The document consists of a series of multiple-choice questions related to construction management, project estimation, quality control, and materials used in construction. It covers various topics including the preparation of bills of quantity, project monitoring, masonry work, and safety regulations. The questions are designed to assess knowledge and understanding of construction practices and principles.

Uploaded by

sultanaliyi8845
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
669 views13 pages

Holestic Coc

The document consists of a series of multiple-choice questions related to construction management, project estimation, quality control, and materials used in construction. It covers various topics including the preparation of bills of quantity, project monitoring, masonry work, and safety regulations. The questions are designed to assess knowledge and understanding of construction practices and principles.

Uploaded by

sultanaliyi8845
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 13

1.

Shows the items present for the construction work with the associated Specification and the
estimated quantity with the Unit price for each of the items.

A Bill of quantity B. Contract C. Technical drawings D. Tender

2. A term or processes used in the construction industry to take measurements of civil Works,
prepare specifications and estimate the cost of , prepare specifications , and estimate the cost of
works either for each trade of work or for the whole project is

A. Quantity Survey B. Contract document

C. Project evaluation D. Project estimation

3. Good project managers try to ensure quality control

A. By maintaining the desired quality

B. By providing defects or failures in constructed facilities

C. By increasing costs and delays

D. By applying the quality of a completed facility during construction stages rather than
during the design and planning.

4. The correct cycle regarding quality of construction supervision is:

A. Plan - Do - Check - Act B. Act – Do- Plan -Check

C. Do- Plan - Check – Act D. Check - Act - Plan - Do

5. The main purpose of costing or estimating are to

A. Know the volume of work in reference to the fund available

B. Check quality of materials

C. Identifying engineering estimate of the work for bidding purpose

D. Work out economical use of materials, labor and equipment's

6. How should management respond to unusable ideas in an effort to foster creativity in the
workplace?

A. Expressing anger B. Using the idea anyway

C. Firing the employee D. Being supportive while explaining how the idea is not right
for the situation
7. The reduction in project time normally results in

A. Decreasing the direct cost and increasing indirect cost

B. Increasing the direct cost and decreasing the indirect cost

C. Increasing the direct cost and indirect cost both

D. Decreasing the direct cost and indirect cost both

8. The ability of performing two or more Activities , is the complement of the other without affecting one
to another

A. Management. B. Quality Control. C. Resource Task management skill. D. Performance note

9. In construction site , work schedule and resource assignments are prepared by

A. Site manager. B. Consultant. C. Contractor. D. Client

10. In the recent days , RC design codes of many countries including ES EN 2 2013 , the cover to the
reinforcements is given based on

A. Member size and shape. B. Exposure condition.

C. Concrete characteristic strength. D. Cement content per m ' of concrete

11. Which one of the following is adequate protective clothing that should be worn especially in areas
where there is likelihood of dust , grease and other spilling materials ?

A. Goggles. B. Over all. C. Safety Shoes. D. Safety Belt

12. A test performed to determine the presence of internal crack and voids and the depth of penetration of
cracks that are visible at the surface is

A. Non - destructive test. B. Destructive test.

C. Fatigue tests. D. Long - time tests

13. The main purpose of costing or estimating are to :

A. Know the volume of work in reference to the fund available B. Check quality of materials

C. Identifying engineering estimate of the work for timely planning purpose

D. Work out economical use of materials , labor and equipment's


14. Which data required for the preparation of detailed cost estimation of masonry work ?

A. Amount of locally available masonry materials B. Quality of local Masons

C. Specification and rate of materials D. Specializations of the skilled labor

15. Which one of the following is true about measurements of work items in the preparation of
bill of quantity?

A. Excavation works for stone pillars can be quantified linearly

B Clearing site vegetation is measured in m

C. Deep excavation conducted for the stone foundation work is measured in m3

D. The steel bar used in reinforced retaining wall are measured in meter length quantities are
taken from the structural drawing

16. Which one of the following is the means for maintenance of brick work?

A. Crushing due to overloading.

B. Shearing along any horizontal Plane due to lateral load.

C. Rupture along a vertical plane due to vertical load.

D. Re - pointing of old brickwork to improve the appearance and make it water tight

. 17. Good Leadership skill consistent, strong or informed leadership is evidenced by

A. Avoiding conflict, “passing the buck” with little follow - through on decisions.

B. Employees see the same continued issues in the workplace.

C. Supervisors understand the jobs of their subordinates.

D. Supervisors don't understand the jobs of their subordinates

18. After demolishing any building structure, you should do

A. Designated demolition area is assessed to determine scope of work

B. Risks are identified and managed

C. Demolition operations and techniques

D. Cleaning, storage and environmentally friendly waste management of material


19. The reason for continued widespread use of brick as an external wall material is:

A. Strong enough to carry higher loads

B. Provides high thermal insulation

C. Retains its good appearance over a long period

D. Higher compressive strength than other masonry walls

20. Choice of masonry units is generally made from the consideration of:

A. Cost, durability, weather condition and ease of construction

B. Local availability, compressive strength, cost and durability

C. Weather condition, physical dimension and cost

D. Compressive strength, weather condition and cost

21. What measures you should consider to retain the excavated soil during the trench excavation
of foundation wall?

A. Timbering B. Trenching

C. Retaining wall construction D. Trenching wall construction

22 Structural units of rectangular shape and convenient size that are made from suitable types of
clays by mounding, drying and burning

A. Blocks B. Stones

C. Concrete D. Bricks

23. Among the following, one is categorized under the mechanical characteristic of bricks?

A. Insulation B. Color C. Flexure strength D. Durability

24. Bricks should be so designed that they are light and strong and give adequate insulation
because

A. Very dense and heavy bricks conduct heat and sound at a greater rate

B. Very strong and light bricks conduct heat and sound at a greater rate.

C. Very strong and heavy bricks conduct heat and sound at a lower rate,

D. Very dense and light bricks conduct heat and sound at a lower rate.
25. One of the following is the advantages of hollow bricks over the ordinary solid bricks

A. Being heavy in weight

B. Offer better insulation against heat and sound

C. Ideal and economical for load - bearing walls

D. Larger in size

26. During excavation of trenches and pits on soft soils, how can you protect the sides of the
excavation from collapsing in?

A By decreasing the shear strength of the soil in the area

B By carrying out the excavation only on stiff grounds

C By applying some water over the ground before excavation

D By providing timber or other boards to the sides of the excavation

27. The surface of stones obtained from quarry is rough, irregular in shape and non - uniform

in size then what do you do to give it a desired aesthetic appearance

A. Painting B. Dressing

C. Pointing D. Tiling

28. Which one of the following working drawings made by imaginary cut lines of a building and
provides more information about construction materials of building elements such as walls?

A. Elevation drawing B. Sectional drawing

C. Floor plans D. Site plans

29. During the construction of fire place and chimney with gladding, which membrane you
should provide to prevent the penetration of moisture from ground surface?

A. Surface course membrane B. Sound insulation membrane

C. Damp proofing course D. Base course

30. Which data is required for the preparation of detailed cost estimation of masonry work?

A. Amount of locally available masonry materials B. Quality of local Masons

C. Specification and rate of materials D. Specializations of the skilled labor


31. Which one of the following is true about measurements of work items in the preparation of
bill of quantity?

A. Excavation works for stone pillars can be quantified linearly

B. Clearing site vegetation is measured in m '

C. Deep excavation conducted for the stone foundation work is measured in m3

D. The steel bar used in reinforced retaining wall are measured in meter length quantities are
taken from the structural drawing

32. A parts of roof structures which is the underside of the eaves that is fixed to the back of the
fascia and the wall and forms an enclosed element all around the building.

A. Ridge B. Gable C. Soffit D. Purlin

33 A system of casting concrete in a reusable mold or “form " which is then treated in a
controlled environment , conveyed to the construction site and lifted to the place is

A. Prestressed structure B. Pre - cast structures

C. Retaining structures D. Reinforced structures

34. The temporary framework is known as and it is useful in construction demolition,


maintenance or repair works.

A. Grouting B. Scaffolding C. Shoring D. Underpinning

35. Construction of cavity walls as external walls to protect the building from the outside heat or
cold as the hollow space between two walls act as an

A. Destructive material B. Burning material

C. Building material D. Insulating material

36. Which of the following line is usually parallel to the plot boundaries and laid down in each
case by the Authority, beyond which nothing can he constructed towards the site boundaries

A. Property Line B. Building Line

C. Plot Line D. Control Line

37. Which of the following term in the buildings is used to mean the coming out of water from
components like walls and floors of the buildings?

A. Water Proofing B. Dampness C. Termite Proofing D. Damp Proofing


38. A window should be located on which of the following side of a room as seen from the point
of view of fresh air?

A. Eastern B. Southern C Northern D. Western

39. Which of the following tools is used for cutting soft bricks?

A. Jointer B. Scotch C. Spirit Level D. Trowel

40. A wall may be defined as that component of a building, whose width is times its thickness.

A.2 B. 4 C. 6 D. 8

41. Which of the following is a mixture of cement, sand, pebbles or crushed rock and water
which, when placed in the skeleton of forms and are allowed to cure, becomes hard like a stone?

A. Cement Mortar B. Cement Grouting

C. Cement Concrete D. Cement slurry

42. Assume that you are vibrating the concrete in the construction site by using the vibrating
machine. Unfortunately, your machine is failed to vibrate, what would you do?

A. Add some amount of aggregate and compact by hands,

B. Add some amount of cement and compact by hands

C. Add some amount of water and compact by hands.

D. Add some amount of sand and compact by hands

43. ______is a temporary support to precast or in situ concrete structure, it holds the concrete
until it has set

A. Bleeding B. Scaffolding C. Grouting D. Form work

44. In concrete production, cement paste means

A. Measuring of the volume of cement

B. The chemical reaction when cement is brought in contact with water.

C. Determine the amount of cement. D. Determine the strength of cement.

45. Project monitoring is required.

A. Before commencement of the project B. During implementation of the project

C. After completion of the project D. At any stage of the project deemed necessary
46. In order to achieve economy, the spacing of stirrups at mid span section - compared to that of
support section

A. May be decreased B May be increased

C. Must be kept equal D. None of the above...

47. Following document define the legal rights and obligations of the parties and may be
described as the regulations under which the contract will be performed.

A. Specifications B. General Conditions of Contract

C. Special provisions D. Bill of Quantities

48. In order to achieve economy; one of the following is correct?

A. The spacing of stirrups at mid span section will be decreased as compare to that of support
section.

B. The number of stirrups at mid span section will be decreased as compare to that of
support Psection.

C. The number of top reinforcements at mid span section will be decreased as compare to that
of support section

D. The number of bottom reinforcements at mid span section will be decreased as compare to
that of support section

49.The purpose of the supplementary condition is used

A.To describes the guidelines that will be used in the administration of the contract

B.To provide an extension of the general provisions of the contract to fit the specific
project at hand

C. To inform the responsibilities of the parties involved in the contract- the owner and the
general contractor

D.To familiarize all parties concerned, and the wording is not only clearly understood, but has
also been tested in the courts.

50. Project manager need communications in a construction place:


A.To provide information and instructions B.To increase defects in the site

C.To minimize productivity D.To entertain the workers

51.Quality control is____________

A. Evaluating overall project performance to ensure the project will satisfy the relevant quality
standards

B. Identifying which quality standards one relevant to the project and how to satisfy them

C. Monitoring specific project results to ensure that they comply with the relevant quality
standards while identifying ways to improve quality

D. The graphic display of data that illustrates results of process over time

52. A team leader must

A. Select the worst solution B.Define the problem properly

C. Detect the problem lately D.Express one’s own decision

53. The process of establishing a structural relationship among function of people to perform the
work effectively within the company.

A. Planning B.Organizing C.Evaluate work plan and activities D.Scheduling

54. Types of projection provide full description of an object .

A Multi - view Drawing B. Isometric Drawing

C. Perspective Drawing D. Oblique Drawing

55. Why do we follow safety rules & regulation during work procedures ?

A .To arrange the working place properly B. For good communication

C . To do proper work D. To protect accident

56 , The last step in establishing of quality standard

A. Review the standard with instantaneous B. Evaluate the standard

C. Identify the user D. Establish the goals

57 , In ordinary Portland cement residue should not be more than

A. 60 gm B. 5 gm C . 10 gm D. 20gm

58.How many columns are there in takeoff sheet ?


A. Three B. Four C. Two D. Five

59 , A test which is conducted with respect to arrangement & direction of external force

A. Shear test B. Static tests C. Wear test D. Dynamic tests

60 , Which one of the following is not true element of stair

A. Riser B. Thread C. Soffit board D. Flight

61. The purpose of having a quality management system in an organization includes .

A. In order to assure inaccuracies B. Helps fight the resistance to change within organization

C. For the freedom of employees D. Reducing motivation within the company

62. The qualities of a property identification number must be :

A. Easy to understand and remember B. Not Uniqueness

C. Temporary D. Not Ease of use

63 , A Service / Production factors that increase cost , in other words , all unnecessary things

A. Mura B. Muri C. Muda D. overburden

64. Plain concrete is

A. Concrete having reinforcement Concrete without reinforcement

B. concrete without reinforcement

C. Concrete without aggregate. D. Concrete without cement.

65, Plumb bob used to

A. Measuring of objects B. Checking of the angle

C. Checking of vertical object D. Checking of horizontal object

66 , The depth of excavation for site clearing

A. 20-30 cm B. 25-50 cm C. 40-50 cm D. 50 cm

67 , A footing type carrying all columns in a foundation

A. Isolated footing B. Combined footing C. Mat foundation D. Strap footing

68 . One of the following bars is not available in stair


A. Starter bar B. Main bar C. Stirrup D. Hanger bar

69. The density of one bag of cement

A. 1200 kg / m³ B. 1400 kg / m. C. 1300 kg / m³ D. 1000 kg / m

70. A footing pad has size of 145 cm x 145 cm x 50 cm. The area of form work is

A. 3.19 m² B.2.95m2 C. 2.9 m² D. 3.5 m²

71 , The most appropriate method of setting out 90 degrees

A. 2-4-3 B. 3-4-6 C. 3-4-5 D. 2-4-5

71 , A column has size 50cm x 40 cm . What is the total length of one stirrup needed?

A. 150 cm B.160cm C.170cm D.180cm

79. If you are required to construct giant building, how do you get the parts that can carry the oversize
concrete?
A. Level the surface using leveling instrument
B. Gig down the top soil to the recommended depth
C. Gig down the top soil similar to nearby building
D. Excavate foundation till you the rock
80. A test conducted of fresh concrete to determine its workability
A. Slump test B. Sieve analysis C. Compaction test D.Hammer test
81. Part of drawing that shows all information about compound
A. Detailed drawing B.Site plan C. Sectional drawing D. Elevation drawing
82. Calculate the amount of cement required to produce 3m3 concrete with a mix ratio of 1:2:4 assume
density of cement 1400kg/m3, and wastage and shrinkage factors of 5% and 30% respectively
A. 4200kg B. 273kg C. 819kg D. 600kg
83. Select the type of reinforcement you provide if you want to protect the concrete in a simple beam
from shear stresses
A. Negative bar B. Positive bar C.Stirrups D. Distribution bar
84. A factor that increases the bond between concrete & steel in reinforced concrete work
A. Adding of more water to the concrete during mixing
B. Good oiling of form work before steel is fixed
C. Excess vibration of concrete during compaction
D. Surface deformations and hooks on steel bars
85. Tools used to finish or level the surface of concrete
A. Wooden float B. Steel tape C. Plumb bob D. Try square

86. On two-way slab


A. The reinforcements in longer direction are placed at the bottom and the reinforcements in
shorter direction are placed above
B. The main reinforcement is placed in shorter direction and distribution bars in longer
direction

95. A term which is used to describe the appearance of water on concrete surface is said to
A. Bleeding
B. Consistency
C. Workability
D. Segregation
96. ___________is used to control the horizontal and vertical alignment of walls surfaces and edges
A. Sprit level
B. Hose level
C. Plumb bob
D. Straight level
97. What will be the total number of reinforcement bars provide in a meter length with a spacing of
50mm and having a cover of 25mm?
A. 10
B. 15
C. 20
D. 25
98. What will be the amount of fine aggregate required producing a cubic meter of concrete if0.15m 3 of
water, 0.085m3 of cement and o.465m3 of coarse aggregate is provided under saturated surface dry
condition? Take unit weight of fine aggregate is 2650kg/m3
A. 665kg
B. 795kg
C. 750kg
D. 825kg
99. Which one of the following is correct?
A. Strength of concrete decrease with increase the grade of workability
B. Bleeding can be minimized by increasing the amount of water
C. The workability of concrete tested by cube test
D. With age, the concrete strength will be decrease
100. Elevation drawing is used to:
A. Shows the construction certain elements of the building
B. Show the width , the height of structures exterior materials found on the structures
C. Describe and define specific points which are too small using accurate measurements
D. Show more information than other working drawings
101. ___________is just oxidation of reinforcement bar at the surface which is activated by the
presence of moisture and carbon dioxide
A. Hardening
B. Measuring
C. Rusting
D. Compacting
102. __________are type of reinforcing bars provided with lugs/ribs on the surface of the bar
A. Deformed bar