Brosur WTP

The document details a successful water treatment plant project at PT Muliaglass Container Division in Cikarang, Bekasi, completed in 2020. The plant has a capacity of 50 m3/hour and involves engineering, procurement, and construction activities to convert impure water into clean water for production. Key components include a clarifier system, sand filter, and chemical dosing system, adhering to health regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Brosur WTP

The document details a successful water treatment plant project at PT Muliaglass Container Division in Cikarang, Bekasi, completed in 2020. The plant has a capacity of 50 m3/hour and involves engineering, procurement, and construction activities to convert impure water into clean water for production. Key components include a clarifier system, sand filter, and chemical dosing system, adhering to health regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ENERBA TEKNOLOGI

Water & System Integration

WATER TREATMENT PLANT


SUCCESS STORY AT PT MULIAGLASS CONTAINER DIVISION
CIKARANG, BEKASI

Water Treatment is part of utility unit that is vital, it functions in water treatment is to support the activities of the production itself,
to meet the needs of clean water and drinking water for both home and factory scales. In this case, we have carried out EPC
activities at PT Muliaglass Container Division to process water containing impurities (suspended solids, etc.) into clean water for
cutting production activities.

BRIEF DESCRIPTION
User : PT Muliaglass Container Division
Location : Cikarang, Bekasi
Year : 2020
Project : Water Treatment Plant (WTP)
Capacity : 50 m3/hour
Scope of Work : Engineering, Procurement, Construction
Parameter : PERMENKES RI No. 492/MENKES/PER/IV/2010
Inlet Outlet

Layout / 3D Treatment:
1. Pretreatment & Main Treatment
Clarifier Tank
Clarifier System (separation of
suspended solid)
Sand Filter Tank 2. Post Treatment
Sand Filter

Chemical:
- Coagulant
- Flocculant
Control Panel
- Oxidator

Supply Item:
- Pumps
- Clarifier System
- Sand Filter Unit
- Chemical Dosing System
Pumps - Control Panel
- Control System by PLC & HMI
Chemical Dosing System - Piping & Interconnecting System

PT ENERBA TEKNOLOGI
Head Office & Workshop: Kawasan Industri Pergudangan Taman Tekno
Jl. Raya Tekno Widya, Blok H-11 No. 10, Setu, Setu, Tangerang Selatan, Banten 15314
Phone: +62 21 29662477 | Email: info@enerba-teknologi.co.id
Website : http://www.enerba-teknologi.co.id

You might also like