CONSOLIDATED BOQ & ESTIMATION OF HORIZONTAL SURGE VESSEL
27M³ (27,000 LITTERS)
CLIENT NAME : AL MANARAT AL MUNIRA LTD.CO OPER. @ GROSS CAPACITY : …... / 27.17 M³
INM No. : 1962 DESIGN CODE : ASME SECTION VIII DIV.1 ED2015
PROJECT : N/A WORK. PRESS. & TEMP. :N/A
REF. DWG No. : CLIENT GIVEN SPECIFICATIONS D / PRESS. & TEMP. : 16 Bar G / 60 °C
ITEM No. : N/A HYDR. PRESS. : 20.8 Bar G
SERVICE : SURGE QTY : 01 No.
CORROSION : 0 mm DATED : 09.04.2016 REV : 00
SHOWN BOQ & ESTIMATION IS FOR 01 VESSEL ONLY
ID Tan to tan Vol (Liters)
Sr No Vessel Dimension 2500 4700 Density 27173
Thk Circum Length Constant Specification Qty Weight Rate Value
1 Shell plate 16 7958 4600 7.85 A 516 GR 70 1 4828 5.0 24139
2 Dished end 20 3000 3000 7.85 A 516 GR 70 2 2826 5.0 14130
3 Saddles Thk Width Lenth 2
a Saddle pad 16 350 3040 7.85 A 516 GR 70 2 281 5.0 1404
b Base plate 16 300 2150 7.85 A-36 2 170 3.0 511
c Web plate 13 700 2150 7.85 A-36 2 323 3.0 968
d Stiffening ribs 13 350 550 7.85 A-36 8 165 3.0 496
4 Nozzle 20" MANWAY 500 500 1
a Shell plate 16 1672.00 500 7.85 A 516 GR 70 1 110 10.0 1103
b Sorf flange 20"NB, PN16 64.00 A 105 1 64 1600.0 1600
c Blind flange 20"NB, PN16 100.00 A 105 1 100 2400.0 2400
d Gasket 20"NB, PN16 2.5 C.N.A.F 1 3 130.0 130
e Fasteners M30 x 170 2 A 193 B7/2H 20 40 25.0 500
f Reinforcing pad 16 1100 1100 7.85 A 516 GR 70 1 152 5.0 760
g Davit arrangement 1 50 10.0 500
5 Nozzle 10" IN / OUT 250 1000 1
a Pipe 10"NB sch.40 5.44 1000 60 A106 GR B 1 60 400.0 400
A516 GR.70 /
1 16 650.0 650
b Sorf flange 10"NB, PN16 16.00 A105
A516 GR.70 /
1 25 500.0 500
c Blind flange 10"NB, PN16 25.00 A105
d Gasket 10"NB, PN16 2.5 C.N.A.F 1 3 70.0 70
e Fasteners M24 x 130 2 A193 B7/2H 12 24 25.0 300
f Reinforcing pad 16 750 750 7.85 A516 GR 70 1 71 5.0 354
6 Nozzle 3" 80 1000 1
a Pipe 3"NB sch.40 5.44 1000 5 A106 GR B 1 5 120.0 120
A516 GR.70 /
1 3 150.0 150
b Sorf flange 3"NB, PN16 2.50 A105
A516 GR.70 /
1 3 100.0 100
c Blind flange 3"NB, PN16 3.20 A105
d Fasteners M16 x 110 0.25 A 193 B7/2H 4 1 15.0 60
e Gasket 3"NB, PN16 C.N.A.F 1 30.0 30
f Reinforcing pad 16 280 280 7.85 A 516 GR 70 1 10 4.5 45
7 Nozzle 2" 60.3 500 7
a Pipe 2"NB sch.80 5.44 500 5 A 106 GR B 7 18 50.0 175
A516 GR.70 /
7 18 80.0 560
b Sorf flange 2"NB, PN16 2.50 A105
A516 GR.70 /
7 22 50.0 350
c Blind flange 2"NB, PN16 3.20 A105
d Fasteners M16 x 100 0.25 A 193 B7/2H 28 7 6.0 168
e Gasket 2"NB, PN16 C.N.A.F 7 30.0 210
8 Nozzle 1" 33 1000 4
a Pipe 1"NB sch.80 5.44 1000 4.3 A 106 GR B 4 17 40.0 160
A516 GR.70 /
4 4 50.0 200
b Sorf flange 1"NB, PN16 1.05 A105
A516 GR.70 /
4 5 30.0 120
c Blind flange 1"NB, PN16 1.30 A105
d Fasteners M14 x 80 0.25 A 193 B7/2H 32 8 4.0 128
e Gasket 1"NB, PN16 C.N.A.F 4 20.0 80
9 internals A 516 GR 70 1lot 30 5.0 150
10 Lifting lug A 516 GR 70 2 50 5.0 250
11 Name plate with bracket,earthing lugs A 516 GR 70/SS 1 lot 10 15.0 150
12 Hydrotest fittings 1 lot 1 300.0 300
13 Hydro testing 1 lot 1 500.0 500
sub total 9606 54921
Material cost SR 54921
A Material cost kgs 9606 SR 54921 54921 PAINTING NOTES:-
B Electrode cost SR 3000 3000 External & Internal surface of
tank will be sand blasting.
C Sand blast & paint sq.mtr SR 6800 6800 External surface will be 01Coat
D Documentation charge SR 500 500 corrosion resistance epoxy and
E DPT SR 3000 3000 two coat of oil paint with white
F Radiography 100% SR 13500 13500 colour(total 200 Mic). Internal
surface will be two coat of Non
G P.W.H.T No need SR 0 0
toxic and corrosion resistant
G Labour Cost Mhr SR 28000 28000 epoxy.(total 300 Mic)
Total cost / unit (Ex-works) 109721 SR
Company overheads SR
Profit margin SR
Selling price / unit (Ex-works) SR
IMPORTANT NOTES:-
* Shown estimation is only for 1 No. vessel.
* Shown estimation does't includes company overheads and profit margin. Sales marketing can change.
* Shown estimation does't include transportaton charges to client's site.
* Shown estimation price is Our Ex- works price.
* Shown estimation does't include any type of paint testing like Holiday test.
* Shown estimation does't include 3rd party inspection price.
* Shown estimation does't include foundation bolts and levelling plate price.
* Shown estimation does't include any type of standard accessories.
* Shown estimation does't include any part of Electrical Or Instrumentation devices.
* Shown estimation does't include Ladder+platform. If needed the extra cost would be added.
ESTIMATED BY APPROVED BY
SAKHAWAT AFRIDI