PD Test Report (Cable)
PD Test Report (Cable)
Test Report
For
IOCL GUJARAT
Document ID : RPT_IOCL_GR_CB_CM_TST_V005
This document is for restricted circulation. No part of this document shall be reproduced, stored in retrieval system or transmitted
in any form or by any means – recording, photocopying, electronic and mechanical without prior permission of NCEPL.
Test Report for On Line Partial Discharge Testing at IOCL Gujarat
Refinery (WO :26807898 Dated: 06/02/21)
Reference:
Tender No JC20ELT221
Customer Details:
Contents
1 Executive Summary ................................................................................................... 6
3 Methodology ............................................................................................................... 8
a) PD-74 ..................................................................................................................................................................... 8
b) PD-30 ..................................................................................................................................................................... 8
c) Prycam Portable ..................................................................................................................................................... 8
d) PD-13 ..................................................................................................................................................................... 8
1 Executive Summary
Background:
Navitus Controls & Equipment (P) Ltd (NCEPL) received a contract from IOCL Gujarat refinery for online partial
discharge monitoring of 33kV cables, HT transformer & motor termination box, Transformer main tank, 33kV,
11kV, 6.6kV switchgears. The contract has defined the test procedures and also mentioned the type of sensors
that are to be used for testing each of the target assets. However, NCEPL not only complied with the stated
procedures and the type of sensors specified against each type of the asset but also deployed additional
sensors to achieve better sensitivity for the tests performed. The following table describes the sensors specified
in the contract and the additional tests performed by NCEPL team for achieving higher sensitivity and data
comparison among various sensors for better accuracy.
Type of asset Tests performed as per SOW in the Additional tests Remarks
tender performed by NCEPL
Cable EMI based PD test in HF range, TeV/ Contact type acoustic
terminations & UHF at the cable terminations and testing at the
cable accessible joints. 72 hrs.Continuous terminations and
monitoring in case of high PD activity accessible joints for data
with rising trend. corroboration
The project envisages repeated testing of the target assets based on their criticality. In the 7th Phase of the
project NCEPL tested the following assets.
NCEPL team has followed a proven testing methodology and has collected the On Line PD data of these target
assets for detail analysis. Depending on the outcome of the analysis, NCEPL team has classified the assets
into different categories based on their criticalities. NCEPL team has also provided specific recommendations
against each type of criticality. Recommendations provided are based upon NCEPL experience against various
types of discharges.
The progression of PD is a complex activity and depends on many factors making it almost impossible to
predict the time to failure for these PD pulses. It is through repeated testing IOCL has to determine the trend
analysis and a fast-increasing trend is what is most critical and requires immediate intervention. Hence it is
helpful to have the failure history of the target assets before any On Line PD Monitoring is performed on an
asset.
The assets with criticality ORANGE should be immediately inspected. The detailed recommendations were
provided in the detailed report later in the document. However, the criticality marked in YELLOW shall also be
inspected as per the recommendations. Failure history shall be shared for more accurate criticality assignment.
Conclusion:
NCEPL team has completed the 5th Phase of the testing and shall undertake the next phase in close
coordination with the IOCL team. Meanwhile, NCEPL urges IOCL to open the assets marked critical and look
for physical marks/ traces of PD in these assets. If found these deteriorations need to be fixed and the assets
can be re-tested after that.
Navitus Controls & Equipment (P) Ltd (NCEPL) received an order from M/S India Oil Corporation
Limited, Gujarat refinery for the online partial discharge testing of the following:
1. Condition assessment of HT 11/33 kV switchgears- 1200 EA
2. Localization of PD activity in 11/33kV switchgears- 100 EA
3. Online PD testing of 6.6kV switchgears- 1848 EA
4. Localization of PD activity in 6.6 kV switchgears- 50 EA
5. Online PD testing of 33 kV cables- 880 EA
6. Cables, cable joints & end termination- 360 EA
7. Diagnostic testing of HT cables- 20 EA
8. 72 hrs continuous monitoring of PD in critical cables- 10 EA
9. Online PD testing of transformer terminal box & motor terminal box- 2240 EA
10. PD monitoring of transformer main tank through UHF drain valve sensors- 10 EA
11. Diagnostic testing of transformers- 8 EA
12. Condition monitoring of HT/ LT motors- 5 EA
13. Diagnostic testing of VCBs of HT panels- 10 EA
Testing modalities were defined by IOCL in the tender as follows:
1. For 11 & 33kV switchgears, PD monitoring shall be done in UHF range using UHF sensors.
2. For PD localization, HFCT/ UHF/ Ultrasonic/ offline PD test shall be carried out for locating the PD in
the switchgear (33 kV & 11kV)
3. For 6.6 kV switchgears airborne acoustic & TeV technology shall be used for PD identification &
localization.
4. For 33kV cables, cable terminations and the whole cable shall be tested through EMI/ HFCT based
sensors & TeV or UHF sensors at the terminals.
5. Critical cables shall be subjected to 72 hrs of continuous monitoring.
6. 6.6 kV transformer terminal box & motor terminal box shall be monitored using air-borne acoustic &
TeV. PD testing has also been done using EMI based sensors for HT motors.
7. PD identification inside the transformer tank shall be done through UHF drain valve sensors.
8. Location of PD in transformers shall be done through four acoustic & one HFCT sensor technology.
NCEPL engineers used multiple On Line PD Testing equipment to ascertain the test results as per the
technology requirement guided in the work order/ tender. The equipment that were used are:-
PD-13 (Acoustic & HFCT based device for location analysis in switchgears
3 Methodology
NCEPL deployed four partial discharge monitoring devices for comprehensive PD monitoring of the
assets listed in the work order of IOCL to NCEPL. The devices are:-
a) PD-74
b) PD-30
c) Prycam Portable
d) Prycam Grids
e) PD-13
f) PD-71
a) PD-74
PD-74 is an HFCT based Cable PD monitoring device. It has three channels viz: Acoustic channel,
High frequency channel &Ultra high frequency channel. It has the following features:-
Real-time PD measurement with provision for Acoustic, HF & UHF range of measurements
in one single unit.
Provision for both Wideband & Narrow band spectrum measurement &analysis.
PRPD, 3D & PD Expert features are available in the unit itself. No requirement of laptop at
site as the unit has a well-defined HMI.
Apart from cables it can also be used for PD measurements in GIS, AIS & HV Switchboards.
b) PD-30
The PD-30 has the following features:-
PD-30 is a TeV& Acoustic measuring instrument.
Data archiving capability in the acquisition unit itself. So it can be easily handled at site for
data acquisition &viewing.
PD-30 is suitable for Cables &HT switchgear.
c) Prycam Portable
The Prycam portable is an EMI antenna based PD monitoring device. It captures PD signals in high
frequency range. The device has the following features:-
Traffic light indication (Green/Yellow/Red) in the power cycle providing an easy
understanding of the health of the asset (Basic mode).
PRPD, Spectrum, Pulse characteristics using waveform analysis, PRPD data filter, Pulse
count, intensity & amplitude for more refined and detailed analysis if the Traffic light is Red
(Advanced/Premium mode).
Data saving option along with the feature for uploading the data in Prysmian cloud for data
retrieving & analysis at a later stage using any i-pad with Prycam software installed with all
the data & photographs from any location.
d) PD-13
Possible Corona
33 SS End 4 N/A N/A 17.15
174 Cable 1 Discharge Moderately Low Critical PD
33 TR End 0 N/A N/A 19.87 Noise
C37 TR-11D B Phase
33 SS End 0 N/A N/A 20.65 Noise
175 Cable 2 Low Critical PD
33 TR End 1 N/A N/A 22.98 Noise
33 SS End 0 N/A N/A 54.93 Corona Discharge
176 Cable 1 Moderately Low Critical PD
33 TR End 1 N/A N/A 17.01 Noise
C37 TR-11B R Phase
33 SS End 0 N/A N/A 21.17 Noise
177 Cable 2 Low Critical PD
33 TR End 0 N/A N/A 14.07 Noise
33 SS End 2 N/A N/A 20.66 Noise
178 Cable 1 Low Critical PD
33 TR End 0 N/A N/A 33.07 Noise
C37 TR-11B Y Phase
33 SS End 2 N/A N/A 21.37 Noise
179 Cable 2 Low Critical PD
33 TR End 0 N/A N/A 31.03 Noise
33 SS End 4 N/A N/A 20.66 Noise
180 Cable 1 Low Critical PD
33 TR End 1 N/A N/A 23.87 Noise
C37 TR-11B B Phase
33 SS End 1 N/A N/A 17.00 Noise
181 Cable 2 Low Critical PD
33 TR End 2 N/A N/A 24.07 Noise
SS-39
182 SS39 OG TO DUMAD-1 Cable 1 33 SS-39 End 4 N/A N/A 46.06 Noise Low Critical PD
FDR
183 Cable 2 33 SS-39 End 3 N/A N/A 50.31 Noise Low Critical PD
184 Cable 1 33 SS-39 End 0 N/A N/A 19.09 Corona Discharge Moderately Low Critical PD
SS39 to DUMAD-2 FDR
185 Cable 2 33 SS-39 End 0 N/A N/A 34.72 Noise Low Critical PD
Cable 1 33 Reactor End 17 N/A N/A 189.1 Internal Surface Discharge Moderately High PD
SS39 REACTOR-11/C
186
CABLES Cable 2 33 Reactor End 12 N/A N/A 11.38 Internal Surface Discharge Moderately Low PD
Moderately Critical PD is
Cable 1 33 Reactor End 4 N/A N/A 46.36 Internal Surface Discharge
SS39 REACTOR-1 O/G observed
187
CABLES Moderately Critical PD is
Cable 2 33 Reactor End 6 N/A N/A 48.39 Internal Surface Discharge
observed
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2 3 4
TeV (dBmV) 2 0 0 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2 3 4
TeV (dBmV) 6 2 0 1
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of the four
cables was not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
th
6th Phase 7 Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
th
6th Phase 7 phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2 3 4
TeV (dBmV) 4 5 1 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of the four
cables was not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
th
6th Phase 7 phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
th
6th Phase 7 Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TeV SS end
Cable R Y B
TeV (dBmV) 2 1 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. R Phase
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
2. Y Phase
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
3. B Phase
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result of SS End
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:-
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable R3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable Y3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
7. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
9. Cable B3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R Y B
TeV (dBmV) 1 1 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable Y
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable B
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 R3 Y1 Y2 Y3
TeV (dBmV) 0 1 1 4 3 7
Cable B1 B2 B3
TeV (dBmV) 3 2 5
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable R3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 6th Phase
PRPD Pattern
7. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
9. Cable B3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all
the cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable R3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
7. Cable Y3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable Y4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
9. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
10. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
11. Cable B3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 R3 R4
TeV (dBmV) 1 1 1 1
Cable Y1 Y2 Y3 Y4
TeV (dBmV) 0 2 1 0
Cable B1 B2 B3 B4
TeV (dBmV) 1 1 1 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable R3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable R4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
7. Cable Y3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable Y4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
7. Cable B3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable B4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R Y B
TeV (dBmV) 0 2 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:-
1. Cable R
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable Y
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable B
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 R3 Y1 Y2 Y3
TeV (dBmV) 0 1 1 2 3 4
Cable B1 B2 B3
TeV (dBmV) 2 6 7
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable R3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable Y3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
7. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
9. Cable B3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R Y B
TeV (dBmV) 9 6 4
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable Y
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable B
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 R3 R4 Y1 Y2
TeV (dBmV) 1 0 3 2 15 8
Cable Y3 Y4 B1 B2 B3 B4
TeV (dBmV) 7 11 15 12 11 12
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
12 cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable R3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable R4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
7. Cable Y3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
8. Cable Y4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
9. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
10. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
11. Cable B3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
12. Cable B4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5.15 SS 37 BUS -A
The feeder has 5 cables.
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable 5
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result SS 37 End
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
CGP-II End
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result of CGP2 End
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result of CGP2 End
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:-
Cable R Y B
TeV (dBmV) 4 2 4
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables from both ends. The result is as
follows:
1. Cable R
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not
known
Advanced Test result
5th Phase 6th Phase
PRPD Pattern
2. Cable Y
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not
known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable B
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): unknown
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result : In S/S-38 End
6th Phase 7th Phase
PRPD Pattern
5. Cable 5
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SS-38 END
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SS-39 END
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SS-38 End
6th Phase 7th Phase
PRPD Pattern
5. Cable 5
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SS-37 End
6th Phase 7th Phase
PRPD Pattern
2. Cable2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SS-37 End
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not
known
Advanced Test result: SS-37 End
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SS-37 End
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R Y B
TeV (dBmV) 1 1 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables from both ends. The result is as
follows:
1. Cable R
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable Y
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
5th Phase 6th Phase
PRPD Pattern
3. Cable B
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2 3
TeV (dBmV) 0 2 4..
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2 3
TeV (dBmV) 0 0 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
th th
6 phase 7 Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable 5
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable 5
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SWGR END
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: SWGR END
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result:
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result:
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 4
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 0 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 1 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2 3 4 5
TeV (dBmV) 0 4 2 1 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable 3
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable 4
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable 5
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 10 12
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 13 12
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 10 12
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 Y1 Y2 B1 B2
TeV (dBmV) 2 1 4 6 0 1
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 Y1 Y2 B1 B2
TeV (dBmV) 5 1 0 0 0 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 Y1 Y2 B1 B2
TeV (dBmV) 0 1 2 1 4 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 Y1 Y2 B1 B2
TeV (dBmV) 0 0 2 2 4 1
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. CableR2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 4 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 0 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result Sub Station End
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 17 12
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: Reactor End
7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: Reactor End
7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 4 6
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows:
2. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: Reactor End
7th Phase
PRPD Pattern
4. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result: Reactor End
7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 Y1 Y2
TeV (dBmV) 2 3 1 0
Cable B1 B2
TeV (dBmV) 2 1
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
six cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows.
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
TEST-1
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable R1 R2 Y1 Y2
TeV (dBmV) 2 4 1 0
Cable B1 B2
TeV (dBmV) 1 2
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheath of all the
six cables was not available.
TEST-3
Test-3 has been conducted through EMI based device, of all the cables. The result is as follows
1. Cable R1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable R2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
3. Cable Y1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
4. Cable Y2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5. Cable B1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
6. Cable B2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 1
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 2 4
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the two
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 4 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the two
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 4 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 4 3
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for all the cables of the feeder. The result is as follows:
Cable 1
TeV (dBmV) 8
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for the cable of the feeder. The result is as follows:
Cable 1
TeV (dBmV) 0
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
5.55 SS61TR-61021
TEST-1
The TeV test has been carried out for the cable of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 6 9
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for the cable of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 6 8
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for the cable of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 3 7
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are as follows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
The TeV test has been carried out for the cable of the feeder. The result is as follows:
Cable 1 2
TeV (dBmV) 6 8
TEST-2
Test-2 has not been conducted through HFCT based device as the common earth sheaths of the
three cables were not accessible.
TEST-3
Test-3 has been conducted through EMI based device in advanced mode, of all the cables. The
results obtained are asfollows:
1. Cable 1
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern
2. Cable 2
Cable details
Type XLPE
Length Not Known
No of joints Not Known
No of cores 3
Voltage level 33 kV
Failure History (If any): Not known
Advanced Test result
6th Phase 7th Phase
PRPD Pattern