Checklist - DBL
Checklist - DBL
2 Cross Travel
3 Long Travel
4 Electrical System
5 Structure
6 Documentation
P&M Code Plate & Afcons Logo Present / Not Present
History Book
REMARKS IF ANY
___________________________
Gearbox Condition
Accessories Fuses
Page 2 of 2
Make & M
Make & Model
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
Hydraulic hoses
Hydraulic Ram
Operation
3 Power Train
Gearbox
Gearbox Mountings
4 Final Drive
Final drive Oil
Prop shaft
Lubrication
Tightness of bolts
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
Chassis
6 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Mixture Unit
Auxillary Frame
Ascent Ladder
Mixer Drum
8 Steering System
System Pressure
Cylinders
Hoses
9 Tyres
Size
Condition
10 Brakes
Parking Brake
Foot Brake
Signature
INSPECTION CHECK LIST FOR TRANSIT MIXER
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Actual temperature
Condition
Level
Condition
Condition
Condition, Leakages
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition
Condition
Condition
Condiiton
Condition
Fuses
Condition
Condition
Condition
Availability / Condition
Condition / Alignment
Level
Condition
Actual pressure
Condition / Leakages
Condition / Leakages
Actual pressure
Actual pressure
Percentage of wear
Oil Level
__
NSIT MIXER
Condition
Vehicle Incharge
_______________________________
Signature
Kilometer:
Hour Meter:
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
Page 2 of 2
INSPECTION CHEC
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Undercarriage
Track
4 Final Drive
Lubrication
Tightness of bolts
5 Upper Structure
P&M Code plate & Afcons Logo
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
6 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Attachments
Boom condition
Dipper condition
Bucket
Swing Lock
_______________________________
Signature
INSPECTION CHECK LIST FOR HYDRAULIC EXCAVATOR
Project
Date of Inspection
Points to be checked
Level
Condition
Condition
Condition, Slackness
Condition
Actual temperature
Condition
Level
Condition
Condition
Actual pressure
Actual pressure
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Tension, Condition
Condition
Condition / Alignment
Condition
Condiiton
Present / Not present
Condition
Fuses
Condiiton
Condition / Lubrication
Condition / Lubrication
Condition
Vehicle Incharge
_______________________________
Signature
Hour Meter:
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
Page 2 of 2
INSPECTION CH
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
System pressure
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Transmission
Transmission mounting
Transmission oil
Control lever
4 Final Drive
Prop shaft
Lubrication
Tightness of bolts
5 Upper Structure & Chassis
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
Chassis
6 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Steering System
System Pressure
Cylinders
Hoses
8 Attachments
Turntable Circle
Circle gear
9 Tyres
Size
_______________________________
Signature
SPECTION CHECK LIST FOR MOTOR GRADER
Project:8527
Points to be checked
Level
Condition
Condition
Condition, Slackness
Condition
Leakages, abnormal sound
Actual temperature
Condition
Condition
Condition
Leakages, abnormal sound
Relief Valve Work Eqp-
Charge pressure-
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Condition
Condition
Actual pressure
Condition
Condition
Condiiton
Condition
Fuses
Actual pressure
Condition / Leakages
Condition / Leakages
400 mm
Condition / Lubrication
Condition
on
ear
Vehicle Incharge
_______________________________
Signature
Hour Meter:
Remarks
Workshop Incharge
___________________________
Signature
INSPECTION CHEC
1 Engine
Engine oil
Fuel filter
V-belt
Blower
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Final Drive
4 Steering System
Steering Cylinder
5 Vibrating Drum
Vibrating pads
Mounting Bolts
Coupling
Drum oil
6 Upper Structure
Operator Seat
Control Levers
Control panel
7 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
8 Brakes
Parking Brake
Foot Brake
9 Tyres
Size
Condition
_______________________________
Signature
ON CHECK LIST FOR VIBRATORY SOIL COMPACTOR
Project
Date of Inspection
Points to be checked
Level
Condition
Condition
Condition, Slackness
To be incorporated
Condition
Condition
Condition
Condition
Condition
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Condition / Lubrication
Condition
Condition
Condition
Condition
Fuses
Actual pressure
Percentage of wear
OMPACTOR
Condition
Vehicle Incharge
_______________________________
Signature
Hour Meter :
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
INSPECTIO
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
System pressure
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Transmission
Transmission mounting
Transmission oil
Control lever
4 Final Drive
Prop shaft
Lubrication
Tightness of bolts
5 Upper Structure & Chassis
Operator Seat
Control Levers
Control panel
Inside Condition
Outside Condition
Chassis
6 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Steering System
System Pressure
Cylinders
Hoses
8 Attachments
Dozer Blade
9 Undercarriage
Track shoes
Track rollers
Carrier Rollers
10 Brakes
Parking Brake
Service Brake
Operator Name & Emp. ID
_______________________________
Signature
INSPECTION CHECK LIST FOR DOZER
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Condition
Condition
Condition
Actual pressure
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Condition
Condition
Actual pressure
Condition
Condition
Condiiton
Condition
Fuses
Condition / Leakages
Condition / Leakages
Condition
Condition
Condition
Condition
Condition
_______________________________
Signature
Inspection Done By
Hour Meter:
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
Signature
INSPECTION CH
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Transmission
Transmission mounting
Transmission oil
Torque Converter
Control lever
4 Final Drive
Prop shaft
Lubrication
Tightness of bolts
5 Upper Structure & Chassis
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
Cabin
6 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Drive Axles
8 Attachments
Bucket
Dump Time
9 Tyres
10 Brakes
Parking Brake
Foot Brake
Signature
INSPECTION CHECK LIST FOR WHEEL LOADER
Date of Inspection-14.07.2018
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Actual temperature
Condition
Condition
Condition
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Condition
Condition
Condition
Condition
Condition
Condiiton
Condition
Condition
Fuses
Condition / Leakages
Condition / Leakages
Condition / Alignment
6 - 7 sec
3 - 5.5 sec
2 - 3.5 sec
Condition / Lubrication
Condition / Lubrication
Condition
Good
Good
Good
4kg/cm2
Good
Good
Good
Good
Good
Working Fine
Good
Good
Good
Ok
Ok
Ok
Good
Good
Good
Smooth
Good
Good
Good
Good
Good
Good
Smooth
Good
Good
Sufficient
Ok
Good
Smooth
Working
Working
Working
Good
Good
Good
Working
Good
Present
Good
Good
Good
Working
Working-Forward
Good
Good
Good
Good
0%
Good
Good
Good Condition
Working
Working
Vehicle Incharge
Narendra Singh
Signature
Hour Meter:8670.00
Remarks
Page 1 of 2
Workshop Incharge
Jitendra Kumar Mishra
Signature
INSPECT
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Transmission
Transmission mounting
Transmission oil
Control lever
4 Final Drive
Prop shaft
Lubrication
Tightness of bolts
Operator Seat
Control Levers
Control panel
Cabin Light
Outside Condition
Doors/Windows
Wiper
Chassis
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Steering System
System Pressure
Cylinders
Hoses
8 Attachments
Slewing system
Boom condition
Dipper condition
Bucket
Teeth & Side cutters
9 Tyres
Size
10 Brakes
Parking Brake
Foot Brake
_______________________________
Signature
INSPECTION CHECKLIST FOR BACKHOE LOADER
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Condition
Condition
Condition
Actual pressure
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Condition
Condition
Condition
Condition
Condiiton
Condition
Fuses
Actual pressure
Condition
Condition
Condiiton
Amount of wear & tear
Condition / Lubrication
Condition / Lubrication
Oil Level
DER
Condition
ication
Vehicle Incharge
_______________________________
Signature
Hour Meter :
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
INSPECTION CH
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
System pressure
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Upper Structure
Operator Seat
Control Levers
Canopy
Control panel
5 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
6 Work Equipment /Attachments
Material Hopper
Conveyor Belts
Auger
Screed
Screed Heater
Sensors
7 Undercarriage
Crawler tracks
Track rollers
8 Brakes
Parking Brake
Service Brake
Operator Name & Emp. ID
_______________________________
Signature
INSPECTION CHECK LIST FOR ASPHALT PAVER
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Condition
Condition
Actual pressure
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Smooth / Jerky operation
Condition
Fuses
Condition
Condition
Condition / Alignment
Condition
Condition
Condition
Vehicle Incharge
_______________________________
Signature
Hour Meter:
Remarks
Page 1 of 2
Hopper capacity = 13T
Workshop Incharge
___________________________
Signature
INSPECTION CHECK LIST FOR AIR COMPRESSOR
1 Engine
2 Compressor Unit
Coupling Condition
3 Auto-Electrical
Accessories Fuses
Canopy Condition
Tyres Condition
_______________________________ __________________________________________________________
1 Engine
Engine oil Level, last replacement reading
Engine oil filter Condition
2 Electrical Connection
Shut off coil Condition
Control Panel Condition
Wireing harness Working/Not working
Starter Condition
DC Alternator Condition
Alternator Guard Condition Fitted/Not fitted
Electrical Panel Condition Working/Not working
Safety Control Condition Working/Not working
5 Cooling System
Coolant level/Radiator Cap Ok/Not Ok
Radiator Condition Ok/Not Ok
Fan hub Condition Ok/Not Ok
Fan Safety guard condition Fitted/Not fitted
6 Fuel System
Any leakages in fuel system Ok/Not Ok
Hoses Condition Ok/Not Ok
Engine Parameters Ok/Not Ok
P&M Code Plate & Afcons Logo Present/Not Present
7 Auto Electrical
Battery Electrolyte level, condition of poles, Cleanliness, Lubrication
Electrical wiring Proper / Wrong wiring
Earthing Provided/Not provided
Switches Working / Not working
_______________________________ ___________________________
Operator Name & Emp. ID Vehicle Incharge Workshop Incharge
1 Engine
Engine oil Level, last replacement reading
Engine oil filter Condition
Fuel filter Condition
Engine oil pressure Actual pressure
V-belt Condition, Slackness
Air filter / Restrictor indicator Condition
Engine Mounting Condition
Controls Working Fine/ Not working properly
__________________________________________________
Operator Name & Emp. ID Vehicle Incharge Workshop Incharge
_______________________________ ____________________________________________________
Eng Sl no:
S.No CHECK POINTS Points to be checked Condition Remarks
1 Engine
2 Hydraulic System
No of Strokes 25 strokes/min
3 Travelling Undercarriage
5 Working Unit
Plunger Condition
Auger Condition
7 Auto-Electrical
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Engine Coolant
Engine Mounting
2 Upperstructure-Slewing
Max Slewing Speed
Jib
Wire Ropes
Crowd Winch
Slide
Rotary
Mast Element
Base Mast
Mast Foot
CFA Equipment
CFA Equipment
3 Cabin
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
4 Electrical Units
ECU
Battery
Electrical wiring
Accessories
Switches
5 Undercarriage
Track
Gear Motor
Hydraulic Cylinders
6 Hydraulic System
Hydraulic Oil
Hydraulic Pump
Hydraulic Filters
Hydraulic Hoses
Operation
Operator Name & Emp. ID
_______________________________
Signature
INSPECTION CHECK LIST FOR PILING RIG
Project
Date of Inspection
Points to be checked
Level
Condition
Condition
Condition, Slackness
Condition
2.8 rpm
Condition
Conditon / Lubrication
Condition
Condition of Auger
Condition
Condition
Condition / Dents
Condition / Dents
Condition / Dents
Condition / Dents
Condition
Fuses
Condition
Condition / Alignment
Condition / Leakages
Level / Condition
Condition
Condiiton / Lekages
Condiiton / Lekages
Condition
Condition / Leakages
Smooth / Jerky
Condition
Vehicle Incharge
_______________________________
Signature
Kilometer:
Hour Meter:
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
Page 2 of 2
INSP
Coupling Condition
Wheels Condition
Service Brake
Electrical Box
Electrical Cable
Cross Beam
Pins & Locks
Lubrication
Mechanical Stopper
2 Base Ballast
Foundation Bolts
3 Tower
Mast Section
Ladders
Rest Platform
Protection Ladder
Cleanliness
4 Slewing Unit
Slewing motors
Slewing bearing
Swing Lock
Slewing Gear/Pinion
Lubrication
Cab Platform
Control Levers
Safety Controls
Cabin Mountings
Panel Board
Operator Seat
Wiper
Glass Condition
6 Jib
Jib Sections
Jib Point
Tie Rod
Wind Vane
Condition of Cat head
7 Counter Jib
Safety Rail
8 Hoisting Unit
Pullies
Reduction Gear
Hoist Drum
Service Brake
Lubrication
Winch Mountings
Jib Trolley
Pullies
Winch Motor
Reduction Gear
Drum
Service Brake
Lubrication
10 Electrical Units
Moment Limiter
Cables
Fuses
Lights
Aviation Light
Earthing
11 Performance
Hoisting
Trolley Travel
_______________________________
Signature
INSPECTION CHECK LIST FOR TOWER CRANE
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition
Amount of wear
Condition
Condition
For any type of settlements (cracks)
Tightness
Condition
Condition (Damage/rusting)
Availability/condtion
Availability/condtion
Availability/condtion
Availability/condtion
Cleaniliness
Condition
Working/Not Working
Performance
Teeth Condition
Oil condition/level
Condition
Proper/improper
Condition
Condition
Dent/Damage
Condition
Condition
Performance
Workimg/Not Working
Condition
Condition (Rusting)
Condition
Availability/Condition
Visibility
Availability/Condition
Dent/Damage
Mechanical Stopper
Condition
Condition
Condition
Availability
Availability
Dent/Damage
Condition
Condition
Condition
Condition
Condition
Diameter, damage
Condition
Condition (Amp)
Oil Condition/level
Performance
Working/Not Working
Wire rope
Tightness of bolts
Condition
Condition
Movement
Diameter/Damage
Condition
Performance
Oil Condition/level
Performance
Working/Not Working
Wire rope
Condition
Condition
Working/Not Working
Condition
Availability as per OEM Recom
Working/Not Working
Condition
Proper Lighting
Resistance Value
Speed
Time
NE
Condition
Vehicle Incharge
_______________________________
Signature
Kilometer:
Hour Meter:
Remarks
Page 1 of 3
Page 2 of 3
Workshop Incharge
___________________________
Signature
INSPECTIO
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Turbo Charger
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
System pressure
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Upper Structure
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
6 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
7 Winch Mechanism
Drum Lock
Wire Rope
Drum Rollers
8 Attachments
Fly Jib
Conterweights
9 Undercarriage
Track
_______________________________
Signature
INSPECTION CHECK LIST FOR CRAWLER CRANE
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Actual temperature
Condition
Condition
Condition
Actual pressure
Condition, Leakages
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Smooth / Jerky operation
Condition / Greasing
Fuses
Condition / Lubrication
Dimension / Condition
Condition
Condition / Capacity
Tension, Condition
Condition
Condition / Alignment
Condition
ANE
Condition
Vehicle Incharge
_______________________________
Signature
Kilometer:
Hour Meter:
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature
Page 2 of 2
INSPECTION CHECK LIS
1 Engine
Engine oil
Fuel filter
Radiator
Water pump
V-belt
Water temperature
Engine Mounting
Controls
2 Hydraulics
Hydraulic oil
Filter element
Breather element
Hydraulic Pump
Hydraulic hoses
Hydraulic Cylinders
Operation
3 Gearbox
Gearbox Mountings
Transmission oil
Control lever
4 Final Drive
Prop shaft
Lubrication
Tightness of bolts
5 Upperstructure
Operator Seat
Control Levers
Control panel
Cabin Light
Inside Condition
Outside Condition
Doors/Windows
Wiper
6 Winch Assembly
Winch Pulley
Wire Rope
Boom
Extended Boom
Limit Switch
7 Auto-Electrical
Battery
Electrical wiring
Accessories
Switches
Horn (For/Rev)
8 Tyres
Size
Condition
9 Brakes
Service Brake
10 Steering System
Steering Cylinder
_______________________________
Signature
PECTION CHECK LIST FOR TYRE MOUNTED MOBILE CRANE
Project
Date of Inspection
Points to be checked
Condition
Condition
Condition, Slackness
Condition
Actual temperature
Condition
Working Fine/ Not working properly
Condition
Condition
Condition, Leakages
Condition, Leakages
Smooth / Jerky
Condition, Leakages
Condition
Condition
Condition
Condition
Condiiton
Condition
Condition
Condition / Lubrication
Condition
Condition
Condition
Fuses
Percentage of wear
Condition / Lubrication
OBILE CRANE
Condition
Vehicle Incharge
_______________________________
Signature
Hour Meter:
Remarks
Page 1 of 2
Workshop Incharge
___________________________
Signature