinges.
Grooving tool should be clean, dry & conirming to standard dimensions.
The height of drop of cup should be adjusted to be exactly 1cm for one revoluion of the handle. The
adjustment plate shall then be secured by ightening the screw.
b) Tesing:
120 gm of soil passing through 425 micron IS sieve is mixed thoroughly with disilled water in an
evaporaing dish to form a uniform paste.
The consistency of the pate is adjusted approximately, such that it will require 30 to 35 drops of the
cup to get the required closure of the standard groove.
i. For clayey soil, the soil paste is allowed to stand for a suicient ime (24hrs) to allow water to
permeate through the soil mass.
ii. Ater 24 hrs i.e. when soaking period is over, the soil sample is taken from the bowl on a glass
plate & mixed by spatula, if required.
iii. The porion of this paste is placed in the cup above the spot where the cup rests on the base.
It is pressed by spatula so that depth of 1cm thickness is achieved at the point of maximum
thickness. The excess paste over 1 cm thickness is trimmed of.
iv. The paste in the cup is divided by grooving tool, by irm stroke, along the diameter through the
centerline of the cam follower so that a clean sharp groove of the proper dimensions is
formed.
v. The cap is lited & dropped by means of handle two revoluions per second unil two halves of
the soil cake come in contact at the botom of the groove along a distance of about 12 cm.
vi. The no. of drops required to cause the groove to close for the length of 12 cm is recorded.
vii. A representaive soil paste is taken from the cup approximately equal to the width of the
spatula, extending from about edge to edge of the soil cake at right angle to the groove &
including that porion of the groove in which the soil lowed together through 12 mm. This
paste is placed in the airight container to determine the moisture content expressed as a
percentage of the oven dry weight.
viii. The remaining soil in the cup is transferred to the evaporaing dish & the cup & grooving tool
are cleaned thoroughly.
ix. More water is added to bring the paste to a more luid condiion & the test is repeated for
three more trials with moisture content in increasing order. In no case dried soil should be
added to the thoroughly mixed soil that is being tested.
x. The no of blows is recorded in each case & the moisture content determined.
xi. The paste shall be of such consistency that the no. of drops required to close the groove shall
not be less than 15 or more than 35.
xii. The test should proceed from the drier (more drops) to the weter (less drops) condiion of the
soil.
xiii. The procedure shall be repeated unil two consecuive results give the same no of droops to
close the groove.
G) OBSERVATION:
As given in the atached format.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 21
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
H) RESULT:
i. A curve is ploted on a semi log graph represening the water content on the arithmeical scale
& the no. of droops on the logarithmic scale. The low curve is a straight line drawn as nearly
as possible through a 3 or more ploted points. The moisture content corresponding to 25
drops is rounded of to the nearest whole no. & reported as liquid limit of the soil.
ii. The liquid limit is reported as moisture content expressed in percentage.
I) CONCLUSION:
i. A high value of liquid limit indicates high compressibility of soil.
ii. High liquid limit value indicates heavy clays & low value indicates friable soils & clayey sand.
QAP/TP/03
PLASTIC LIMIT
A) AIM:
To determine the plasic limit of soil.
B) SCOPE:
i. The plasic limit of soil depends on the amount & type of clay in a soil & forms the basis for the
soil classiicaion system for cohesive soil based on the plasicity tests.
ii. The plasicity tests give informaion regarding the cohesion properies of soil & the amount of
capillary water, which it can hold.
iii. This test is used directly in speciicaions for controlling soil for use in ill.
Deiniion: Plasic limit is the water content at which soil will just begin to crumble when rolled in to
a thread of approximately 3mm diameter.
C) REFERENCE: Code IS 2720 (Part V) 1985 (Revision-2).
D) APPARATUS REQUIRED:
1. Porcelain evaporaing dish of about 12 cm diameter.
2. IS sieve 425 micron, Spatula & Wash botle.
3. Ground glass plate of 45 cm2 i.e. surface for rolling.
4. Airight container to determine moisture content.
5. Oven to maintain 1050C to 1100C temperature with non-corroding interior material.
Balance sensiive to 0.01gms.
6. Brass rod of 3 mm diameter & about 10 cm long.
7. Mortar & pestle, coton waste, disilled water
E) SAMPLING:
A sample weighing about 20g from the thoroughly mixed porion of the material passing 425 micron
IS sieve is taken.
In the process of mixing soil & water, when the soil mass becomes plasic enough to be easily shaped
into a ball, a porion of the soil sample in the plasic state is taken for plasic limit test.
F) PROCEDURE:
i. The soil specimen is mixed thoroughly with disilled water in an evaporaing dish ill the soil
mass becomes plasic enough so that it can be easily moulded with ingers.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 22
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
ii. The soil mass is allowed to stand for 24 hrs for clayey soil to ensure uniform distribuion of
moisture throughout the soil.
iii. A ball is formed with about 8g of the plasics soil mass and rolled between the ingers & the
glass plate with just suicient pressure to form a thread of uniform diameter throughout its
length.
iv. Rate of rolling is kept between 80 to 90 strokes/ minute, each stroke being one complete
moion of hand forward & backward to original posiion.
v. The specimen is rolled ill the thread becomes 3mm diameter approximately. The signs of
crumbling are observed on the thread.
vi. If no signs of crumbling are observed on the thread, then the thread is kneaded together to a
uniform mass & rerolled to form 3mm diameter thread.
vii. The process is coninued ill signs of crumbling are observed at 3mm diameter. This crumbling
may occur when the thread has a diameter greater than 3mm also.
viii. The crumbled pieces of soil thread are collected in airight container to determine the
moisture content in % age.
ix. The avg. of such three moisture content determinaions is found & reported as plasic limit of
soil.
G) OBSERVATION:
As given in the atached format.
H) RESULT:
The avg. of the calculated result is rounded to the nearest whole number for sandy soils, the plasic
limit should be determined irst. When plasic limit can’t be determined the plasicity index should
be reported as Non plasic (NP)
When plasic limit is equal to or greater than liquid limit, than the plasicity index is reported as zero.
I) CONCLUSION:
At the same liquid limit, higher the plasicity index, the more cohesive is the clay. Aterberg limits
along with mechanical analysis helps in the ideniicaion & classiicaion of soils. These limits also
provide general idea about other properies of soils such as shear strength, permeability etc. on the
basis which their suitability for the proposed work can be determined.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 23
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/04
RELATIONSHIP BETWEEN MOISTURE CONTENT & DRY DENSITY BY MODIFIED PROCTOR
A) AIM: To determine the relaionship between the moisture contents & dry density of soil using
heavy compacion.
B) SCOPE:
This test is conducted to determine the proper amount of mixing water to be used when compacing
the soil in the ield & the resuling degree of denseness, which can be expected from compacion at
opimum moisture content. This test is saisfactory for cohesive soils but not for clean sands or
gravels, which displace easily when struck with the rammer.
C) REFERENCE: Code IS 2720 (Part VIII) 1974 (Revision- I).
D) APPARATUS REQUIRED:
i. Cylindrical Metal mould of 2250 cm3 with collar & base plate.
ii. Balance of 10 kg capacity & sensiive to 1 g.
iii. Other 200 g Capacity & Sensiive to 0.01g.
iv. Oven – to maintain the temperature between 105 0 to 1100 C
v. Airight Containers.
vi. Steel Straight Edge.
vii. IS Sieves 4 .75 mm &19 mm.
viii. Metal Rammer of 4.9 kg wt.
ix. Mixing Tools Tray, Spatula etc.
E) SAMPLING:
Soil passing 19 mm IS sieve shall be taken. The raio of fracion passing 20 mm & retained on 4.75
mm IS sieve to the fracion passing 4.75 IS sieve shall be determined.
In case the material passing 19mm IS sieve & retained on 4.75 mm IS sieve is more than 20%, the
raio of such material to the material passing 4.75 IS sieve shall be maintained for each
determinaion of any test. If the coarse material retained on 4.75 mm is less than 20% the sample
may be directly used.
F) PROCEDURE:
a) The empty mould is weighed as Wm gm.
b) About 6 kg of sample is prepared by sampling.
c) The mould is then kept on the base plate & collar is atached.
d) The soil is mixed & compacted in the mould in 5 equal layers by giving 55 blows to each layer
by 4.9 kg rammer.
e) The collar is removed & the compacted soil is leveled of to the top of the mould with the help
of straight edge. The mould with compacted soil is weighed as W.
f) The soil is then taken out from the mould. The representaive sample is taken from this soil in
the container for determining moisture content.
g) The above procedure is repeated with fresh soil sample by addiion of higher water content
than proceeding unil there is decrease in the compacted weight of soil.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 24
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
G) OBSERVATION:
As given in the atached format.
H) RESULT:
The relaionship between moisture content & dry density is ploted in the graph. The moisture
density curve is a parabola & the apex corresponds to Maximum Dry Density (M.D.D.) &
Opimum Moisture Content (O. M. C)
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 25
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
FIELD COMPACTION TRIAL – COMPUTATION SHEET
Moisture Dry density of soil (gm/cc)
Lit thickness
S.No. content Nos. of the roller passes Remarks
(mm)
% 4 6 8 10 12 14 16 18
1 225
2 300
3 375
4 450
5 525
6 600
Computed by ………………………… Checked by …………………………………
Name ……………………………………Name …………………………………..
Designaion ……………………………Designaion …………………………..
Dated ……………………….. Dated ……………….
Project …………………………………………………………………………………………….....
Locaion ………………………………………………………………………………………………
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 26
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/05
DETERMINATION OF MOISTURE CONTENT OF AGGREGATES & SOILS BY OVEN DRYING
a. Clean the container thoroughly.
b. Dry it & determine its empty weight (W1) with lid.
c. Take the required quanity of the soil specimen in the container. Crumble it & place loosely
inside the container.
d. Close the container & Determine its weight (W2)
e. Keep the container with the lid removed in an oven maintained at a temperature of 110+5
degree cenigrade for 24 hours.
f. Ater drying, remove the container and allow it to cool to room temperature.
g. Determine weight of the dry sample with lid (W3)
CALCULATION:
1. Calculate the water content in percentage using the formula
W2-W3
w= x 100
W3- W1
QAP/TP/06
DETERMINATION OF WATER CONTENT
BY RAPID MOISTURE METER
a. Install and set the balance in the box of the rapid moisture meter.
b. Place sample in pan ill the mass on the balance arm matches with index mark.
c. Un clamp the clamping screw of the rapid moisture suiciently to remove the U- Clamp of
the cup.
d. Remove the cup and clean it with brush.
e. Holding cup and chamber horizontally, gently deposit one level spoonful of Calcium Carbide
halfway inside the chamber.
f. Transfer the soil sample from the pan to the cup
g. Holding cup and chamber horizontally, bring them together without disturbing sample or
Calcium Carbide.
h. Turn the U- Clamp round and close the meter ightly.
i. With the gauge downwards (except when the steel balls are used for clayey soils) shake the
moisture meter up and down vigorously for 5 seconds.
j. Quickly turn the meter down so that the gauge is up-wards.
k. Tap the body of the moisture meter to ensure that all the contents in it fall in to the cup.
l. Shake the moisture meter at least 3 imes.
m. Note reading when the needle in the dial comes to rest.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 27
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
n. This reading directly gives the percentage moisture content (m) of the wet sample.
o. Release the pressure in the meter slowly (away from the operator) by opening the clamp
screw.
p. Remove the cup out and empty the contents.
q. Clean the instrument with a brush.
r. Calculate the water content (w) of the dry sample using the formula
m
w= x 100
(100-m)
QAP/TP/07
DETERMINATION OF FIELD DENSITY BY SAND REPLACEMENT
a) Clean and level the surface.
b) Place the metal try with central hole on the prepared surface.
c) Excavate a hole 150mm deep and collect the excavated material in a container (polythene
bags)
d) Take the weight of the excavated soil/ material.
e) Pour the standard sand in the cylinder up top (leave 1 cm from top) and take the weight.
f) Place the sand pouring cylinder centrally over the excavated hole.
g) Open the shuter ill the sand ills the excavated hole and the cone completely (Seeing the
movement of sand in the Cylinder).
h) Close the shuter and take the weight of the cylinder with remaining sand (w3)
i) Determine the moisture content of excavated soil/ material.
j) Determine the bulk & dry densiies of excavated soil
k) Calculate the degree of compacion---- by comparing the ield dry density with the MDD
determined in the laboratory.
QAP/TP/08
DETERMINATION OF FIELD DENSITY BY CORE CUTTER
a) Clean and level the surface
b) Place the steel dolly on the top of the cuter
c) Ram down the dolly with cuter verically into the soil layer unil only about 15mm
of the dolly protrudes about the surface.
d) The cuter shall then be dug out of the surrounding soil.
e) Care being taken to allow some soil to project from the lower end of the cuter.
f) The end of the soil core shall then be trimmed lat.
g) Determine the moisture content of the soil in the case cuter.
h) Determine the bulk and dry density of the soil
i) Calculate the degree of compacion.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 28
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/09
DETERMINATION OF GRADATION OF SOIL/ SAND/ AGGREGATE BY WET SIEVE ANALYSIS
a. Take two porions of the sample prepared by drying in oven and brought to room
temperature.
b. Soak one porion for 10 min and the other porion for 24 Hrs. in water separately.
c. Ater soaking, wash the sample on 75 micron sieve ill the water passes through the sieve
without colour.
d. Then dry it in oven for 24 hours and sieve the dry paricles and ind the percentage of soil
passing through each sieve in dry sieve analysis.
e. Report these results against the results obtained in dry sieving so that comparison is easier.
QAP/TP/10
DETERMINATION OF SOIL AND CLAY BY HYDROMETER
PRE-TREATMENT OF SOIL:
a. Take 50 ( if clayey ) to 100gm (if sandy) oven dried soil (Md) passing the 2mm I.S. sieve.
b. If soluble salts is greater than 1%, than add 150ml Hydrogen Peroxide in a conical lask and
sir it gently for few minutes and then cover the lask with glass and leave it to stand
overnight.
c. Next morning, heat the mixture and reduce the volume to about 50ml.
d. If the soil contains insoluble calcium compounds add 50ml HCL, cool the mixture and allow
to stand at least for one hour.
e. Filter the mixture and wash it with warm water unil the iltrate shows an acid reacion to
litmus.
f. Transfer the damp soil on the ilter paper and funnel to the evaporaing dish using a jet of
disilled water.
g. Place the dish and its contents in the oven.
h. Take the mass of the oven dried soil remaining ater pretreatment (Mb) and ind the loss of
mass due to pretreatment.
i. Loss of mass in pretreatment (P)=(Mb/Md)x100%
DISPERSION OF SOIL:
a. Take oven dried soil in the evaporaing dish and add 100ml of Sodium Hexa- Metaphosphate
soluion and heat the mixture for about 10 minutes.
b. Transfer the mixture to the cup of the mechanical mixer using a jet of disilled water and sir
it well for about 15 minutes.
c. Transfer the soil suspension to the 75mm I.S. sieve placed on a receiver and wash the soil
using disilled water of about 500ml.
d. Transfer the soil suspension to 1000ml measuring cylinder and add disilled water to make
the volume exactly 1000ml.
e. Collect the material retained on 75mm sieve and put it in oven for drying Determine the dry
mass of soil retained on 75mm sieve.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 29
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
SEDIMENTATION TEST WITH HYDROMETER:
a) Insert a rubber bung on the top of the 1000ml measuring cylinder and shake it vigorously
end over end.
b) Stop shaking and allow it to stand. Immediately start the stop watch.
c) Immerse the hydrometer and then allow it to loat freely. Take the hydrometer reading ater
½ , 1, 2 and 4 minutes.
d) Take out the hydrometer and rinse it in disilled water.
e) The hydrometer is reinserted in the suspension and readings are taken ater a period of 8, 15
and 30 minutes, 1, 2,3 hours ater shaking. The hydrometer should be removed, rinsed and
placed in the disilled water ater each reading. Ater the end of 4 hours, reading should be
taken once or twice within 24 hours.
f) Observe the temperature once during irst 15 minutes and then ater every subsequent
reading.
g) Do Calculaions as per IS2720- part 4 to ind silt and clay content.
QAP/TP/11
DETERMINATION OF FREE SWELL INDEX OF SOIL
a) Take 2 samples of 10 g of over dried soil passing through IS 425 micro sieve.
b) Pour soil specimens in 2 separate graduated cylinders of 100 ml capacity.
c) Fill one cylinder with kerosene and the other cylinder with disilled water up to 100 ml mark.
d) Sir the sample gently to remove entrapped air and allow it to stand for 24 hours.
e) The diference in readings of both the cylinders, shall be expressed in % of volume of soil in
kerosene, to give the free swell index of soil.
QAP/TP/12
DETERMINATION OF DELETERIOUS CONTENT OF SOIL
a) Dry the sample in oven at 105-110 degree celsius.
b) Break the lumps of soil paricle by suitable means.
c) Mix the sample thoroughly and then subdivide by quartering.
d) Take 10 gm of soil sample in a breaker and add about 50 ml of water.
e) Sir well and allow to decant through ilter paper by adding water to wash the soil and make
the iltrate to 100 ml.
f) Pipete out 10 ml of the water extract, in a conical lask. Make it slightly acidic by adding
concentrated Hydrochloric Acid (HCL) and heart the same up to boiling point.
g) While boiling, add Barium Chloride soluion (N/4) from the Burnet ill the precipitaion is
complete, add some more Barium Chloride soluion.
h) Neutralize the soluion with Ammonium Hydroxide and iltrate the excess of Barium Chloride
against Potassium Chloride soluion (N/4).
i) The end point may be conirmed. If it is necessary by using Agt. No. 3 soluion as an external
indicator.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 30
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
CALCULATION:
Sulphate as Sodium Sulphate in soil.
Percent by mass = 0.017 x 100 (x – y)
X = Volume of (N/4) Barium Chloride added (ml.)
Y = Volume of Potassium Chloride added (ml.)
QAP/TP/13
California Bearing Raio Test
Standard: IS: 2720 (Part 16) 1979.
Deiniion: California bearing raio is the raio of force per unit area required to penetrate in to
a soil mass with a circular plunger of 50mm diameter at the rate of 1.25mm / min.
Apparatus:
i. Moulds 2250cc capacity with base plate, stay rod and wing nut conirming to 4.1, 4.3 and 4.4
of IS: 9669-1980.
ii. Collar conirming to 4.2 of IS: 9669-1980.
iii. Spacer Disc conirming to 4.4 of IS: 9669-1980.
iv. Metal rammer conirming to IS: 9189-1979.
v. Expansion measuring apparatus with the adjustable stem, perforated plates, tripod
conirming and to weights conirming to 4.4 of IS: 9669-1980.
vi. Loading machine having a capacity of at least 5000kg and equipped with a movable head or
base that travels at a uniform rate of 1.25mm / min for use in forcing the penetraion
plunger in to the specimen.
vii. Penetraion plunger conirming to 4.4 of IS: 9669-1980.
viii. Dial gauge two numbers reading to 0.01mm.
ix. IS sieves 37.50 or 22.50 or 19mm and 4.75mm.
x. Miscellaneous apparatus such as mixing bowl, straight edge, scales, soaking tank, drying
oven, ilter paper, dishes and calibrated measuring jar.
Procedure:
a) There are two types of methods in compacing soil specimen in the CBR moulds
i. Staic Compacion method.
ii. Dynamic Compacion method.
b) The material used in the above two methods shall pass 19mm sieve for ine grained soils and
37.50mm sieve for coarse materials up to 37.50mm.
c) Replace the material retained on 19mm sieve by an equal amount of material passing 19mm
sieve and retained on 4.75mm sieve
d) Replace the material retained on 37.50mm sieve by an equal amount of material passing
37.50mm sieve and retained on 4.75mm sieve.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 31
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
Staic Compacion
a) In this method calculate the mass of wet soil at required moisture content to give a desired
density when compacted in a standard test mould as given below
Volume of mould = 2250cc.
Weight of dry soil (W) = 2250 x MDD.
m
Weight of wet soil = 1+ -------------- x W
100
Weight of water = Weight of wet soil - Weight of dry soil.
b) Take oven dried soil sample of calculated weight and thoroughly mix with water (OMC) as
obtained from the above equaion.
c) Record the empty weight of the mould with base plate, with extension collar removed (m1).
Place the correct mass of the wet soil in to the mould in ive layers.
d) Gently compact each layer with the spacer disc.
e) Place a ilter paper on top of the soil followed by a 5cms displacer disc.
f) Compact the mould by pressing it in between the platens of the compression tesing
machine unil the top of the spacer disc comes lush with the top of the mould.
g) Held the load for about 30 seconds and then release.
h) In some soil types where a certain amount of rebound occurs, it may be necessary to reapply
load to force the displacer disc slightly below the top of the mould so that on rebound the
right volume is obtained.
i) Remove the mould from the compression tesing machine.
j) Remove the spacer disc and weigh the mould with compacted soil (m2).
k) Replace the extension collar of the mould.
l) Prepare two more specimens in the same procedure as described above.
Dynamic Compacion
a) Take representaive sample of soil weighing approximately 6kg and mix thoroughly at OMC.
b) Record the empty weight of the mould with base plate, with extension collar removed (m1).
c) Replace the extension collar of the mould.
d) Insert a spacer disc over the base plate and place a coarse ilter paper on the top of the
spacer disc.
e) Place the mould on a solid base such as a concrete loor or plinth and compact the wet soil
in to the mould in ive layers of approximately equal mass each layer being given 56 blows
with 4.90kg hammer equally distributed and dropped from a height of 450 mm above the
soil.
f) The amount of soil used shall be suicient to ill the mould, leaving not more than about
6mm to be struck of when the extension collar is removed.
g) Remove the extension collar and carefully level the compacted soil to the top of the mould
by means of a straight edge.
h) Remove the spacer disc by invering the mould and weigh the mould with compacted soil
(m2).
i) Place a ilter paper between the base plate and the inverted mould.
j) Replace the extension collar of the mould.
k) Prepare two more specimens in the same procedure as described above.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 32
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
l) In both the cases of compacion, if the sample is to be soaked, take representaive samples
of the material at the beginning of compacion and another sample of remaining material
ater compacion for the determinaion of moisture content.
m) Each sample shall weigh not less than 100g for ine-grained soils and not less than 500 for
granular soils.
n) Place the adjustable stem and perforated plate on the compacted soil specimen in the
mould.
o) Place the weights to produce a surcharge equal to the weight of base material and
pavement to the nearest 2.5kg on the perforated plate.
p) Immerse the whole mould and weights in a tank of water allowing free access of water to
the top and botom of specimen for 96 hours.
Test for Swelling
a) This test is opional and may be omited if not necessary.
b) Determine the iniial height of specimen (h) in mm.
c) Mount the expansion-measuring device along with the tripod on the edge of the mould and
record the iniial dial gauge reading (ds).
d) Keep this set up as such undisturbed for 96 hours noing down the readings every day
against the ime of reading.
e) Maintain a constant water level throughout the period of soaking.
f) Note the inal reading of the dial gauge at the end of soaking period (dh).
Calculaions for Swelling
df -ds
Expansion raio = ---------------- x 100
H
ds = Iniial dial gauge reading in mm
df = inal dial gauge reading in mm
h = iniial height of specimen in mm
Penetraion Test
a) Ater 96 hours of soaking take out the specimen from the water and remove the extension
collar, perforated disc, surcharge weights and ilter paper.
b) Drain of the excess water by placing the mould inclined for about 15 minutes and weigh the
mould.
c) Place the mould on the lower plate of the tesing machine with top face exposed
d) To prevent upheaval of soil in to the hole of surcharge weights, place 2.5kg annular weights
on the soil surface prior to seaing the penetraion plunger ater which place the reminder of
the surcharge weights.
e) Set the plunger under a load of 4kg so that full contact is established between the surface of
the specimen and the plunger.
f) Set the stress and strain gauges to zero.
g) Consider the iniial load applied to the plunger as the zero load.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 33
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
h) Apply the load at the rate of 1.25 mm / min as shown in Fig: 2.9.1.
i) Take the readings of the load at penetraion of 0, 0.5, 1.0, 1.5, 2.0, 2.5, 3.0, 4, 5, 7.5, 10 and
12.5.
j) Raise the plunger and detach the mould from the loading equipment.
k) Collect the sample of about 20 to 50gms of soil from the top 30mm layer of specimen and
determine the water content in accordance with IS: 2720 (Part 4) 1973.
l) Examine the specimen carefully ater the test is completed for the presence of any oversize
soil paricles, which are likely to afect the results if they happen to be located directly below
the penetraion plunger.
CALCULATION OF CBR FROM LOAD PENETRATION CURVE
a) Plot the load penetraion curve in natural scale, load on Y - axis and penetraion on X – axis
as shown in Fig: 8.9.B
b) If the curve is uniformly convex upwards although the iniial porion of the curve may be
concave upwards due to surface irregulariies make correcion by drawing a tangent to the
upper curve at the point of contra lexure as shown in Fig.
Fig: - Load vs. Penetraion curve
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 34
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
a) Take the intersecion point of the tangent and the X – axis as the origin.
b) Calculate the CBR values for penetraion of 2.50mm and 5.00mm.
c) Corresponding to the penetraion value at which CBR is to be desired, take the corrected
load values from the load penetraion curve and calculate the CBR from the equaion
PT x Cf
California Bearing Raio = ----------------- x 100
PS
PT = Corrected unit test load corresponding to the chosen penetraion from load
penetraion curve
PS =Total standard load for the same depth of penetraion, which can be taken from the
following table.
Cf = Proving ring correcion factor.
Standard loads at speciied penetraions
Penetraion depth Unit Standard load Total Standard load
(mm) Kg/ cm2 (Kg)
2.50 70 1370
5.00 105 2055
7.50 134 2630
10.00 162 3180
12.50 183 3600
Result:
i. Report the CBR value to the nearest second decimal.
ii. Take the average of three test specimens as the CBR value of the test.
iii. Generally, the CBR value at 2.50mm penetraion will be greater than that at 5.00mm
penetraion and in such case take the value at 2.50mm as the CBR value.
iv. If the CBR value corresponding to a penetraion of 5.00mm exceeds that of 2.50mm, repeat
the test.
v. If the idenical results follow, take the value corresponding to 5.00mm as the CBR value.
Precauions:
i. Clean the holes of the base plate and that of perforated disc thoroughly.
ii. Align the surcharge weight with the plunger so that the plunger penetrates freely in to the
soil.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 35
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
8. TEST PROCEDURES FOR THE INGREDIENTS OF CONCRETE
Note: Test Procedures for some common tests are speciied for more details, the corresponding
speciicaions (IS/IRS/RVNL) may be referred.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 36
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
1. Aggregates
The physical & chemical properies will be tested in independent laboratory for approving
the source. Thereater rouine tests will be conducted in the site laboratory as per the
speciicaions to ensure the consistency of the same.
a) Coarse Aggregate:
The aggregates will be tested for Gradaion, Flakiness index, Aggregate impact Value,
Speciic Gravity & water Absorpion etc. to check the consistency of the quality of the
aggregate produced from the crusher.
b) Fine Aggregate:
Natural Sand shall be used as ine aggregate as plenty of stocks are available in the area and
could be procured easily. The sand collected from source shall be tested for Gradaion,
Speciic Gravity & Water Absorpion and other physical & chemical .
2. Cement
As per Contract condiions of the client RVNL, the cement to be used shall be either 53/43
grade cement PSC/ OPC/ PPC. Regular cement tests such as Normal Consistency, Iniial
seing Time, Final Seing Time, and compressive strength shall be carried out lot wise or
provision of frequency test as per RVNL Speciicaion to check the quality of the cement in
the project work. In addiion samples of cement are to be tested for chemical analysis as
well as for physical properies in the approved out-side laboratory also.
3. Water
Water is required primarily for hydraion of cement and to give luidity to the plasic mass.
The Physical and chemical properies such as PH value, Chloride & Sulphate, Alkalinity,
Hardness, Organic Impuriies etc. of water shall be tested to check the suitability as per IS
3025. The quality of water is to be checked by frequent tesing in the site laboratory/
outside laboratory.
4. Admixture:
Admixture shall be tested following IS 9103 and Chloride Content shall be tested according
to IS 6925. The Manufacturer’s Test Ceriicate shall be produced for every batch of
procurement and infrared spectrograph test report shall be produced to ensure the base
material.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 37
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/14
SAMPLING OF AGGREGATES FOR CONCRETE
1. Sampling from stock piles
a) Divide the quanity of aggregate into a suitable no of sub-lots of approximately equal
size.
b) Scope out aggregate at various points of the sub-lots.
c) Take a minimum no. of ten increments from the thus exposed sides of the stock piles
each increment being not less than 1 kg the no of increments being equally distributed
over the sub-lot.
d) Collect it in a sampling bag to form a gross sample representaive of the sub- lot.
e) The no of increments are taken equally from top-third at the mid point and at the bot-
tom third of the volume of the pile.
2. REDUCTION OF GROSS SAMPLE
a) Divide the aggregates that have been collected, by any one of the methods explained
below :
b) Reducion by rile divider.
i. Keep the collector boxes on either side of rile divider.
ii. Mix the aggregates and pour into the rile.
iii. Repeat the process using diferent size of riles according to the size of aggreg-
ates, ill the required quanity of aggregate & contained.
c) Mix the aggregate and scope it into a cone-shaped pile, taking care that the aggregate is
dropped from each scope over the same spot so as to avoid uneven distribuion of the
paricle sizes.
d) Ater forming the cone, laten it by pressing the top of the cone with the smooth sur-
face of the scope.
e) Cut into quarters by two lines which intersect at right angles at the center of the cone.
f) The bulk of the sample in this is reduced by rejecing any two diagonally opposite quar-
ters.
Table 1: Number of sub-lots into which a lot is to be divided.
LOT SIZE (IN M3) NO OF SUB-LOTS
101-500 3
501-1500 5
1501-5000 7
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 38
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/15
Aggregate Impact Value
A) AIM:
The Aggregate impact value indicates a relaive measure of resistance of aggregate to impact which
has diferent efect than the resistance to gradually increasing compressive stress. A test designed to
evaluate the toughness of stones or the resistance of the aggregates to fracture under repeated
impacts is called impact test. The aggregate impact test is commonly carried out to evaluate the
resistance to impact of aggregates and has been standardized by ISI. The aggregate impact value
gives a relaive measure of the resistance of an aggregate to sudden shock or impact.
B) REFERENCE : Code IS 2386 Part IV
C) APPARATUS REQUIRED:
i. Balance – accuracy 0.1 gm
ii. Sieves of 12.5mm, 10mm & 2.36mm
iii. Aggregate Impact Value (AIV) machine conforming IS 2386 part 4-1963
iv. Oven - to maintain the temperature between 100-110 degree C
D) SAMPLING:
The sample shall be prepared by sieving from a representaive sample only. The sample shall consist
of aggregate passing through IS 12.5mm sieve and retained on 10mm IS sieve.
E) PROCEDURE:
i. The aggregate comprising the test sample shall be dried in an oven for a period of 4 hours at a
temperature of 100 to 110 Degree C and cooled.
ii. The measure shall be illed in three layers by tamping each layer 25 imes by tamping rod &
then the net weight of aggregate in the measure shall be determined to the nearest gm.
iii. Then the test sample is placed in the AIV machine conforming IS 2386 part 4 1963. The
hammer of the AIV tesing machine is raised to a height of 38 cm above the upper surface of
the aggregate in the measure and allowed to fall freely on the specimen which is subjected to
a total of 15 blows at an interval of not less than one second.
iv. The crushed aggregate shall then be removed from the cup and the whole of it sieved through
IS 2.36 mm sieve and the fracion passing through it is weighed.
G) OBSERVATION:
As given in the atached format .
H) CALCULATION:
Weight of fracion passing through IS 2.36 mm sieve
AIV = x100
Weight of test sample (gm)
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 39
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/16
Los Angeles Abrasion Value
A) AIM
Aggregate abrasion value test is conducted to determine the resistance of aggregate to wear and is a
very important property of aggregate especially for road construcion and pavement work.
B) REFERENCE: Code IS 2386 Part IV
C) APPARATUS REQUIRED:
i. Balance – accuracy 1gm
ii. 1.7mm sieve & other IS sieves (following the grading requirement)
iii. Los Angeles Abrasion tesing machine with abrasive charges.
iv. Oven – to maintain the temperature between 100- 110 Degree C
D) SAMPLING:
The sample shall be prepared by sieving from a representaive sample only. The sample shall be
prepared by sieving through speciied sieves so that the aggregate conforms to the grading
requirement following Speciicaion. The sample should be dried at room temperature or by
heading at a temperature of 100-110 Degree C.
E) PROCEDURE:
i. The speciied test sample along with speciied number of abrasive charges (solid steel spheres
of weight about 392gm-445gm & 48mm dia each) shall be placed in the Los Angeles Abrasion
tesing machine and the machine rotated at a speed of 30 to 33 revoluions per minute.
ii. The machine shall be rotated either 500 or 1000 imes depending upon the grading of the test
sample taken.
iii. Ater compleion of the scheduled numbers of rotaions, the material is taken out from the
machine and sieved it through IS 1.7 mm sieve.
iv. The weight of the material iner that 1.7 mm is taken to the nearest gm. And the raio of
material iner than 1.7mm sieve to the original weight of the material taken is expressed in
percentage.
F) OBSERVATION
As given in the atached format.
G) CALCULATION:
Weight of fracion passing through IS 1.7 mm sieve (gm)
LAA Value = x100
Weight of test sample (gm)
QAP/TP/17
Gradaion of Aggregate
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 40
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
A) AIM:
The objecive of the test is to determine the paricle size distribuion of ine, coarse & all in
aggregate passing through diferent sieves.
B) REFERENCE: Code IS 2386 Part 1
C) APPARATUS REQUIRED:
i) Balance - accuracy 1 gm
ii) Diferent IS Sieves.
a) Square hole perforated plate-80, 63, 50, 40, 31, 5, 20, 16, 12.5, 10, 6.3 and 4.75.
b) Fine mesh wire cloth 4.75, 2.36, 1.18, 600mic, 300mic, 150mic, 75mic.
iii) Oven - to maintain the temperature of 100-110 oC.
D) SAMPLING:
Sample should be collected from the stock piles and care to be taken so that the sample should be a
representaive sample. The sample should be dried at room temperature or by heaing at a
temperature of 1000C -1100 C.
E) PROCEDURE:
Grading of aggregate can be done by sieve analysis either manually or with the help of mechanical
devices. The grading patern of a sample of coarse aggregate and ine aggregate is assumed by
sieving a sample successively through all the sieves mounted one over the other in order of size,
with larger sieve on the top. The material retained on each sieve ater shaking, represents the
fracion of aggregate coarser than the sieve and rest is iner than the sieve. In manual operaion, the
sieve is shaken giving movements in all possible direcions to give chance to all paricles for passing
through the sieve and is coninued ill almost no paricle is passing through. The weight of the
retained fracion on each sieve is taken and expressed in percentage retained to the total sample
taken. Hence cumulaive percentage retained and percentage passing through each sieve may be
calculated. The sieve size is ploted along X-axis in logarithmic scale. Grading curve can be drawn by
connecing the ploted points, which gives paricle size distribuion of the aggregate at a glance.
F) OBSERVATION:
As given in the atached format for Course & ine aggregate.
G) CALCULATION:
Grading of aggregate will be expressed as the % passing of diferent fracion through speciied
sieves.
QAP/TP/18
Flakiness Index and Elongaion Index
A) AIM:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 41
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
The objecive of the test is to determine the Flakiness index of the aggregate. The lakiness
index of aggregate is the percentage by weight of paricles in it whose least dimension
(thickness) is less than three-ith of their mean dimensions. The test is not applicable to
sizes smaller than 6.3mm.
B) REFERENCE: Code IS 2386 Part I
C) APPARATUS REQUIRED:
Flakiness Gauge – Conforming IS 2336(part)
IS Sieve: 63, 50, 40, 31.5, 25, 20, 16, 12.5, 10, 6.3 mm
Balance with accuracy of 1gm.
D) SAMPLING:
i. The sample shall be prepared from a representaive sample by sieving through
diferent sieves menioned above. Suicient quanity of sample is needed so that it
consists of at least 200 pieces of any fracion to be tested.
E) PROCEDURE:
i. The sample has to be carefully & properly sieved.
ii. Each fracion is gauged through the standard lakiness index gauge.
iii. Thus each fracion is to be separated in two parts: one consising of pieces which pass
through the corresponding slot in the standard gauge and the other consising of
pieces which don’t pass through the corresponding slot in the standard gauge.
iv. Then the weight of each part is separately weighed. Sum of both the weights gives the
total weight of each fracion.
F) OBSERVATION:
As given in the atached format.
G) CALCULATION:
The lakiness index is taken as the total weight of the material passing the various
thickness gauges expressed as a percentage of the total weight of the sample taken.
Total weight of laky material (gm)
F.I. Value = x100
Weight of test sample (gm)
QAP/TP/19
Speciic Gravity and water Absorpion Test.
A) AIM:
The objecive of the test is to determine the speciic Gravity, App. Sp. Gravity & water absorpion of
aggregates.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 42
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
B) REFERENCE: code IS 2386 Part III
C) APPARATUS REQUIRED.
i. Pycnometer botle or large air – ight container.
ii. Balance- Balance (capacity 3 kg) along with density basket.
iii. Oven – to maintain the temperature between 100 – 110 Degree C
iv. Clothes- two dry sot absorbent clothes of size 75x45 cm.
v. Tray- Shallow tray of area 325 cm 2
D) SAMPLING:
1. A sample of coarse aggregate not less than 2 kg is taken and thoroughly washed to remove
the iner paricles and dust adhering to the aggregate.
2. A sample of about 1kg for 10mm to 4.75mm or 500 gm if iner than 4.75mm shall be taken
for the test.
E) PROCEDURE:
i) For Coarse Aggregate (larger than 10mm)
The cleaned aggregate is placed in a wire basket and immersed in disilled water at a temperature
between 22 C to 32 Degree C and kept for a period of 24 hours. Immediately ater immersion, the
entrapped air is removed from the sample by joling it 25 imes at the rate of one drop per second.
Then the weight of basket and aggregate are taken (A1) in water at a temperature 22 C to 32 Degree
C. Then it is removed from the water and the aggregate is placed on dry cloth to get the saturated
surface dry condiion. The empty basket is again immersed in water and jolted 25 imes and
weighted in water (A2). Ater taking weight of aggregate in saturated surface dry condiion (B), it is
kept in the oven at a temperature 100-110 Degree C for a period of 24 hours. Then it is cooled down
in the airight container and weighted (C).
Speciic Gravity : C : where A = A1 -A2
B-A
Apparent Speciic Gravity : C
C-A
Water Absorpion : B-C x 100
C
ii) For Fine Aggregate (Finer Than 10 Mm)
A sample of about 1kg for 10mm to 4.75mm shall be placed in the tray and covered with disilled
water at a temperature of 22 to 32 Degree C for a period of 24+1/2 hours. The water shall be
carefully drained from the sample by decantaion through a ilter paper. The aggregate including any
solid mater retained on the ilter paper shall be exposed to a gentle current of warm air (by hair
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 43
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
drier) to evaporate surface moisture and to atain a ‘free running’ condiion. Then the saturated and
surface dry sample shall be weighed (A). The aggregate shall then be placed in the pycnometer
which shall be illed with disilled water. To remove the entrapped air, the pycnometer shall be
shaken properly and carefully and then it shall be topped up with disilled water to remove any froth
from the surface and so that the surface of the water in the hole is lat. The outside surface of the
pycnometer shall be dried by wiping of with a clean dry cloth and weighed (B).
The pycnometer then then be empied carefully into the tray and illed with disilled water and
weighed (C). The water shall be drained from the sample and then it shall be placed in the oven in
the tray at a temperature of 105 to 110 Degree C for a period of 24+ ½ hour. It shall be cooled in the
airight container and weighted (D).
Speciic Gravity : C
A - (B-C)
Apparent Speciic Gravity : D
D-(B-C)
Water Absorpion : A-D x 100
D
Where, A is the weight in gm of saturated surface dry sample
B is the weight in gm of pycnometer containing sample and illed with disilled water
C is the weight in gm of pycnometer illed with disilled water only
D is the weight in gm of oven – dried sample
F) OBSERVATIONS: As given in the atached format for coarse & ine aggregate.
QAP/TP/20
LABORATORY TESTS FOR CEMENT CONSISTENCY
A) AIM:
The objecive of this test procedure is to determine the quanity of water required to produce a
cement paste of standard consistency.
B) REFERENCE: Code IS 4031(Part 4)
C) APPARATUS REQUIRED:
1. Vicat Apparatus – conforming to IS: 5513.
2. Balance – Electronic Balance of 1gm accuracy
3. Gauging – Trowel – Conforming to IS: 10086
D) SAMPLING :
The sample of cement shall be taken in accordance with the requirements of IS: 3535 and the
relevant standard speciicaion for the type of cement being tested. The representaive sample
of the cement selected as above shall be thoroughly mixed before tesing.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 44
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
E) PROCEDURE:
The standard consistency of cement paste is deined as the consistency that will permit a Vicat
(apparatus) plunger having 10mm dia and 50 mm length to penetrate to a depth of 33-35 mm
from the top of the mould.
i. Ater taking 500 gm of cement, prepare a paste with a weighed quanity of water (say 24% by
weight of cement ) for the irst trial. The paste must be prepared in standard manner and illed
in the Vicatmould within 3 to 5 minutes.
ii. Standard plunger of 10mm dia and 50mm. length is atached and brought down to touch the
surface of the paste in the test block and quickly released allowing it to penetrate into the
paste by its own weight and take the reading of the depth of the penetraion of the plunger.
iii. Similarly conduct a number of trials with varied water content ill the plunger penetrates for a
depth of 33-35 mm from the top. That paricular percentage of water which allows the plunger
to penetrate to a depth of 33-35 from the top is known as normal consistency of that cement
and it is denoted by ‘P’.
OBSERVATION:
As given in the atached format.
G) RESULT: Normal Consistency is expressed as percentage.
QAP/TP/21
Iniial and inal seing ime
A) AIM:-
The objecive of the test procedure is to determine the iniial and inal seing imes of cement.
B) REFERENCE: Reference IS 4031 (Part 5)
C) APPARATUS REQUIRED:
Vicat Apparatus – conforming to IS:5513.
Balance – Electronic Balance of 1 gm accuracy
Gauging Trowel – conforming to IS. 10086
D) SAMPLING: The sample of cement shall be taken in accordance with the requirements of IS: 3535
and the relevant standard speciicaion for the type of cement being tested. The representaive
sample of the cement selected as above shall be thoroughly mixed before tesing
E) PROCEDURE:
The same Vicat apparatus is used for the determinaion of iniial and inal seing ime also.
i. Ater taking 500gm of cement, gauge it with 0.85 imes the water required to produce cement
paste of standard consistency (0.85 P). The paste shall be gauged and illed into the
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 45
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
Vicatmould in speciied manner within 3 to 5 minutes. Start the stopwatch at the moment the
water is added to the cement.
ii. The temperature of water and that of the test room, at the ime of mixing shall be within 27+2
degree C. Lower the needle (cross secional area 1 mm2) gently and bring it in contact with the
surface of the test block and quickly release and allow it to penetrate into the test block. In the
beginning, the needle will completely pierce through the test block. Repeat the procedure ill
the needle fails to pierce the block for 5 + 0.5 mm measured from the botom of the mould.
iii. The period elapsing between the ime when water is added to the cement and the ime at
which the needle fails to pierce the test block by 5+ 0.5 mm shall be the iniial seing ime of
cement.
iv. Replace the needle of the Vicat apparatus by the needle with an annular atachment. Lower
the angular atachment to the surface of the test block and gently release. The cement shall be
considered as inally set when upon applying the needle gently to the surface of the test block,
the needle makes an impression thereon, while the atachment fails to do so.
v. The period elapsing between the ime when water is added to the cement and the ime at
which the needle makes an impression on the surface of the test block while the atachment
fails to do so shall be the inal seing ime of cement.
F) OBSERVATION:
As given in the atached format.
G) RESULT:
Iniial seing ime of cement should not be less than 30 minutes and inal seing ime of cement
should not be more than 600 minutes.
QAP/TP/22
Compressive Strength
A) AIM:
The objecive of the test procedure is to determine the strength of cement as represented by
compressive strength lasts on mortar cubes compacted by means of standards vibraion machine.
B) Reference: Reference IS 4031-1969 (Part6)
C) APPARATUS REQUIRED:
Vibraion machine conforming to IS: 10080
Poking rod conforming to IS: 10080
The cube moulds shall be of 70.6mm size conforming to IS: 1008
Graduated glass cylinders of 150 to 200ml capacity
Balance – Electronic Balance of 1 gm accuracy
Gauging Trowel – conforming to IS: 10086
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 46
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
D) SAMPLING:
The sample of cement shall be taken in accordance with the requirements of IS: 3535- 1986 and the
relevant standard speciicaion for the type of cement being tested. The representaive sample of
the cement selected as above shall be thoroughly mixed before tesing.
E) PROCEDURE:
The test is carried out to determine the compressive strength of cement by casing of cube specimen
having area of each face 50 cm 2 and tesing it for 3 days, 7 days and 28 days compressive strength.
i. The materials for each cube specimen shall be mixed separately and the quanity of cement,
standard sand and water as follows:
Cement : 200gm
Sand : 600 gm (200 gm of each grade I, II, III- Conforming IS 650).
Water : (P/4 +3) x percent of combined weight of cement and sand.
Where ‘P” is the percentage of water required to produce a paste of standard consistency.
ii. Cement and Standard sand in the proporion of 1 : 3 by weight is mixed thoroughly with the
help of trowel for one minute and the speciied quaniies of water are added and again mixed
unil the mixture is of uniform color. The ime of mixing should not be less than 3 minutes but
not exceeding 4 minutes.
iii. Immediately ater mixing the mortar, place it in cube mould and is prodded 20 imes with rod
of speciied size to ensure the eliminaion of entrained air/ honey combing. Then the cube
mould is compacted by vibraion for a period of two minutes.
iv. Keep the illed moulds in moist closet or moist room for 24+ 1 hours ater compacion of
vibraion. At the end of the period, remove them from the moulds and immediately submerge
in clean fresh water and keep there unil taken out just prior to breaking.
F) TESTING:
Test three cubes for compressive strength for each periods of curing menioned under the relevant
speciicaions. The cubes shall be tested on their sides without any packing between the cube and
the steel plates of the tesing machine. One of the plates shall be carried on a base and shall be self –
adjusing, and the load shall be steadily and uniformly applied staring from zero at a rate of 35
N/mm2/min
G) CALCULATION:
The measured compressive strength of the cubes shall be calculated by dividing the maximum loads
applied to the cubes during the test by the cross – secional area, calculated from the mean
dimensions of the secion and shall be expressed to the nearest 0.5 N/MM2. In deterring the
compressive strength do not consider specimens that are manifestly faulty, or that give strengths
difering by more than 10 percent from the average value of all the test specimens. Ater discarding
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 47
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
specimens or strength values, if less than two strength values are let for determinaion of the
compressive strength at any given period, a retest shall be made.
QAP/TP/23
DETERMINATION OF SOUNDNESS OF CEMENT
a. Prepare a cement paste with quanity of water equal to 0.78 P (P Normal consistency of
cement).
b. Fill the mould of Le – Chaier apparatus, with the –paste, place it on a glass plate. Place
another glass plate on the top.
c. Immediately place the whole assembly in water maintained at 27 Degree C.
d. Ater 24 hours, determine the distance between pointers, nearest to 0.5mm
e. Place the mould in a water bath and heat the water to boiling and keep the mould at that
temperature for three hours.
f. Remove the mould from water, allow to cool and again measure the distance between the
pointers.
The diference between the iniial and inal measurements of the distance between the pointers,
represent the soundness of cement which is expressed in mm.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 48
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
9. TEST PROCEDURES FOR CONCRETE
Note: Test Procedures for some common tests are speciied for more details, the corresponding
speciicaions (IS/IRS/RVNL) may be referred.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 49
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/24
LAB & SITE TESTS FOR FRESH CONCRETE
SAMPLING OF FRESH CONCRETE
i. The sampling is done from at least 3 porions of the batch and in a such a way that the
composite sample will be 0.02 cum approx.
ii. For samples collected at the ime of deposiion of concrete, sample from not less than 5 well
distributed posiions/ locaions. Avoid the edge of the mass where segregaion might have
occurred.
iii. Ater collecion, mix thoroughly with shovel to obtain a uniform sample.
Workability (Slump Test):
Various methods such as Compacing Factor, Vee-Bee ime, Slump test, Flow Test etc. are available
to determine the workability of fresh concrete. But Slump test is the most simple and commonly
used method of measuring the consistency of concrete, which can be employed either in laboratory
or at work site.
A) AIM:
This objecive of the test is to determine the consistency of fresh concrete and the workability of
the Concrete Mix.
B) REFERENCE: IS 1199.
C) APPARATUS REQUIRED:
The apparatus for conducing the slump test consists of a metallic mould in the form a frustum of a
cone having the internal dimension as follows:
Botom diameter: 20CM, Top diameter: 10CM, Height: 30cm.
For tamping the concrete, a steel tamping rod 16mm diameter, 0.6 meter long with bullet end is
used.
D) PROCEDURE:
i. The mould is placed on a smooth rigid and non-absorbent surface ater cleaning the internal
surface of the mould thoroughly.
ii. The mould is then illed in four equal layers and each layer is tamped 25 imes evenly over the
enire cross secion by tamping rod. Ater striking of the excess concrete from the top, the
mould is removed from the concrete immediately by raising it slowly and carefully in a verical
direcion, which allows the concrete to subside.
iii. The diference in level between the height of the mould and that at the highest point of the
subsided concrete measured in mm is deined as slump of concrete. The workability as well as
the quality of concrete can be detected by observing the patern of slump.
E) CONCLUSION:
The slump test should be carried out at Birching plant as well as at pouring end to know the
workability of the concrete mix.
Any adjustment in the mix could be done depending upon the analysis of the test results.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 50
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/25
LAB TEST FOR HARDENED CONCRETE
Compressive strength of concrete:
A) AIM:
The objecive of the test is to determine the compressive strength of concrete ater curing for a
speciied period under controlled temperature.
B) REFERENCE: Reference IS 516.
C) APPARATUS REQUIRED:
Compression Tesing Machine, Balance – 1gm accuracy.
Cube specimen (15CM X 15CM X 15CM).
Tamping rod having 16mm diameter & 600 mm long with a bullet end.
D. SAMPLING: The sample of the freshly mixed concrete shall be obtained in accordance with the
method secured in IS 1199.
E. PROCEDURE:
i. To determine the compressive strength of concrete at diferent age such as 7 days, 14 days and
28 days, cube specimens are prepared in suicient numbers. The cube moulds are illed in three
equal layers in which each layer is subjected to minimum of 35 strokes applied evenly over the
cross secion by the tamping rod. Finally level of the concrete of member with the trowel. Mark
the date of casing, cube number and the ideniicaion of member.
ii. Then the test specimen is stored at a place free from vibraion under damp maing for a period
of 24 hours. Then the specimen is demoulded and stored in clean water at a temperature 27 +
2oc unlit the ime of test.
iii. The test specimen shall be tested immediately ater removal from the water while they are sill
in wet condiion. The test specimen shall be cleaned and the surface water shall be wiped of
and the weight of each specimen is taken before tesing.
iv. Dimension of each cube is checked properly and then placed in the compression tesing machine
in such a manner that the load shall be applied to opposite sides of the cube as cast. Load shall
be applied without shock at the rate of 140 kg/ cm2/ min unil the resistance of the specimen to
the increasing load breaks down and no greater load can be sustained.
v. The maximum load applied to the specimen is noted and the appearance of the concrete and
any unusual features in the type of failure shall be recorded. Compressive strength is calculated
dividing the maximum load applied by the cross secional area of the cube specimen and
average result of three specimens is expressed as sample strength.
F) OBSERVATION:
As given in the atached format.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 51
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/26
STATISTICAL QUALITY CONTROL OF CONCRETE
a. Collect the 28 days cube test results for each lot and grade of concrete.
b. Check that the sample size is more than 10.
c. Calculate the Average cube compressive strength.
d. Check if the variaion of the individual cube strength is within + 15% of the average strength.
e. Discard the sample items that are beyond the variaion limits. Designate the number of
accepted values as ‘n;.
f. Recalculate the average strength based on the accepted values. Designate it as Xn.
g. Compute the standard deviaion (Sn) of the accepted values. From where
Xi = 28 day strength of any individual cube.
h. Circularly fck + 1.4 Sn
i. Similarly Compute fck – 3.
j. Check the following:
k. Whether Xn>fck + 1.4 Sn
l. b) Whether Xi >fck – 3
m. Note the characterisic compressive strength (fck) of the grade of concrete.
n. All computaions and results shall be reported in N/ Sq. mm for this analysis.
o. Mean strength calculated from any group of consecuive samples should exceed speciied
characterisic strength.
p. The cubes taken for design mixes shall be subjected to the following condiion.
Xm>Fck + 1.65 Sn
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 52
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
QAP/TP/27
PERMEABILITY OF CONCRETE
a. Prepare a cylindrical test specimen of 200 mm dia and 120 mm thick.
b. Ater 24 hrs of casing of specimen, central circular area of 100 mm diameter shall be
roughened with a wire brush on the side on which the water pressure is to be applied.
c. The roughened part of the side of the test specimen which is subjected to water pres-
sure is to be sealed with two coats of cement water paster (w/c = 0.4).
d. Ater 28 days of curing, test specimen is to be ited into a test apparatus where water
pressure acts on the required face and remaining faces can be observed.
e. At irst, a pressure of 1 bar is to be applied for 48 hours, then 3 bar for 24 hours and 7
bar for 24 hours.
f. Ater the test, the specimen is to be split in the middle by compression applied on two
round steel bars lying on opposite sides above and below. The side ater test specimen
exposed to the water pressure should face down words.
g. Observe the penetraion of water and record it in mm. (Permeability is to be expressed
as mm in this case).
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 53
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
10. TEST PROCEDURES FOR BRICKS
Note: Test Procedures for some common tests are speciied for more details, the corresponding
speciicaions (IS/IRS/RVNL) may be referred.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 54
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/TP/28
LAB TEST FOR BRICKS
Compressive strength of Bricks:
A. AIM:
The objecive of the test is to determine the compressive strength of brick ater curing for a speciied
period under controlled temperature.
B. REFERENCE: IS 1077, IS 3495 (Part-1).
C. APPARATUS REQUIRED:
i. Compression Tesing Machine.
ii. Steel Scale.
D. SAMPLING:
The sample of bricks shall be obtained in accordance with the method secured in IS 5454.
E. PROCEDURE:
i. Collect the brick samples randomly from lot.
ii. Remove unevenness observed in the bed faces to provide two smooth and parallel faces by
grinding and immerse in water at room temperature for 21 hours.
iii. Measure the dimensions and note down in approved proforma.
iv. Remove the specimen and drain out any surplus moisture at room temperature.
v. Fill the frog (where provided) and all voids in the bed face lush with cement mortar of grade
MM3.
vi. Store under the damp jute bags for 24 hours followed by immersion in clean water for 3
days. Remove, and wipe out any traces of moisture.
vii. Place the specimen with lat faces horizontal, and mortar illed face facing upwards between
two 3-ply plywood sheets each of 3 mm thickness and carefully centered between plates of
the tesing machine.
viii. Apply load axially at a uniform rate of 14 N/mm* (140 kgf/cm 2) per minute ill failure occurs
and note the maximum load at failure.
ix. The load at failure shall be the maximum load at which the specimen fails to produce any
further increase in the indicator reading on the tesing machine.
x. Note down the failure load and calculate the compressive strength.
F) OBSERVATIONS: As given in the atached format.
G) CALCULATIONS:
Comp. strength in N/mm2 = Maximum load at failure in N
Average net area of the two faces under
compression in mm2
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 55
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/TP/29
Water Absorpion of Bricks:
A. AIM:
The objecive of the test is to determine the water absorpion of bricks.
B. REFERENCE: IS 1077, IS 3495 (Part – 2).
C.APPARATUS REQUIRED:
i. Electronic Balance of 1 gm accuracy.
ii. Oven.
D. SAMPLING:
The sample of bricks shall be obtained in accordance with the method secured in IS 5454.
E.PROCEDURE:
a) Remove unevenness observed in the bed faces to provide two smooth and parallel faces by
grinding.
b) Dry the specimen in a venilated oven at a temperature of 105 to 115°C ill it atains
substanially constant mass.
c) Cool the specimen to room temperature and obtain its weight (M1).
d) Specimen warm to touch shall not be used for the purpose.
e) Immerse completely dried specimen in clean water at a temperature of 27 0± 2°C for 24
hours.
f) Remove the specimen and wipe out any traces of water with a damp cloth and weigh the
specimen.
g) Complete the weighing 3 minutes ater the specimen has been removed from water (M2).
F) OBSERVATIONS: As given in the atached format.
G) CALCULATIONS:
Water Absorpion = M2 – M1 × 100
M1
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 56
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/TP/30
Elorescence of Bricks:
A. AIM:
The objecive of the test is to determine the elorescence of bricks.
B. REFERENCE: IS 1077, IS 3495 (Part – 2).
C. APPARATUS REQUIRED:
i) Disilled Water.
ii) 180×180×40 mm glass or porcelain dish.
iii) 200 mm dia and 40 mm depth cylindrical dish.
D. SAMPLING:
The sample of bricks shall be obtained in accordance with the method secured in IS 5454.
E.PROCEDURE:
a) Remove unevenness observed in the bed faces to provide two smooth and parallel faces by
grinding.
b) Place the end of the bricks in the dish, the depth of immersion in water being 25 mm.
c) Place the whole arrangement in 20 to 30°C well venilated room unil all the water in the
dish is absorbed by the specimens and the surplus water evaporates.
d) Cover the dish containing the brick with suitable glass cylinder so that excessive evaporaion
from the dish may not occur. When the water has been absorbed and bricks appear to be
dry.
e) Place a similar quanity of water in the dish and allow it to evaporate as before.
f) Examine the bricks for elorescence ater the second evaporaion and report the results.
F) OBSERVATIONS: As given in the atached format.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 57
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/TP/31
Visual Dimensions of Bricks:
A. AIM:
The objecive of the test is to determine the dimensions of bricks.
B. REFERENCE: IS 1077.
C. APPARATUS REQUIRED: Steel Tape.
D. SAMPLING:
The sample of bricks shall be obtained in accordance with the method secured in IS 5454
and IS 1077.
E. PROCEDURE:
i. Twenty (or more according to the size of stack) whole bricks shall be collected randomly
from the stack.
ii. All blisters, loose paricles of clay and small projecions shall be removed.
iii. They shall then be arranged upon a level surface successively assembled in length, breadth
and thickness wise in contact with each other and in a straight line.
iv. The overall length of the assembled bricks shall be measured with a steel tape suiciently
long to .measure the whole row at one stretch.
v. Measurement by repeated applicaion of short rule or measure shall not be permited.
vi. If, for any reason it is found impracicable to measure bricks in one row, the sample may be
divided into rows of 10 bricks each which shall be measured separately to the nearest
millimeter. All these dimensions shall be added together.
F. OBSERVATIONS: As given in the atached format.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 58
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
11. QUALITY ASSURANCE PLANS OF CIVIL WORKS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 59
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical
& Other works related to construcion of New BG line from KM 78 (Excluding
Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in
Maharashtra State, India.
LIST OF QUALITY ASSURANCE PLANS
QAP No. TITLE
QAP/Civil/01 Quality Assurance Plan for cement
QAP/Civil/02 Quality Assurance Plan for Coarse Aggregates
QAP/Civil/03 Quality Assurance Plan for Fine Aggregate
QAP/Civil/04 Quality Assurance Plan for Water
QAP/Civil/05 Quality Assurance Plan for Admixture
QAP/Civil/06 Quality Assurance Plan for Producion of Concrete
QAP/Civil/07 Quality Assurance Plan for Transportaion of concrete
QAP/Civil/08 Quality Assurance Plan for transporing, Placing & Compacion of
Concrete
QAP/Civil/09 Quality Assurance Plan for Reinforcement Steel for Concrete
QAP/Civil/10 Quality Assurance Plan for Hardened concrete
QAP/Civil/11 Quality Assurance Plan for Earthwork and Blankeing
QAP/Civil/12 Quality Assurance Plan for Guide Bund & Slope Pitching
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 60
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR CEMENT QAP/Civil/01
Speciicaion Responsible Agencies For
S. Descripion of Check for Acceptance
Frequency Speciied Remarks
No. Acivity Level Inspecion/ Speciicaion Limit
Performance Witness Veriicaion
Tesing
Immediately on Project Project Contractor
1. Storage 2 Contractor PMC
receipt at site speciicaion Speciicaion
Immediately on
2. Test Ceriicate 1 - - Manufacturer Contractor /PMC
receipt at site
For every batch of
cement or 1 test / PMC
3. Sampling 2 - - Contractor PMC
1000 bags whichever
is lesser
4. Test
Normal For every batch of
constancy, cement or 1 test / IS 4031 (part PMC
A 2 IS8112,IS12269 Contractor PMC
iniial & Final 1000 bags whichever 4&5)
seing ime is lesser
Compressive For a source or IS 4031 (Part
b. 3 IS 8112 Contractor PMC
strength change of source 45)
For every batch of
cement or 1 test / IS 4031 (Part
C Fineness 2 IS8112,IS12269 Contractor PMC PMC
1000 bags whichever 45)
is lesser
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 61
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR CEMENT QAP/Civil/01
Speciicaion Responsible Agencies For
S. Descripion of Check for Acceptance
Frequency Speciied Remarks
No. Acivity Level Inspecion/ Speciicaion Limit Performance Witness Veriicaion
Tesing
D Soundless 3 IS 8112 IS12269
Autoclave For a source or IS 4031 0.8% minimum Independent test
Contractor/ PMC
Le-chatlier change of source (Par1) house
10mm(max)
Expansion
For a source or Independent test
E Speciic Gravity 3 IS4031 IS8112, IS12269 Contractor/ PMC
change of source house
Chemical For a source or Independent test
F 3 IS4032 IS8112, IS12269 Contractor/ PMC
Analysis change of source house
Heat of For a source or Independent test
G 3 IS 4032 IS8112, IS12269 Contractor/ PMC
hydraion change of source house
Check level :
1. Manufacturer’s Test report
2. Internal test
3. Independent test house
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 62
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR COARSE AGGREGATES QAP/Civil/02
Reference Responsible Agencies For
Acceptance
S. Descripion Of Check Speciicaion For
Frequency Speciied Speciicaion Remarks
No. Acivity Level Inspecion Performance Witness Veriicaion
Limit
Tesing
Project Project
1. Storage 2 Ater procurement Contractor Contractor PMC
speciicaion Speciicaion
IS.2386(part 1 to
2. Sampling 2 Prior to Concreing - Contractor PMC PMC
part 8)
3. Test:
a Size & Gradaion 2 Prior to concreing IS 2386(part 1) IS 383 Contractor PMC PMC
Maximum
b Flakiness 2 Once in a month IS2386(part 2) Contractor PMC PMC
35%
Moisture Daily/prior to
c 2 IS2386(part 3) Contractor PMAC PMAC
Content Concreing
Water
d 2 Once In a month IS2386(part 3) 2% Maximum Contractor PMC PAMC
Absorpion
e Speciic Gravity 2 Once in a month IS 2386(Part 3) - Contractor PMC PMC
Once for a source or
IS 383
change of source Contractor/
f Abrasion Value 3 IS 2386(part 4) Maximum Contractor/PMC -
subsequently once in PMC
33%
three months
Once for a source or
IS 383
change of source Contractor/
g Impact Value 3 IS 2386(Part 2) Maximum Contractor/PMC -
subsequently once in PMC
30%
three months
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 63
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR COARSE AGGREGATES QAP/Civil/02
Reference Responsible Agencies For
Acceptance
S. Descripion Of Check Speciicaion For
Frequency Speciied Speciicaion Remarks
No. Acivity Level Inspecion Performance Witness Veriicaion
Limit
Tesing
Total Detenions Once for a source or Independent Test Contractor/
h 3 IS 2386(part 2) IS383 -
Maternal change of source House PMC
Alkali Aggregate
Independent Test Contractor/
i Reacivity 3 Once for a source or IS 2386(Part 7) IS383 -
House PMC
(Chemical) change of source
Once for a source or Independent test Contractor/
j Chloride Content 3 IS 383 IS383 -
change of source House PMC
Sulphate Once for a source or Contractor/
k 3 IS 383 IS383 Indecent test House -
Content change of source PMC
Max 12% (Na2
On once for a source or Independent Test Contractor/
L Soundness 3 IS 383 SO 4) Max -
change of source House PMC
18% (MgSO4)
Check Level:
1-Manufacturer’s Test Report
2- Internal Test
3- Independent Test House
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 64
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR FINE AGGREGATES QAP/Civil/03
Responsible Agencies For
Reference Acceptance
S. Descripion Of Check
Frequency Speciied Speciicaion For Speciicaion Remarks
No. Acivity Level Performance Witness veriicaion
Inspecion Tesing Limit
Project Project
1. Storage 2 Ater procurement Contractor Contractor PMC
speciicaion Speciicaion
IS.2386(part 1 to
2. Sampling 2 Prior to Concreing - Contractor PMC PMC
part 8)
3. Test:
a Size & Gradaion 2 Prior to concreing IS 2386(part1) IS383 Contractor PMC PMC
b Silt content 2 As and when required IS 2386(part3) IS 383 Contractor PMC PMC
Moisture Daily/prior to
c 2 IS 2386(part 3) IS 383 Contractor PMC PMC
Content Concreing
Water
d 2 Once In a month IS 2386(part 3) 2% Maximum Contractor PMC PMC
Absorpion
e Speciic Gravity 2 Once in a month IS 2386(Part 3) - Contractor PMC PMC
Organic Once for a source or Independent Test Contractor/
f 3 IS 2386(part 2) IS383 -
impuriies change of source House PMC
Total deleterious Once for a source or Independent test Contractor/
g 3 IS 2386(Part 2) IS 383 -
material change of source House PMC
Alkali aggregate
Once for a source or Independent Test Contractor/
h Reacivity 3 IS 2386(part 7) IS383 -
change of source House PMC
(Chemical)
i Chloride Content 3 Once in 3 months IS 383 IS 383 Contractor PMC PMC
j Sulphate Content 3 Once in 3 months IS 383 IS383 Contractor PMC PMC
k Soundness 3 Once for a source or IS 383 Max 10% (Na2 Independent Test - Contractor/
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 65
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR FINE AGGREGATES QAP/Civil/03
Responsible Agencies For
Reference Acceptance
S. Descripion Of Check
Frequency Speciied Speciicaion For Speciicaion Remarks
No. Acivity Level Performance Witness veriicaion
Inspecion Tesing Limit
SO 4) Max 15%
change of source House PMC
(MgSO4)
Check Level:
1-Manufacture Test Report
2- Internal Test
3- Independent Test House
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 66
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR WATER QAP/Civil/04
Reference
Responsible Agencies For
Speciicaion
S. Descripion Check Frequency Acceptance
for Remarks
NO. of Acivity Level Speciied Speciicaion Limit
Inspecion Performance Witness Veriicaion
Tesing
Storage
1. 2 Once in month Contractor PMC PMC
(Cleaning)
Once in Three Project speciicaion/
2 IS3025 Contractor PMC PMC
month Minimum 6.00
2. Ph Value Once for a source
Project speciicaion/ Independent Contractor
3 or change of IS3025 ---
Minimum 6.00 Test House PMC
source
Once in Three Project speciicaion/
Total 2 IS3025 Contractor PMC PMC
month Maximum 200mg/lit
Organic
3 Once for a source
Solids Project speciicaion/ Independent Contractor
3 or change of IS3025 ---
(mg/lit) Maximum 200mg/lit Test House PMC
source
Once in Three Project speciicaion/
2 IS3025 Contractor PMC PMC
Inorganic month Maximum 3000mg/lit
4 Solids Once for a source
Project speciicaion/ Independent Contractor
(mg/lit) 3 or change of IS3025 ---
Maximum 3000mg/lit Test House PMC
source
Once in Three Project speciicaion/
5 Chlorides 2 IS3025 Contractor PMC PMC
month Maximum 300mg/lit
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 67
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR WATER QAP/Civil/04
Reference
Responsible Agencies For
Speciicaion
S. Descripion Check Frequency Acceptance
for Remarks
NO. of Acivity Level Speciied Speciicaion Limit
Inspecion Performance Witness Veriicaion
Tesing
Once for a source
Project speciicaion/ Independent Contractor/
3 or change of IS3025 ---
Maximum 300mg/lit Test House PMC
source
Once in Three Project speciicaion/
2 IS3025 Contractor PMC PMC
month Maximum 500mg/lit
Sulphates
6 Once for a source
(mg/lit) Project speciicaion/ Independent Contractor/
3 or change of IS3025 ---
Maximum 500mg/lit Test House PMC
source
Once in Three Project speciicaion/
2 IS3025 Contractor PMC PMC
Suspended month Maximum 200mg/lit
7 Maters Once for a source
Project speciicaion/ Independent Contractor/
(mg/lit) 3 or change of IS3025 ---
Maximum 200mg/lit Test House PMC
source
Once in Three Project speciicaion/
2 IS3025 Contractor PMC PMC
month Maximum 2mg/lit
8 Acidity Once for a source
Project speciicaion/ Independent Contractor/
3 or change of IS3025 ---
Maximum 2mg/lit Test House PMC
source
9 Alkaline 2 Once in Three IS3025 Project speciicaion/ Contractor PMC PMC
month Maximum 10mg/lit
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 68
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR WATER QAP/Civil/04
Reference
Responsible Agencies For
Speciicaion
S. Descripion Check Frequency Acceptance
for Remarks
NO. of Acivity Level Speciied Speciicaion Limit
Inspecion Performance Witness Veriicaion
Tesing
Once for a source
Project speciicaion/ Independent Contractor/
3 or change of IS3025 ---
Maximum 10mg/lit Test House PMC
source
Check Level :
1 – Manufacture Test Report
2 – Internal Test
3 – Independent Test House
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 69
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR ADMIXTURE QAP/Civil/05
S. Descripion of Check Frequency Reference speciicaion Acceptance Responsible agencies for
Remarks
No. acivity level speciied for inspecion tesing speciicaion limit Performance Witness Veriicaion
Ater
1. Storage 2 -- -- Contractor PMC PMC
Procurement
2. Sampling 2 Every lot -- -- Contractor PMC PMC
On Receipt of Project Speciicaion/ IS Project Speciicaion / Contractor/
3. Test Ceriicate 1 Manufacturer ---
each Batch 9103 IS 9103 PMC
Infrared Project Speciicaion / Contractor/
4. 3 Every lot Project Speciicaion Manufacturer ---
Spectroscope IS 9103 PMC
Project Speciicaion/ IS Project Speciicaion / Independent Test Contractor/
5. Ph Value 3 As Required ---
9103 IS 9103 House PMC
Project Speciicaion/ IS Project Speciicaion / Independent Test Contractor/
6. % Solid Content 3 As Required ---
9103 IS 9103 House PMC
% Chloride Independent Test Contractor/
7. 3 As Required IS6925 / 9103 Project Speciicaion ---
Content House PMC
Project Speciicaion/ IS Independent Test Contractor/
8. Speciic Gravity 3 As Required As Per Manufacturer ---
9103 House PMC
Check Level :
1 – Manufacture Test Report
2 – Internal Test
3 – Independent Test House
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 70
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR PRODUCTION OF CONCRETE QAP/Civil/06
Responsible agencies.
Applicable Performance Frequency of
S.No. Descripion Performance Remarks
standard standard performance QA / PMC
Agency
Well in advance of
Project
1. Concrete Mix Design IS: 10262&SP-23 commencement of Contractor Contractor/PMC
Speciicaion
work
Calibraion of
2. Weighing scales - - Once in three months Contractor Contractor/PMC
(Batching Plant)
3. Batching of materials - - Each batch Contractor Contractor/PMC On line print out
Test on Fresh
4. - - - - - -
Concrete
Project First mix of the day
5 Slump Test Project speciicaion Contractor Contractor/PMC -
speciicaion when in doubt
Project First mix of the day/
6. Temperature Project speciicaion Contractor Contractor/PMC
speciicaion when in doubt
7. Batch Weight Record Each mix Batched Contractor Contractor/PMC On line print out
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 71
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY ASSURANCE PLAN FOR TRANSPORTATION OF CONCRETE QAP/Civil/07
Responsible agencies.
Applicable Performance
S.No. 5.0 Descripion Frequency of performance Performance 5.1 Remarks
standard standard QA / PMC
Agency
Project
Project
1. Scheme of transportaion Speciicaion Before start of concreing Contractor Contractor/PMC
speciicaion
IS: 456
Project
Project
2. Arrangements of Vehicles Speciicaion Before start of concreing Contractor Contractor/PMC
speciicaion
IS: 456
Project
Arrangement of protecion Project
3. Speciicaion Before start of concreing Contractor Contractor/PMC
from Sun & Rain speciicaion
IS: 456
Ater each pour / In case of
4. Cleaning of vehicles - - transit mixer twice a day Contractor Contractor/PMC
before & ater concreing
Communicaion regarding
movement of vehicles
5 - - Each trip Contractor Contractor/PMC
between concrete mixer &
placement point
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 72
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
6. QUALITY PLAN FOR TRANSPORTING, PLACING & COMPACTION OF CONCRETE QAP/Civil/08
Contractor’s Performing Funcions/Responsibility Consultant Inspecion/
Reference
S. No. Acivity/Descripion Reviewer/ Record Funcions Inspec- Remarks
Spec/standard Performer Checkers
Approver ion/ Record Funcions
1. Transporing & placing of con- Project Speciicaions Contractor Contractor/PMC PMC Check List
crete
2. Chipping, roughening& clean- Project Speciicaions Contractor Contractor/ PMC PMC Check List
ing previously laid concrete
3. Erecion & Checking of Form- Project speciicaions Contractor Contractor/ PMC PMC Check List
work
4. Inspecion of Reinforcement Project speciicaions Contractor Contractor/ PMC PMC Check List
5. Fixing of Embedded Parts Project speciicaions Contractor Contractor/ PMC PMC Check List
6. Pour clearance for Concreing Project speciicaions Contractor Contractor/ PMC PMC Check List
7. Compacion of Concrete Project Speciicaions Contractor Contractor/ PMC PMC Check List
8. Inspecion of Concrete surface Project speciicaions Contractor Contractor/PMC PMC Check List
ater removal of formwork
9. Approval of Pour ater repairs Project speciicaions Contractor Contractor/PMC PMC Check List
QUALITY ASSURANCE PLAN FOR REINFORCEMENT STEEL FOR CONCRETE QAP/Civil/09
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 73
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
Responsible agencies for
Performance stan-
S.No Descripion Applicable standard Frequency of performance Performance Remarks
dard QA Agency
Agency
1. Pre-qualiicaion of - - Well in advance of placement of Contractor Contractor/
source order PMC
2. Procurement - - Well in advance of placement of Contractor Contractor/
order PMC
3. Storage Project speciicaion Project speciica- On receipt at site Contractor Contractor/
ions PMC
4. Test ceriicate - - On receipt from manufacture Contractor Contractor/
PMC
5. Test
a. Chemical Test ISI 1786, 1985 ISI 1786 MTC/Approved lab Contractor/
PMC
b. Pracical test As per RVNL speciicaion for
i. Tensile Strength ISI 1786,1985 ISI 1786 10mm dia or less than10mmdia, MTC/ Approved lab Contractor/
one sample in every 25 MT & for PMC
ii. Bend test ISI 1786,1985 ISI 1786 more than10mm dia one sample MTC/Approved Lab Contractor/
in every 40 MT PMC
iii. Rebend test ISI 1786,1985 ISI 1786 MTC/Approved Lab Contractor/
PMC
iv. Unit weight and Cross ISI1786,1985 ISI 1786 MTC/Approved lab Contractor/
secional area PMC
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 74
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
7. QUALITY PLAN FOR HARDENED CONCRETE QAP/Civil/10
Contractor’s Performing Funcions/Responsibility
Reference
S. No. Acivity/Descripion Reviewer/ Remarks
Spec/standard Performer Checkers
Approver
1. Compressive strength IS-576 Contractor PMC PMC
2. Permeability test IS-3085-1965 Contractor PMC PMC
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 75
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY PLAN FOR EARTH WORK AND BLANKETING QAP/Civil/11
Contractor’s performing funcions/resonsibility
Acivity Reference Consultant
Consultant inspecion/record funcions
S. No inspecion/record Remarks
Reviewer/
Descripion Spec./ Standard Performer Checkers funcions
approver
1. Qualiicaion Tech. Speciicaion Contractor Contractor PMC Test Reports
of Source RDSO
2. Procurement Tech. Speciicaion Contractor Contractor PMC Test Reports
RDSO
3. Tesing of Tech. Speciicaion Contractor Contractor PMC Test Reports
material RDSO
4. Laying Tech Speciicaion Contractor Contractor PMC Test Report
RDSO
5. Compacion Tech Speciicaion Contractor Contractor PMC Test Report
RDSO
6. Filed Tests Tech. Speciicaion Contractor Contractor PMC Test Report
RDSO
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 76
Project Management Consultancy Services for Construcion of Roadbed, Major bridges, minor bridges, ROBs & RUBs including Road Approaches,
Staion Building, Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical & Other works related to construcion of
New BG line from KM 78 (Excluding Yavatmal Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State, India.
QUALITY PLAN FOR GUIDE BUND & SLOPE PITCHING QAP/Civil/12
Contractor’s performing funcions/responsibility
Acivity Reference Consultant
S. Consultant inspecion/record funcions
Inspecion/Rec Remarks
No. Reviewer/
Descripion Spec./standard Performer Checkers ord Funcions
Approver
1. Pre – qualiicaion of Tech. Speciicaion RDSO Contractor-QC Contractor -QC PMC Test Reports
material for earth work
2. Tesing of earth work Tech. Speciicaion RDSO Contractor-QC Contractor -QC PMC Test Reports
material
3. Laying & compacion of Tech. Speciicaion RDSO Contractor Contractor PMC
Earth work material
4. Pre – qualiicaion of ilter Tech Speciicaion RDSO Contractor-QC Contractor -QC PMC Test Reports
material
5. Tesing of ilter material Tech Speciicaion RDSO Contractor –QC Contractor -QC PMC Test Reports
6. Laying of ilter material Tech. Speciicaion RDSO Contractor Contractor PMC
7. Pre – qualiicaion of Tech. Speciicaion Contractor-QC Contractor -QC PMC Test Reports
Boulder material
8. Pitching of Boulders Tech. Speciicaion Contractor Contractor PMC
9. Poining of Boulder Tech. Speciicaion Contractor Contractor PMC
pitching
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 77
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
12. TEST FORMATS FOR CIVIL WORKS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 78
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
S.No. LIST OF TEST FORMATS FOR CIVIL WORKS
1 Grain Size Analysis
2 Aterberg Limits
3 Modiied Proctor’s Compacion Test
4 Field Compacion Test by Sand Replacement Method
5 Field Compacion Test by Core Cuter Method
6 Silt & Clay Content Of Fine Aggregate
7 Free Swell Index
8 California Bearing Raio Test
9 Aggregate Impact Value Test
10 Sieve Analysis of Fine Aggregate for Concrete
11 Combined Flakiness and Elongaion Index
12 Speciic Gravity and Water Absorpion of Aggregate
13 Consistency, Iniial and Final Seing Time of Cement
14 Compressive Strength of Cement
15 Fineness of Cement
16 Slump Test
17 Concrete Delivery and Pour Card
18 Compressive Strength of Cement
19 Tests of Bricks
20 Calibraion of Batching Plant - Cement
21 Calibraion of Batching Plant – Admixture
22 Calibraion of Batching Plant – Water
23 Calibraion of Batching Plant – Aggregate
24 Summary of calibraion of tesing and measuring equipment
25 Request for Inspecion
Project
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 79
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
GRAIN SIZE ANALYSIS
[As per IS: 2720 (Part-4)]
Laboratory Job No.: Date of Sampled:
Type of Materials: Sampled by:
Source: Date of Tested:
Locaion: Tested by:
Proposed use: Weight of Dry sample in gms
Cumulaive Cumulaive Per- Cumulaive Per-
IS Sleve size Weight Re-
Weight Re- centage Re- centage passing Remarks
(mm) tained (gm)
tained (gm) tained (%) (%)
100
75
Gravel
20
4.75
2.00
0.425 Sand
0.075
Pan Silt & Clay
DESCRIPTION OF PARTICLE SIEVE SIZE (mm) PERCENTAGE
Coarse 75 - 20
Gravel
Fine 20 - 4.75
Coarse 4.75 - 2.00
Sand Medium 2.00 0.425
Fine 0.425 - 0.075
Silt & Clay Passing through 0.075
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 80
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
ATTERBERG LIMITS
[As per IS 2720 (Part-5)]
Laboratory No.: Date of Sampled:
Type of Material: Sampled by:
Source: Date Tested:
Locaion: Tested by:
Proposed Use:
Liquid Limit Plasic Limit
Determinaion No.
1 2 3 4 1 2
Container no.
Empty Wt of Container (W1) gm
Wt. of Container and Wet Soil (W2) gm
Wt. of Container and Dry Soil (W3) gm
Wt. of Moisture (W4 = W2 - W3) gm
Wt. of Dry Soil (W5 = W3 - W1) gm
Moisture Contant W6 = 100*(W4/W5) (%0
No. of blows Avg:
Results:
Calculaion for Px shall made as follows:
1. The plasicity index is calculated as the diference between as liquid ………….. Limit
2. in case of sandy soil Pl should be determined rest, when PL can not be determined, the PI should be reported as non-plasic (NP)
3. When the plasic limit is equal to or greater than the required limit. The PL shall to reported as ……
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 81
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
MODIFIED PROCTOR'S COMPACTION TEST
[As per IS 2720 (Part-VIII)]
Laboratory No.: Date of Sampled:
Type of Material: Sampled by:
Source: Date Tested:
Locaion: Tested by:
Proposed Use: NMC:
Wt. of mould (A) =
Volume of mould (V) = gms
B) Mould No. gms
C) Trail No. 1 2 3 1 2 3
D) Wt. of wet soil + mould gm
E) Wt. wet soil, (E=D-A gm
F) Wet. Density of soil, (F=E/V)
gm/cc
G) Container No. gms
H) Wt. of container gms
I) Wt of wet soil + Cont. gms
I) Wt of dry soil + Cont. gms
K) Wt of water (L=j-k) gms
L) Wt of dry soil (M= K-H)
gms
M) Water content (N=100x(L/
M)) gms
N) Dry density (P= 100*(F/
100+N)) gms
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 82
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
FIELDCOMPACTION TEST BY SAND REPLACEMENT METHOD
(As per IS 2720: Part 28)
Source of borrowed earth: Layer No.:
Locaion of Tesing: R.L.:
Date of Tesing:
Tested by:
3
Bulk density of Sand (gs) : gm/cm Max Dry Density: gm/cm3
Wt. Sand in cone (Ws) : gm Opt. Moisture Content: %
S.No. Observaions & Calculaions
1 Chainage (km)
2 Depth of layer
3 Ofset
4 Weight of soil from hole (Ww) gm
5 Wt. of sand + cylinder before pouring (W1) gm
6 Wt. of sand + cylinder ater pouring (W2) gm
7 Wt. of sand in hole (W3)=(W1-W2)-Wsgm.
8 Volume of sand (V) = (W3/gs) cu.m
9 Bulk Density = (Ww/V) gm/cum.cm
Moisture content determined by rapid mousture meter
10 Reading in moisture meter, %
11 Actual moisture content, %
12 D.D. of soil=(100xB.D.)/(100+M.C.) gm/cumcm
13 Degree of compacion, %
14 Speciied degree of compacion, %
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 83
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
FIELDCOMPACTION TEST BY CORE CUTTER METHOD
(As per IS 2720: Part 29)
Source of borrowed earth: Layer No.:
Locaion of Tesing: R.L.:
Date of Tesing:
Tested by:
Opt. moisture content: Max Dry Density:
S.No. Observaions & Calculaions
1 Determinaion number 1 2 3 4 5 6
2 Chainage (km)
3 Depth of layer
4 Ofset
5 Wt. of core cuter + wet soil
(W1 g)
6 Wt. of core cuter (W2 g)
7 Wt. of wet soil (W3 g = W1-
W2)
8 Volume of core cuter
(Vccm3)
9 Bulk Density = (W3/Vc) g/
cm3
Moisture content determined by rapid mousture meter
10 Reading in moisture meter,
%
11 Actual moisture content, %
12 Dry density =(100xBulk den-
sity)/(100+M.C.) g/cm3
13 Degree of compacion, %
14 Speciied degree of com-
pacion, %
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 84
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
SILT & CLAY CONTENT OF FINE AGGREGATE
Locaion / Chainage: Report No.
Source of Material: Date of Sampling:
Descripion of material: Date of Tesing:
Sampled By:
SILT & CLAY CONTENT BY WEIGHT
S.No Determinaion No. 1 2 Average
1 Total Weight of sample (W1) gm
2 Weight of sample retained on 75 u sleve
(W2)
3 Silt & Clay content {[W1 -}-[W2]/W1)x100
%
SILT & CLAY CONTENT BY VOLUME
S.No Determinaion No. 1 2 Average
1 Total Weight of sample (V1) ml
2 Volume of silt ater 3 hr (V2) ml
3 Parcentegae of silt & Clay volume [(V2)/
(V1)]x100
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 85
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
FREE SWELL INDEX
(As per IS 2720: Part 40)
Sample No.: Date of Sampling:
Source of Sample: Sampled by:
Locaion: Date of Tesing:
Lab job no. :
Method of Drying: Over Dry/ Air Dry/ Natural Dry
Observaions & Calculaions
Period of Submergence
Dry Weight of Soil
Volume of Soil in Disilled Water = Vd, Ater Speci-
ied period of submergence
Voulme of Soil in (Kerosine = VK
Free sell Index per unit = (Vd-Vk)Vk8100
Note: As per M.O.S.T. Speciicaion (Clause: 305.2.1.2), Free Swell index < 50%
Remarks:
Contractor: Engineer: Employer:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 86
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
CALIFORNIA BEARING RATIO
Laboratory Job No.: Date of Sampled:
Locaion/ Source: Sampled by:
Type of Materials: Date of Test:
Proposed use: Tested by:
Period of socking:
MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLE
Descripion Mould No. Mould No. Mould No.
No. of Layers
No. of blows per layer
Condiion of Sample before socking ater socking before socking ater socking before socking ater socking
Wt. of Mould W1
Wt. of Wet Soil + Mould, W2
Wt. of wet soil, W3=(W2-W1)
Volume of mould, V
Wet Density, YD = W3/V
MOISTURE DETERMINATION before socking ater socking before socking ater socking before socking ater socking
Coniner No.
Wt. of container, W5
Wt. of wet soil + cont. W6
Wt. of dry soil + cont. W7
Wt. of water, W8=(W6-W7)
Wt. of dry soil W9=(W7-W5)
Water content W=W8/W9
Dry Density Vd = Vb*(1+w/100)
LOAD - PENETRATION TEST DATA:
Proving ring No.: Proving Ring Calibraion Factor:
Mould No. Mould No. Mould No.
Penetraion
Sl.No. Proving Ring Corrected load Proving Ring Corrected load
(mm) Proving Ring reading: Corrected load (kg)
reading: (kg) reading: (kg)
1 0.50
2 1.00
3 1.50
4 2.00
5 2.50
6 3.00
7 4.00
8 5.00
9 7.50
10 10.00
11 12.50
CRR CALCULATION
Corrected unit Load in CBR % CRB % Note:
Mould No.
2.5 mm 5.0 mm 2.5 mm 5.0 mm reported 1) Graph ror load vs penetraion atached
2) CBR = (corrected load/ standard load)*100
3) Standard Unit load = @2.5mm penetraion - 1370kg
= @2.5mm penetraion - 2055kg
Average CBR values Degree of compecion=
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 87
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
AGGREGATE IMPACT VALUE TEST
As per IS 2386, (Part-IV)
Date of Sam-
Laboratory No.:
pled:
Type of Materials: Sampled by:
Source: Date of Test:
Locaion: Tested by:
Proposed use:
Descripion Test 1 Test 2 Test 3
Weight of surface dry sample passing 12.5mm and re-
tained on 10mm is sieves, W1
(GM)
Weight of FRACTION PASSING 2.36 MM Sieve ater the
test, W2 (GM)
Weight of fracion retained on 2.36 mm sleve ater the
test, W3 (GM)
W4 = W1 - (W2 + W3)
(GM)
Aggregate Impact Value (A.I.V) - (W2/W1) x 100
(%)
Average Value of A.I.V
(%)
Note: If W4 > 1 gm, discard and retest
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Project
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 88
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
SIEVE ANALYSIS OF FINE AGGREGATE FOR CONCRETE
As per IS: 383 - 1970
Laboratory No.: Date of Sampled:
Locaion: Sampled by:
Type of Materials: Date of Test:
Proposed use: Tested by:
Wt. of sample:
Cumulaive % Cumulaive Spec. % Passing
Weight Re-
Sieve Size weight re- weight re- % Passing
tained (gm) Zone I Zone II Zone III
tained (gm) tained
10 mm 100 100 100
4.75 mm 90 - 100 90 - 100 90 - 100
2.36 mm 60 - 95 75 - 100 85 - 100
1.18 mm 30 - 70 55 - 90 75 - 100
600 mic 15 - 34 35 - 59 60 - 79
300 mic 5 - 20 8 - 30 12 - 40
150 mic 0 - 10 0 - 10 0 - 10
75 mic
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 89
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
COMBINED FLAKINESS AND ELONGATION INDEX
[As per IS: 2386, (Part-i)]
Laboratory No.: Date of Sampled:
Type of Materials: Date of Test:
Locaion: Sampled by:
Proposed use: Tested by:
Size fracion of Aggregate Wt Re-
Wt Passing
Total Wt of ag- tained on Wt Retained on
on Flaki-
Passing on IS Sieves Retained on IS gregate Re- Flakiness Flakiness gauge
ness gauge
(mm) Sieves (mm) tained (gm) gauge (gm)
(gm)
(gm)
63.0 50.0
50.0 40.0
40.0 31.5
31.5 25.0
25.0 20.0
20.0 16.0
16.0 12.5
12.5 10.0
10.0 6.3
Total weight in gm A= B= C= D=
(a) Flakiness Inxex (FI-(B/A)=100)-
(b) Elongaion Inxex (EI-(D/C)+100)-
COMBINED FLAKINESS ELECONGATION INDEX (FI+EI) =
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 90
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
DETERMINATION OF SPECIFIC GRAVITY AND WATER ABSORPTION
(As per IS 2386 : Part iii)
Sample No.: Lab. Job no.:
Descripion of material Date of Sampling:
Locaion/ Source: Total Wt. of sample:
Sampled by: Date of Tesing:
S.No. Details Determinaion Number Mean Value
1 Weight of saturated surface dry sample (A) gm
2 Weight of pycnometer containing sample and Disilled water (B) gm
3 Weight of pycnometer and Disilled water (C) gm
4 Weight of over dried sample (D) gm
5 Speciic gravity {(D/C) - (A-B)}
6 Apparent speciic gravity {D/D) - (A-B)}
7 Water absorpion, (A-D) * 100/D
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 91
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
CONSISTENCY, INITIAL & FINAL SETTING TIME OF CEMENT
Is: 4031 (Part-4&5)
Laboratory No.: Date of Sampled:
Cement Brand name: Sampled by:
Cement Grade: Date Tested
Locaion: Tested by:
Proposed Use:
Duraion
Needle pen-
Weight of Ce- Volume of Water % of Water in of Time
Test No. etraion in Remarks
ment in gms in ml Mix in Min-
mm
utes
Results:
Standard Consistancy of Cement: ...……………………………..………………………………….(P) %
Iniial Seing Time: ……………………………………………………………………………………….Minutes
Final Seing Time: ……………………………………………………………………………………….Minutes
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 92
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
COMPRESSIVE STRENGTH OF CEMENT
Laboratory No.: Date of Casing:
Cement Grade: Date of Tesing:
Brande name of Cement: Age in Days:
Batch/Week No.:
Compressive
Failure Load Average Strength N/
S.No. Wt of Cube (gm) Strength N/
(kN) mm2
mm2
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 93
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
FINENESS OF CEMENT
IS: 4031 (Part-1)
Laboratory No.: Date of Sampled:
Cement Brand name: Date Tested:
Cement Grade/WEEK No.: Tested by:
Locaion: Proposed Use:
Trail No.
Determinaion Unit Remarks
1 2 3
Weight of cement taken (A) g
Weight of cement related on 90 mi-
cron sleve (B) g
Percentage of retained (B/A * 100) %
Average percentage of ineness of ce-
ment %
Speciied limit %
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 94
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
WORKABILITY (SLUMP TEST) AT SITE OF WORK (Concrete by concrete mixer at site of work/from
batching plant)
(As per IS 1199)
Grade of Concrete: Lab. Job no.:
Structure Details: Date of Tesing:
Mix. Proporion: Tested by:
Cement:
W/c Raio:
Admixture(
if):
Average slump at
S.No. Time of Tesing Slump (in mm) Design slump (mm
mixing site (mm)
1
2
3
Remarks:
Contrac-
tor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 95
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client Rail Vikas Nigam Limited
PMC Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor
CONCRETE DELIVERY AND POUR CARD
DELIVERY CARD
Structure: Date:
Structural Component: W/C Raio:
Concrete grade: Admixture type:
Cement Typ: Max Agg. Size:
Descripion Cement Aggregate Sand Water Admixture
Material per Cum of
Concrete
Material per batch of
Concrete
Concrete Quanity per batch: No. of batches carried:
Staring Time of mixing 1st batch: Finish ime of mixing last batch:
Slump at batching plant: Time of despatch:
Concrete quanity despatched: Transit mixer no.:
Remarks:
POUR CARD
Concrete pouring method: Time of start of pouring:
Transit mixture arrival ime: W/C Raio:
Slump at pouring site: Admixture type:
Weather condiion: Max Agg. Size:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 96
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
COMPRESSIVE STRENGTH OF CONCRETE
(As per IS:516)
Laboratory No.: Grade of concrete:
Locaion: Water Cement Raio:
Part of Structure: Date of Tesing:
Date of Casing: Age in Days:
Mix Design Trail No.: Quanity m3:
Weight of Failure Compressive Average Compres-
Density of Test area
S.No. Cube No. the Load Strenth (N/ sive Strength (N/
Cube mm2
Cube(Kgs) (KN) mm2) mm2)
Average Compressive strength: ……………………………… N/MM2
Remarks:
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 97
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project
Client : Rail Vikas Nigam Limited
PMC : Aarvee Associates Architects Engineers and Consultants Pvt. Ltd
Contractor :
COMPRESSIVE STRENGTH OF BRICKS
IS 1077-1992 & IS 3495 (Part-I)-1992
Source: Date of Sampling:
Locaion: Date of Tesing:
Sampled by: Tested by:
Size of brick (mm)
Load Applied Area of Brick Achieved Strength Average Strength Required Strength
S.No. Length Breadth Thickness Remarks
(KN) (mm2) (N/mm2) (N/mm2) (N/mm2)
7.50
WATER ABSORPTION OF BRICKS
IS 1077-1992 & IS 3495 (Part-II)-1992
Size of brick (mm)
Over Dried
S.No. Length Breadth Thickness SSD weigth (gm) Achieved W.A (%) Average W.A (%) Speciic Limits (%) Remarks
weigth (gm)
20.00
DIMENSIONS OF BRICKS
IS 1077-1992
S.No. Descripion Dimensions Speciic Limits
1 Length of 20 Bricks 4600 + 80mm
2 Width of 20 Bricks 2200 + 40mm
3 Height of 20 Bricks 1400 + 40 mm
EFFLORESCENCE OF BRICKS
IS 1077-1992 & IS 3495 (Part-III)-1992
S.No. Size of Depth of Water Area of Brick Deposite of salts (% Speciic Limits Remarks
Moderate
Contractor: Engineer: Employer:
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 98
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
CALIBRATION OF BATCHING PLANT (CEMENT)
Batching Plant No. Date of calibration
Make Due date of Calibration
Last Calibration done on
Load Dial Gauge Reading
Applied in Trial – 1 Trial - 2 Trial - 3 Average
Kg. Loading Unloading Loading Unloading Unloading Unloading
Remarks;
FOR CONTRACTOR FOR PMC
NAME NAME
DESIGNATION DESIGNATION
SIGNATURE SIGNATURE
DATE DATE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 99
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
CALIBRATION OF BATCHING PLANT (ADMIXTURE)
Batching Plant No. Date of calibration
Make Due date of Calibration
Last Calibration done on
Load Dial Gauge Reading
Applied
Trial – 1 Trial - 2 Trial - 3 Average
in
Kg. Loading Unloading Loading Unloading Unloading Unloadin
g
Remarks;
FOR CONTRACTOR FOR PMC
NAME NAME
DESIGNATION DESIGNATION
SIGNATURE SIGNATURE
DATE DATE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 100
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
CALIBRATION OF BATCHING PLANT (WATER)
Batching Plant No. Date of calibraion
Make Due date of Calibraion
Last Calibraion done on
Dial Gauge Reading
Trial – 1 Trial – 2 Trial - 3 Average
Sl. No. Load applied Water Load Water Load Water
in kg Measure applied in Measure applied in Measure in
in kg. kg. in kg. kg. kg.
Remarks:
FOR CONTRACTOR FOR PMC
NAME NAME
DESIGNATION DESIGNATION
SIGNATURE SIGNATURE
DATE DATE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 101
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
CALIBRATION OF BATCHING PLANT (AGGREGATE)
Batching Plant No. Date of calibraion
Make Due date of Calibraion
Last Calibraion done on
Dial Gauge Reading
Load Trial - 1 Trial – 2 Trial - 3 Average
applied Loading Unloading Loading Unloading Unloading Unloading
In kg.
Remarks:
FOR CONTRACTOR FOR PMC
NAME NAME
DESIGNATION DESIGNATION
SIGNATURE SIGNATURE
DATE DATE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 102
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Batching Plant No. Date of calibration
Make Due date of Calibration
Last Calibration done on
Dial Gauge Reading
Load applied Trial - 1 Trial – 2 Trial - 3 Average
In gm. Loading Unloading Loading Unloading Unloading Unloading
Remarks;
FOR CONTRACTOR FOR PMC
NAME NAME
DESIGNATION DESIGNATION
SIGNATURE SIGNATURE
DATE DATE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 103
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
SUMMARY OF CALIBRATION OF TESTING AND MEASURING EQUIPMENT
Recomme
Calibrati Date of Reference
Name of Make Identifi nded Last Date
on date next of issue of
the & cation frequency of Remarks
& calibration Calibration
equipment Model No. of calibration
Agency due certificate
calibration
Frequency of calibration for different equipment to be specified in advance
FOR CONTRACTOR FOR PMC
Name NAME
DESIGNATION DESIGNATION
SIGNATURE SIGNATURE
DATE DATE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 104
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Project:
REQUEST FOR INSPECTION
Client: Rail Vikas Nigam Ltd.,
PMC: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.
Contractor:
RFI No.: Package No.
Reference of previous acivity's RFI with details (if any):
1) You are requested to inspect the below menioned work which is checked by our Engineer / Supplier and ready
for your checking and clearance.
2) Requested Inspecion date and ime ___________
3) Actual Inspecion date _________________ and ime ____________
S.N. BOQ Ref. Descripion of Work (with quanity) Locaion Chainage
OBSERVATIONS (STRIKE OFF WHICH IS NOT APPLICABLE)
1) Inspecion passed. Proceed for the above menion acivity.
2) Remedial work listed below to be completed, but no fresh RFI is required.
3) Remedial work listed below to be completed, fresh RFI is required if the remedial work is not completed on the
same day.
4) Failed, fresh RFI required. Passed Failed
FINAL ANALYSIS OF THE ABOVE WORK:
Inspecion Remarks of PMC Representaive:
(To be submited in 4-copies at PMC oice during oice hours on the preceding day duly signed by authorized per-
son only)
Contractor PMC Employer
Date: Date: Date:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 105
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
13. CHECKLISTS FOR CIVIL WORKS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 106
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
COMPREHENSIVE CHECK LIST FOR EARTH WORK
(1). EARTH WORK IN FORMATION
a. Collecion of plans
Whether plans showing details of exising alignment of formaion, longitudinal secion and cross
secion proile with formaion width on top and at ground level, top slopes & side slopes, ground
level and top levels and formaion have been collected. (Ref: 3.0 of RVNL specs).
b. Fixing the reference bench marks and Field Veriicaion details
Whether the Bench Mark references have been from permanent benchmarks correctly carried
forward.
Whether center line of the Alignment reference pegs are ixed @ every 200M C/C. (Ref: 3.1.2 of
RVNL speciicaions).
Whether these are test checked by Civil Engg. / Works Expert / Supervisor of PMC
Whether permanent arrangements of the ixed reference points and Bench Marks have been
made.
Whether these are entered in register the references of Bench Marks and obtained signature of
Civil Engg./ works expert in addiion to the contractor and site supervisor Civil Engg.
Whether pucca arrangements made for avoiding disturbances to the reference points and bench
marks while working
C. Site Clearance
Whether land acquisiion has been completed for full formaion width over enire stretch.
Whether cleared all the obstrucion i.e. structures, Fencing, vegetaion / trees / jungle growth /
Bushes duly uprooted the trees, over enire formaion width and 1m extra wide on both sides.
(Ref: 3.1.1.1 of RVNLspcs of RVNL).
d. Taking Iniial ground level
Whether iniial ground levels of cross secions are taken jointly and entered in machine numbered
level books and signed page wise by contractor and site supervisor Civil Engg. Ref 5 and 7.1 of
speciicaions of RVNL.
Whether these are test checked by civil Engg. Works Expert
Whether iniial ground levels of cross secions are ploted (Ref: 7.1of RVNLspcs of RVNL.)
Whether the ploted cross secions are signed jointly by the contractor and consultant and the
quaniies for payment of earth work calculated.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 107
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
e. Seing up of Geo Technical Engineering Lab at site at suitable locaions to perform efecive
checks
Whether G.E. labs have been set up with full required tesing equipment at site. (Ref: 4.1of RVNL
Speciicaions)& Annexure IV & X of RDSO guide lines.
Whether ield tesing lab is manned adequately by trained oicials / staf capable of carrying out
soil tesing and quality control at site.( Ref: 4.1 of RVNL Speciicaions).
Whether records of test results of suitability of borrow earth material and compacion are
maintained for permanent record. (Ref: 5.1, 5.2 of RVNL Speciicaions).
f. Selecion of Quarries of borrow earth (soil) and approved.
6.1.3, 6.1.4 of RDSO guidelines, whether borrow areas are selected idenifying the soil suitable for
Railway formaion for the required axle load.( Ref: 3.0 & 3.1.3 (b) of RVNLspcs of RVNL).
Whether borrow area is away from the Railway land Ref: 2.2.4, 3.1.3a & 3.0 of RVNL
Speciicaions.
Whether the soil samples have been for suitability for use tested in construcion by recognized
insituion and obtained test result. (Ref: 3.1.4 Speciicaions of RVNL).
Whether test result accepted by Civil Engg/Works Expert for its adopion. (Ref: 3.1.4 (a)
Speciicaions of RVNL).
Whether test report submited to the site supervisor Civil Engg.for record. (Ref: 4.0, 5.1 & 5.2
Speciicaions of RVNL).
g. Execuion of Earth Work in Embankment / Formaion
(i). Preliminary Works
Whether Reference pegs of central line of alignment are provided at every 200 meter C/C (Ref:
3.1.2.Speciicaions of RVNL).
Whether full construcion width is demarcated. (Ref: 3.1.2.spcs of RVNL).
Whether dug belling is made at 90 Cm away from proposed toe of the bank. (Ref: 3.1.2
speciicaions of RVNL).
Whether the low lying area / borrow pits exising if any close to the toe of the Bank are illed and
leveled. (Ref: 2.2.4 of Speciicaions of RVNL).
Whether the depression if any in the leveled area / surface before ill earth is illed with material
(soil ). (Ref: 3.1.1. &3.7 (i) Speciicaions of RVNL).
Whether surface area of natural ground is properly compacted before earth is dumped (Ref:
3.1.1.1 speciicaions of RVNL).
Whether benching is done on slopes at 30 Cm intervals verically though out its length to ensure
proper bonding of exising bank material and new material (soil) . (Ref: 6.7.2 of RDSO guide lines).
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 108
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Whether ield trial test on a test secion conducted, compacted with suitable compactor for the
type of soil used to decide thickness of layer and to assess number of passes of roller required.
(Ref: 3.2.1, 3.2.6 speciicaions of RVNL, 6.3.2 of RDSO, Annexure IV RDSO guide lines)
(ii). Spreading of borrow earth (Soil) in layers and compacion
Whether earth material is laid in 30 Cm layers or less (loose earth) Ref: 3.7 (b) spans
Whether frequent compacion checks are done for density at Bridge approaches. Ref:
4.2.2.1speciicaions of RVNL.
(iii). Tesing for Slope stability for bank. Ref: Annexure III of RDSO Guide Lines.
Whether slops stability analysis done for banks of more than 6m height (Ref: 4.4 of RDSO
guidelines).
(iv). Ensuring inal proile of compacted formaion. Ref. 4 of RDSO guidelines
Whether the required longitudinal grade has been ensured.
Whether cross slope on top i.e. 1 in 30 from centre to both sides on single line and one end to the
other end ( a single slope) for muliple lines has been provided. (Ref: 3.7 (h) &
4.2.2.3.speciicaions of RVNL).
Whether side slopes of 2:1 for banks upto 6m height are ensured (ref2.5speciicaions of RVNL).
Whether the required the top width is ensured. (Ref: 2.2.1 & 4.2.2.5 speciicaions of RVNL).
Whether extra width of bank where required is provided in curves (Ref: 4.2.3 of RDSO guide lines).
Whether trolley refuges are provided at the required chainage saisfying schedule of dimensions.
h. Placement of Back Fills on Bridge Approaches
Whether backill material is of granular and sandy type soil is ensured. (Ref: 3.4.3.spcs of RVNL).
Whether laying of aback ill material is done in 150mm thick layers or less. (Ref: 3.4.3
speciicaions of RVNL).
Whether compacion is done using vibratory plate compactors. Ref: 3.4.3 spcs of RVNL.
Whether benching is done in approach embankment to achieve proper binding of the back illed
material. Ref: 3.4.4. speciicaions of RVNL.
i. Maintenance of Records
Whether required registers are maintained with full details of type of earth, soil tesing
references, density tests ( OMC & OMDD) etc for submission to Railways the permanent record.
( Ref: 5.0 speciicaions of RVNL).
Whether all the records of work executed should be maintained, inal alignment, inal LS levels,
inal Cross secion of the bank, details of soil tesing, density test with signatures of concerned
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 109
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
contractor site supervisor of Civil Engg. And Civil Engg. / Works Expert for submission to Railway
Engineers at the ime of handing over the secion. (Ref: 5.1. & 5.2 speciicaions of RVNL).
j. Measurements for making payments
Whether inal levels are taken jointly ater compleion of earth work. (Ref: 7 speciicaions of
RVNL).
Whether signature of the contractor and site supervisor of Civil Engg. have been obtained on the
inal levels Ref: 7.0speciicaions of RVNL.
Whether the inal work done cross secions are ploted over the iniially ploted cross secions for
assessing the quanity for payment (Ref: 7.0 speciicaions of RVNL). And signature of contractor&
PMC obtained.
(2). EARTHWORK IN CUTTING
Whether cross secion details of cuing is approved specifying the details of botom width of
cuing, details of drains and side slopes of cuing and level of cuing.
Whether cuing executed / formed to the required proile and the level
Whether required safety measures are being followed if blasing is insulated for excavaion like
proper approval obtained.
Whether trolley refuges are provided.
Whether the surplus spoil is disposed far beyond the cuing length
Whether longitudinal grade of cuing are ensured as per approved LS.
Whether explosives are stored / handled observing all the safety precauions.
Whether the bed of cuing is compacted thoroughly without any depressions / pits, uniformly
sloped cross wise & longitudinal grade before ballast is dumped.
(3). EARTH WORK IN CONSTRUCTION OF DRAINS :
Whether longitudinal / side drains are provided in cuing as required.
Whether drains are as per approved cross secion proile.
Whether drains are built with approved materials.
Whether drains are provided ensuring the longitudinal slope to facilitate easy draining of the
water.
Whether construcion of drains are the required line and level.
Whether catch water drains are provided
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 110
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
(4). BLANKETING WORK
Whether quarry of blankeing material is jointly inspected. (Ref: 2.3.2.3, 6.0 of RVNL speciicaions
& 4.3.4. & 7.2.1.2 of RDSO guidelines).
Whether samples of blankeing material is tested and got approved. Whether the approval of the
samples is submited for record. (Ref; 5.0 of speciicaions).
Whether the surface of sub grade level, slope wise and longitudinal, duly rolled is ensured well
before dumping the blankeing material.
Final compacted blanket thickness approval has been taken from RVNL.
Whether the layer of blankeing material is dumped and leveled to the required proile using
motor graders and not more than 250mm thickness (Ref: 3.7. speciicaions of RVNL).
Whether layers of blankeing material spread is not more than 250 mm thickness. (Ref: 3.7 (b))
Whether the same is compacted well ill it atains the required density; OMC & MDD using
vibratory compactors. (Ref: 4.2.2speciicaions of RVNL).
Whether compacion test for the compactness is done for every 200sq. m. 4.2.2.1.(i)
Whether the work is inally executed to the required proile, ensuring required top width, slopes,
top level without any pit on top (such that rain water does not stagnate) and without rain cuts.
(Ref: 6.0 speciicaions of RVNL).
Whether samples of blankeing material are tested for every 500 cum or part thereof work done
(4.2.1.2(a) speciicaions of RVNL)& 7.2.1.2 of RDSO guideline.
Whether cross secions of the moorum blankeing work done are ploted as per the inal level
taken. (Ref 7.2 (a) spcs of RVNL).
Whether these are jointly signed by contractor, Civil Engineering site supervisor. (Ref: 7.1.1.4
specs).
Whether necessary details are incorporated in the permanent register which is to be handed over
to Railways at the ime of handing over secion. (Ref : 5.0 spcs of RVNL)
ANY OTHER CHECK AS DEEMED REQUIRED BY PMC / RVNL.
Frequency of tests
1. New bank
i. At least one density check for every 500sq m for other than blankeing layer and top
one meter of sub grade.(Ref: 4.2.2.1(b) of speciicaions of RVNL)
ii. At least one density check for every 200sq m for the blankeing layer and top one meter
of sub grade(Ref: 4.2.2.1(b) of speciicaions of RVNL).
2. Bank Widening
At least one density check at interval of minimum200m on widened side of embankment. (Ref.
4.2.2.1(a) of speciicaions of RVNL)
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 111
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
3. Bridge approaches or special locaions
Closer frequency as may be speciied by the Engineer.
Acceptance criteria
New Bank
1. Coarse grained soil containing ines passing 75 micron IS sieve up to 5% should have the
density index (relaive density) a minimum of 70% obtained in accordance with IS : 2720
( Part –14) –1983.
2. For other soil ield dry density should not be less than 98% of maximum dry density (MDD)
values as obtained by Heavy compacion test (IS 2720 – Part 8 – 1983) in the laboratory.
Bank widening for gauge conversion and rehabilitaion of unstable formaions.
Field dry density should be a minimum of 98% of MDD as obtained in the laboratory or 70% relaive
density for cohesion less soils.
Other Checks
a) Formaion width should not be less than the speciied width.
b) Formaion level
1). ± 25mm in respect of sub grade as compared to design level
2). + 25mm for inished top of blanket layer
3). No ruts or low Pockets
c) Cross slope 1 in 30 to 1 in 40
d) Side slope Not steeper than design side slope
e) Berm width If berms are provided, berm width should not be less than the designed width
COMPREHENSIVE CHECK LIST FOR CC/ RCC/ PSC
(FOR ADOPTING SECTION WISE/ WORK WISE AS APPLICABLE)
a. Cement
Whether test ceriicates are submited to Civil Engineering Works Expert for record ater
obtaining his approval. (Ref: 6.3 speciicaions of RVNL).
Whether cement is not contaminated while storing / transporing. (Ref: 6.3 speciicaions of
RVNL).
Whether cement to be used for works is fresh and less than 3 months old from the date of
manufacture. (Ref: 6.3 speciicaions of RVNL)
Whether a sample test of cement is tested from every batch supplied / delivered at site or once in
every 1000 bags whichever is frequent as per IS 4031, 4032, IS 3535. (Ref: 6.3 spcs of RVNL).
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 112
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
b. Fine Aggregate (Sand)
Whether sand is rejected if the source is from creek / Marine. (Ref: 2 (i) spcs of RVNL)
Whether sand is tested according to IS 2386 in an approved lab to ensure sand is not containing
silt etc., and also to blend if required ixing percentage of the coarse and ine sand.Ref. 2.1 ( i ) of
speciicaions
Whether sand is not containing more than 3% of silt content by weight / shale / clay and other
weak paricles. (Ref: 2 (ii) speciicaions of RVNL).
Whether sand is washed in a screw type mechanical washers in potable water to remove excess
silt, clay and chlorides ensuring screening and washing of sand is done one day before using. (Ref:
2 (iii) speciicaions of RVNL).
c. Coarse Aggregate (Metal)
Whether the metal is tested in lab according to IS 2386 and submited the test ceriicate. Ref: 2.2
& 6.2 speciicaions of RVNL.
Whether metal is of crushed stone conforming to IS 383 and of cubicle & angular in shape. Ref: 2.2
(i) speciicaions of RVNL.
Whether metal is not of laky and micaceous. Ref: 2.2 (ii) speciicaions of RVNL
Whether speciied sizes of graded metal are being used in concrete for achieving densest mix. Ref:
6.2 & 7.9 speciicaions of RVNL.
d. Water
Whether the water is tested in regard to solids / impuriies and submited test ceriicate before it
is used in concrete. Ref: 3.0 speciicaions of RVNL.
Whether the water is of potable one. Ref: 3 speciicaions of RVNL
Whether the PH value of water is less than 6. Ref: 3 (iv) speciicaions of RVNL
Whether the solids contents are within the permissible limits. Ref: 3.0 speciicaions of RVNL
e. Concrete Admixtures
Whether procurement of Admixtures are from an established manufactures. Ref: 5.1
speciicaions of RVNL.
Whether the Admixtures are as speciied in the design mix. Ref: 7.1
Whether physical and chemical requirements of Admixtures are as per IS 9103, 1199 & 6925. Ref:
5.2 speciicaions of RVNL.
f. Reinforcement Un-tensioned Steel
Whether ensured steel is procured from the speciied manufacturers. Ref: 6.4 speciicaions of
RVNL
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 113
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Whether test ceriicate obtained and submited to Civil engineering Works Expert. Ref: 6.4
speciicaions of RVNL
Whether defecive, britle, rusted burnt bars and bars of cracked ends are removed. Ref: 6.4
speciicaions of RVNL.
Whether stacked the reinforcement steel at a suitable place over plaform, skits, and on other
supports without resuling in formaion of rust. Ref: 6.4 speciicaions of RVNL
g. Design Mix
Whether design mixes are made for all the grades of concrete at lab. Ref: 7.0 speciicaions of
RVNL.
Whether approval from Civil Engineering Works Expert is obtained for adopion of the design
mixes made basing on trial mixes. Ref: 7.0 speciicaions of RVNL.
Whether design mix is made / tried at the site ixing the quaniies of all the materials including
plasicizers required for achieving the required strength of concrete and ixing suitable water
cement raio. Ref: 7.0 speciicaions of RVNL.
h. Form Work
Whether calculaions and details of formwork are submited by the contractor to the PMC for
approval.
Whether Civil Engineering Works Expert has approved the use of the speciied form work together
with all props, staging centering, scafolding and temporary connecions required for their support
in regard to the design and drawing of complete form work. Ref: 19.6 speciicaions of RVNL.
Whether the steel used for formwork is to the required shape and thickness. Ref: 19.6
speciicaions of RVNL.
Whether foundaion of all supports are suiing to the bearing capacity of soil to take loads without
setlement. Ref: 19.6 speciicaions of RVNL.
Whether form work is robust, strong and the joints are leak proof. Ref: 19.6 speciicaions of RVNL
Whether staging is provided with cross bracings and diagonal bracings in both direcions and
designed base plate resing on irm strata. Ref: 19.6 speciicaions of RVNL
Whether large size panels are used reducing the number of joints of form work. Ref: 19.6
speciicaions of RVNL.
Whether staging are correctly spaced ensuring correct alignment. Ref: 19.6 speciicaions of RVNL.
Whether use of PVC joint sealing tapes, foam rubber or PVC T-secion are used to prevent leakage
of grout. Ref: 19.6 speciicaions of RVNL
Whether required clamps are provided to hold the forms together. Ref: 19.6 speciicaions of
RVNL.
Whether use of ies are restricted as far as pracicable, if ies are used whether they are of HDPE
sheathing to facilitate easy removal.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 114
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Whether chamfers or illets of size 25 mm x 25 mm are provided at all angles of the form work to
avoid sharp corners.
Whether openings for ixtures and other iings are provided in the shutering as directed by the
Civil Engineering supervisors at site.
Whether shutering for walls, sloping members and thin secions of considerable height are
provided with temporary opening to permit inspecion and cleaning out before placing concrete.
Whether the form work is so made as to produce a inished concrete true to shape, line level and
to the dimensions as per the drawing.
For metal forms whether all bolts and rivets are counter sunk and well-grounded to provide a
smooth & plane surface
Whether forms are made suiciently rigid by the use of ies and bracings to prevent any
displacement or sagging between supporters.
I.) Mixing of Concrete
Whether standard equipment are being used for mixing concrete i.e., standard automaic
batching plant, mechanical mixers and weigh batchers. Ref: 8.0 speciicaions of RVNL
Whether all measuring devices of concrete mixing equipment are maintained clean and
serviceable condiion. Ref: 8.0 speciicaions of RVNL
Whether calculaion is done for batching plant and weigh batchers for ensuring accuracy of
measurements. Ref: 8.0 speciicaions of RVNL
Whether the quaniies of approved materials i.e. ine aggregate material, coarse aggregate,
cement, water & admixtures are a per speciied and approved design mix. Ref: 8 speciicaions of
RVNL.
Whether the mix has speciied slump as per IS 516 for diferent grades of concrete used in the
work to ensure the required consistency and densest mix. Ref: 7.2 speciicaions of RVNL.
f) Transporing, Placing & Compacion of Concrete
Whether standard equipment are used for transporing concrete like concrete dumpers, powered
hoists, chutes, buckets handled by cranes, transit mixers, concrete pump, concrete distributor
booms, belt conveyors, cranes with skips, tremies and air compressors etc. Ref: 8 (b) speciicaions
of RVNL.
Whether standard and approved mechanical vibrators like pin (internal) / Form / Vibrators /
Screed as per IS 2502, 2506, 2514 and 4656 are being used for compacion of concrete to have a
dense homogenous void free concrete. Ref: 8 (c) & 10.0 speciicaions of RVNL.
Whether addiional vibrators in good / working condiion are kept as standby at the site while the
concrete work progresses to enable immediate use if any breakdown occurs. Ref: 10.0
speciicaions of RVNL.
Whether thorough / proper / suicient / vibraion is done without resuling forming honey
coombs and to achieve required surface inish. Ref: 10 speciicaions of RVNL.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 115
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Whether thorough vibraing is done without disturbing the reinforcement ixtures and ensuring
compacion in corner of the formwork to produce a homogenous void-free mass. Ref: 10.0
speciicaions of RVNL.
Whether over vibraion is avoided to minimize the risk forming a weak surface layer. Ref: 10.0
speciicaions of RVNL.
g) Construcion Joints
Whether construcion joints are avoided as far as possible. Ref: 11.0 speciicaions of RVNL
Whether sequence of concrete placement is organized in such a way that cold joint are
eliminated. Ref: 11.0 speciicaions of RVNL
Whether construcion joints are approved by Civil Engineering Works Expert and are treated with
epoxy compound ater cleaning & preparing the surface with V – notch to the saisfacion of Civil
Engineering Supervisor at site. Ref: 11.0 speciicaions of RVNL.
h) Concreing Under Water
Whether that sea water is not allowed to come in contact with the concrete for at least 72 hours.
Ref: 12.0 speciicaions of RVNL
Whether the approval of Civil Engineering Works Expert is obtained if necessity arises to place /
deposit concrete under water. Ref: 12.0 speciicaions of RVNL.
Whether speciied equipment’s and methods are adopted for deposiing concrete under water.
12.0 speciicaions of RVNL.
Whether concreing is carried out by tremie method only using tremie of appropriate shape and
diameter such that the dia of pipe is not less than 200 mm to ensure free low of concrete. Ref:
12.0 speciicaions of RVNL.
Whether number of spacing of the tremies is followed as ixed by the Civil Engineering Works
Expert to ensure proper concrete in speciied area. Ref: 12.0 speciicaions of RVNL
Whether tremie concreing is coninued without interrupion to the full height of the member
being concreted. Ref: 12.0 speciicaions of RVNL
Whether ensured arrangements for producing required concrete and number of tremies are
suicient to enable the underwater concrete being completed uninterruptedly with in the
sipulated ime. Ref: 12.0 speciicaions of RVNL
Whether necessary stand-by equipment is kept at the site for emergency situaion. Ref: 12.0
speciicaions of RVNL
Whether skilled staf experience in concreing with the tremie are available to avoid problems.
Ref: 12.0 speciicaions of RVNL
Whether 10% of cement content has been addiionally used in the mix for concreing under
water. Ref: 12.0 speciicaions of RVNL.
Whether cofer dams are provided suiciently ight to have sill water condiion. Ref: 12.0
speciicaions of RVNL.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 116
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Whether the cofer dams are ight such that the low of water is less than 3 meters per minute
through the space into which the concrete is to be deposited. Ref: 12.0 speciicaions of RVNL.
Whether cofer dams in sill water are suiciently ight to prevent loss of motor through the joints
in the walls. Ref: 12.0 speciicaions of RVNL
Whether pumping out of water is not done while concreing is placed and unil 24 hours
thereater to avoid disturbance to the concrete where cofer dams are provided. Ref: 12.0
speciicaions of RVNL.
I) Curing of Concrete
Whether adequate arrangements for curing the concrete are made before taking up the concrete.
Ref: 13.0 speciicaions of RVNL
Whether appropriate methods of curing as approved by Civil Engineering Works Expert are
adopted to have coninuous curing upto the speciied period to achieve coninuous damp or wet
condiion.
Whether usage of the speciied and approved curing compound is done to achieve the required
early strength. Ref: 12.3 speciicaions of RVNL.
Whether the arrangements are made to have suicient and suitable water for concreing as
approved by Civil Engineering Expert for curing purpose. Ref: 13.2 speciicaions of RVNL.
J) Finishing
Whether the exposed bars/ bolts are cut inside the concrete member to a depth of atleast 50 mm
inside immediately ater removal of form work. Ref: 14 speciicaions of RVNL.
Whether the above hole formed for cuing the rod/ bolt is illed with cement motar of dry pack
consistency. Ref: 14 speciicaions of RVNL
Whether all construcion and expansion joints in the completed concrete work are kept free from
any mortar and concrete. Ref: 14 speciicaions of RVNL.
Whether expansion joint iller let is exposed for its full length with clean and true edges. Ref: 14
speciicaions of RVNL.
Whether the ins if any formed at the form joints are ground using electric surface grinder. Ref: 14
speciicaions of RVNL.
Whether concrete work is rejected if found sagged or contained honey comb to an extent
detrimental to structure safety or architectural appearance. Ref: 14 (a) speciicaions of RVNL.
Whether minor surface defect if any is reciied as directed by Civil Engineering Supervisor at site.
Ref: 14 (b) speciicaions of RVNL.
K) Tests and Standard of Acceptance
Whether standard test cubes of diferent sizes are procured for concrete cube tesing. Ref: 15
speciicaions of RVNL.
Whether atleast one random concrete sample test for every lot of concrete of 30 cum is taken at
point of delivery. Ref: 15 speciicaions of RVNL.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 117
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Whether one sample test for each and every grade of concrete is made. Ref 15 speciicaions of
RVNL.
Whether skilled men are deployed for making test tubes. Ref: 15 speciicaions of RVNL
Whether the concrete cube tesing machines are in working condiion of diferent capacity to test
the required compressive strength of diferent grades concrete. Ref: 15 speciicaions of RVNL.
Whether calibraion test ceriicate is obtained procured and submited to the Civil Engineering
Works Expert for ensuring that tests are made at site and their results are correct. Ref: 15
speciicaions of RVNL.
Whether cube tests are made for diferent grades of concrete at a reputed lab/Field lab in
presence of PMC personnel’s to ascertain the compressive strength of concrete ater seven days
and twenty eight days. Ref: 15 speciicaions of RVNL.
Whether concrete test cubes (Three cubes shall be made from each sample) are properly cured
before tesing for compressive strength of seven days and twenty eight days. Ref:
16.0speciicaions of RVNL.
Whether minimum frequency of sampling of concrete of each grade is made in accordance to the
speciicaions. Ref: 15.3speciicaions of RVNL.
Whether strength of test cubes ater check varies more than + or (-) 15 % of average. Ref:
15.2speciicaions of RVNL.
Whether all test results are obtained and got accepted by the Civil Engineering Works Expert and
entered in the register. Ref: 16.0 speciicaions of RVNL.
L) Acceptance criteria :
Whether required/ speciied strength of any paricular grade of concrete ater twenty eight days
of curing is achieved. Ref: 16.0 speciicaions of RVNL.
Whether tests are done for a changed mix if any due to a change in the quality of aggregate or
cement for any reason. Ref: 16.0 speciicaions of RVNL.
M) Cracks
Whether concrete is rejected if cracks develop in concrete construcion which in the opinion of
the Civil Engineering Expert may be detrimental to the strength of the construcion. Ref: 17
speciicaions of RVNL.
Whether contractor dismantled the rejected construcion clearing the site and carrying away the
debris. Ref: 17 speciicaions of RVNL.
Whether grouted the cracked concrete structure which in the opinion of the Civil Engineering
Expert is not detrimental to the stability of the construcion with polymer cement grout of
approved quality. Ref: 17 speciicaions of RVNL.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 118
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
N) Tolerance in Concrete Elements
S.No. Descripion Tolerances
1 Deviaion from Plum or speciied 1 in 250, subject to a maximum value of bater
for face of exposed piers 0.05imes the latest
lateral dimension of pier.
2 Shit of alignment ± 25mm
3 Deviaion from Plum or speciied bater 1 in 125
for face of backilled abutments
4 Size and locaions of openings ±12mm
5 Plan dimension of fooings(formed) +50mm,-25mm
6 Plan dimension of fooings(Unformed +75mm,-00mm
excavaion)
7 Thickness of fooings +No limit,-5%
8 Fooing eccentricity 0.02 imes the width of the fooing in the
direcion of deviaion but not more than 50mm
9 Reduce level of top of fooing/pier/bed ±5mm
block
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 119
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
14. PERMANENT WAY WORKS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 120
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
14.1. TRACK WORKS (PERMANENT WAY) Salient Features:
S.No. Pariculars Details
1 Gauge 1676 mm(B.G)
2 Rail proile- a) Main Line 60kg
b)Loop Line 60 kg
c)Guard rail 60 Kg
d) Check Rail 60 kg
PSC Mono Block Sleeper(60kg)
Ballast decks of bridges and bridge approaches, Mono
Block 60kg. PSC sleepers with arrangements for ixing
3 Type of Sleepers
guard rails.
At level crossings Mono Block 60 kg. PSC sleepers with
arrangements for ixing Check Rails.
Main line- 1660 nos./km
4 Sleeper density
Loop line-1540 nos./km
Main line-350 mm
5 Ballast cushion
Loop line-250 mm
Free 13 m/26m long rails for Fish plated track.
SWR of 3x13 m rail panels with ish plates at ends.
LWR 1 km. long panel with switch expansion joints at
6 Rail lengths and rail end iings
ends.
CWR 3 km. long panel with switch expansion joints at
ends.
7 Maximum cant 165 mm
Generally 75 mm
8 Maximum cant deiciency
For nominated stock 100 mm
Generally 75 mm
9 Maximum cant excess
For nominated stock 100 mm
Generally 1 in 720 or later.
10 Maximum cant gradient
1 in 360 in very excepional circumstances only.
Rate of change of cant/cant
11 35 mm/sec
deiciency
Where passenger trains ply both on main lines and loops:
1 in 12 Turnout with curved switches and CMS crossings
laid on PSC sleepers on fan shaped layout.
12 Turnouts in yards: Loops and sidings where passenger trains do not ply: 1 in
8.5 turnout with curved switches and CMS crossings laid
on PSC sleepers on fan shaped layout.
Derailing switch 60 kg on 60 kg PSC Sleepers.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 121
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Track Laying Tolerances
A Gauge – Sleeper to Sleeper variaion +3 mm
B Expansion gap average gap worked out by recording 20
+2 mm
successive gaps.
c Joints :
Low joints not permited.
High joints not more than +2 mm
Squareness of joints on straight +/- 10 mm
D Spacing of sleepers
With respect to theoreical spacing not difering by more
+/- 20 mm
than
E Cross Level
To be recorded on every 4th sleeper not more than.
Twist on 3.6 m base.
2.78 mm/m
F Alignment on 7.2 m chord + 5 mm
g. Variaion in longitudinal level with reference to approved
longitudinal secion prepared before the start of the work 50 mm
not more than
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 122
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
14.2 FORMATS TO BE FOLLOWED IN PERMANENT WAY WORKS
S.NO. DESCRIPTION PROFORMA NO.
1 Rails QAP/PW/1
2 Ballast QAP/PW/2
3 Sleepers QAP/PW/3
4 Formaion Check Before Laying QAP/PW/4
Track
5 Laying of Plain Track QAP/PW/5
6 Laying of Track in Curve QAP/PW/6
7 Laying of Level Crossing QAP/PW/7
8 Guard Rails on Bridges QAP/PW/8
9 Long Welded Rails QAP/PW/9
10 Turnout and Derailing Switch QAP/PW/10
11 Bufer Stop QAP/PW/11
12 Sand Hump QAP/PW/12
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 123
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/1
RAILS
Recorded by Checking /
S.
Acivity Execuion Inspecion by Remarks
No.
Agency PMC
1. Ani corrosive paining done
2. Cuing- verical & with approved type of Rail
cuing machine (abrasive cuter)
3. Drilling holes – chamfering of Hole done
4. Flash But Welding
a) As per approved method statement
b) Done by competent welder
c) Checking rail ends and reciicaion if
any
d) Clearing of rail ends for welding
e) Ensuring desired gap between the two
rails
f) Welding as per parameters of welding
and with ok from welder
g) Checking weld print outs
h) Grinding of welded joints to the
speciied tolerances and checking the
same
i) USFD tesing
j) Marking with paint details of welded
joints
k) Joint inspecion and approval by PMC
l) Stacking of welded panels
5. Thermite Welding –
1. As per approved method
2. Done by competent welder
3. Desired gap at joint provided (24-26
mm)
4. Required welding temperature (600c)
5. Adequate preheaing pressure (110
PSI)
6. Welding porion free from moisture
7. Prefabricated mould used without
crack or damage
8. Chipping, grinding and proiling done
properly
9. Tesing of welds done (1 in 100 welds)
10. USFD tesing done
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 124
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Recorded by Checking /
S.
Acivity Execuion Inspecion by Remarks
No.
Agency PMC
11. USFD test-results are ok
6. Instruments required
a) Abrasive Cuing Machine
b) Drilling machine
c) Chamfering tools
d) Scale steel 15cm and 30 cm
e) Welding equipment
f) RDSO ceriied welder and welding
supervisor
g) USFD machine and qualiied PWI for
USFD tesing
Notaion for Inspecion / checking
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 125
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/2
BALLAST
Checking /
S. Recorded by
Acivity Inspecion by Remarks
No. Contractor
PMC
1 From approved quarry
2 Tesing of samples done
3 Earmarking and approval of plots
4 Stacking on approved plot
5. Measurement of stack by PMC
6. Reading of botom ballast by vibratory roller
7. Sieve analysis done
8. Spreading Ballast botom as prescribed
9. Checking of center line with chord
10. Speciied top ballast ater linking of track
11. Tamping and surfacing to correct line & level
12 Final proiling of ballast with ballast regulator
13 Instruments required:
a) Leveling instrument
b) Staf
c) Piano wire / chord
d) Vibratory Roller
e) Measuring Steel tape
Notaion for Inspecion
R – Rouine
S – Sipulated
RM - Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 126
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/3
SLEEPERS
Checking /
Sl. Recorded by
Acivity Inspecion by Remarks
No. Contractor
PMC
1 Serial numbers engraved
2 Centre line marking
3 Spreading correctly
4 Alignment and posiion
5 Sleeper spacing
6 Instruments required
a) Nylon chord
b) Measuring tape
c) Paint
Notaion for Inspecion
R - Rouine
S - Sipulated
RM - Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 127
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/4
FORMATION CHECK – BEFORE LAYING TRACK
Checking /
Sl. Recorded by
Acivity Inspecion by Remarks
No. Contractor
PMC
1 Proposed formaion level
2 Actual formaion level
3 Ploing and comparison
4 Raiicaion of levels if any and cross slope
of 1 in 30
5 Marking center line
6 Fixing center line pegs
7 Checking of center line with chord
8 Instruments required:
a) leveling instrument
b) staf
c) piano wire / chord
d) Vibratory Roller
e) Measuring Steel tape
Notaion for Inspecion
R – Rouine
S – Sipulated
RM - Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 128
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/5
LAYING OF PLAIN TRACK
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Ballast provided as speciied
2 Sleepers placed correctly as speciied
3 Rails are correctly matched, paired and
placed on sleeper with their ends square
4 Adequate expansion gaps provided
5 Greasing of ERC clips
6 All ERC slips and other iings correctly
ixed
7 Provision of CIJs & SEJs
8 Packing / tamping of track done as required
9 Instruments required
a) Level cum Gauge
b) Stepped feeler Gauge
c) Liners for expansion gaps
d) Toe load measuring device
e) Tape and Nylon chord
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 129
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/6
LAYING OF TRACK IN CURVE
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Seing and pegging of center line
2 Transiion length provided as required
3 Super elevaion provided as required
4 Required extra clearance between adjacent
curved track provided
5 Versines are within prescribed limit
6 Marking of versines and super elevaion
done
7 Extra shoulder ballast width and height
provided
8 Instruments required
a) Theodolite
b) Staf
c) Measuring tape
d) Pegs
e) Tools for measuring versine and
cant
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 130
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/7
LAYING OF LEVEL CROSSING
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Correct type of special PSC sleepers used
2 Rail joint is not located within level crossing
3 Level crossing not in breathing length of
LWR
4 Check rail – length & clearances are
adequate
5 Fencing provided
6 Speed breakers provided
7 Road sign boards provided
8 Stop boards provided
9 Whistle boards provided
10 Height gauge provided (If required)
11 Gradient of approach road is proper
12 Level length of road is as required
13 Instruments required
a) Measuring Tape
b) Nylon chord
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 131
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/8
GUARD RAILS ON BRIDGES
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Guard rails provided on speciied bridges
2 Correct type of PSC sleepers used
3. Spacing of sleepers is correct
4. Correctness of iings for main rail and guard
rail
5. Clearance between guard rail and main rail
correct.
6. Guard rail-following to be checked
a) Straight porion outside ballast wall-
1825mm
b) Bent porion outside ballast wall –
4875 mm
c) Guard rail ends bent and buried
d) Clearance between running rail and
guard rail
e) End wooden block provided
7. Instruments required
a) Measuring scale
b) Stepped feeler gauge
c) Sleigh gauge
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 132
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/9
LONG WELDED RAILS (LWR)
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Requirement for laying LWR fulilled as per
checklist
2 LWR diagram approved by Chief Tack
Engineer (CTE)
3 Provision of SEJs:
a) Laid in mean posiion
b) Requisite gap at SEJ provided
c) Central sleepers spacing as
required
d) Markers provided at both ends
4 Distressing of LWR
a) Done as per laid down procedure
b) Done within rail temperature range
5 Desired reference posts provided
6 Boards with LWR details provided
7 Instruments required
a) Nylon chord
b) Measuring tape
c) Rail thermometers
d) Distressing equipment/rollers
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 133
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/10
TURN OUT AND DERAILING SWITCH
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Switches & Crossing correctly provided
according to:
a) Let hand / Right hand turn out.
b) Curved switches
I) RH&LH switch
II) RH&LH stock
2 Required special PSC sleepers are used and
spread serially
3 Required iings correctly ixed
4 Housing of tongue rail with stock rail is
proper
5 Clearances & gaps provided as required
6 Throw of switch is proper
7 Clearance at heel is proper
8 Spacing of sleepers is as per drawing of
turnout
9. Clearances at check rails are correct
10. Instruments required
a) Sleigh Gauge
b) Measuring scale
c) Nylon chord
d) Fish Bolt Spanner
e) Spare spring washers
f) Spare spherical washers
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
QAP/PW/11
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 134
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
BUFFER STOP
Checking / Remarks
Sl. Recorded by
Acivity Inspecion by
No. Contractor
PMC
1 Assembly as per standard drawing
2 Fiings correctly ixed as required
3 Cross sleepers/rails provided at bufer
height of 1060 mm from Rail level and
painted red.
4 Instruments required
a) Measuring tape
b) Nylon chord
c) Fish Bold Spanner
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 135
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/PW/12
SAND HUMP
Checking /
Sl. Recorded by
Acivity Inspecion by Remarks
No. Contractor
PMC
1 Fiings are proper as per drawing
2 Correct laying of track structure done
3 Proper gradient provided
4 Length of open; sanded & embankment are
as per drawing
5 Brick channel provide for sanded porion as
required
6 Instruments required
a) Measuring scale
b) Nylon chord
c) Gradient Board (Cant Board)
Notaion for Inspecion
R – Rouine
S – Sipulated
RM – Random
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 136
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
15. SIGNALING AND TELECOMMUNICATION WORKS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 137
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
SIGNALING AND TELECOMMUNICATION
15.1 Objecive of PMC:
1. Assist client in following aspects:
a) Conirm to railway rules and regulaions
b) Conirm to local laws, Bye Laws, regulaions and rules etc.,
2. Implementaion of “Commercial Operaion” up to end of Defect Liability Period” under the
contract
3. Observe due diligence of prevailing standards in the performance of assignment (S&T works)
4. The S&T materials to be supplied by Contractor as per RDSO Spec/Drgs and to be procured
from RDSO approved irms in Part-I and to be supplied duly inspected by RDSO/RITES.
5. The S&T work is required to be carried out in accordance with the IRS speciicaion for RRI/PI
(S/36/87) and RDSO Spec.No. RDSO/SPN/192/2005 for Electronic interlocking with latest
amendments.
6. The installaion pracices should be as per SEM Part-I & II and RE Manual. The work shall
conirm to the drawings speciied by BOQ/RVNL drawings. The ield book shall be
maintained at site and all measurements of trench and foundaions & the materials are to
be recorded in the ield book and shall be signed by both PMC & contractor.
7. Ensure accuracy, quality of workmanship, safety of works assigned with contractors ensuring
the standards of remedial acions in the works.
8. Minimize claims, disputes & assising in resolving them
9. Closing of contract:-
PMC shall prepare the materials statement for the work to see that there is no
misappropriaion of materials supplied and the materials used at site.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 138
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
15.2 Quality Policy:
Preparaion of Quality Assurance Manual
A. Acceptance Criteria of supply of items
QA System at various level
Mode of Source of PMC’s Role Internal /
Contractors
supply supply Quality Audit
Supervi
role Physical Check @ Engineer
sor
Directly by From the Request to be Shall see that the 100 % 90% As Deemed it
contractor RDSO submited for inspecion ceriicates & by RVNL
approved inspecion (RFI) seal of RDSO/RITES are in
venders or ISI from contractors order, the physical
standards for for each item of condiion and the
materials supply ater the quaniies are as per the
other than materials reached schedule quanity.
RDSO at site for PMC and
Also should check all
approved RVNL Engineer for
other materials which are
items. inspecion.
not inspected by
RDSO/RITES to see that
they are as per drawings/
ISI standards.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 139
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
B. Acceptance Criteria of Execuion of Signalling Work
QA System at various level Internal/
Execuing
Work descripion PMC’s Role Quality
agency Contractor’s role
Physical Check @ Supr Engr Audit
Contractor/ - Cable Trench, Laying of The contractor shall Shall ensure that 100 % 90 % As
subcontract cable (Sig & Power), reilling carry out all the works the work is done deemed
or the trench, casing as per drawings and as per the it by
foundaion for boxes, local railway pracice. drawing and RVNL
erecion of boxes, The workmanship shall speciicaions if
terminaion and Paining be maintained high not get the work
Measuring of all the cables standards. re-done.
laid & recording the values Recording of
Wiring of sig /LC gate/Track measurements
ckt/Pt-ctl relays,
interlocking of LC gate.
- Casing of Sig foundaion
Erecion and Wiring of all
signals, RI, Shunt calling on,
Installaion of Pt M/C &
detector wiring,
The indoor work in Relay Integraion of indoor & Technical Check
Room either PI/RRI/EI shall outdoor equipment, to std drg &
be carried out as the tesing and specs, Voltages,
corresponding commissioning the Current raings
speciicaions/Drawings. staion. Recommended
cable joints
locaion wise.
Insulaion &
coninuity
Indoor equipment (R/R) Point to Point
includes EI equipment tesing, locaion
Relays, racks, IPS, Data wise tesing as
loggers & Bateries. per std pracice
Installaion, wiring & tesing
of all indoor equipment
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 140
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QA System at various level Internal/
Execuing
Work descripion PMC’s Role Quality
agency Contractor’s role
Physical Check @ Supr Engr Audit
Ensure supply of all ‘As
made’ ckt diagram, cable The contractor shall PMC shall check
plan, cable route plan, track make all as made all the drawings
bonding plans, power drawings as at site of with respect to
supply layout, contact all indoor & outdoor site installaion &
analysis, relay disposiion & gears and make get them signed
terminaion pariculars of booklets for handing by Railway
all locaions,CTR & RR ater over to Railways ater authoriies & get
Final tesing & approval & signature. the booklets
commissioning prepared by
contractor &
handover to
Railways.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 141
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
C. Acceptance Criteria of Telecommunicaion Works
QA System at various level
Mode of PMC’s Role Internal/
Source of supply Quality Audit
supply Contractor’s role Physical
Supr Engr
Check @
Directly by - Cable trench, as per cable The contractor shall Shall ensure that the 100 % 90 % As deemed it
Contractor route plan, laying, illing up carry out all the work is done as per the by RVNL
or Sub locaion, Xing (Rd, LC, works as per drawing and
Contractor Track, Bridge with relevant drawings and local speciicaions if not get
items for transmission railway pracice. The the work re-done.
workmanship shall
Recording of
be maintained high
measurements
standards.
- Cable markers, Remove or make good
Terminaion of 6Q/OFC which is not as per drg/
cable at all staions spec recording reasons
for non-acceptability
- Installaion of Isolaion
Tfr, Repeater Bays-
Joining procedure of
various types- Acceptance
test for 6Q PIJF cables &
OFC
- Provisioning Earth Technical Check
electrodes
- Provision of EC all along
the Track & LCs
-Cross Talk measurement Shall check that all
technical parameters
- Noise level
are within the limits as
-Installaion & wiring of per technical manual.
diferent control phones at
Staions.
- Final Tesing and
Commissioning
- Ensure supply of all ‘As
made’ diagrams, cable
plan, cable route plan,
track bonding plans, power
supply layout, contact
analysis, relay disposiion
& terminaion pariculars
of all locaions, CTR & RR
ater Final tesing &
commissioning
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 142
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
15.3 List of Speciicaion/Drawing
S.No Sch. No. Descripion Spn. No. Drg. NO.
1 A1 Relay rack assembly - S 727 & MTJ/S&T/C/143
2 A2,3,4 Tag blocks IRS S 77/91 SA 24751/52
3 A6 8 Way terminal strips IRS S 75/91 SA 24811
4 A7 Data loggers IRS S 99/01
5 B(xxiii) ECR unit IRS S 100/2002 SA 24851.ALT3,
SA.24852.ALT 1
6 D1 PVC indoor cables IRS S76/89 AMD.2
7 E2 Batery charges IRS S 86/2000
8 E4 DC-DC Converter IRS S 96/2000
9 F10 Electronic Desk Magneto IRS.TC 79/2000
telephone
10 G2 Double line block instrument IRS S 22/91
11 G3 Block bell equipment IRS.TC.44/88
12 G4 Filter unit IRS S.68/89
13 L1 Signalling cable IRS S.63/89 AMD 5
14 L5 4 quad cable IRS S.30/97
15 L6 Jelly illed cable IRS.TC.41/97 AMD I
16 L9 Cable route marker RST/C/203
17 J.1 Signal post IRS S.6/81
18 J.4 Surface base SA.23156
19 J5 CLS units IRS S.10 SA.23002/23003 A/M
20 J.7 Shunt signal units SA.23840
21 J.8 Jn. Route indicator SA.23401/402 ADV.
22 J.11 Calling on unit SA.24351 ALT 1
23 J.17 Signal lamps IRS S.57/2003
24 K.4 ARA terminal IRS S.75/91 SA.23741 ALT 3
25 k.5 Fuse blocks PBT make IRS S.75/91 SA.23748 ALT 4
26 L1 Adj. Track resistance SA.20166/M/ADV
27 L9 Thermo polyurethane rail RDSO/SPN/168/2002 SA.22171/ALT.2 (60 kg)
insulted joints SA.2210/ALT.6(52 kg)
28 M2 Ground connecions SA9151-52
29 N1 AFTC RDSO/SPN/146/2001
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 143
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
15.4 FORMATS TO BE FOLLOWED IN S&T WORKS
S.NO. DESCRIPTION PROFORMA NO.
1 Inspecion of Material QAP/S&T/1/INSPECTION
2 Inspecion of Apparatus Cases QAP/S&T/2/AC
3 Cable Test Record QAP/S&T/3/CABLE
4 Checks for points QAP/S&T/4/POINTS
5 Checks for Signals QAP/S&T/5/SIGNALS
6 Checks for Internal Wiring QAP/S&T/6/INTERNAL WIRING
7 Checks for Earthing QAP/S&T/7/EARTHING
8 Checks for Block instrument QAP/S&T/8/BLOCK INSTRUMENT
9 Checks for Track Circuits QAP/S&T/9/TRACK CIRCUITS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 144
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/1/INSPECTION
Descripion of materials
Speciicaion No.
Drawing No.
Source of supply
S.No. Check to Carried out Yes No Remarks
1 Visual Inspecion of material
2 Dimension measurement
3 Physical damages if any
4 Inspecion ceriicates issued by various authoriies
5 Manufactures Guarantee ceriicate if issued
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 145
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/2/AC
CHECK LIST FOR APPARATUS CASES
S.No. Check to Carried out Yes No Remarks
1 Foundaions are as per drawing given in BOQ
2 Apparatus case not erected on slopes or banks
3 Outer masonry done properly
4 Apparatus case plumbed properly and not learning away
5 Godown locks provided and outside locaion
6 Paining done inside and out side locaion
7 Terminals details painted
8 Hylam sheets prepared as per requirement with ARA
terminal & holes on either sides
9 Cable terminated on ARA terminals properly
CONTRACTOR ENGINEER EMPLOYER
QAP/S&T/3/CABLE
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 146
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
CABLE TEST RECORD
Cable size.............. Drum No...............................
Core Type .............. Make...............................
Length ................. Spare core Nos. ...............
Date of tesing .............. between Loc .............. & ...............
Test result
1 2 3 4 5 6 7 8 9 10 11 12 E
1
2
3
4
5
6
7
8
9
10
11
12
E
Remarks
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 147
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/4/POINTS
CHECK LIST FOR POINTS
S.No. Check the following Yes No Remarks
1 Opening of the switches (115mm)
2 Machines free from rust and dirt
3 Lubricaion of gears & bearings
4 Piing of contacts & proper Adjustments
5 Proper ballasing & packing
6 Dressing of wires & its clearance from moving parts
7 Lubricaion of slides rollers, pins with Axle oil - Medium
grade to IS - 1628
8 Simultaneous break & make of contacts
9 Rib formaion or excessive wear of lines of switch
extension
10 Funcioning of over load arrangements
11 Tripping of fricion clutch at overload
12 Insulaion test of point machines
13 Spring on tongue rails
14 Measure the voltage & current on motor terminals
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 148
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/5/SIGNAL
CHECK LIST FOR SIGNAL
S.No. Check the following Yes No Remarks
1 Signals are erected correctly and plumbed properly
2 Cleanliness of lenses
3 Condiions of lamps & holders
4 Working voltage of the bulb (90% of rated voltage)
5 Focussing of the signal
6 Wiring inside the units
7 Clearance of schedule of dimensions
8 Correct number plate provided
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 149
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/6/INTERNAL WIRING
CHECK LIST FOR INTERNAL WIRING
S.No. Check the following Yes No Remarks
1 The insulaion test of tag block (not less 500m ohms)
2 Availability of wiring diagram
3 Proper erecion of relay racks
4 Insulaion & anchoring of relay racks
5 Control panel as per the approved diagram
6 Use of proper soldering iron and other tools
7 Not more than 2 wires are on one terminal
8 Proper terminaion of cables & wires
9 Guide rails for relay groups provided
10 Lacing of wires & jumpers
11 Use of insulaion sleeves for muli strand wires terminated
on lugs
12 Use of crimping tools of appropriate design
13 Augmentaion of power supply arrangement
14 Fuses are of rated capacity
15 No dry solder on terminal
16 Relays are plugged properly
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 150
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/7/EARTHING
CHECK LIST FOR EARTHING
S.No. Check the following Yes No Remarks
1 Earth resistance are not more than 10 ohms
2 Earth wires are of proper size and not rusty
3 Charcoal and salt is illed in earth pit
4 Enclosure for earth pipe prepared
5 Block earth separate from other earth
6 Earth values are tested & record maintained
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 151
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/8/BLOCK INSTRUMENT
CHECK LIST FOR BLOCK INSTRUMENT
S.No. Check the following Yes No Remarks
1 The needle for full delecion
2 Polarised relays return to normal when no current is
lowing
3 All electrical & mechanical locks in working condiion
4 SM's key is efecive
5 All contacts are clean & free from piing
6 All springs in good condiion & properly adjusted
7 Block bateries terminals are clean & ight
8 Record the voltage of the bateries
9 The line current is measured (25ma)
10 The block is sealed & locked
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 152
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/S&T/9/TRACK CIRCUITS
CHECK LIST FOR TRACK CIRCUITS
S.No. Check the following Yes No Remarks
1 Insulaion joints tested
2 Track lead JB's are correctly erected
3 Track lead wires are properly ixed on rail
4 Bonding done as per approved plan
5 Ballast clear of rails
6 Proper drainage in track circuits area
7 Cables to TLJB taken properly
8 Track circuit parameters are taken & recorded
9 Liners & pads under sleepers are provided by engrs.
CONTRACTOR ENGINEER EMPLOYER
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 153
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
16. ELECTRICAL WORKS
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 154
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QUALITY CONTROL AND QUALITY ASSURANCE MANUAL
ELECTRICAL
1.0 Quality Control and Quality Assurance
The aim of quality assurance is zero defect ensuring full safety to train, passengers and
works staf. Hence the provision of quality assurance will apply to all designs, drawings,
materials, with relevant drawings, speciicaions, IE Rules and Railway Rules, conformity
workmanship form trained staf, usage of proper tools, equipments, machines and
instruments which are duly tested and calibrated from approved test labs to achieve zero
defect.
1.1 Approved source:
Quality assurance commences from the process of manufacturing of material which includes
the faciliies provided by the manufacturer for quality control, correct process of
manufacturing, conformity tests conducted at various stage as per speciicaions on all
equipments and components and short list such manufacturing sources and inally select,
approve, and list them.
The contractor shall ensure the following
a) The supply orders are placed only on approved sources.
b) And the materials shall conform to latest RDSO/IS speciicaions and RDSO/ drawings
The validity of the approved sources shall be current
The supply order shall not be placed on irms which are on trial order.
2.0 Inspecion (Check list as per proforma QAP/OHE/1/Inspecion)
Third party inspecion of all materials at manufacturer's works shall be done by RDSO/CORE/
RITES and shall be done prior to dispatch of material.
Items like galvanized and fabricated steel, conductors like copper contract wire, Catenary
wire, insulators of various types and regulaing equipments etc. Shall be subjected to 100%
inspecion prior to dispatch.
All equipments like circuit breakers, auxiliary transformers, current transformers, potenial
transformers, lightning arrestors etc. When supplied ater inspecion, shall accompany Type
test ceriicate for submission to EIG.
Equipments/components and accessories, like General service ixtures, wires etc. Which do
not have any approved vendors shall be from well established and reputed manufacturers
and proven quality.
2.1 Inspecions of materials at site:
On receipt of materials at site, all items shall be subject to visual inspecion as per proforma.
QAP/OHE/2/Site Check
100% site inspecion of all materials shall be done by Contractor.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 155
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
PMC shall carry out random check of the materials at site as shown below:
Quanity Quanity to be inspected % Checks of sample
100 20 20
1000 125 12.5
3000 200 6.7
Necessary assistance shall be provided by the Contractor
Material shall be checked for dimensions (thickness and diameters) and surface defects as
per drawing/speciicaion
It shall also be checked for any damages, deformiies, breakages being, twist, damage to
galvanizing or paining etc. And shall be recorded in Proforma QAP/OHE/2/Site Check.
3.0 Tools & Instruments for Checking:
The following tools and instrument/ equipments shall be made available to PMC by the
Contractor
i) Measuring tape 5m.
ii) Scale
iii) Vernier
iv) Calliper inside & out side
v) Wire gauge
vi) Screw driver
vii) Electometer/Magneic thickness gauge
viii) Spanner of diferent sizes
ix) Adjustable spanner
x) Megger 500v and 2500v
xi) Muli meter
xii) Tonge Tester
xiii) Earth tester
xiv) Torch light
xv) Level gauge
xvi) Plumb bob
xvii) Non Contact Type Infra-red thermometer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 156
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
4.0 Test Ceriicates
4.1 Type Test: Three copies of type test ceriicate of equipment wherever sipulated in
speciicaion shall be furnished to PMC/Client/ EIG
4.2 Prototype Tests: The result of test carried out at manufacturers factory shall be furnished to
the PMC/Client along with the material in 3 copies.
4.3 Rouine Test: The result of test carried out on each equipment shall be furnished to the
PMC/Client along with the material in 3 copies ater equipment is passed by the inspecing
authority.
4.4 Other Tests:
Results of other test carried out at site shall conform to speciied values and records shall be
jointly signed with PMC e.g. Insulators, cable earthing, oil tesing etc.
5.0 Drawings and Speciicaions
List of RDSO drawings/ speciicaions and IS speciicaions are given in Table-1.
Drawings: The following drawings shall be referred to for execuion of the work:
a) Approved OHE layout plan
b) Approved secioning diagram & wiring diagram
c) Approved cross secion drawing (CSD)
d) Approved structure erecion drawing (SED)
e) Approved general power supply diagram
f) Approved signalling locaion diagram
g) Approved civil engineering scale plan shown the secion to be electriied/ modiied
h) Approved locaions of feeder staion/SP/SSP and switching staions
i) Approved locaion of auxiliary transformer staions
j) Locaion of OH transmission line crossing to be modiied
k) Approved cable route plan
l) Other approved drawings of tracion sub staions/SSP/ Feeder, route plan &
electrical and mechanical clearance drawings.
6.0 Foundaion
All method of work including casing of foundaions & erecion works shall be as per
approved method statements.
6.1 Materials for foundaions: All major items shall be from approved list and as per relevant IS
speciicaion
Cement
Coarse aggregate & Fine aggregate
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 157
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Steel reinforcement bars
Water and Consumables
a) Cement shall be of ordinary port land cement grade 53 and shall comply with IS
speciicaion for mix design suitable for M10 for foundaion and M15 for grouing and
muing as per IS 456 latest.
b) Coarse aggregate shall be approved stone aggregate of sizes 40mm nominal size (Table 2
of IS 383 - 1970) for foundaions and 20 mm grade nominal size as per Table 2 of IS 383 -
1970 for grouing and muing and Fine aggregate as per IS 383 - 1970.
c) Steel reinforcement bars shall conform to IS speciicaion and shall be of accurate
dimension according to size and shape shown in drawing.
d) Water: Water used for mixing and curing shall be clean from oils, chemicals, alkalis, salt,
sugar, organic materials or any harmful or injurious materials or substances deleterious
to concrete for foundaion.
e) Potable water is considered suitable and hence the same shall be used.
f) Water shall be mixed in measured quanity
6.2 Foundaions: (Proforma Ref QAP/OHE/3/Foundaion)
Foundaions for OHE shall conform to IS 2720 (and relevant parts – latest). Mix of M10 for
foundaion and M15 for grouing and muing shall conform to up to date IS 456. The
foundaion shall be economical as well as safe for all OHE loads and shall be as per RDSO's
FBM code and volume chart.
6.3 Casing of foundaion:
OHE, foundaions shall be as per RDSO Drg. No. TI/DRG/CIV/FND/RDSO/0001/12/O or latest
& shall be according to the volume charts & equivalent charts, based on direct load,
foundaion code for bending moment (FBM) and soil bearing capacity.
6.4 Type of Foundaions
Following type of foundaion shall be adopted depending up on the site:
S. No. Type Fdn. Series Depth of foundaion in meter
1 Side bearing B Series 1.8 to 2.1m
2 Side gravity BG Series 1.6 m
3 Pure gravity BG Special series 1.5 m
4 Hard Soil HB Series 1.5 to 1.7 m
5 Sot rock SRB Series 1.6 m
6 Anchor Block A Series 1.0 m
7 Dwarf Mast DF Series 1.5 m
8 AT Locaion AT – N series 1.6 m
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 158
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
9 Portal foundaion P series 1.7 m
10 Dry Black Coton NBC 3.0 m
Contractor shall prepare cross secionalise drawings (CSD) showing following details as given
in method statement:
a) Locaion No.
b) Chainage
c) Seing distance in m
d) Step distance in m
e) Foundaion bending moment code (FBM)
f) Soil type and pressure in kg m
g) Foundaion type and size (as per volume chart)
h) Mast embedded length in m
i) Reverse delecion in cm
j) Super mast length in m
k) Cross arm length & clearance in m
l) Any other informaion like shoulder width in m
m) Obstrucions (if any)
Foundaion work shall be commenced on approval of CSD only
6.5 Special foundaion:
a) If any special designs are required at paricular locaion, design calculaions shall be
furnished and got prior approved from PMC.
b) All deviaions from standard, shall be got approved prior to casing of foundaion
c) Ballasing for foundaion shall be planned with prior approval and shall be done
under traic/ power block only
d) Locaion shall be as per approval LOP and CSD
e) At staion/ yard area the mechanized method shall only be adopted
f) Type of soil and soil bearing pressure shall be tested at every 5km interval by SPT
method as per code of Pracice IS 6043.
g) Addiional test shall be done by Dial gauge penetrometer and shall be done at every
250m intervals.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 159
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
6.6 Locaion of Anchor:
The locaion of each foundaion of anchor blocks shall be set out correctly in accordance
with approved structure cross secion drawings or foundaion layout drawings, in presence
of Client / PMC representaive.
6.7 Method of Installaion:
The contractor shall adopt mechanized method (concrete mixture) for installaion of
foundaion. The method of casing of foundaion blocks and erecion of masts or structure
shall be as per approved method statement.
6.8 Excavaion:
The excavaion may be undertaken only ater ceriicaion by client representaive to be safe
and concrete is cast on the same day, shoring shall be done to the saisfacion of client
representaive.
6.9 Anchor Blocks:
All anchor blocks and foundaions of structures carrying overhead equipment shall be
provided with concrete mufs. The top of these mufs shall be above the level of ground of
the track formaion and of adequate height of not less than 15cm to aford reasonable
protecion during rainy weather
6.10 Mufs
a) Ater erecion & grouing structure muing shall be provided to prevent water
logging & corrosion.
b) Muf volume of shall be added to the foundaion volume
c) Mufs may be installed at the ime of grouing of mast.
d) The top of such foundaion shall be given a slop of 1 in 50 towards the edge to
ensure that water does not collect at the base of the structure
e) The framework of equipment structure shall not infringe with the schedule of
dimensions 1676 gauge printed in 2004 and standards prescribed in ACTM.
6.11 Concrete Cube Tesing:
a) Use standard mould.
b) Take six random samples from mix from various locaion for every 50 cum of
concrete mix
c) ater compacing by tamping and levelling, cover the mould by damp Hessian cloth
to prevent loss of water.
d) Ater 24hrs remove specimen carefully
e) Mark locaion & date on the cube
f) Sub merge specimen in clean water ill the ime of tesing
g) Test 3 specimens ater 7 days curing and 3 specimen ater 28 days of curing
h) Enter the locaion, date and weight in a register.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 160
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
i) Put the tesing machine on opposite sides of casing of cube (on sides of mould) and
apply pressure gradually @ 400 kg per minute, without jerks and interrupion, unil
breakage
j) Record maximum load applied to the specimen
k) Take average strength of 3 specimens.
l) M 10 mix shall have strength of (10N/mm 2) and M15 mix shall have (15N/mm2)
6.12 Safety in foundaion work:
a) Foundaion drawing and volume chart shall be available at site
b) Excavated foundaion pit shall be illed up on the same day and not let overnight.
c) Excavaion near track shall be done only under authorized client's representaive &
proper protecion of track and workman
d) Avoid crossing of track by men or materials during the work
e) Concering shall be done on the same day in day light hours only.
f) At loose soil and water logged areas shoring shall be done efecively to the
saisfacion of client's representaive
g) Remove all loose soil and materials away from the pit and shall not collapse in the
pit
h) Core hole cover shall be illed with water for curing
i) Cover for core hole shall be provided within 48 hrs and their edges should be
cemented to be foundaion block.
j) Track ballast should be restored to its original form
k) No excavated soil shall be got mixed with ballast and shall be clear of the area of
work.
l) These should not be any obstrucion to the drainage obstrucion to drainage shall
be removed, if broken it shall be cemented and restored to original form to ensure
drainage of water.
m) In case of cuing, the earth drawn shall be formed in such a way that the water
shall be thrown away from the shoulder of the foundaion to avoid risk of illing back
during rainy season
n) If blasing is involved all safety precauions of the works sipulated in the method
statement shall be strictly followed by site engineer of contractor & site
supervisor/expert of PMC as far as traic, Rly. Installaions, private property men
and materials are concerned.
7.0 OHE Structures
Steel Work and Protecion Against Rust:
All steel used for manufacture shall be as prescribed below:
Quality of steel – IS 2062 Grade-A
Fabricaion etc. - IS 800
Electrical are welding – IS 816
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 161
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Galvanizaion – RDSO Span. No. - ETI/OHE/13/(4/84)
7.1 Galvanizing:
a) All ferrous materials and iings shall be hot dip galvanized as per speciicaion
ETI/OHE/13/(4/84) with A & C slip No. 1 to 3 of (5/86) or latest
b) Minimum average equaing of zinc galvanizaion shall be 1000gm/sq.m applicable
for polluted zone.
c) The following item shall be subject to quality checks and illed in proforma
QAP/OHE/2/Site Check.
7.1.1 Visual Inspecion
a) Galvanized surface shall be as follows:
b) It is smooth, reasonably bright, coninuous and free from such imperfecions as lux/
ash/ dross including bare patches, blacks spots, pimples, lumpiness runs, bulky with
deposits and glistens and stains of lux.
c) If damaged, the damaged surface ater cleaning as prescribed in the speciicaion
shall be applied zinc rich primer of three coats as per paining system. Zinc rich paint
for the above purpose shall be from reputed source.
d) Type of fabricated structure and gantries shall consist of following types: BFB, RSJ's,
B/K 150, 175, 200, 225, 250, TTC/G/O/N/R portals structures, structural uprights,
SPS including Bolts, nuts and washers.
e) All steel secion and fabricaion shall be as per RDSO drawings or approved
drawings.
f) Thickness of any steel member shall not be less than 5mm, galvanized Quality of
steel shall be grade 'A' conforming to IS 2062 latest version.
g) Drilling of masts for any iing shall be avoided. Only clamps shall be provided for
any addiional ighings.
h) The steel secion shall be free from blisters, scales, laminaions or such other
defects.
i) No iing or plugging of defecive steel secion shall be permited
j) No joints either welded or bolted shall be permited in any of the members
k) No parts shall be painted
l) All joints shall be free from twists and open joints.
m) All laice works on main members shall be riveted or welded together
n) Use of any alternaive secion shall be of raionalized higher secion and shal be used
only with prior approval of the client.
7.2 Mast & Structure Erecion: proforma (Ref. Profoma QAP/OHE/4/Str. Erecion)
Mast/ uprights should be grouted on the same day as they are dropped in the foundaions.
7.3 Type of Structures:
OHE of one main line shall be electrically and mechanically independent. As far as possible
independent canilever masts shall be used
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 162
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
7.3.1 Portal Structures: Portal structures shall be provided where independent structures cannot
be provided or where there is no prescribed seing distance available. Rigid portals shall be
used at ATD Locaion, in the vicinity of points & Crossings Portals shall be equipped to
support diferent tracks and at ani creep locaions.
7.4 Reverse delecion: All tracion mast and structures shall be erected with the correct reverse
delecion so that they become reasonably verical ater they are loaded. When measured at
the centre of mast it shall not exceed 8cms. The method of erecion of mast to the correct
reverse delecion shall be as per approved method statement.
7.5 Infringement to standard dimension: In erecion, care shall be taken to ensure that no part
of the tracion mast structure or any iing located on such mast or structure infringes the
schedule of dimensions 1676 gauge printed in metric units in 2004 and standard prescribed
in ACTM, which shall be as under.
7.6 Normal seing of Masts:
Tangent tracks
i. Normal seing distance as per speciicaion: 2.80m (As against 2.5m, sipulated in
ACTM)
ii. Seing distance for portal up rights and masts carrying more than one OHE: 3.00m
iii. Plaform masts shall be not less than: 4.75 m
Extra curve allowance shown over and above the seing distance of 2.5m at 8.8.1 shown
below shall be added on the above seing distance
7.6.1 For Curved Tracks
On outside curves Standard seing (m)
a) Radius of curvature greater than or equal to 875m 2.80
b) Radius of curvature less than 875m 3.05
On inside curves
a) Radius of curvature greater than or equal to 3500m 3.20
b) Radius of curvature greater than or 3.35
equal to 2350m, but less than 3500m
c) Radius of curvature greater than or equal to 1150m 3.55
but less than 2350m, but less than 2350m
d) Radius of curvature greater than equal to 300m, 3.60
but less than 1150m
7.6.2 Tolerance: The permissible tolerance in dimensions for erecion from those included in
appropriate drawings or schedules for diferent items are given below:
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 163
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
a) Measurement: The mast to mast span length shall not vary more than +/- 50 mm as
measured along the appropriate rail. The cumulaive error of measurement of all
span in a KM shall be not more than 1000mm
b) Seing structure: The seing of a structure shall not be less than that included in
appropriate cross secion drawings specially those with a minimum seing 2.80m on
main line a tolerance of – 20mm will be permited.
7.7 Paining on Structures
The value of seing of masts/ structure shall be painted on each mast structure. The igures
shall be 25mm in size in white on a red background. In addiion the track level shall also be
marked on the masts/ structure by a horizontal red painted stroke.
8.0 Canilever Assembly
8.1 Stay Arms: The choice of stay arms shall be such that their adjusters are capable of
adjustment of minimum 90 mm in either direcion
Visual examinaion of Stay tube:
Outer dia 33.7mm
Inner dia 23.4mm
Tube shall not any bend, twist, cracks or any other damages
8.2 Bracket Assembly
Bracket assembly shall permit easy adjustment to the extent of 100mm on either side of
track centre
8.2.1 Bracket Tubes:
Bracket tube shall be of seamless cold drawn or electric resistance weld steel complying with
ETI/OHE/11(5/89) with an insulator near support.
In the erecion of bracket assembly it shall be ensured that the free length of the bracket
tube beyond the Catenary suspension bracket is at least of 150mm to facilitate the
adjustment during maintenance proforma Ref. QAP/OHE//6/CL assembly)
8.2.2 Standard Bracket Tube
Outer dia 38mm
Inner dia 30mm
Tube shall not have any bend, twist, cracks or any other damages
8.2.3 Large bracket tube
The length of the bracket tube shall be such that there is a free length of about 150mm
beyond the Catenary suspension bracket to facilitate adjustment.
The brackets shall be fabricated as per approved SED and marked with indelibe labels /paint
marking indicaing the locaions. Physical dimension shall be as per approved drawing.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 164
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Outer dia 49mm
Inner dia 40mm
8.3 Standard register arm:
Outer dia 33.7mm
Inner dia 23.4mm
The tubes shall be checked for dia, thickness and for any bends and damages.
8.4 Steady Arm:
The steady arm shall be of light alloy BFB secion arranged to work always in tension, in
accordance with ETI/OHE/21(9/74) Bent steady arm tube conforming to speciicaion
ETI/OHE/21 (9.74) shall be used for neutral secion overlap and in the central mast of a 4
span insulator.
9.0 Insulators
9.1 Speciicaions:
All solid core insulators shall conform to ETI/OHE/15/(11/83) A&C slip No. 3 of 7/85 or latest.
Clevis type 255mm disc insulator will be used for each wire/cut in insulator (as per IS 731
latest)
9.2 Dimensional check of solid core porcelain insulators
a) Opening rod insulator Creepage distance 850mm 547+ 10mm
b) Post insulator Creepage distance 850mm 420 + 2mm
c) Secion insulator Creepage distance 850mm 580 + 10mm
d) Stay arm polluted zone Creepage distance 1050mm 485 + 10mm
e) Bracket tube polluted zone Creepage distance 1050mm 550 + 10mm
f) 9 Ton polluted zone Creepage distance 1050mm 540 + 10mm
9.3 Visual examinaion of insulators
a) Free from physical distorion of shape
b) Vitriied glaze is hard and smooth
c) surface is free from cracks or any other defect prejudicial to saisfactory
performance
d) Cement for joining shall be inished lush with edge of the metal iing and shall not
project more than 2mm
e) Exposed surface of cement shall not shown any sign of crack or blow hole
f) Metal iing shall be smooth without any excrescence
g) Physical dimension shall be as per approved drawing unless otherwise stated
9.4 Secion Insulators
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 165
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
a) At locaion of secion insulators, the axial distance between the Catenary and
Contact wire shall not be:
b) less than 450mm in case of single wire
c) less than 600mm in the case of the double wire
d) more than 1.40m encumbrance at the supports
e) The secion insulator shall be located beyond the point where the centre distance
between the two tracks is equal or more than 1.65m
f) If the secion insulator is erected with the free ends of the runners away from the
centre of the turnout this distance my be reduced to 1.45m
g) The stagger of the contact wire at the locaion of the secion insulator should
normally be zero, but in no case should it exceed + 100mm
h) On loops the secion insulators shall be close to the irst support
9.5 Insulators Tesing: The erecion insulators shall be tested for rouine mechanical test. No
chip or crack insulators shall be installed.
Table for test load and counter weight for insulator tesing
Type of Insulator Test load in kg Counterweight in kg
Stay arm 3240 648
Bracket tube 3240 648
9 – Tonne 5940 1188
Based on 1:5 lever arm
Before applying test as per speciicaion, prior approval shall be obtained from PMC
Rejected insulators shall be recorded in the register.
Record of Tesing: Test values shall be jointly signed and record shall be submited to EIG.
10.0 Conductors
Contact Wire (RDSO's speciicaion no. ETI/OHE/42/11/83 with A&C slip 1&2 Aug. 85 or
latest)
i) Contact wire shall be hard drawn electrolyic copper, solid grooved
ii) Dia of conductor: 16.4mm
iii) Cross secional area of conductor: 193 sq mm
iv) Weight of conductor: 1.7158 kg/m
v) Conductor shall not have any bend, twists or kinks
vi) Joint shall be silver brazed but welded.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 166
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
10.1 Stringing of contact wire: Care shall be taken to avoid formaion of kinks, twist and damages
of contract wire in stringing and subsequent operaion string shall be carried as per
approved method statement
a) Contact Wire Height:
b) OHE shall be of 10cm pre-sag
c) The height of contact wire shall not be less than 5.50m at any point in the span
under the worst temperature condiions
d) Normal height on regulated OHE with 10cm pre-sag shall be 5.60m
e) Normal height on unregulated OHE designed for areas with temp 5.65m range of
15OC to 65OC shall be
f) At loco inspecion pits, the minimum height shall be 5.80m
g) At level crossing, the minimum height shall be 5.50m
10.2 Erecion tolerance
A tolerance of + 20mm is permissible on the height of contact wire as measured at a point of
support.
On either side of an over-bridge, tolerance shall be of + 10mm
The diference between the heights of contact wire at two adjacent supports shall not
exceed 20mm
Any change in the height of the contact wire shall not exceed 3mm/m on main lines and
10mm/m on sidings
The relaive gradient of the contact wire in two adjacent spans shall not be greater than
1.5mm/m on main lines and 5mm/m on sidings
10.3 Reduced Encumbrance
The preferred values of reduced encumbrance fo erecion of overhead equipment under
over line structure are:
Span under over line Recommended encumbrance for span Largest permissible
structure under over line structure (m) adjacent spans(m)
(1) (2) (3)
63.0 0.9 67.5
58.5 0.9 67.5
54.0 0.75 67.5#
49.5 0.6 63.0
45.0 0.6 63.0
40.5 0.5 58.5
36.0 0.40 54.0
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 167
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
31.5 0.40 49.5
27.0 0.30 45.0
Largest span in the secion shall not be more than 63m, and shall be as per approved LOP.
Normal encumbrance shall not be increased to 1.4m in single span from the value given
above
The normal encumbrance of 1.40m should be provided in subsequent spans
10.4 Catenary wire RDSO's speciicaion no.
Catenary wire shall be of cadmium copper stranded conductor.
Cross secional area 65(64.84)mm
Over all dia 10.5mm
Weight 0.5973 kg/m
No. of conductor strands 19
Dia. of each strand 2.10 mm each strand shall be clean, smooth free from harmful defects
such as scratches, surface cracking, breakage, abrasive, spills and spums
10.5 Stringing of Catenary:
Stringing of Catenary shall be done as per approved method statement Care shall be taken
to avoid kinking or bird caging the Catenary wire in stringing and subsequent operaions
Ater iniial stringing of the Catenary it shall be maintained at no load tension for a minimum
duraion of 48 hours before the pulley blocks are removed and the Catenary is clamped to
suspension clamps of bracket assembly
Tension in OHE conductors:
For 65 sq mm Catenary 1000kgf
For 242 sq mm Catenary 1200kgf
For 193 sq mm contact wire 1200kgf
For tram way type OHE 1250kgf'
11.0 Droppers:
The droppers shall generally be so designed as shown in standard drawing and made of
copper wire about 5mm diameter conforming to IS:252.
11.1.1 Small droppers: Speciicaion electrolyic hard drawn copper conductor
Over all dia 5mm
Cross secional area 19.645 sq.mm
Weight 0.1746 kg/m
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 168
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
11.1.2 Locaions of droppers: Dropper shall be correctly posiioned in each span to ensure correct
level of contact wire as per dropper chart applicable to the span.
11.1.3 Clipping of droppers: The droppers shall be clipped on to the contact wire only ater
minimum duraion of 48 hours from the automaic tensioning device is brought in to acion
11.1.4 Tolerance
Dropper Length: +1-5mm will be permited for dropper length
Dropper Locaions: + 100mm will be permited for dropper locaions
Dropper Loading: The droppers shall be able to withstands a verical load of 200kg at the
point of atachment to the contact wire & the clip shall not slide under horizontal load of
120kgf.
The permissible tolerance in the overall length of a dropper will be + 5mm
11.1.5 Large dropper
Electrolyic hard drawn copper conductor
Over all dia 7 mm
Cross secional area 38.48 sq mm
Weight 03421 kg/m
12.0 Jumpers:
All jumpers shall be of annealed copper stranded wire conforming to RDSO speciicaion NO.
ETI/OHE 3) with (1/83A&C slip No.2 of Feb.85.
Annealed stranded copper conductor sizes shall be as under
Normal Dia mm Minimum Dia mm Maximum Dia mm
1.016 1.006 1.0026
1.25 1.237 1.263
1.80 1.782 1.818
Freedom from defect
Wire shall be clean "smooth" & free from harmful defect such as scratches, surface cracking,
peeling, abrasion, spills and spurns
12.1 Locaion & Size of jumpers:
50 sq mm cross secion
19/18mm size shall be used for the following jumpers:
In span jumpers,
Ani thet jumper,
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 169
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Potenial equalizing jumper at insulated over lap and Neutral Secion out of run wire, ani
creep, out of run wire at crossing of terminaing wire
12.2 Locaion & Size of large jumpers
105 sq mm cross secionalized17/7/1.06 mm size lexible wire shall be used for the following
jumpers;
For insulated over laps, turn out and crossings coninuity
jumper at isolators and cross feeders
G, Jumpers shall be 5.6m away from structure
1) They shall not cross diferent elementary secion
2) They shall not cause strain on PG clamps
3) They shall not be used in tension
12.3 Bus Bars: Bus bars of rigid jumpers of copper where ever used shall be 18mm copper rod in
accordance with RE/30/OHE/5 (11/60)
Aluminium bus bars where ever used shall be of 36/20mm
Aluminium tubular bus bars shall be made of alloy to IS: 5082-1981
The tolerance in diameter and thickness shall ne as per IS:673-1979
12.4 Feeders: Feeder shall be of all aluminium conductors 19/3.99mm (SPIDER) and shall be
supported on independent masts and shall be as per approved drawings
13.0 Regulaing equipment (Auto tensioning device):
The auto tensioning device shall be of 3 pulley block type
The reducion raio shall be 1:3
The tension length of OHE shall not exceed 1500m
The half tension length from ani creep shall not exceed 750m
Each counter weight shall be of 40kg round disc type
The clearance top of muf and rail level shall be 200 mm to cater for the free movement of
tensioning device
The normal height of regulaing equipment shall be 6750mm
The galvanized steel wire rope shall conform to RDSO spen. No. ETI/OHE/36 (12/73 or latest)
The installaion of the device shall be such as to permit free easy and unobstructed
movement of the counter weight.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 170
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
13.1 Ani creep: shall be provided approximately at midpoint of regulated OHE with two
Automaic tensioning Devices (ATD) on either end, Length on one side shall not exceed
750m. On one side, number of spans shall not exceed 15 supporing structures.
14.0 Isolators: Shall be submited to EIG in prescribed proforma)
a) Ater erecion manually operate isolator several imes and observe whether it
operates smoothly and correctly
b) Check inter locks and integral lock
c) Lubricate moving parts if necessary with appropriate lubricant
d) Check the wipe of contact blades
e) Clean blade ips and ixed contact ingers and ightly Vaseline the contact making
surfaces
f) Clean all ariculated joints, sliding and bearing surface thoroughly
g) Check all split pins, lock nuts and check nuts for proper condiion
h) Check for correct seing and alignment of arching ohms
i) Correct alignment of blade ips in the ixed contact jaws of the poles.
j) Adjust and ensure that the blades are fully home between the4 contracts when
handle is in closed posiion
k) Check locking arrangements
l) Operaion of switch shall face direcion of traic
m) Check earth connecion if earthing heel is provided
n) Earth resistance shall not exceed 10 ohms
15.0 Lighing Arresters: (shall be submited to EIG in prescribed proforma)
a) Check earthing terminals and earth strips for proper condiion
b) Check connecion to the line
c) Where lighing arresters are provided with discharge counters, record the counter
reading
d) Separate and disinct earth shall be provided to the lighing arrester
16.0 Batery Charger and Bateries:
a) Check acid level
b) Check presence of sedimentaion
c) Check speciic gravity and voltage of pilot cell
d) Check presence of insulaion and ightness of inter cell connectors
e) Check size of fuses of batery charger.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 171
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
f) Check working of voltmeter and ammeter and its readings
g) Check earth connecions of batery charger
17.0 PTs and CTs: (shall be submited to EIG in prescribed proforma)
a) Test oil samples if possible
b) Check rod gap seing, if provided
c) measure insulaion resistance
d) Check condiions of terminal connecions for CTC
e) Check leakage of oil
f) Check earth connecion
18.0 Auxiliary Transformers (shall be submited to EIG in prescribed proforma) (Ref. Proforma
QAP/OHE/11/AT)
a) Measure insulaion resistance of transformer winding and record values along with
temperature
b) Test a sample of oil for BDV
c) Check that the 25kv fuse holder drops out freely on raising the spring latch
d) Check rod gap seing
e) Measure earth resistance of neutral conductor
f) Check for leakage of oil
g) The 230 V side shall be connected to a juncion box locaion on the mast by means
of 2 core 25sq. Aluminium cable.
h) Ensure duplicate earth connecions
i) Earth insistence shall not exceed 10 ohms
19.0 25KV SF6 Gas Circuit Breaker (shall be submited to EIG in prescribed proforma) (Ref.
proforma QAP/OHE/10/CB)
a) Check External condiion and insulators
b) Take insulaion resistance (in m. Ohm with 5kv megger)
c) Terminal and body with breaker open
d) Between terminal with breaker open
e) Measure IR of operaion mechanics (in m. Ohm with 100kv megger)
f) Spring charging motor
g) Closing coil
h) Trip Coil
i) Remote operaion from control room
j) Close
k) Open
l) Manual Operaion
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 172
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
m) Close
n) Open
o) Electrical operaion for mechanics box
p) Close
q) Open
r) Check duplicate earth and coninu8ity
s) Check auxiliary contact
t) Check terminal connecion
u) Check operaional counter
v) Check tripping ime in M second
w) Check closing ime in M second
20.0 SCADA
1) Provide addiional RTU units at SSP and ensure adequacy of RTU units at TSS and 'SP
which are matching with exising RTUS and master staion as CSTM
2) The unit shall be dust proof and vermin proof
3) provide separate batery, 24v supply and charger for RTU of SCADA
4) Ensure minimum 6 pair of conductors are available for each RTU, I pair being spare
5) Matching frequency shall be jointly checked with S&T staf
6) RTU units shall be earthed as per standard of earthing
7) All control cable shall be megger tested with 500v megger
21.0 CABLES
All types of cables (including control cable) shall be conform to relevant IS speciicaion. PVC
insulated cable shall conform IS 1554 and XLPE cables shall conform to IS 7098 and relevant
parts for approximate voltage grades and laying and joining and tesing shall conform to IS
1255 latest. (Ref. Proforma QAP/OHE/9/Cable)
1) All power cable shall be laid at depth not less than 1 meter from ground level
2) All track crossings shall be at 1.3meter below rail level
3) All plane including crossing locaion shall have priory from railway authority
4) All crossing shall be by RCC spun pipe
5) RCC trunking shall be provided for protecion of cable
6) All joining shall be by qualiied jointer
7) Cable marker shall be provided at 20m interval
8) Power cable shall be tested with 2.5 kv megger and jointly recorded
9) Cable Armour shall be earthed as per IS 3043
10) All control cables shall be dressed and properly cleated
11) IR of control cable shall be taken by 500 v megger and recorded
12) Cable Armour shall be earthed as per IS 3043
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 173
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
13) All control cables shall be dressed and properly dress and cleated
14) IR of control cable shall be taken by 500 v megger and recorded
15) IR test values shall be jointly recorded
16) HV test shall be done in the present railway representaive signed
17) If high voltage, EIG's sancion shall be obtained before energisaion
22.0 Bonding: (shall be submited to EIG in prescribed proforma) (Proformas
QAP/OHE/7/Bonding)
1) All non-current carrying metallic parts of tracion masts or structures shall be
conducted by means of a structure – bond to the nearest tracion rail or to an earth.
2) In the case of a protocol structure, only one leg of the portal shall be provided with
the structure bond
3) Where tracion masts or structures or supports are located on railway plaforms and
are bonded to the nearest tracion rail.
4) A cross bond shall be provided at the locaion of the structure-bond to connect the
rail to the adjacent tracion rial
5) All types of bond i.e. Rail-bond, cross-bond and structure-bond shall be of mild steel
of not less than 200 (4x5) sq mm cross secional area.
23.0 Earthing (shall be submited to EIG in prescribed proforma) (Ref. Proforma
QAP/OHE/8/Earthing)
1) All parts of the equipment, other than live parts are at earth potenial and that
atending personnel are at earth potenial at all imes
2) There shall exist no diference of potenial in a short distance big enough to shock or
injure an atendant when short circuits or other abnormal occurrences take place.
3) The primary requirements of a good earthing system are:
4) It should stabilize circuit potenials with respect to ground and limit the overall
potenial rise
5) It should protect men and materials from injury or damage due to over voltage.
6) It should provide low impedance path to fault current to ensure prompt and
consistent operaion of protecive device during ground faults
7) It should keep the maximum voltage gradient along the surface inside and around
the substaion within safe limits during earth faults.
23.1 Earth grid
1) Earth electrode shall be of 40mm dia. MS pipe for individual earth
2) 25kv equipment shall be of Gt lat for Earth grid of 50 x 60 mm.
3) MS lat earth shall be buried 600mm below ground level.
4) The combined resistance of earth system shall be less than 0.5 Ohm
5) Spacing of earth electrode shall be greater than 8000mm.
6) The two earth strips shall be welded where ever they cross each other
7) Earth bus shall be of 50 x 6mm lat as per RDSO Drg. No. ETI/PSI/023
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 174
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
8) The connecion between 50 x 6mm GI lat and 40mm. Dia. MS Pipe shall be made
though ms link by bolted joints
9) Lighing arrester shall be provided with individual earth pit and connected by 50 x 6
GI lat for 25kv LA.
10) Pit size shall be of 600 x 600mm
11) Tube diameter shall be 40mm nominal bore, 3 meter long as per IS 1239
12) Earth strip shall be laid beneath the cable trench wherever they cross
13) Earth screen shall be of 19/2.5 mm GI steel stranded wire above the ground and
connected to 50 x 6 GI grid
14) Control room equipment shall connected with GI steel wire for earthing
15) All doors, windows panels shall be connected to independent earth of 50 x 6 MS lat
and to earth bus
16) All fencing upright and panels are connected to 50 x 6 GI lat and earth wire of 6
SWG. Wire respecively
17) Two separate and disinct connecion with main earth bus shall be provided for each
and every electrical equipment and apparatus metallic frame
23.2 Earthing values
IS 3043-1987 – Code of pracice for Earthing (irst revision) shall be referred for adoping
method of measurement. The combined resistance of the earthing system shall be not more
than the following values
The limit of combined Earth
S.No. Name of the staion
resistance in Ohms
1 Tracion substaion 0.5
2 Depot & switching staions 2.0
3 Depot & Auxiliary transformer staions 10.0
4 Structure/ rail earthing 10.0
5 Lighing arrester earthing 10.0
6 Metal work of over bridge / over line structure, 10.0
girder, bridge
7 Earthing heel of isolator 10.0
8 Loco/EMU siding 10.0
9 Exposed metal work metal fencing, plaform mat 10.0
from shed, wire pipes in the vicinity of tracion.
24.0 Tests on OHE: (shall be submited to EIG in prescribed proforma)
As soon as a secion is ready for inspecion and tesing the contractor shall advice to the
client/PMC in wriing
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 175
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Joint tests to be carried by the client and the railway oicials in the presence of contractor
representaive and shall include the following apart from the reasonable tests.
24.1 Insulaion: The strength of the insulators and dielectric strength of the desired insulaion
values shall be 25mega ohm
The test also shall be conducted with the adjacent elementary secion
24.2 Electrical impedance: The electrical impedance of individual elementary secions in relaion
to one another shall also be tested similarly
24.3 Test on coninuity: The electrical coninuity of the line and the existence of bad contacts if
any will be tested with a megger
24.4 Switches: All isolators shall be tested for smooth and trouble free operaion
Tensioning Device: All automaic tensioning devices installed shall be tested for smooth
funcioning and adjustment
24.5 Stagger and Height: The stagger and height of contact wire over enire secion of completed
OHE and clearances available shall be measured and the measurement shall be checked
against approved drawings.
24.6 Turnouts and Crossings:
a) Clearance between indecenter of track of main line and runners of secion insulator
towards the centre of turn out shall be 1.65m (minimum)
b) Runner away from the centre of turn out shall be 1.45m (minimum)
c) Stagger and height at cross over shall be as per approved SED
d) The measurement shall be recorded at low speed with tower wagon or trolley
e) While taking the above reading the level variaion if any with respect to rail level
may be observed and noted
f) Implantaion from centre line of tracks to face of any structure or part of it or
equipment
25.0 Feeding Post/ Switching Staions: (shall be submited to EIG in prescribed proforma)
1) The equipment and material to be supplied against various items shall conform to
RDSO/IS Speciicaions
2) All equipment shall be erected as per approved equipment layout plan
3) All electrical clearance shall be as per IE Rules and IS speciicaion
4) All tesing shall be jointly done with Railway Engineers
5) All seings shall be validated duly tesing the equipment by creaing the fault
6) All the earthing shall be as per approved earthing layout plan
7) Earthing shall conform to IS 3040 latest
8) Earthing resistance shall be jointly tested and value recorded with date
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 176
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
9) Earth resistance shall be displayed/ writen conspicuously near the earth electrode
10) Insulator resistance of all cables and equipments shall be jointly tested and recorded
with voltage raing of megger
11) The protecive scheme shall be as per RDSO's speciicaion No.
ETI/SPC/PSI/PROTECT/3003
12) All test result jointly signal shall be submited to EIG .
26.0 Applicaion to EIG
The document of the joint inspecion, tesing with Rly. Engineers, PMC Engineers as
prescribed in ACTM, Indian Electrical Rules 1956 and schedule moving dimensions 2004,
shall be furnished to EIG, S. C. Rly for obtaining his sancion for energisaion of 25kv Ac, OHE,
as per proforma QAP/OHE/14/EIG
27.0 Energisaion
If the OHE ater being subjected to the above test in an un energized condiion is found to be
saisfactory, it will be energized with normal 25 kv AC ater obtaining EIG sancion
28.0 Defects and Deiciencies
All defects and deiciencies shall be atended within the sipulated ime and to the
saisfacion of railway
29.0 As erected Drawing
As erected drawing of all equipments and layouts shall be handed over to the railway
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 177
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Table-1. LIST OF TECHNICAL SPECIFICATION
Structural Steel IS:2062 Gr.A (Latest)
IS:800-1984
IS:808-1964 & IS:800 (Pt.-1978)
IS:808(pt.II) 1978
(Pt.-III) 1979
(Pt.-V)1976
(Pt.-VI) 1976
Tensile tesing IS:1731-1971
IS:2004-1978
IS:808-1972 for steel products
Welding IS:816-1969
Disc insulator IS:731-1971
IS:3100-1980 IS:3188-1980
Annealed cu. Jumper wire IS:434(Pt-I)-1964
All Aluminium conductor IS:398 (Pt-i-1974) (Pt.I-1976)
Material for al tubular bus bar IS:500-1981
Dimensions for al. tubular bus bars IS:2673-1979
Galvanized stay. standard IS:2141-1979
PVC insulated cables IS:1554 (Pt-I) 1976
Tin bronze casings IS:306-1968
Aluminium bronze casing IS:3091-1965
Malleable iron casing IS:2108-1977
Grey iron casings IS:210-1978
Aluminium Casing IS:617-1975
Copper strip for formed iigns IS:1897-1985
Cadmium copper conductor ETI/OHE/50(8/83) with A&C slip no. 1&2 of 10/88
(4/85) & (8/85) or latest amendment
Contact wire ETI/OHE/42(11/83) with A&C slip no. 1&2 of (4/85) &
(8/85) or latest amendment
Annealed stranded copper conductors for jumper ETI/OHE/3(1/83) with A&C slip No. 2 of Feb 85
wire
Copper bus bar RE/30/OHE/5 (11/60)
Structural steel tubes ETI/OHE/5 (11/60)
Hot dip galvanizaion of steel masts latest revision ETI/OHE/13 (4/84)
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 178
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
1000 gm/sq. Mtr. (Rolled and fabricated) for
polluted zone.
Hot dip galvanizaion of tubes latest revision. For ETI/OHE/23 (4/84) or its latest revision
polluted zone & iings
Hot dip galvanizaion of tubes latest revision. For ETI/OHE/23 (4/84) or its latest revision
polluted zone & ighings
Stainless steel wire rope ETI/OHE/14 (9/94) and to latest amendments
25 KV solid core insulator ETI/OHE/15 (11/85) 11/83) with A&C slip for polluted
zones
25 KV single & double pole isolator ETI/OHE/16(1/94)
Bolts, Nuts and washers TI/OHE/18(4/84) with amendment 3(9/87)
Aluminium alloy secion and tube ETI/OHE/21(9/74)
Standard drawings for tracion overhead equipment RE/OHE/25(3/66)
Secion insulator RE/OHE/27(8/84) amend-1 (10/92)
Double wire secion insulator RE/OHE/28/(3/72)
Galvanized steel wire ETI/OHE/36/(12/73)
Copper trolley Contact wire for Electric tracion ETI/OHE/42(11/83) with A&C slip No. 1 of Aug. 85
AC&DC
Fiings for 25Kv 50 Hz AC Tracion Equipment ETI/OHE 49(5/84) with A&C slip No. 1 of Sept 85 No.2
of (6/86). 3 of (7/88) and 4 of (8/89)
7.5 KV lightening arrestor ETI/PSI/3 (8/87)
25 KV Potenial Transformer ETI/PSI/8(12/79) with A&C slip No. 1 of 7/82 slip
No.2 of 3/86 & slip No. 3 of 8/86
25 KV interrupter ETI/PSI/4(9/79)
25 KV Dropout fuse switch Ei/PSI/14(1/86) with A&C slip No. 1 of (4/87)
Three pulley type regulaing equipment ETI/OHE/48A(9/85) Amend-1 (11/87)
Birnetallic (Al.cu) Strip ETI/OHE/55(5/85)
Note: Unless otherwise speciied, the latest amendments to the speciicaion shall be applicable.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 179
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Table2. LIMITS FOR LOCATION OF OBLIGATORY STRUCTURE WITH OVERLAP TYPE OF EQUIPMENT
AT TURNOUTS
Limits to which structures possible from
Type of Recommended Limits
theoreical center of turnout
Turnouts
Towards Toe (m) Towards nose (m) Towards Toe (m) Towards nose (m)
1 in 20 -10.7 -10.5 +1.0 +7.0
1 in 16 -9.6 -7.5 +2.0 +7.5
1 in 12 -7.0 -6.1 -7.0 +2.0
1 in 8.5 -5.7 +4.2 -5.7 +1.0
Notes:
1. All distances are measured with respect with to center of turnouts
2. In the tables above '-' sign is used for distances measured from theoreical center of turn out
towards toe of switch and '+' sign is used for distances measured from theoreical center of
turnout towards nose of crossing
3. Theoreical central of turnout is the imaginary point of intersecion of the center line of the
main track with the extended center line of the straight porion of turnout track beyond the
nose of crossing.
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 180
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Table 3. LIMITS FOR LOCATION OF OBLIGATORY STRUCTURE WITH OVERLAP TYPE OF EQUIPMENT
AT CROSSOVERS WITHOUT SECTION INSULATOR
Limits to which structures possible Limits Recommended
Type of
Towards Toe Towards nose Towards Toe Towards nose Remarks
Turnouts
(m) (m) (m) (m)
1 in 20 With intermediate
a) -10.7 -10.5 +7.0 +7.0 portal at + 4.5m
of center line of
b) +6.2 +10.5 +6.2 +13.00 Crossover with
out inter mediate
portal
1 in 16 With intermediate
a) -9.6 +7.5 +2.0 +7.5 portal at = 4.5m
of center line of
b) 0 +7.5 +7.5 Crossover with
out inter mediate
portal
1 in 12 -6.0 -7.0 -6.0 +7.0 -
1 in 8.5 -5.7 +4.20 -5.7 +4.2 -
Notes:
a. All distances are measured with respect with to center of turnout
b. In the tables above '-' sign is used for distances measured from theoreical center of
turn out towards toe of switch and '+' sign is used for distances measured from theoreical
center of turnout towards nose of crossing
c. Theoreical central of turnout is the imaginary point of intersecion of the centreline
of the main track with the extended centreline of the straight porion of turnout track
beyond the nose of crossing.
d. + indicates either side of the centraliser
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 181
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Table 4. LIMITS FOR LOCATION OF OBLIGATORY STRUCTURE WITH OVERLAP TYPE OF EQUIPMENT
AT CROSSOVERS WITH SECTION INSULATOR
Limits to which possible Limits Recommended
Type of
Towards Toe Towards Nose Towards Toe Towards nose Remarks
Turnouts
(m) (m) (m) (m)
1 in 20 With intermediate at
a) -10.7 -10.5 +7.0 +10.5 + 4.5m of center line
of Crossover without
b) - - - - intermediate portal
1 in 16 With intermediate at
a) -9.6 +7.5 -6.0 +7.5 + 4.5m of center line
of Crossover
b) - - - -
1 in 12 - +7.0 - +7.0 Span with secion
insulator not to
exceed 49.5m
1 in 8.5 -5.7 +4.20 -4.0 +4.20 If located between
5.70m & -1.0m span
should not exceed
45m
Notes:
a. All distances are measured with respect with to center of turnouts
b. In the tables above '-' sign is used for distances measured from theoreical center of turn out
towards toe of switch and '+' sign is used for distances measured from theoreical center of
turnout towards nose of crossing
c. Theoreical central of turnout is the imaginary point of intersecion of the centreline of the
main track with the extended centreline of the straight porion of turnout track beyond the
nose of crossing.
d. + Indicates either side of the center line
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 182
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Table-5. OHE SPAN, VERSINE AND STAGER CHART
Mid Span Stagger
Maximum Spans (m) Maximum Versines Stagger (mm)
(mm)
Radius (m) Heavy Medium Heavy Medium Heavy Medium Heavy Medium
112.5kgt/ 112.5kgt/ 150 kgf/ 150kgf/ 112.5
Kgt/m3 Kgt/m3 25.5kgf
m3 m3 m2 m2 kgf/m2
1 2 3 4 5 6 7 8 9
67.5 72 72 0 1200 1200 0 +75
R 5000 63 72 100 130 100 100 +50 +50
5000>R 4000 63 72 125 165 100 150 +50 +50
4000>R 3000 63 72 165 220 100/150 50/200 +50 +50
3000>R 2500 63 72 200 260 150/100 100/250 +50 +50
2500>R 2200 63 72 225 295 200/250 50/300 +50 +50
2200>R 1900 63 67.5 255 300 200/250 300 +50 +50
1900>R 1600 58.5 63 265 310 750/300 300 +50 +150
1600>R 1400 54 58.5 250 310 250/300 300 +50 +150
1400>R 1150 49.5 54 265 320 250/300 300 +100 +150
1150>R 850 49.5 49.5 360 360 300 300 +120 +160
850>R 700 45 45 360 360 300 300 +160 +160
700>R 550 40.5 40.5 375 375 300 300 +200 +160
550>R 400 36 36 405 405 300 300 +200 +200
400>R 300 31.5 31.5 405 405 300 300 +200 +200
300>R 200 27 27 455 455 300 300 +240 +240
Table-6. CURVE ALLOWANCE FOR MAXIMUM SPEED UPTO 105 KM/H
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 183
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
- BROAD GUAGE
Extra Clearance between
Super Adjacent track (mm)
Degree of Radius of Curvature Max. Permissible
Elevaion
Curvature meter Speed (Km/h) Outside
(mm) Inside Curve
Curve
1* 1747 105 50 130 -
1 1/2* 1164 105 75 220 -
2* 875 105 100 310 10
3* 583 96 120 390 30
4* 438 80 125 420 40
5* 350 72 120 420 60
6* 292 65 105 390 80
7* 250 56 125 470 90
8* 219 48 140 540 110
9* 194 48 140 550 130
10* 175 40 120 500 140
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 184
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
30. LIST of FORMATS
S.No. Descripion Format No.
1 Material inspecion QAP/OHE/1/Inspecion
2 Material site check QAP/OHE/2/Site check
3 Foundaion QAP/OHE/3/Foundaion
4 Structure erecion QAP/OHE/4/Str. Erecion
5 Boom erecion QAP/OHE/5/Boom
6 Canilever assembly and anchoring QAP/OHE/6/CL Assembly
7 Bonding QAP/OHE/7/Bonding
8 Earthing QAP/OHE/8/Earthing
9 Cable QAP/OHE/9/Cable
10 25 KV SF6 gas circuit breakers QAP/OHE/10/CB
11 Auxiliary transformer QAP/OHE/11/AT
12 OHE Overall check QAP/OHE/12/OC
13 Turn out & Crossover QAP/OHE/13/x-over
14 Applicaion to electrical inspector to Govt. QAP/OHE/14/EIG
15 Log Sheet for Tower wagon QAP/OHE/15/T Wagon
16 Log Sheet for Crane QAP/OHE/16/Crane
17 Log Sheet for wiring Train QAP/OHE/17/W Train
QAP/OHE/1/Inspecion
Material Check list
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 185
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Name At works At Site
Contract Descri of
S. Speciic
Schedule/ pion Approv On Remarks
No aion RDSO CORE RITES PMC
Item Rl No. No. ed
suppler
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 186
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/2/Site check
Schedule item no. Rl no.
Speciicaion No.
Drawing No.
Source of supply
S.No. Check to Carried out Yes No Remarks
1 Visual Inspecion of material
2 Dimension measurement
3 Physical damages/ breakages/ deformity/ bent/ twist/
damage to galvanizing / paining etc.
4 Inspecion ceriicate received with no and date
5 Manufacturer's Guarantee if any
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 187
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/3/Foundaion
Foundaion
S.
Descripion No. Locaion No.
No
1 Chainage
2 Nature of soil
3 Pressure of Soil in kg/m2
4 Step Distance in Mtr.
5 Type of Foundaion
6 Extra Depth
7 Super block
8 Implantaion in Mtr
9 Actual Volume cast in m3
10 Scroll/Mof Volume In M3
11 Gross Volume In M3
12 Coarse Aggregate Quality
13 Property of cement
Concrete (cube test) date of
sample
a) Compressive strength
b) Actual value
c) 7 days
d) 28 days
Note: Selecion of locaion for cube tesing shall be random and at intervals sipulated as per
speciicaion
Remarks:
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 188
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/4/Str. Erecion
Structural erecion
Implantaion Type of Overal
Step Embedde Camber Reverse
S. Chain As Mast/ l
Locaion distanc d Length of delecio Remarks
No age As per measu portal/ length
SED e (m) (m) boom n (mm)
red upright (m)
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 189
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/5/Boom
Boom erecion details
Locaion No.
S.
Descripion No. Requi Obser
No
red ved
1 Km/Chainage
2 Type of Structure
3 Clear Span (m)
4 Boom Combinaion
End Piece I
Middle Piece
End Piece II
5 Verically of Uprights
6 Mix Design
Remarks:
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 190
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/6/CL Assembly
Canilever assembly and Anchoring
Locaion No.
S.
Descripion No. Requi Obser
No
red ved
1 Height of Botom iings
2 Basic Design
3 Surface condiion of
Insulators
Top
Botom
4 Provision of Tightness of
Fasteners
5 Provision of Bracket on
Muliple locaion as per
SED (Yes/No)/ LOP
6 Height of Guy rod Anchor
iings
7 Height of Brackets
8 Locking of canilever on
structure (Yes/No)
9 Provision of Guide tube
10 Tension of AC wire
11 Others if Any
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 191
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/7/Bonding
Bonding
Bond size ........... mm ..... Electrode dia ............. mm
S.
Descripion No. Type of Bond (Structure/ Longitudinal/Special) Locaion No.
No
1 Holes at rails
2 Holes at lat
3 Seaing of bond
4 Tightening of bolts
5 Paining of Red oxide
6 Paining of Bituminous
7 Insulaing sleeve at
recirculated rail
8 Bering of bond at lat forms
9 Independent earth
electrode at plat form
shelter & fencing
10 Bond at bridge locaions
a) Connecion with girder
to girder
b) Connecion of Rail with
independent electrode
c) Connecion between
guide rails with tracion
rails at 100 m interval
d) Connecion of track rails
with GI Pipe at 100 m
interval
11 At level crossing gate
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 192
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/8/Earthing
Earthing
S.No Check List Date of Test
1 Locaion
2 Name of equipment structure
3 Size of earth strip as per speciicaion Yes No Remarks
4 Size of GI pipes dia > 40mm
5 Length of pipe is
6 Charcoal salt & water illed in earth pit
7 Earth terminal is
i) Rigid
ii) Rust less
iii) Separable for tesing
8 Enclosure for earth electrode made
9 Lightning arrester is separately earth
10 Equipments have duplicate earth
11 Earthing heel of isolator is earth
12 Earth value records with date
13 Combined earth value of FP/SP/SSP
taken
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 193
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/9/CABLE
CHECK LIST FOR POWER CABLE
S.No Check List Date of Test
1 Voltage grade
2 Core
3 Insulaion Type
4 Make
5 Length
From .............. to ..............
6 Availability of approved cable route Yes No Remarks
7 Depth of cable as per speciicaion/ drawings
8 Trench bed is made even with out sharp edges/
stones etc.
9 Bend dia is even
10 Provided cable marker
11 Cable warning cover are properly placed
12 Any RCC pipe is used
13 Trench is closed and surface is evened
14 Cable and terminaion made by joining material
of crimping
15 Cable tested for insulaion resistance recorded
16 Insulaion resistance value in megohms
RY YB BR RE YE BE
IR: Test Value
HV: Test value
Voltage Megger:
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 194
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/10/CB
25 KV SF6 Gas Circuit Breaker
S.No Descripion Observaion/ results
1 Check External condiion and insulators
2 Take insulaion resistance (in m Ohm with 5kv
megger)
3 Terminal is body with breaker open
4 Between terminal with breaker open
5 Measure IR of operaion mechanism (in m
Ohm with 1000 v megger)
6 Spring charging motor
a) Closing coil
b) Trip coil
7 Remote operaion from control room
a) Close
b) Open
8 Manual operaion
a) Close
b) Open
9 Electrical operaion for mechanism box
a) Close
b) Open
10 Check duplicate earth and contumely
11 Check auxilary content
12 Check terminal connecion
13 Check operaion cuter
14 Check tripping ime in M seconds
15 Check closing ime in m seconds
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 195
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/11/AT
Auxiliary Transformer
S.No Descripion Observaion
1 Measure insulaion resistance of transformer
2 Winding and record values along with
temperature
3 Test sample of oil for BDV
4 Check that the 25kv fuse holder drops out
freely on raising the spring fatch
5 Check rod gap seing
6 Measure earth resistance of neutral
conductor
7 Check for leakage of oil
8 The 230v side shall be connected to a juncion
box located on the mast by means of 2 core
25sq aluminium cable
9 Ensure duplicate earth is provided
10 Check earth connecions
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 196
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/12/OC
OHE – Overall Check
S.N Observaion
Items of Check
o Standard Actual
1 Contact wire height – at main line 4.8 m to (5.60+0.02)m
2 Contact wire height – at turn out/ 50mm above main line
crossover
3 Contact wire stagger at turnout/ 300mm (max)
crossover
4 Steady arm length of contact wire
- Main line 0.75m, 0.95m
- Turn out/crossover 1.15m/ 1.35m
5 Register arm tube Horizontal
6 Register arm dropper clip No Displacement
7 Track separaion at obligatory point 150-700mm
8 Posiion at which ohm of pantograph Should not jump
may be jumped over contact wire
9 Verical height between contact 0.25 m – 0.3m
plane & register arm tube
10 Steady arm, Registraion arm tube PG No hiing mark, looseness breakage
clamp, dropper Contact wire, dropper or crack
clip splices, jumper
11 Steady arm verical movement Free movement
12 Adjust turn out/ crossovers, staggers Ensure that the height of turn out
and height and cross over contact wire is kept 5
cm above main line contact wire at
obligatory locaions & the contact
wires at 10m from Obligatory
structure is not less than 30mm. The
height and stagger should be strictly
as per SED.
13 Check ATD Ensure that pantograph is not
touching turn out and crossover
contact wore on man line and free
movement of ATD at turnout and
crossover
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 197
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
S.N Observaion
Items of Check
o Standard Actual
14 Crack on components ater erecion Check insulators droppers and any
other cracks
15 PG clamps Ensure provision of double PG
clamps on 'G' jumpers and feeder
wire locaions
16 Special check ater Engg. Work on Check implantaion, height and
track stagger ater any Engg. Work on
track
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 198
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/13/X-Over
FORMAT FOR RECORDING THE OBSERVATIONS/ MEASUREMENTS TURNOUT/ CROSSOVER
NO..........
Standard
S.No. Items Measured Value
Value
1 Pariculars of Turnouts/Crossover
Secion
Locaion No.
Date checked
2 Type of Arrangement - Crossed type/ Overlap Type
3 Height of Contact wire above Main Line Contact wire (m),
rail H
Level at Obligatory structure Turnout Contact Wire(m) H + 50 mm
4 Turnout span 54m. Max
5 Height of Contact wire in Main line contact wire (m)- H + 50 mm
overlapping zone H Turnout Contact Wire (m)
6 Stagger of Contact wire at Mainline contact wire (m) 300mm (max)
obligatory structure
7 Sag of Secion insulator at Zero
Turnout/ Crossover (mm)
8 Movement of tower wagon 670 + 20mm
from mainline to turnout
a) Take of
b) Point of take of (in meters
from support)
9 Movement of tower wagon As per A&C slip no. 1 (or
from turnout to main line latest)
a) Take of
b) Point of take of (in meters
from support)
10 Stagger of secion insulator at + 100mm
Turnout/ Crossover
11 Track center at the locaion of
secion insulator
a) Runners towards the center 1.65m (min)
of turnout
b) Runners away from the 1.45m (min)
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 199
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
Standard
S.No. Items Measured Value
Value
center of turnout
12 Condiion of ATD of turnout/ Free to move
main line OHE
13 Length of tube provided in 30cm to 45cm
ani-falling device to bridge
redundant length
14 Seing distance of obligatory 3.0m (min)
structure
15 Track center at obligatory 500mm to 700mm
structure
16 Distance of 'G' jumpers from 5.6m
obligatory structure
17 Deviaion from SEDs
18 Adjustments done, if any
Notes:
a) All distances are measured with respect with to center of turnouts
b) In the tables above '-' sign is used for distances measured from theoreical center of turn out
towards toe of switch and '+' sign is used for distances measured from theoreical center of
turnout towards nose of crossing
c) Theoreical central of turnout is the imaginary point of intersecion of the centreline of the
main track with the extended centreline of the straight porion of turnout track beyond the
nose of crossing.
d) + Indicates either side of the center line
Remarks.
Contractor Engineer Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 200
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/14/EIG
Applicaion to Electrical Inspecion to Govt. (EIG) .
a) Applicaion for EIG sancion
b) Answers to quesionnaire from EIG's oice
c) Public noiicaion in regard to energizaion of secion on 25 kv AC as per proforma 10.01 of
ACTM
d) Public noiicaion in regard to warning to road users – as per proforma 10.02 of ACTM
e) Ceriicate regarding OHE – as per proforma 10.03 of ACTM
f) Ceriicate regarding Bonding & Earthing as per proforma 10.04 of ACTM
g) Ceriicate regarding Safety instrucion and precauionary measure as per proforma 10.04 of
ACTM
h) Ceriicate by S&T engineers as per proforma 10.08 of ACTM
i) DOT clearance ceriicate as per proforma 10.03 of ACTM
j) Ceriicate for energizaion of switching staion of 25kv Ac as per proforma 10.10
k) Ceriicate regarding Electrical OHE works as per proforma 10.11
l) Clearance ceriicate for energizaion of switching staion as per proforma 10.12
m) Clearance ceriicate S&T engineer as per proforma 10.14
n) Clearance ceriicate by OHE contractor as per proforma 10.15
o) Clearance ceriicate by switching staion contractor as per proforma 10.16
p) Clearance ceriicate by SCDA contractor as per proforma 10.17
q) IR value ceriicate for OHE
r) Joint inspecion report FP, SSP, SSP
s) Compliance report to pre EIG Inspecion report
t) Tesing ceriicate of OHE materials used
u) Tesing ceriicate of FP, SP & SSP and their Drgs
v) Secioning diagram
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 201
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/15/T_Wagon
LOG SHEET
Tower Wagon No. PB. Sancion Date: .............
Name of Driver: No.
Stabling Staion: Line No.
Line Name:
Working Details ............................
Started from Arrive at Sancion Pariculars Duraion
From To
Work
Stai Sanci Oper Remarks
Staion Time Time Staion Time Staion Time done
on Hr. Hr. oned ated
STR Km STR Km
Min Min
Contractor PMC Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 202
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/16/Crane
LOG SHEET
Date: .............
Power/ Traic Block No.
Sancion No.:
Crane No.:
Crane Stabling Staion (if steam crane):
Engine No.:
Engine Stabling Staion:
Working Crane No.:
Locaion of Crane:
Driver's Name:
Guard's Name:
Started from Arrive at Sancion Pariculars Duraion
From To
Work
Sanci Oper Remarks
Staion Time Staion Time Staio Time Staion Time done
n STR Hr. Hr. oned ated
STR Km
Km Min Min
Contractor PMC Employer
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 203
Project Management Consultancy Services for Construcion of Roadbed, Major
bridges, minor bridges, ROBs & RUBs including Road Approaches, Staion Building,
Staf Quarters, Other service buildings, HL plaforms, cops, FOBS General Electrical &
Other works related to construcion of New BG line from KM 78 (Excluding Yavatmal
Staion) To KM 157 (Near Digras Staion) of Central Railway in Maharashtra State,
India.
QAP/OHE/17/W Train
LOG SHEET
Wiring of Train Formaion Locaion Work done Str Km
Engine No. Direcion of Crane Required From ......... To..............
Name of Driver Locaion of Wiring Train
Name of Guard Required Line No.
Started from Arrive at Sancion Pariculars Duraion
From To
Work
Stai Sanci Oper Remarks
Staion Time Time Staion Time Staion Time done
on Hr. Hr. oned ated
STR Km STR Km
Min Min
Contractor PMC Employer
*********************************
Prepared and submited by: Systems and Procedures
NOA No. RVNL/MUMBAI/YTL-NED/Package 1/PMC dated 31.05.2021 Page 204