TAKE OFF SHEET PREPARATION
EMPLOYER:-
CONSULTANT:-
  Times        DIMENSION         QUANTITY          UNIT
           1      28
                  22
                                 616.00            m2
          12
                          2
                        1.5
                       1.74
                                      62.64 m3
           6
                          2
                        1.5
                       1.74
                                      31.32 m3
          11
                          2
                        1.5
                       1.74
                                      57.42 m3
                                     151.38 m2
                       3.6
                       0.2
                                       0.72 m2
                            4
                           0.2
                                          0.8 m2
                       3.6
                       0.2
                                       0.72 m2
                            4
      0.2
              0.8 m2
     3.6
     0.2
             0.72 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
       4
      0.2
              0.8 m2
12
        2
      1.5
     1.74
            62.64 m3
 6
       2
      1.5
     1.74
             31.32 m3
11
        2
      1.5
     1.74
             57.42 m3
            151.38 m2
12
        2
      1.5
     1.74
             62.64 m3
 6
        2
      1.5
     1.74
             31.32 m3
11
        2
      1.5
     1.74
             57.42 m3
            151.38 m2
     3.6
     0.2
              0.72 m2
       4
      0.2
               0.8 m2
     3.6
     0.2
              0.72 m2
       4
      0.2
               0.8 m2
     3.6
0.2
       0.72 m2
  4
 0.2
        0.8 m2
  4
 0.2
        0.8 m2
  4
 0.2
        0.8 m2
  4
 0.2
        0.8 m2
  4
 0.2
        0.8 m2
  4
 0.2
        0.8 m2
  4
 0.2
        0.8 m2
  4
 0.2
 0.2
       0.04 m2
 3.6
 6.2
0.15
       3.35 m3
 3.6
 4.2
0.15   0.53
       1.74 m3
     4.4
     6.2
    0.15
            4.09 m3
     4.4
     4.2
    0.15
            2.77 m3
     4.4
     5.7
    0.15
            3.76 m3
     4.2
     6.2
    0.15
            3.91 m3
     4.2
     4.2
    0.15
            2.65 m3
     4.2
     5.7
    0.15
            3.59 m3
     5.5
     3.9
    0.15
            3.22 m3
     1.6
     6.2
    0.15
            1.49 m3
     1.6
     4.2
    0.15
            1.01 m3
           31.57 m3
2    0.8
     1.2
            1.92 m2
2   0.85
     1.2
            2.04 m2
3          11.88 m2
2    0.7
     1.2
            1.68 m2
2   0.75
     1.2
             1.8 m2
7          24.36 m2
2    0.7
     1.2
            1.68 m2
2   0.75
     1.2
             1.8 m2
5           17.4 m2
2    0.5
     1.2
             1.2 m2
2   0.55
     1.2
            1.32 m2
2           5.04 m2
           58.68 m2
2    0.8
     1.2
            1.92 m2
2   0.85
     1.2
            2.04 m2
3          11.88 m2
2    0.7
     1.2
            1.68 m2
2   0.75
     1.2
             1.8 m2
7          24.36 m2
2    0.7
     1.2
            1.68 m2
2   0.75
     1.2
             1.8 m2
5             17.4 m2
2     0.5
      1.2
               1.2 m2
2    0.55
      1.2
              1.32 m2
2             5.04 m2
             58.68 m2
    53.73
      0.5
      1.2
            32.238 m3
OFF SHEET PREPARATION                                                                                        TAKE OFF SHEET PRE
       CONTRACTOR:-                                                                               EMPLOYER:-
       PROJECT:-                                                              CONSULTANT:-
                                      DESCRIPTION                               Times        DIMENSION       QUANTITY
       A.SUB STRUCTURE
                          1.EXCAVATION AND EARTH WORK
                                  1.1 site clearing
       clear the site at a depth of 20 cm or remove the top 20cm soil. Site
       clearing includes total area of the site or compound
                                                                                        12
       Total area of site clearing                                                                       2
                               2. CONCRETE WORK                                                      1.5
                         2.1 lean concrete under footing pad                                        1.74
                           C-5 lean concrete under footing pad                                                     62.64
                                                                                         6
       Total lean concreate under f1                                                                   2
                                                                                                     1.5
       f total                                                                                      1.74
                                                                                                                   31.32
                                                                                        11
                                                                                                       2
                                                                                                     1.5
       F2 total lean concreate under F2                                                             1.74
                                                                                                                   57.42
                                                                                                                  151.38
                                                                                                     0.3
                                                                                                     0.4
       F3 total lean concreate under F3                                                                                0
       Total area of lean concrete footing pad                                                                     57.42
         2.2. Lean concrete under masonary and above masonary work
       on axis '' A' ''
       b/n axis ''2 & 6''
       on axis ''B' ''
       b/n axis ''2 & 6''
       on axis '' C' ''
       b/n axis ''1& 7''
       on axis ''D' ''
b/n axis ''1 & 7''
on axis '' E' ''
b/n axis ''1 & 7''
on axis 'F' ''
b/n axis ''1& 7''
on axis '1' ''
b/n axis ''C& F''
on axis ''2' ''
b/n axis ''C& F''
on axis ''3' ''
b/n axis ''C& F''
on axis ''4' ''
b/n axis ''A& F''
on axis ''5' ''
b/n axis ''A& F''
on axis ''6' ''
b/n axis ''A& F''
on axis ''7' ''
b/n axis ''C& F''
                   2.3 concrete work for footing pad
                                 c25
F1
f total
F2 total
F3 total
Tota Volume concrete footing pad
2.4 Foundation column concreate
c1
C1 total
C2 total
C3 total
Tota Volume Foundation column
              2.4 concrete work for grade beam
on axis '' A' ''
b/n axis ''2 & 6''
on axis ''B' ''
b/n axis ''2 & 6''
on axis '' C' ''
b/n axis ''1& 7''
on axis ''D' ''
b/n axis ''1 & 7''
on axis '' E' ''
b/n axis ''1 & 7''
on axis 'F' ''
b/n axis ''1& 7''
on axis '1' ''
b/n axis ''C& F''
on axis ''2' ''
b/n axis ''C& F''
on axis ''3' ''
b/n axis ''C& F''
on axis ''4' ''
b/n axis ''A& F''
on axis ''5' ''
b/n axis ''A& F''
on axis ''6' ''
b/n axis ''A& F''
on axis ''7' ''
b/n axis ''C& F''
             2.5 concrete work for Ground floor slab
concrete work for basement floor slab at a depth of 15cm
slab b/n axis 1-2 & D-C
slab b/n axis 1-2 & B-C (minus area of lift in m3=0.53)
slab b/n axis 2-3 & D-C
slab b/n axis 2-3 & C-B
slab b/n axis 2-3 & B-A'
slab b/n axis 3-4 & D-C
slab b/n axis 3-4 & C-B
slab b/n axis 3-4 & B-A'
slab b/n axis 1'-2 & B-A'
slab b/n axis 1'-1 & D-C
slab b/n axis 1'-1 & C-B
Total area of concrete for ground floor slab
                            3. FORMWORK
                   3.1 form work for footing pad
            F1
           F2
           F3
             F4
total area of form work for foundation column
                3..2 form work for foundation column
            C1
           C2
           C3
            C4
total area of form work for foundation column
                 3.3 form work for grade beam
total perimeter of external beam form work= 56.73m
total perimeter of internal beam form work= 100m
                      4. Masonary work
                    volume of masonary work
A masonary work above external mat beam at a depth of 1.20m
and width of 50cm
total perimeter(girth)= 53.73
1.5+3.2+3.85+3.75+5.74+3.75+5.3+3.75+4.3+5.4+3.6+3.85+5.74
column to column length=53.73m
Total volume of masonary work
AKE OFF SHEET PREPARATION
-               CONTRACTOR:-
                PROJECT:-
         UNIT                    DESCRIPTION
                B.SUPER STRUCTURE
                1. CONCRETE WORK
                                  1.1 COLUMN
                1.1.1 Ground floor
                c-25 concrete for ground floor column
       m3       intersection b/n beams
       m3       volume of concrete for ground floor column
                1.1.2 First floor
       m3
       m2
                intersection b/n beams
       m3
       m3       volume of concrete for first floor column
                                           NO. OF
                                                      NO. OF       TOTAL NO .
    LOCATION         DIA (MM) LENGTH (M) BARS PER
                                                     MEMBER         OF BARS
                                          MEMBER                                8.00
 SUB STRUCTURE
    Footing Pad
                            8        0.8        41             2           82   65.60
                                            TOTAL LENGTH, M                            65.60
                                            UNIT WEIGHT , KG/ M                         0.40
                                            TOTAL WEIGHT,KG                         25.91
SUPER STRUCTURE
 Elevation Column
        C-1                16      14.60        8          14             112
                           16       6.85        6          14              84
       St-up                8       1.10      108          14            1512     1663.20
       C-2                 16      14.60        8              1            8
                           16       9.80        6              1            6
       St-up                8      11.10      122              1          122     1354.20
       C-3                 16       3.65       10              3           30
                           16      17.90        8              3           24
       St-up                8       1.50      108              3          324      486.00
 1st Floor to Roof
       Beam
        FB-1               16       4.37         6             5           30
                           16      1.595         2             5           10
       St-up                8       1.20        28             5          140      168.00
       FB-2                16       4.35         6             5           30
                           16       1.59         2             5           10
       St-up                8       1.20        28             5          140      168.00
       FB-3                16      11.12         6             5           30
                           16       1.60         2             5           10
                           16      2.205         1             5            5
                           16       2.20         1             5            5
       St-up                8       1.20        87             5          435      522.00
       FB-4                16      11.27         6             5           30
                           16       1.68         1             5
                           16       2.23         1             5
                           16       2.23         1             5
                           16       1.68         1             5
       St-up                8       1.20        90             5          450      540.00
        FB-5             16   11.47    6    5    30
                         16    1.71    3    5    15
                         16    2.26    2    5    10
                         16    3.50    2    5    10
        St-up            10    1.20   69    5   345
        FB-6             16   11.70    6    5    30
                         16    1.75    2    5    10
                         16    2.30    2    5    10
        St-up             8    1.20   86    5   430     516.00
        FB-7             16   17.26    6   20    120
                         16    6.48    1   20     20
                         16    4.98    2   20     40
        St-up             8    1.20   61   20   1220   1464.00
                         10    1.20   56   20   1120
1st Floor to Roof Slab
            1             8    6.11   14    5     70    427.70
            2             8    5.98   14    5     70    418.25
            3             8    5.03   13    5     65    326.63
            4             8    3.25   91    5   455    1478.75
            5             8    5.04   13    5     65    327.60
            6             8    4.47    5    5     25    111.63
            7             8    4.28   12    5     60    256.80
            8             8    4.48    5    5     25    112.00
            9             8    4.28   12    5     60    256.80
           10             8    5.22   26    5   130     678.60
           11             8    5.23   26    5   130     679.90
           12             8    5.38   33    5   165     887.70
           13             8    5.38   33    5   165     887.70
           14             8    5.49   23    5   115     630.78
           15             8    5.05   19    5     95    479.28
           16             8    5.00   23    5   115     574.43
           17             8    3.25   24    5   120     390.00
           18             8    4.25   69    5   345    1466.25
           19             8    6.32   26    5   130     820.95
           19'            8    5.72   30    5   150     857.25
           20             8    5.48   19    5     95    520.13
           21            10    2.30   30    5   150
           22            10    2.30   43    5   215
           23             8    2.30   19    5     95    218.50
           24             8    2.30   19    5     95    218.50
           25             8    2.30   28    5   140     322.00
           26             8    2.30   28    5   140     322.00
       27           10    2.34      23          5   115
       28           10    3.03      24          5   120
       29            8    2.34      74          5   370      863.95
       30            8    2.89      75          5   375     1083.75
       31           10    2.24      21          5   105
       32           10    2.21      20          5   100
       33           10    2.48      36          5   180
Water tanker slab
        1            8    5.12      36          1    36      184.32
        2            8    7.64      19          4    76      580.26
        3           10    2.93      19          2    38
     RB-1           16    3.85       6          2    12
     st-up          16    1.43       2          2     4
                     8    1.20      24          2    48       57.60
                    16    6.37       6          2    12
     RB-1           16    3.28       1          2     2
                    16    1.76       1          2     2
     st-up           8    1.20      45          2    90      108.00
    Staircase
                    14    5.64    12.00      5.00    60
                    14    1.85    12.00      5.00    60
                    14    1.72    12.00      5.00    60
                    14    2.18    12.00      5.00    60
                    14    2.24    12.00      5.00    60
                     8    1.55    35.00      5.00   175      271.25
                     8    1.55    35.00      5.00   175      271.25
                     8    1.23   100.00      5.00   500      615.00
                    14    4.13    12.00      5.00    60
                    14    1.88    12.00      5.00    60
                    14    1.63    12.00      5.00    60
                    14    2.36    12.00      5.00    60
                     8    1.55    31.00      5.00   155      240.25
                     8    1.55    31.00      5.00   155      240.25
                     8    1.23   100.00      5.00   500      615.00
                    14    1.96    24.00      1.00    24
                    14    6.03    24.00      1.00    24
                    10   0.896   264.00      1.00   264
                    10    2.22    24.00      1.00    24
                     8    3.66    22.00      1.00    22       80.41
 Landing Beam-1     16    3.85     7.00      5.00    35
                    10    1.20    24.00      5.00   120
 Landing Beam-2     16    4.38     3.00      5.00    15
                     8    1.20     5.00      5.00    25        30.00
                                 TOTAL LENGTH, M          25,792.79
UNIT WEIGHT , KG/ M         0.40
TOTAL WEIGHT,KG       10,188.15
10.00       12.00     14.00     16.00       20.00     24.00            d=3.5
                                                                       a=6.265
                                                                       b=
    0.00       0.00      0.00       0.00       0.00      0.00   0.00
    0.62       0.89      1.21       1.58       2.47      3.56   6.31
        -       -         -             -       -         -      -
                                 1635.20
                                  575.40
                                  116.80
                                   58.80
                                  109.50
                                  429.60
                                  130.95
                                   15.95
                                  130.50
                                   15.90
                                  333.60
                                   15.95
                                   11.03
                                   11.00
                                  338.10
                                    0.00
                                    0.00
                                    0.00
                                    0.00
           343.95
            25.65
            22.60
            35.00
 414.00
           351.00
            17.50
            23.00
          2071.20
           129.60
           199.20
1344.00
 345.00
 494.50
  268.53
  363.60
  235.20
  220.50
  446.40
  111.15
                             46.20
                              5.70
                             76.38
                              6.55
                              3.52
                 338.40
                 110.70
                 103.20
                 130.50
                 134.10
                 247.80
                 112.50
                  97.80
                 141.30
                                             23.23
                  46.92
                 144.72
  236.54
   53.28
                            134.75
  144.00
                             65.70
4,676.70   -   1,607.94   7,485.78   -   -
     0.62   0.89     1.21         1.58   2.47   3.56
2,885.52      - 1,944.00    11,820.04      -      -
Time        Dimension           Quantity        Unit   Description
       10                 0.1                          Staircase concreate
                         0.25
                            5                          steps
                                            1.25 M3
                         2.69
                            5                          soffit
                         0.19
                                            0.95 m3
                            5
                            1
                        15.83                          landing
                                           79.15 m2