Published By:
ISBN: 978-93-94342-39-2
Mobile App: Physics Wallah (Available on Play Store)
Website: www.pw.live
Email: support@pw.live
Rights
All rights will be reserved by Publisher. No part of this book may be used or reproduced in any manner
whatsoever without the written permission from author or publisher.
In the interest of student's community:
Circulation of soft copy of Book(s) in PDF or other equivalent format(s) through any social media channels,
emails, etc. or any other channels through mobiles, laptops or desktop is a criminal offence. Anybody
circulating, downloading, storing, soft copy of the book on his device(s) is in breach of Copyright Act. Further
Photocopying of this book or any of its material is also illegal. Do not download or forward in case you come
across any such soft copy material.
Disclaimer
A team of PW experts and faculties with an understanding of the subject has worked hard for the books.
While the author and publisher have used their best efforts in preparing these books. The content has been
checked for accuracy. As the book is intended for educational purposes, the author shall not be responsible for
any errors contained in the book.
The publication is designed to provide accurate and authoritative information with regard to the subject matter
covered.
This book and the individual contribution contained in it are protected under copyright by the publisher.
(This Module shall only be Used for Educational Purpose.)
RAILWAY ENGINEERING
These are steel girders for the purpose of carrying axle load made up of high carbon steel which convert moving wheel loads
of train into point load which then acts on sleepers.
Requirement of Rails:
(i) Rails are tested by falling weight text.
(ii) Rails are manufactured by open heart or duplex process.
(iii) Maximum wear of head allowed is 10 mm
(iv) Minimum tensile strength needed 72 kg/m2
Note: 52 kg rail (i.e. 52kg/m F.F) is suitable upto 130 kmph and 60 kg rail is suitable upto speed of 160 kmph.
Length of Rail: Rails of larger length are always preferred as they will have less no. of joints. Rail length of 12.8m for BG
tracks and rail length of 11.8 gm for MG tracks are used in Indian railways.
wt. of Rail 1
Note :
wt. of locomotive 510
When wear of head exceeds 5% of total weight, the rail is to be replaced.
Sometimes temporary tracks are laid down for material transportation. Hence, word permanent way is coined for railway
track.
It is Semi-elastic in nature due to packing of ballast cushion.
Ganges in Railway Track: It's the clear distance between inner faces of two track rails.
Broad Gauge = l.676m Narrow Gauge = 0.762m Meter Gauge = l.Om
Standard gauge = l.435m (Delhi metro)
Coning of Wheels: Wheels of the train are made at a slope of 1:20. Thus is known as coning of wheels.
Adzing of Sleepers: For effective use of coning of wheels, the rails are also laid at the slope of 1in 20 on the sleepers.
Rail Joints: Are needed to hold together the adjoining ends of the rail. They are the weakest part of the track.
Welded Rails: Rails are welded to provide sufficient restrain at the ends of rail and better degree of fixity of rail to the sleeper
so that the stresses produced are resisted by sleeper fasteners.
Length of welded Rail:
L = n −1 S
TES AS
n=
R
S = Sleeper Spacing
n = No. of sleepers required
= Coefficient of thermal expansion
T = Rise in temperature
ES = Modulus of elasticity
AS = Cross. sectional area of rail
R = Resisting force/sleeper
Breathing Length: Minimum length of rail required to be welded at the end of track, so the portion of rail between welded rail
does not undergo any thermal expansion or contraction.
Sleepers are the members which support the rail and are laid transverse to it. They act as elastic medium for providing
longitudinal and lateral stability to the track.
• Wooden sleepers are best sleepers but they have maximum life of 12-15 years.
• C.I sleepers are used more than steel sleepers as they are less prone to corrosion.
• C.I sleepers can be used with every type of ballast but are not suitable for track circuiting.
• ST 9 sleeper has inverted triangular pot on either side of the rail section and a plate with the projecting rib and a box
on top of the plate.
• Steel sleepers are light in weight, require less no. of fasteners but get easily rusted.
• Concrete sleepers have high track modulus, hence used for developing high speed tracks.
Note: Serviceable portion of the spiked killed wooden sleepers is cut and used with tie bars in station yards is known as check
sleepers.
Composite Sleeper Index (C.S.I.) Used to measure the mechanical strength of timber.
S + 10H
CSI =
20
S = Strength Index. H = Hardness Index.
Both Index are measured at 12% moisture content.
Track fasteners:
(i) Fish plates: used to join two rail joints.
(ii) Spiker: hold's rail on wooden sleepers.
(iii) Bolts: used where sleepers rest on steel girders.
(iv) Chair: support bull headed rails on sleepers.
(v) Keys :fix rails to chairs on metal sleepers.
(vi) Bearing plates: used below F.F. rails to distribute load over wooden sleeper.
Sleeper Density: Number of sleepers per rail length. Its M + x,
Where M = Rail length (13 for BG)
x = Varies b/w 3 to 7
for BG sleeper density is M + 5 i.e. 18 sleepers/rail.
Squaring of Sleeper: Adjusting ballast under the sleepers to space them parallel to each other.
• Ballast: It's high Quality crushed stone with desired specifications placed immediately beneath the sleepers.
• Ballast Cushion: Depth of ballast below the bottom of the sleeper, normally measured under the rail seat. On the
curved track super- elevation is maintained by ballast cushion.
Types of Ballast:
(i) Broken stone: Best material as ballast, has maximum stability.
(ii) Gravel or River pebble: Smooth and round so poor packing and interlocking.
(iii) Sand: Good drainage, provides silent track, blown off due to vibrations
(iv) Asher or girders: Excellent drainage property, Excellent ballast material for station yards.
Minimum Depth of Ballast Layer = D
S −W
Dmin =
2
• Packing: Process of ramming the ballast underneath the sleeper.
• Boxing: Loosely filled ballast above the packed layer.
• Subgrade: Naturally occurring soil prepared to receive the ballast.
The ideal material for subgrade is soil containing gravel, sand, clay and siltin equal proportion withmoisture cont.entjust above
the plastic limit.
Subgrades can be improved by
(i) adding mixture of sand, silt and clay
(ii) providing blanket of non-cohesive soil over poor cohesive soil.
(iii) injecting mixture of cement and sand under pressure.
(iv) providing concrete mats to stabilise poor subgrade.
Survey works for alignment of track.
(i) Traffic survey
(ii) Reconnaissance survey
(iii) Preliminary survey
(iv) Detailed or location survey
Track Modulus (µ): Load per unit length of the rail reoccurred to produce unit deformation or depression in the track.
Note: Elasto-plastic theory is used to define tack modulus.
• Stresses on the Rail: Torsional stresses are developed due to eccentric vertical loads while max shear stress below
the contact surface of rail and diesel locomotive is 36.25 kg /mm2.
• Hammer Blow Effect: Alternate lifting and sudden pressing is called hammer blow
M 2
Hammer blow = 0.14 2n sin
g
Where, M = Net over weight in kg
r = Crank pin diameter in m
n = Number of revolutions of wheel per sec
= Crank angle
• Steam Effect: The vertical component of pressure of steam acting on piston is given in F.P.S units as
r sin h
P = d 2 p
4 L
Where, L = Length of connecting rod in inches
d = diameter of piston in inches
H = height of cross head above the centre line of driving wheel in inches.
= Crank angle.
m 2 r r sin h
F = r 2n cos + cos 2
g L L
Stresses on Sleeper
Method of calculating longitudinal bending stress inrail.
I
(i) X i = 42.33
Xi = Distance from the load to the point of contrafiexure of the rail in cm.
I = Vertical moment of inertia of rail section in cm4
µ = Track modulus in kg/cm2.
m0 m0
(ii) comp = tonnes / cm2 tension = tonnes / cm2
Zcomp Ztension
m0 = B.M. in tonne cm immediately under an isolated load p tonne on one rail.
Zcomp/Ztension = Section modulus of rail in compression/tension
comp/tension = consequent compressive/tensile stress in the rail head/ foot under the load p in tonne per square cm.
9.25p
(iii) d=
4 I3
d = deflection of track in cm
P = load on one rail in tonnes.
Creep of the Rail: It’s the longitudinal movement of rail with respect to sleepers in a tack.
Prevention of Creep:
(i) Pulling back rails to original position
(ii) Using steel sleepers
(iii) By providing sufficient crib ballast
Factors Governing Creep of the Rail:
(i) Alignment of track: observed greater on curves
(ii) Grade of track: more creep in downward steep gradients.
(iii) Type of rails: old rails have more creep
(iv) More creep in the direction of heaviest traffic.
Gradient: Any rise or fall in track level is called gradient.
Grade Compensation: Due to curvature on the grade, the gradients on the curves are to be reduced to reduce the resistance in
motion of train.
BG 0.04
MG 0.03
NG 0.02
Degree of Curve:
1720
For 30m Chain
R
1150
For 20m Chain
R
As per Indian Railways,
BG
MG
NG 50°
Versine of Curve: Used to check the accuracy of the curve.
L2
Versine = V = cm
8R
L, R = m
Super Elevation or Cant
e 2
tan = =
G gR
G2 V in kmph
e=
127R R in m
G → Gauge (in m)
Equilibrium Speed
Maximum Limit of Super Elevation
Can't Deficiency: For trains running with higher speed than equilibrium speed actual can't requirement is more than
provided. This shortage is known as can't deficiency.
can 't deficiency = X1 − X A
X1 = Can't required for higher speed train
XA = Actual can't provided as per average speed
eth = eact + D
eth = Theoretical can't
eact = Actual can't
D = can't deficiency
Limit on Dmax
Transition Curve: Cubic parabola is used as transition curve.
x3
(i) Equation of deflection y =
6 RL
x2
(ii) Spiral angle = tan–1
2RL
1
(iii) Deflection angle = tan–1 tan
3
L2
(iv) Shift s =
24 R
Note: Transition curve are early set out by offset method. Cubic parabola is also known as Froude's curve.
Gauge Widening on Curves
2
13 B + L
WC =
R
B = Rigid wheel base in meters
For BG = 6m For MG = 4.88m
R = Radius of curve (in m)
L = 0.02 h 2 + Dh
L = Lap of flange
h = depth of wheel flange below rails in cm
D = Diameter of wheel in cm
WC = Widening of gauge in cm
Turnout: It's the combination of points and crossing which enables a back either a branch line or siding to take off from main
track.
Turn out consists of
(i) 2 points or switches
(ii) 2 pair of stock rails
(iii) A pair of check rails.
(iv) An acute angle crossing
(v) 4 lead rails
(vi) A pair of stock rail
Important Points of Switch:
(i) Heel divergence: Distance b/w running faces of stock rail and tongue rail at the heel of switch.
(ii) Flange way clearance: Distance b/w adjacent faces of tongue rail and stock rail at the heel of switch.
(iii) Flange way depth: Vertical distance b/w top of rail to heel block.
(iv) Throw of switch: max distance by which toe of tongue rail moves sideways.
(v) Switch angle: Angle b/w running faces of stock rail and tongue rail when tongue rail touches the stock rail.
d = heel divergence
S1 = Actual length of tongue rail
S2 = Theoretical length of tongue rail.
Crossing Angle:
The speed at the leg of crossing
No. of crossing N =
The length of crossing T.N.C
T.N.C. is the theoretical nose of crossing
Design of Turnout:
(i) Curve lead: Distance measured along stock rail b/w TNC and toe of switch
(ii) Switch lead: Distance between heel of the switch and toe of the switch
(iii) Lead: Distance between TNC and heel measured along stock rail
Curve Lead = Lead + Switch Leaddd
Method (a):
(i) CL = G cot
2
CL = 2R0G
CL 2 GN
(ii) Central Radius R
r = R0 – R0 = G + 2GN2
R0 = 1.5G + 2GN2
Indian Railways
R0 = CL cosec
(i) SL = 2R 0d
(ii) L = CL – SL
SL2
(v) d=
2R 0
Method (b):
+
(i) L = (G – d) cot
2
G G−d
(ii) R = R0 – r0 =
2 cos − cos
Method (c)
+
(i) L = x cos a + (G – d – x sin ) cot
2
G − d − xsin G
(ii) R0 – R = R0 −
cos − cos 2
Note: Check rails are provided on opposite sides of the crossing for guiding the wheel while wing rails help in channelizing
the wheels in their route.
It's used to transfer trains from one track to another
(i) Diamonds crossings are avoided on curves
(ii) Cross-over are useful when trains are approaching from one direction only.
(iii) In single slip tracks can be changed from one direction only while in double tracks can be changed from either direction.
(iv) Scissor cross-over enables the train to change track from either direction.
Type 1: Two turn out provided on two tracks joint with straight position between two turnoffs.
N = cot
Length of one turnout = CL = 2GN
Length of straight portion S = (d – a)N – G 1 + N2
Overall length of turnout = 4NG + (D – a)N – G 1 + N2
Type 2: Cross over with curved path between two turnouts having different crossing angles.
2 2
RO1 + 1.5G + 1.5 GN1 RO2 = 1.5G + 1.5 GN 2
R1 = RO2 – R2 = RO2 –
2 2
Overall length L = O1O2 − A1A 2
(i) AB = BC = CD = DA = G cosec
(ii) DE = BF = G cot
(iii) AC = G cosec
2
(iv) BD = G sec
2
Operational Classification Functional Classification
Loop: When branch from main line again terminates at the same line.
Sidings: When a branch line from main line or a loop line terminates at a dead end with a buffer stop or sand hump
Note: Marshalling yard is considered as “the heart that pumps the flow of commence along the track and it may too, without
the internal vigilance become the grave yard of wagons”.
Other Equipments of Station Yard
(i) Engine shed or loco shed: Purpose is to clean, repair and maintain locomotives
(ii) Ash pits: To receive ashes from locomotive boilers.
(iii) Drop pits: To remove wheels of engine
(iv) Triangles and turn tables: Changing the direction of engine
(v) Traverser: To transfer wagons one at a time to and fro from parallel tracks without necessity of shunting.
(vi) Scotch blocks: To separate all the sidings and shunting lines through running lines.
(vii) Fouling marks: Points fixed between a pair of converging tracks to indicate a foul or possibility of collision of vehicles
beyond these points.
(viii) Sand Hump or Snag dead end: A hump of sand with a rising gradient at the dead end of siding is provided.
These are systems devices and means by which trains are operated efficiently.
(i) Detonating signals are used in foggy and cloudy weather. These are placed on rails which explode with when train passes
over them.
(ii) Stop/Semaphore Signal: Under normal position its arm is horizontal and it indicates stop or danger indication.
(iii) Warner signal: A semaphore signal at entrance is combined with a warner system.
(iii) Shunting signals are used in station yards in shunting operation.
(iv) Calling on signals are very much useful with repair work, it permits to the train to proceed with caution.
(v) Repeater or co-acting signal’s are used where driver's vision is obstructed. A duplicate arm of smaller size is placed at a
suitable position on the same post.
(vi) Routing signals are provided where no of lines exist at a station taking off different locations from main line.
Note: Absolute block system or space interval system is extensively used in India.
Tractive Effort: Pull applied by engine on driving wheel
Hauling Capacity: Maximum value of frictional force due to driving wheels
Hauling Capacity (H.C.) = nw
µ = Friction coefficient
n = No of driving wheels
w = wt. of one pair of driving wheel
(i) Due to speed
RT = 0.0016 w + 0.00008 wv + 0.0000006 wv2
w = wt. of train in tonnes V= Speed of trains in km.ph
(ii) Due to track profile
(a) Gradient Rg = tan e
(b) Curvature Rc = 0.0004 WD → For BG
0.0003WD → 4ForMG where D-degree of curve
0.0002 WD 4 For NG
−
→
→