                                    A Template for an Inspection
                                   And Maintenance Plan for Dams
       Purpose:
       Pursuant to New York State Environmental Conservation Law Article 15-0507: Dam owners
       shall at all times operate and maintain the dam and all appurtenant works in a safe
       condition. The purpose of this document is to assist dam owners in developing a Dam Safety
       Inspection and Maintenance Plan (I&M Plan) as required by NYCRR Part 673.6. The I&M Plan
       should be used by the owner and kept on file, but does not need to be submitted to the
       Department unless requested.
       This template reflects the general components of an I&M plan for the average dam. Use of this
       format does not guarantee acceptance of the Inspection and Maintenance Plan by the
       Department. Dam owners may use other guidance and formats so long as the plan complies with
       6 NYCRR Part 673.6.
       Additional narrative space should be added as needed.
                                                 TEMPLATE
       An I&M Plan should indicate who prepared it, when it was last revised and where the Plan is
       located, as in the following:
       Prepared By: Name: ____________________________________________________________
                    Title: _____________________________________________________________
                    Company: _________________________________________________________
       Date Last Revised: ______________________________________________________________
       Location of Dam Inspection and Maintenance Plan: ____________________________________
       ______________________________________________________________________________
       ______________________________________________________________________________
       DS-IM-1 (9/09) DRAFT                            1
                                       Part 1: Dam Data
Dam Name: ____________________________________________________________________
Dam State Identification Number: __________________________________________________
Federal Energy Regulatory Commission Identification Number, if applicable: _______________
Dam Hazard Classification: _______________________________________________________
                             (C-High Hazard, B-Intermediate Hazard, A-Low Hazard)
Date of last Hazard Class Verification: ______________________________________________
Dam Location: County: _____________________ Town/City/Village: ____________________
              Latitude:_____________________ Longitude: ___________________________
Dam Type: ________________________________ (embankment, concrete, combination, other)
Year of original construction: ______________ Year of last construction activity: ____________
Name of last Engineer and Builder: _________________________________________________
Dam Use(s): ___________________________________________________________________
(water supply, flood control, energy generation, recreation, irrigation, pollution control, other)
Dam Owner(s) Name: ____________________________________________________________
Dam Owner(s) Mailing Address: ___________________________________________________
Dam Owner(s) Telephone Number: _________________________________________________
Dam Owner(s) Facsimile Number: __________________________________________________
Dam Owner(s) E-Mail: ___________________________________________________________
Reservoir and stream (inflow and outflow) name and class (and/or navigability?):
______________________________________________________________________________
Associated wetlands and other natural resources of special concern:
______________________________________________________________________________
Dam height: ________________________________________________________________ feet
       (as measured from downstream toe at lowest point to top of dam)
Dam Crest length: ___________________________________________________________feet
Dam Crest width: ___________________________________________________________ feet
Maximum Impoundment Volume: ___________________________________________ gallons
All Counties/Towns/Cities/Villages within downstream inundation zone:
       (B and C Hazard Class dam owners should refer to their Emergency Action Plans)
       ________________________________________________________________________
       ________________________________________________________________________
Normal Pool Elevation:___________________________________________________________
       (set by crest of service spillway)
Auxiliary/Emergency Spillway Elevation: ____________________________________________
Maximum Design Water Surface Elevation: __________________________________________
       (specify vertical datum used: local, barge canal, NGVD 29, NAVD 88, IGLD)
DS-IM-1 (9/09) DRAFT                            2
                                Part II: Dam Inspection and Maintenance
      Primary person responsible for Dam Operations: ______________________________________
                                                        (name, title, phone number)
      INSPECTION - This section of your I&M Plan should indicate who, how frequent, and what is
      involved in an inspection. A form or forms should be developed and included which can be used
      for each type of inspection or items to be monitored. Each dam will typically have specific
      features which will require monitoring. Such features may be adapted from past inspection
      reports that were either prepared by NYSDEC or the owner=s engineer. Include a table, such as
      the following, to identify the various type of inspections.
INSPECTION TYPE               FREQUENCY                         ITEMS TO                       PERSONNEL
                                                            INSPECT/MONITOR
     Informal           As needed, after event        Spillway/Aux. Spillway/Seepage       Damtender/Owner
 (i.e. storm events,
     snow melts)
     Informal           Monthly/Bi-Monthly/Other      Seepage/Wet Areas/ Toe Drain         Damtender/Owner
                                                      Flow/ Pool Level/ Trash Rack
                                                      Debris/ Slides/Cracks/ Rodent
                                                      Activity/ Vegetation/ Concrete
                                                      Surfaces/ Vandalism/ Piezometers
   Maintenance          Semi-Annually/ Annually/      In addition to above items: Slope    Damtender/Owner/
                        Other                         Protection/Riprap Erosion/              Engineer
                                                      Condition of Vegetative Cover/
                                                      Spillway and embankment
                                                      Condition/ Lake Drain
                                                      Conditions/
                                                      Settlement Monuments
     Technical          Periodic*                     Safety Inspection                         Engineer
                                                      (See Part 673.12)
     Technical          Periodic (After initial,      Engineering Assessment                    Engineer
                        every 10 years)               (See Part 673.13)
      *       For Class C dams, typical Safety Inspection frequency should be every 2 years,
              For Class B dams, typical Safety Inspection frequency should be every 4 years
      DS-IM-1 (9/09) DRAFT                           3
        MAINTENANCE – Indicate in your I&M Plan the items which will require periodic
maintenance. Particular attention should be given to conditions noted on past inspection reports.
Examples of typical maintenance are given below. Your dam may consist of some or all of these items
and/ or require additional measures, or modified frequencies.
              ITEM                                                      FREQUENCY
              Mow embankment and emergency spillway                     2 times/year
              Lubricate and repair as needed lake drain                 Annually
              valve mechanism
              Re-establish proper vegetative cover                      As needed
              Address erosion                                           As needed
              Address rodent damage                                     As needed
              Clean trash rack                                          As needed
              Concrete Maintenance                                      As needed
              Maintain other mechanical equipment                       Annually
              Replace/ replenish riprap                                 Annually
   OPERATION - Give a summary of all your operation procedures for the dam. Specific
   procedures for operation of mechanical equipment such as valves should be included here, or
   attached. Emergency operation should be covered in an Emergency Action Plan (EAP).
   Some examples of items that would require operational/ procedural descriptions may include:
       •   pool level drawdown for the winter season
       •   exercise (specified frequency – i.e. 2x/year), lubrication of valves
       •   record keeping (who is maintaining, location)
   SAFE RATE DRAWDOWN PLAN - This section should include the method to be used for
   drawing the impoundment down under emergency and non-emergency conditions. This could
   include the maximum release rate which will not cause downstream flooding or rapid drawdown
   damage. Alternative ways to provide for drawdown if needed (i.e. portable pumps, temporary
   siphons) should also be included. (Hasty, unplanned action during emergency situations could
   increase the dam failure rate or actually cause failure)
   DS-IM-1 (9/09) DRAFT                              4
                                      Part III: Training
List of procedures and frequency for training personnel regarding the I&M Plan. Also note other
training needs, such as confined space entry procedures per OSHA requirements.
                                    Part IV: Notifications
List of Items Requiring Notification and Notification Procedures pursuant to ECL Part 673. This
should consist of at a minimum the following:
                     Form                                  Submittal Date
Annual Certification                       By January 31, of each year
Incident Report Form (EAP Activation, Flow Within 5 days of incident
in Erodible Spillway)
Notification of Property Transfer          Sale of property where dam is located
                                     Part V: Appendices
Examples of typical appendices include the following:
1.     Inspection Forms
2.     Past Inspection Reports
3.     Reduced Size As-Built Drawings
4.     Spillway Rating Curve
5.     Drain Rating Curve
6.     Pictures
                                 Part VI: Available References
1.     An Owners Guidance Manual for the Inspection and Maintenance of Dams in New York
       State, DEC June 1987.
       http://www.dec.ny.gov/docs/water_pdf/damguideman.pdf
2.     Guidelines for Design of Dams, DEC Revised January 1989.
       http://www.dec.ny.gov/docs/water_pdf/damguideli.pdf