MFMA Report 2023-24
MFMA Report 2023-24
GENERAL REPORT
ON LOCAL
GOVERNMENT
AUDIT OUTCOMES
2023-24
Scan to download this report
ANNEXURES
Annexures containing information on the following are available on our reports website:
• Annexure 1: Auditees’ audit outcomes; areas qualified; and findings on
performance reports, compliance, specific risk areas and unauthorised,
irregular, as well as fruitless and wasteful expenditure
• Annexure 2: Auditees’ financial health indicators, supply chain management
findings and root causes
• Annexure 3: Auditees’ audit opinions over the past five years
• Annexure 4: Assessment of auditees’ key controls at the time of the audit
• Annexure 5: Consultant costs
The Auditor-General of South Africa
has a constitutional mandate and, as
the supreme audit institution of South
Africa, exists to strengthen our country’s
democracy by enabling oversight,
accountability and governance in the
public sector through auditing, thereby
building public confidence.
CONTENTS
FOREWORD FROM THE AUDITOR-GENERAL 4
EXECUTIVE SUMMARY 6
01 INTRODUCTION 14
1.1 The local government system 16
1.2 Planning, budgeting, monitoring and reporting process 18
1.3 Human resource and consequence management 23
02 AUDIT OUTCOMES 24
2.1 Overall audit outcomes 25
2.2 Financial statements 32
2.3 Performance reports 41
2.4 Compliance with key legislation 51
2.5 Disclaimed audit opinions 54
2.6 Conclusion 61
07 PROVINCES 170
7.1 Overview 170
7.2 Eastern Cape 183
7.3 Free State 186
7.4 Gauteng 189
7.5 KwaZulu-Natal 192
7.6 Limpopo 196
7.7 Mpumalanga 199
7.8 Northern Cape 202
7.9 North West 206
7.10 Western Cape 210
The messages in my last three general reports have been aimed at the local government administration
that took office in 2021 – the new mayors, speakers and council members who were elected to represent
their communities. I called on them to work with urgency to overhaul a local government characterised
by insufficient accountability, failing service delivery, poor financial management and governance,
weak institutional capability and widespread instability.
Each year, I also engaged with those in national and provincial government tasked with overseeing and
supporting local government, including premiers, ministers, members of executive councils and portfolio
committees in provincial legislatures and Parliament, imploring them to intervene and assist municipalities
that were failing.
Despite the commitments made in response to these calls, action has been too slow and has had little
impact on the lived realities of South Africans.
Three years into the administrative term, metros still struggle to take the lead in ensuring service delivery to
all their residents in a financially responsible manner. Actions taken to eradicate disclaimed audit opinions
have had little impact in 2023-24 and more municipalities regressed into this category. Municipal finances
are severely troubled and, even though funds are constrained, mayors, councils and municipalities are
displaying little fiscal discipline. Money paid by residents and funded from the national purse is often
wasted through poor financial and procurement decisions and project failures.
Failure at municipal level has a direct and significant impact across South African cities and towns.
Residents and businesses face regular disruptions in service delivery and have to contend with water
leaks, potholes and filth in their streets. Municipalities are operating landfill sites in an irresponsible manner
and are neglecting wastewater treatment works, displaying a blatant disregard for the environment and
the impact that the resultant pollution has on the wellbeing of nearby communities. Communities are yet
to experience quality service delivery through new and well-maintained infrastructure, despite national
government making available R68,4 billion for infrastructure projects in 2023-24.
Despite continued advocacy for intergovernmental support and collaboration, the opposite is evident in
the lack of partnership among the three spheres of government at most municipalities and in the weak
oversight by provincial legislatures and Parliament – particularly at metros. Where the political leadership
of municipalities respond well to the support and guidance provided by national and provincial
government, improved governance follows.
I again implore the mayors, speakers and council members of municipalities to use the remaining year
of their term in service of their constituents and to leave a legacy of improved governance and delivery.
I also call on national and provincial government to work with local government to improve institutional
capability. Legislation is clear on what the responsibilities of mayors, councils and executive authorities
are – it is the diligent and effective implementation of these responsibilities that is lacking.
As an office, we will continue to share our insights widely, advance tailored recommendations and advocate
for leadership at all levels of government to play their part in shifting the culture in local government.
I thank the audit teams from my office and the audit firms for their diligent efforts in helping us fulfil our
constitutional mandate and for continuing to strengthen cooperation with government leadership. I also
want to thank the leadership of all municipalities, municipal entities and provinces for working with us
during the audit process.
I remain convinced that capable, cooperative, accountable and responsive institutions delivering on their
mandates in national, provincial and local government is the key to municipalities that are characterised
by sustained strong performance, accountable leadership and employees, transparent systems and
processes, as well as solid institutional integrity.
I therefore encourage the administrative and political leadership in all three spheres of government to
use the information and insights presented in this report to enable the much-needed improvement at
municipal level and in the lives of our country’s citizens. I am hopeful that this report will encourage all
South Africans to be active participants in the accountability ecosystem.
All spheres of government have a role to play in improving local government and ensuring that services
are delivered to all South Africans. Arresting the decline of local government will require our collective
action. I also call on civil society, business and citizens to make it their business to make local government
work. As the Auditor-General of South Africa, we will continue to execute our mandate without fear,
favour or prejudice.
Tsakani Maluleke
Auditor-General
In our previous general report, we raised the alarm that there has been little change in the poor
state of affairs in local government since the end of the 5th administration’s term. We also reported
that, despite commitments made for improvement, action has been too slow and has had little
impact on the lived realities of South Africans.
Our call to action was again directed to the political leadership of municipalities, urging them to
instil a culture of performance, transparency and institutional integrity, and to be accountable to
the communities they serve. We also reminded them that there is limited time left in their term to
leave a legacy of improved governance and service delivery.
Based on the overall audit outcomes in 2023-24, the results from the detailed work that we
performed at metropolitan municipalities and municipalities with disclaimed audit opinions, and
the matters that we identified as posing significant risks to municipal service delivery, we can only
conclude that little has changed and that local government remains in a dire state.
AUDIT OUTCOMES
The trend of poor audit outcomes continued, with only 41 municipalities (16%) obtaining clean
audits. While 59 municipalities have improved their audit outcomes since 2020-21 (the last year of
the previous administration), 40 have regressed.
Thirteen municipalities did not submit their financial statements and performance reports for
auditing by the legislated date. Seven of these municipalities (five of which are in the Free State)
disregard the legislated requirement and submit their financial statements and performance reports
late every year – or do not submit them at all. In 2023-24, these seven municipalities managed a
combined budget of R6,85 billion.
A disclaimed audit opinion is the worst opinion a municipality can get as it means that we could
not find evidence for most of the information in its financial statements. The lack of transparency in
how these municipalities use public funds and deliver services significantly weakens accountability,
In 2023-24, the most common outcome was an unqualified audit opinion with findings – which
99 municipalities (39%) received. This is not an outcome to celebrate or to stay in. While the opinion
on these municipalities’ financial statements may be unqualified (often due to corrections made
based on our findings), the material findings on performance mean that their performance reports
are not credible, while the material findings on compliance signal a disregard for legislation or
significant lapses in control. These 99 municipalities could easily lose their unqualified status if they
do not address the remaining challenges in their control environment. We also remain concerned
that not enough attention is being paid to the significant weaknesses in meeting performance and
compliance obligations and the resultant impact this has on the lives of South Africans.
Overall, the outcomes in the three areas that we audit each year paint a picture of municipalities
that do not have the institutional capability to produce credible and useful financial and
performance reports. They also do not have the institutional integrity to ensure that municipal
leadership and officials consistently behave ethically, comply with legislation, and act in the best
interest of the municipality and its residents.
In summary, the 2023-24 audit results for the 247 municipalities at which the audits had been
completed by 31 January 2025 (the cut-off date for inclusion in this report) were as follows:
1. A total of 107 municipalities (43%), mainly in the Eastern Cape, Northern Cape and North
West, received modified audit opinions due to material misstatements in their financial
statements – 90 (35%) received qualified audit opinions, six (2%) received adverse audit
opinions and 11 (4%) received disclaimed audit opinions. Of the 99 municipalities that
received unqualified audit opinions with findings, 77 (31%) did so by relying on the
audit process to identify errors in their financial statements that they then corrected.
2. A performance report should include information that is useful for both the council and the
public to determine if the municipality delivered on its core mandated functions (such as
delivering basic services) and is on track to deliver on its integrated development plan. The
reported achievements must also be reliable. We reported material findings on the usefulness
and reliability of the information included in the performance reports of 119 municipalities
(48%). The poor-quality performance reports were most prevalent in the Free State, Northern
Cape and North West. As is the case with the financial statements, many municipalities –
63 in total (26%) – managed to avoid material findings by relying on the audit process to identify
misstatements that they then corrected.
The poorly prepared performance reports and significant activity required to make corrections
in response to our audits also raise questions about the credibility of the in-year reporting
and the effectiveness of performance monitoring throughout the year. The lack of proper
planning and effective in-year monitoring, along with unreliable information being used for
accountability and decision-making processes, contribute to the lack of service delivery by
local government.
3. Non-compliance with legislation remained high, with 206 municipalities (83%) materially not
complying with key legislation. A total of 201 municipalities (81%) received material compliance
findings in all three years of the current administration, indicating a clear disregard for
compliance with limited consequences. Non-compliance has resulted in irregular expenditure
of R87,03 billion having been incurred over the three years of the current administration.
Municipalities with clean audits, particularly those that have sustained this status over several years,
are generally characterised by sound financial and performance management disciplines and
perform their functions in accordance with applicable legislation. The well-functioning control
environment and good systems at these municipalities form a solid foundation from which councils
can prioritise further improving the performance and service delivery of their municipalities. The
25 municipalities that have sustained their clean audit status every year since 2020-21 continue to
be an example of what is possible.
• Municipal managers, mayors and councils all contributed to poor financial management
in municipalities. Councils again adopted unfunded budgets in 2023-24, contrary to advice
given by the national and provincial treasuries. A budget is unfunded when the budgeted
expenditure is more than the projected revenue. When the mid-year adjustments budget was
done, most of the adjusted budgets remained unfunded, resulting in 113 municipalities (44%)
operating with unfunded budgets.
Of the 113 municipalities that adopted unfunded budgets, 91 (81%) incurred unauthorised
expenditure. Of these 91 municipalities, 53 (58%) of which the audits had been completed
at the cut-off date, incurred deficits. Municipalities with unfunded budgets, unauthorised
expenditure and deficits were most prevalent in the Free State, Gauteng and North West.
Municipalities lost revenue because they did not bill or collect all revenue owed to them, and
they estimated that 67,80% of the revenue that they disclosed in their financial statements
would not be recovered. Water and electricity losses due to infrastructure neglect accounted
for an additional R37,28 billion in lost revenue.
The limited funds that municipalities had were also not spent carefully. The main reasons
for the continuing financial losses and waste were widespread poor payment practices,
uncompetitive and uneconomical procurement practices, limited value and benefit received
for money spent, and weaknesses in project management.
As a result, the financial health of municipalities remains weak. Poorly managed local
government finances directly affect municipalities’ ability to deliver the promised services to
their communities and place further pressure on the already constrained public purse. Creditors
are not paid within legislated timelines, and the debt owed to Eskom and the water boards
remains high and continues to increase. The Eskom debt-relief programme was intended to
provide some relief to municipalities that struggled to pay the electricity supplier, but 53 of the
participating municipalities (84%) are not complying with the conditions of the programme.
If these debts are not paid, communities are left without access to basic services such as
electricity and water. This also makes it difficult for businesses to operate optimally, further
adding to the struggling economy.
The desired impact of national and provincial interventions to help financially distressed
municipalities deal with their challenges has not yet been realised. We urge them to continue
and intensify this support.
• Our audit work incorporated numerous site visits to inspect the progress and quality of
infrastructure projects. We identified deficiencies at 87 of the 113 projects (77%) that we visited.
We found that, all too often, work on projects is delayed, costs more than planned and is of
poor quality. New infrastructure is also not commissioned for use upon completion. Existing
infrastructure continues to deteriorate because it is not properly maintained and safeguarded.
• Municipalities depend on service providers and contractors to deliver on their projects and
programmes and to support their operations. Continued non-compliance with procurement
legislation leads to unfair and uncompetitive processes, which often result in financial losses
and contractors not delivering the goods or services for which they were contracted.
One of the root causes of project failures and financial loss is poor contract management
and a reluctance to hold suppliers accountable for late and poor-quality delivery. In total,
214 municipalities (87%) had findings on non-compliance with procurement and contract
management legislation in 2023-24. At 155 municipalities (63%), these findings were material.
• The lack of consequences in local government will continue to slow progress towards improved
service delivery and financial performance. In 2023-24, 132 municipalities (53%) did not comply
The lack of consequences is most evident in the areas of poor and slow responses to investigating
allegations of financial and supply chain management misconduct and fraud indicators; not
investigating and/or not properly dealing with unauthorised, irregular, and fruitless and wasteful
expenditure; and material non-compliance with legislation on consequence management.
METROPOLITAN MUNICIPALITIES
In 2023-24, the eight metropolitan municipalities (commonly known as metros) were responsible for
service delivery to 8,9 million households – 46% of all households in the country. The metros and their
municipal entities were responsible for 57% of the estimated local government expenditure budget.
Metros typically have better capacity and bigger budgets and can more easily attract suitably
skilled and competent professionals. Therefore, their audit outcomes are expected to be better and
they should be setting an example to other municipalities. However, the overall audit outcomes of
metros have continued to regress since 2020-21.
We do not audit the performance of metros but, through our work on their financial statements,
performance reports, and infrastructure and environmental management, we identified that both
their financial and service delivery-related performance are at risk.
Metros are plagued by poor revenue management, debt collection and budgeting practices,
coupled with financial losses due to poor-quality spending. Metros have listed debt and significant
loans to service, while they are financially strained. City of Tshwane and Mangaung metros have –
for at least the past four years – disclosed significant doubt on their ability to continue fully operating
as a going concern.
Five metros did not comply with environmental management legislation, including not
having valid operating licences for their wastewater treatment works and landfill sites, and
not maintaining or safeguarding their wastewater treatment works. Infrastructure neglect and
non-compliance with environmental management often result in harm to the public. Since
2021, we have notified accounting officers at five metros and three municipal entities of
15 material irregularities related to the poor management of wastewater treatment works and
landfill sites.
As is the case with other municipalities, metros must be transparent in their financial and
performance reporting and display financial accountability to enable them to perform well
financially and deliver in line with their planned objectives. Four metros received modified opinions
on their financial statements, while six had material findings on their performance reports.
Institutional integrity refers to the importance of metros institutionalising controls to ensure that
leadership and officials behave ethically, comply with legislation, act in the metro’s best interest
and avoid conflicts of interest. Through our audits, we identified a lack of such institutional controls.
This was most evident in the lack of compliance with legislation by all metros, except City of Cape
Metros can only achieve their goals and objectives effectively with sufficient institutional capability.
In other words, they need resources, skills, strong governance and effective management; good
systems, processes and controls; and effective coordination and collaboration between different
stakeholders, both within and outside the metro. In this report, we highlight that these capabilities
are not in place, as evidenced by weak internal controls, a lack of integration and coordination
of functions, instability in key leadership positions, and ineffective internal audit units and audit
committees. Our 2023-24 audits also revealed significant deficiencies in the information technology
environment of metros, along with cybersecurity vulnerabilities, as these areas are not prioritised
and information technology is not viewed as a strategic enabler.
The lack of accountability at most metros is clear from the slow response to unauthorised, irregular,
and fruitless and wasteful expenditure, as well as the ineffective accountability structures and
processes that we observed. It is rare for metro leadership (including mayors) to account to
provincial legislatures and Parliament.
IMPACT
When municipalities do not effectively manage their performance, finances and infrastructure,
it directly affects the delivery of key government priorities that are intended to improve the
lives of South Africans. Services and infrastructure in the basic areas of water, sanitation, waste
management, electricity, housing and roads are not consistently and sustainably delivered, despite
the budgeted funds being spent. Deteriorating living conditions and harm caused by polluted
water sources and landfill sites are also widespread.
When money and resources are wasted, there are reduced funds available for service delivery
priorities and, eventually, there is a greater burden on taxpayers. The lack of credible reporting
on performance and finances weakens not only municipal accountability processes, but also
the councils’ ability to assess municipalities’ performance or make decisions in response to
underachievement.
MATERIAL IRREGULARITIES
The nature of the material irregularities that we have identified, since the Public Audit Act was
amended in April 2019, mirrors the rising concerns on which we have been reporting.
Money is being lost through non-compliance with legislation and suspected fraud, and we have
identified 285 material irregularities in this area with an estimated financial loss totalling R8,74 billion.
This includes payments made for goods and services that were not received, were of poor quality,
were not in line with contracts or were to ineligible beneficiaries (72); Eskom, the water boards,
lenders and suppliers not being paid on time, resulting in interest charges (56); the inefficient use of
resources, resulting in no or limited benefit for the money spent (40); revenue lost due to revenue
not billed, debt not recovered or unrecorded receipts (39); uneconomical procurement and
procurement non-compliance, resulting in overpricing of procured goods and services (20); and
assets not being properly maintained and safeguarded (20).
In total, 48% of the 446 material irregularities that we have identified in local government since 2019
have been resolved by auditees:
• preventing or recovering financial losses (an estimated R1,32 billion has been recovered, is in
the process of being recovered or has been prevented)
• preventing further harm to the general public and public sector institutions
Where the material irregularities were not dealt with swiftly or with the required seriousness, we
included recommendations in audit reports, took remedial action and referred matters to relevant
public bodies for investigation. The number of material irregularities where we have to use our
powers increases every year.
The material irregularity process is not yet having the desired impact in local government, due
largely to instability in accounting officer positions; a slow response by accounting officers to
our notifications, recommendations and remedial actions; prolonged investigations or delays
in concluding criminal proceedings; and delays in disciplining officials. Where we escalate the
non-responsiveness to mayors and provincial government leaders, it is rare for them to act or for
their actions to have a significant impact.
Some roleplayers in the accountability ecosystem and other public bodies have mandates
and powers similar to, or more comprehensive than ours, which they should use to ensure that
irregularities are dealt with swiftly and that similar instances are prevented.
CALL TO ACTION
We repeat our call from previous general reports that all roleplayers in the local government
accountability ecosystem should work deliberately and with urgency towards a culture of
performance, accountability, transparency and institutional integrity.
There is only a year left in the current administrative term for mayors, speakers and council members
of municipalities to leave a legacy of improved governance and service delivery.
Through the insights from our audits and our experience with the material irregularity process, we
identified three main shortcomings in local government that hold back progress, and we have
reported on these root causes throughout the current administrative term. They are:
• governance failures
1. Build capable institutions with intergovernmental support: Support from all spheres of
government – through coordinated and collaborative efforts in partnership with municipal
leadership – is needed to promote strong governance within municipalities.
2. Professionalise and capacitate local government: Skills and capacity gaps can be addressed
through a concerted effort to support and implement local government professionalisation
initiatives. In pursuing professionalisation, all roleplayers should strive towards a future in which
local government is a career of choice for professionals and where scarce skills can thrive and
be retained.
We also have a direct call to action to the political leadership in all three spheres of government
and the elected representatives of the citizens in councils, Parliament and the provincial legislatures:
diligent oversight and decisive action on municipal failure will change the local government culture.
This report and our call to action are directed to the mayors, councils and executives in national and
provincial government and provincial legislatures that are failing in their oversight duties and allowing
local government to deteriorate.
Local government processes and oversight responsibilities are well-defined in legislation. The mayor
and council have key responsibilities in municipal planning, budgeting, monitoring, reporting and
accountability processes. In our audits, we identified that at the worst performing municipalities,
these officials are either not doing what legislation requires of them or are not performing their duties
effectively.
If municipalities are failing in their reporting responsibilities, are not performing well or are not
addressing our findings, legislation enables national and provincial government and the legislatures
to ensure that the required corrective action is taken – and even to intervene where necessary.
However, we found that members of the executive councils for local government did not comply in
this area, while provincial legislatures provided little to no oversight. The provinces in which we raised
these findings are also those that received poor audit outcomes, namely the Eastern Cape, Free
State, Limpopo, Northern Cape and North West.
The most recent consolidated report on municipal performance and the responses to issues raised
in our audit reports, tabled by the cooperative governance minister in Parliament in January 2025,
related to the 2020-21 financial year. This backlog disempowers Parliament and prevents it from
making a meaningful contribution to improving municipal performance.
We urge all roleplayers in the accountability ecosystem to fulfil their designated roles and to play
their part effectively and without fear or favour to ensure accountability for government spending to
improve the lives of all South Africans.
We remain committed to partnering with and supporting the public sector through our audits, the use
of our expanded powers, as granted by the Public Audit Act amendments, and the many initiatives
that we have implemented to assist and guide all roleplayers in the accountability ecosystem. We
trust that the insights and recommendations in this report will be of value in this pursuit.
Local government is the sphere of government that is closest to South Africans because it provides
the basic services that have a direct impact on their lives. It is meant to operate through an
inclusive, democratic and accountable system enabled by transparency and strong institutional
integrity, with the interests of residents and business being represented by both the people that
they elect and the communities and community organisations that are directly involved through
public participation processes.
To achieve these goals, deliver services and ultimately provide a better lived experience for
the people in the towns and cities across South Africa, the culture in local government must
be characterised by performance, accountability, transparency and institutional integrity. The
Constitution envisages that such a culture is made up of the basic values and principles that must
govern public administration.
Culture
Accountability
Be responsive to public,
Provide the public, oversight and other
oversight, auditors and stakeholders through
other stakeholders with reporting and providing
timely, relevant and answers on mandated
reliable information on responsibilities fulfilled,
Transparency
institution’s finances, actions taken and
performance, use decisions made; ensure
of resources and swift consequences for
compliance with transgressions and poor
legislation performance
Such a culture should be built on a foundation of institutional capability. In other words, municipalities
and municipal entities should be able to use their knowledge, skills, resources and systems to
effectively achieve their goals and objectives. This institutional capability requires local government
to strengthen its capacity to manage both its operations and the services that it provides.
• Technical knowledge and skills: Relevant expertise is needed for effective functioning.
• Systems, processes and controls: Clear and efficient systems and processes and a strong
control environment are needed to effectively implement policies and programmes.
Despite being independent, local government receives money from national and provincial
government through equitable share and grant funding. Municipalities are required to play their
part in achieving national aspirations as defined in the National Development Plan by participating
in – and delivering on – government-wide and province-specific programmes. The relevant
national or provincial department must monitor all conditional grant spending and take corrective
action when necessary. Each municipality is accountable to its residents directly through a
council. Municipalities are also accountable to the broader citizenry through the reports on local
government that are tabled in provincial legislatures and Parliament, as legislated.
The legislation that applies to municipalities and municipal entities is specific on the processes and
responsibilities of all roleplayers in local government – at the level of the municipal administration,
mayor and council, as well as in the province and nationally. It also defines who should act if a
municipality is failing. The most relevant legislation that we reflect on in this report is the Municipal
Finance Management Act (MFMA) and the Municipal Systems Act (MSA). This legislation, together
with its accompanying and detailed regulations, allows for institutional capability to enable the
envisioned culture of performance, accountability, transparency and institutional integrity.
However, this culture is not what is experienced in local government, mainly because the roleplayers
are not effective in doing what the legislation requires of them.
We have highlighted the important role of the members of the accountability ecosystem in local
government in previous general reports and we have directed our calls to action to them.
Municipal
Municipal public accounts
council committee
Treasuries
Internal audit unit Parliament/ Cooperative
provincial governance
Audit committee legislatures and departments
Mayor and oversight Premiers’ offices
speaker committees
Accounting
Senior officer Coordinating
management institutions
Provincial
Officials leadership
Influence
Active citizenry
The success of local government rests on the ability of the whole accountability ecosystem to
work together – for all roleplayers to not operate only in silos, but function collaboratively with
an awareness of how their respective roles influence and complement each other. If any part
of the ecosystem fails to effectively play its unique legislated role, this reduces the effectiveness
of the ecosystem as a whole. It also means, in the case of poor audit outcomes, that the entire
accountability ecosystem has failed – up to executive and oversight levels.
In our audits, we focus on the legislated responsibilities of those in the accountability ecosystem
responsible for the planning, budgeting, monitoring and reporting process; human resource
management; and the implementation of consequences for transgressions and poor performance.
The effectiveness of the process is heavily dependent on timely, relevant and reliable financial and
performance reports. To ensure that the reports used for oversight and monitoring include relevant
and reliable information, some of the roleplayers in the accountability ecosystem also have an
assurance role. During the financial year, this role is fulfilled by senior management, accounting
officers, internal audit units, audit committees and mayors. As the national audit office, we function
as an independent external assurance provider that is responsible for providing assurance on the
annual financial statements and performance reports.
The remainder of this subsection details the planning, budgeting, monitoring and reporting process,
as well as the responsibilities of the different roleplayers. Throughout this report, we highlight where
these roleplayers have failed to fulfil their duties.
Community needs
Community
2021
Identify 2026
Five-year integrated development plan desired
impact
S
Community ion and pecif
act tar y p
ve Strategic ge e
National and provincial ecti ts rfo
an rm
National and provincial
rr planning government
government co d
a
e
an oca
k
Parliament and
ll
ce te
ta
d
provincial legislatures
ind reso
an
ica urce
nt
ou
tors s
ACT PLAN
A cc
• Annual budget
• Service
Institution Operational delivery
• Annual report End-year Municipality planning and budget
• Oversight reporting unicipal entity
M and implementation
report Council budgeting plan
• Performance
ction
agreements
CHECK DO
a
ve
b le m
c ti
Im
ud g en
rr e
p
co
et t
al
e
k lo
ca
ta te pl
National and provincial Implementation
d d an
an us
and in-year
r
government ito ing
n
Mo
reporting
In-year reports
The integrated development plans for the 6th administration were adopted by councils in 2021-22.
The annual planning, budgeting and performance agreement process operationalises these plans
and sets each municipality up to perform. National and provincial government also has distinct
roles to play in this process to ensure that municipal budgets are sound and finalised in time.
The mayor (assisted by the municipal manager) coordinates the budget preparation process, which
includes consulting districts and treasuries.
Sections 21, 53 and 68 of the MFMA
The National Treasury may review budgets of metros and intermediate cities, and provincial
treasuries review budgets of other municipalities (as delegated).
Section 5(2) of the MFMA
The council approves the budget and revenue-raising measures (e.g. tariffs) after considering the
views of communities, treasuries or others in national and provincial government.
Section 23(1) of the MFMA
The member of the executive council for local government intervenes if the budget or revenue-
raising measures are not approved in time, which can include dissolving the council and appointing
an administrator.
Sections 26 and 136(3) of the MFMA;
Section 139(4) of the Constitution
The municipal manager drafts the service delivery and budget implementation plan.
Section 69(3)(a) of the MFMA
The mayor approves the service delivery and budget implementation plan after the council has
approved the budget.
Section 53(1)(c)(ii) of the MFMA
The municipal manager drafts the performance agreements for the municipal manager and senior
managers.
Section 69(3)(b) of the MFMA
The mayor ensures that the agreements are linked to measurable performance objectives approved
with the budget and the service delivery and budget implementation plan.
Section 53(1)(c)(iii)(bb) of the MFMA
The mayor enters into a performance agreement with the municipal manager, and the municipal
manager with senior management.
Section 57(2)(b) and (c) of the MSA
The mayor ensures that the service delivery and budget implementation plan is made public no later
than 14 days after it is approved.
Section 53(3)(b) of the MFMA
The administration’s performance is monitored through a process of in-year reporting, but the
effectiveness of this process depends on timely, relevant and reliable reports being submitted and
action being taken to correct deviations or address challenges.
The mayor monitors and may oversee – without interfering – how the municipal manager and chief
financial officer exercise their responsibilities, and ensures that municipal functions are performed
within the limits of the approved budget.
Section 52 of the MFMA
The audit committee advises the municipal manager, the mayor and the council on the adequacy,
reliability and accuracy of financial reporting and information.
Section 166(a)(2)(iv) of the MFMA
The internal audit unit assesses the extent to which performance measurements are reliable in
measuring the municipality’s performance on indicators, and submits quarterly reports on these
assessments to the municipal manager and audit committee.
Regulations 14(1)(b)(iii) and 3(c)(ii) of the Municipal Planning and Performance
Management Regulations
The audit committee reviews the internal audit unit’s quarterly reports on performance measurements
and, at least twice a year, submits a report to the municipal council.
Regulation 14(4)(a)(i & iii) of the Municipal Planning and Performance Management
Regulations
The mayor uses the monthly budget statements and mid-year performance report to check how the
budget and the service delivery and budget implementation plan are being implemented, and to
identify any financial problems. The mayor also submits a mid-year report to the council.
Section 54(1) of the MFMA
The provincial treasury prepares a consolidated quarterly budget statement for municipalities in
the province and makes it public. The member of the executive council for finance submits the
statement to the provincial legislature.
Section 71(7) of the MFMA
The municipal manager may prepare an adjustments budget and revisions to the service delivery
and budget implementation plan for consideration and tabling by the mayor and approval by the
council.
Sections 28(1), 69(2) and 54(1) of the MFMA
In case of serious financial problems, the mayor takes the required actions proposed by the
municipal manager and alerts the council and the member of the executive council for local
government.
Section 54(2) of the MFMA
The member of the executive council for local government assesses the seriousness of the financial
problems and determines if they require provincial intervention.
Section 136 of the MFMA
If intervention is required, the member of the executive council takes appropriate steps for a
mandatory or discretionary provincial intervention.
Chapter 13, part 2 of the MFMA
At the end of the financial year, the performance against the budget and the service delivery
and budget implementation plan should be assessed and corrective action taken for improved
performance. The year-end process also lends itself to assessing individual performance and
ensuring accountability for transgressions and non-performance. The oversight processes enable
the municipality to account to the public and those that had provided funds to the municipality.
Again, assurance providers play a key role in ensuring that this process is effective.
The municipal manager prepares an annual report (which includes the financial statements,
performance report and audit report).
Sections 121–127 of the MFMA;
Section 46 of the MSA
The internal audit unit audits the results of performance measurement (i.e. the performance report).
Section 45(a) of the MSA
The audit committee reviews the annual financial statements to provide the council with an
authoritative and credible view of the municipality’s financial position, efficiency and effectiveness;
and its overall level of compliance with the relevant applicable legislation.
Section 166(2)(b) of the MFMA
The municipal manager responds to questions on the annual report in the council.
Section 129(2) of the MFMA
The council considers the annual report and adopts an oversight report, which is made public.
Section 129(1) and (3) of the MFMA
The municipal manager submits the annual report and oversight report to the provincial legislature.
Section 132(2) of the MFMA
The member of the executive council for local government monitors the submission of these reports
to the provincial legislature.
Section 132(3) of the MFMA
The provincial legislature may deal with annual and oversight reports submitted by municipalities.
Section 132(4) of the MFMA
The member of the executive council for local government compiles and submits to the provincial
legislature and the National Council of Provinces a consolidated report of municipal performance
in the province, which identifies those municipalities that underperformed and proposes remedial
action to be taken.
Section 47 of the MSA
The mayor ensures that the municipality addresses any issues raised in its audit report.
Section 131(1) of the MFMA
The member of the executive council for local government assesses the financial statements of all
the municipalities in the province, along with the audit reports and any municipal responses to them,
and determines if the municipalities have adequately addressed the issues raised in the reports. A
report is then submitted to the provincial legislature on any areas in which municipalities have not
adequately addressed those issues.
Section 131(2) of the MFMA
The minister responsible for local government annually compiles and submits to Parliament a
consolidated report on local government performance, which includes a report on actions taken by
members of the executive council for local government to address issues raised in audit reports on
the financial statements.
Section 48 of the MSA;
Section 134 of the MFMA
Such a state requires effective human resource management, which includes determining how
many staff members are required (and employed), ensuring that job descriptions are in place
and that the posts are funded, and appointing competent officials and ensuring their continuous
development and performance management. The MSA and its accompanying Municipal Staff
Regulations define legislated responsibilities for the council, the mayor and the accounting officer
to manage municipal leadership and officials.
The process and responsibilities for implementing consequences for transgressions and poor
performance are also well-defined in legislation – which we detail in section 3.4.
• Metropolitan municipalities
• Material irregularities
2
A call to action for all roleplayers in the accountability ecosystem
to address the root causes of municipal failures
Accountability is enabled through credible financial statements and performance reports that provide
a transparent account of an auditee’s performance, finances and compliance with legislation (for
example, through the disclosure of irregular expenditure).
Legislation is in place to regulate responsible and effective financial and performance management;
the protection of public funds and resources; and the fiduciary duties of leadership and officials to
behave ethically and act in the best interest of the state, and to ensure that there are consequences
for transgressions and poor performance.
This section focuses on the 2023-24 audit outcomes and the movements in outcomes since 2020-21
(the last year of the previous administration), based on our audits of the financial statements and
performance reports, as well as compliance with key legislation. The cut-off date for inclusion of audit
outcomes in this report was 31 January 2025.
2020-21 41 100 83 4 28 1
Last year
257
of previous
administration
2022-23 34 110 91 6 15 1
257
2023-24 41 99 90 6 11 10
257
16% 39% 35% 2% 4% 4%
Since 2020-21, the audit outcomes of some provinces have regressed, some have remained the same
and some have improved but the overall status continued to be far from desirable. Further insights on
the audit outcomes per province are included in section 7.
2020-21 1 5 2 0 0 0
8 1 3
2023-24 1 3 4 0 0 0
Budget: R295,27 billion (48%)
Households: 8 903 584 (46%)
Intermediate cities
2020-21 5 16 15 1 1 1
39 8 4
2023-24 4 18 14 0 0 0
Budget: R127,49 billion (21%)
Households: 5 251 067 (27%)
District municipalities
2020-21 15 14 10 2 3 0
44 11 5
2023-24 14 18 11 1 0 0
Budget: R39,75 billion (6%)
Local municipalities
2020-21 20 65 56 1 24 0
166 39 28
2023-24 22 60 61 5 11 7
Budget: R99,44 billion (16%)
Households: 5 286 824 (27%)
Municipal entities
2020-21 1 13 1 0 1 0
16 3 0
2023-24 3 12 0 0 1 0
Budget: R56,10 billion (9%)
Total estimated expenditure budget (operating and capital) for municipalities and municipal entities:
R618,05 billion
Total number of households: 19 441 475
Number of households served by metropolitan municipalities, intermediate cities and local municipalities is
based on the National Treasury’s local government equitable share data and formula for 2023-24.
Intermediate cities serve over a quarter of the country’s households. Like metros, they typically have
greater capacity, larger budgets and can more easily attract suitably skilled professionals. However,
their outcomes do not reflect the expected level of financial and performance management.
District municipalities perform certain functions on behalf of local municipalities, such as integrated
planning, infrastructure development, electricity provision and public transport. A district municipality
may be a water services authority and may also provide financial, technical and administrative support
services to a local municipality within its area. Despite some improvement, they are not yet leading by
example with good audit outcomes.
A clean audit is not always an indicator of good service delivery and does not always reflect the lived
experience of all communities in a municipal area. However, a clean audit positions a municipality to
transparently communicate to communities about whether and when their needs will be met through
accurate records, which also enables the different roleplayers in the accountability ecosystem to
make informed decisions.
We have observed that municipalities with institutionalised controls and systems to plan, measure,
monitor and account for their finances and performance, and to stay within the rules, often have a
solid foundation for service delivery to their communities.
uMshwathi Local Municipality (KwaZulu-Natal) improved from a qualified audit opinion with
findings in 2020-21 to an unqualified audit opinion with findings in 2021-22, which it maintained
in 2022-23. In 2023-24, the municipality achieved a clean audit. The improvement was driven
by a strong commitment by both management and leadership to achieve a clean audit,
continue to receive no material findings on its performance report, improve the quality of
the submitted financial statements and address material findings on compliance with key
legislation raised in prior years. The appointment of the chief financial officer in 2022-23
played a crucial role in reinforcing this commitment. Reviews of the financial statements
and performance report and robust monitoring of audit action plans by senior management
and the internal audit unit were intensified to ensure credible and reliable financial and
performance reporting. The municipality’s success can be attributed to a combination of
focused leadership, enhanced financial reporting controls and thorough reviews.
The number of municipalities that received clean audits has increased from last year – but not from
2020-21. In the next subsection, we expand on the many municipalities that have remained in the
category of unqualified audit opinion with findings since 2020-21 and are struggling to improve to a
clean audit status.
12 29 12
A municipality will often find it difficult to sustain a clean audit if it does not have the institutional capability
to maintain and consistently apply its good practices – also when there is instability in key positions.
Hantam Local Municipality (Northern Cape) regressed from a clean audit in 2021-22 to an
unqualified audit opinion with findings in 2022-23, mainly due to the departure of the municipal
manager and the chief financial officer, who were instrumental in driving the positive outcomes.
In 2023-24, the municipality regressed to a qualified opinion with findings on performance
reporting and compliance with key legislation. The head of supply chain and senior accountant
positions also became vacant during this period. This left only one official to perform the
financial functions of the municipality, including adequately preparing and reviewing the
financial statements and implementing proper record keeping. The council did not intervene
and the audit committee’s interventions were limited. A chief financial officer was appointed
in October 2024, which resulted in some improvement in the submission of information, but the
official had limited impact due to being appointed so late in the audit process.
This success was underpinned by practices such as institutionalising and monitoring key controls
(including preventative controls), as well as implementing and monitoring action plans to address
deficiencies. These municipalities were generally characterised by stability in key positions such as
the municipal manager and chief financial officer. Senior management, the municipal manager,
the mayor and the council – supported by the internal audit unit and audit committee – were
committed to fulfilling their monitoring, governance and oversight roles.
Municipalities that sustained clean audit status for four or more consecutive years
2 Northern Cape
Namakwa DM (4 years)
Langeberg Local Municipality (Western Cape) has sustained its clean audit status since
2018-19. There is a strong desire and commitment to achieving a clean audit, with the
municipal manager and senior management prioritising the resolution of audit findings
and decisive action. Stability in the finance unit has created a strong control environment,
with ongoing improvement where necessary. Audit committee recommendations are
taken seriously and addressed promptly, while the internal audit unit plays a crucial role in
identifying control weaknesses early on, which prevents misstatements and non-compliance.
The combination of stability in the administration and institutionalised controls enabled the
municipality to maintain its clean audit status throughout a period of council instability in
2023-24 when there were coalition party disagreements. Its success is driven by focused
leadership, strong financial controls and effective oversight.
In most cases, municipalities in this category received an unqualified audit opinion on their financial
statements only because they corrected misstatements in response to our audit findings. In section 2.2,
we list the 46 municipalities that received unqualified audit opinions every year over the administrative
term in this manner. These municipalities do not have the institutional capability and good preventative
controls in place to enable credible and transparent in-year and year-end reporting, which could
easily result in them losing their unqualified status.
When municipalities receive material findings on their performance reports, this means that the
performance information that they have reported is not credible, which weakens the accountability
processes. Material non-compliance signals a disregard for legislation or significant lapses in control,
which is often an indicator of potential financial mismanagement and a leadership culture that does
not emphasise the importance of compliance.
An unqualified audit opinion with findings is not a desirable outcome and municipalities should not
become complacent when they receive such an outcome. The municipalities that have remained in
this category should address the remaining challenges in their control environments to improve their
outcomes to a clean audit and shift their focus to improving service delivery.
The audit of the remaining municipality (Maluti-a-Phofung Local Municipality in the Free State) has not
been concluded for four years due to the late submission of its consolidated financial statements. In
section 2.2, we provide more information on the late submission of financial statements, including this
municipality’s history of late submissions.
By 31 January 2025, the 2023-24 audits for 10 municipalities had not been completed. By 25 April 2025,
seven of these audits had been finalised.
Status of outstanding audits and outcomes of audits subsequently finalised by 25 April 2025
9 2023-24 9 Municipalities
Outstanding
audits 2 delays encountered during audit process
Matjhabeng LM (Free State)
Msunduzi LM (KwaZulu-Natal)
(consolidated)
1 2020-21 1 Municipality
1 late submission of financial statements
Maluti-a-Phofung LM (Free State)
(consolidated)
(outstanding for four years)
A municipality’s financial statements show how it spends its money, where its revenue comes from,
what assets it has and the state of those assets, how much it owes its creditors, how much it is owed by
its debtors, and whether the money owed to it is expected to be received. The financial statements
also provide crucial information on how the municipality adhered to its budget; the unauthorised,
irregular, and fruitless and wasteful expenditure it incurred; as well as its overall financial position – in
other words, whether its operations are financially sustainable.
The financial statements are used by the council and its committees to hold the accounting officers
accountable and make financial and related service delivery decisions. In the case of some
municipalities, particularly metros, the financial statements are also used by creditors, banks and rating
agencies to determine the level of risk in lending money to the municipality. In addition, members of
the public can use the financial statements to see how well the municipality is using the taxes they pay
to provide services.
The Public Audit Act requires us to annually audit and report on whether the municipalities’ financial
statements fairly present their financial position at year-end and the results of their operations for that
year. Our audit opinion on the financial statements provides assurance on whether the financial
statements are free from material misstatements that could affect the decisions that users make based
on these statements.
If we cannot complete our audit on time, it delays the tabling of the annual report in the council,
which is then unable to hold the municipal manager to account and make decisions. It also delays the
finalisation and publishing of the council’s oversight report. It further affects the reporting and oversight
actions by the minister and members of the executive councils for local government, the provincial
legislatures and Parliament. Given that these municipalities receive an equitable share and conditional
grants, this lack of transparency and accountability should also be of great concern to national and
provincial government.
The percentage of municipalities that submitted their financial statements for auditing by the legislated
date was 82% in 2020-21 due to delays caused by the covid-19 pandemic. While this returned to a more
typical pre-covid-19 submission rate of 92% in the first year of the current administration (2021-22), there
has since been little improvement and only 95% of municipalities submitted their financial statements
on time in 2023-24. This was mostly due to a combination of interventions by provincial leadership and
the material irregularity (MI) notifications we issued.
Most of the municipalities that repeatedly did not submit their financial statements for auditing, or
submitted them late, were in the Free State.
Repeat offenders – municipalities submitting financial statements late over past three years
Municipality Years submitted Reasons for late submission and action taken to address it
late
Mafube Local 2021-22 2021-22: The municipality did not promptly address the audit
Municipality findings that gave rise to the disclaimed audit opinions it received
2022-23
in prior years.
(Free State)
2023-24
2022-23 and 2023-24: The delays were caused by non-payment
of staff and consultants responsible for preparing the financial
statements.
Maluti-a-Phofung 2021-22 All three years: Internal reviews were late and there was a
Local Municipality backlog in the preparation of consolidated financial statements
2022-23
because the municipality and its municipal entity had received
(Free State)
2023-24 disclaimed audit opinions in prior years, which required significant
time to resolve.
Kopanong Local 2021-22 2021-22: The chief financial officer resigned and there were
Municipality accounting system challenges.
2023-24
(Free State) 2023-24: The financial system was temporarily suspended by the
service provider due to non-payment.
Makhado Local 2022-23 2022-23 and 2023-24: The municipality faced challenges in
Municipality preparing the fixed asset register.
2023-24
(Limpopo) The 2022-23 financial statements were submitted in September
2023 and the 2023-24 financial statements were submitted in
September 2024.
Municipality Years submitted Reasons for late submission and action taken to address it
late
Ubuntu Local 2022-23 2022-23: The chief financial officer position was vacant.
Municipality
2023-24 2023-24: There were technical issues with the new financial
(Northern Cape) system.
As part of our engagements in preparing to table this report, we again requested commitments from
the premiers and members of the executive councils for local government and for finance in these
provinces to take action to prevent further late submissions.
58%
56% 57%
64 63
57
If we express an unqualified audit opinion on the financial statements, it means that there were no
material misstatements (errors or omissions) in the financial statements and those who use these
financial statements can trust the credibility of the information.
For years and across multiple administrations, we have urged municipalities to submit good-quality
financial statements for auditing. But even when municipalities receive unqualified audit opinions on
their financial statements, this is often because we allow them to correct material misstatements that
we identify during the audit – a practice that is not sustainable and creates delays in finalising the audit.
If we had not allowed municipalities to correct such material misstatements in their financial statements,
only 63 municipalities (26%) would have received unqualified audit opinions in 2023-24, compared to
the 140 (57%) that eventually did.
The poor quality of the financial statements submitted for auditing also raises concerns about the
credibility of municipalities’ in-year financial reporting through the monthly budget statements, the
mid-year budget and performance assessment, and the quarterly reports on municipal finance to the
council. This means that important financial decisions, analyses and monitoring could be based on
unreliable information.
The following 46 municipalities have received unqualified audit opinions every year for the past three
years, despite having initially submitted poor-quality financial statements that they then corrected.
Mbhashe LM Makhado LM
Ngqushwa LM Makhuduthamaga LM
Maruleng LM
Molemole LM
Polokwane LM
4 Free State
Phumelela LM
Thabo Mofutsanyana DM
6 Mpumalanga
Tswelopele LM
Xhariep DM Bushbuckridge LM
City of Mbombela LM
Mkhondo LM
3 Gauteng
Nkomazi LM
City of Johannesburg MM Thembisile Hani LM
Lesedi LM
1 Northern Cape
Gamagara LM
16 KwaZulu-Natal
AbaQulusi LM
Dannhauser LM
1 North West
Dr Nkosazana Dlamini Zuma LM
Impendle LM
Mandeni LM
Mfolozi LM
Mkhambathini LM
Newcastle LM
Nkandla LM
Ubuhlebezwe LM
Ugu DM
uMgungundlovu DM
uMhlabuyalingana LM
uMzimkhulu LM
uPhongolo LM
A qualified audit opinion means that there were areas in the financial statements that we found to be
materially misstated. In our audit reports, we point out which areas of the financial statements are not
credible. In 2023-24, a total of 90 municipalities (35%) received a qualified audit opinion.
An adverse audit opinion means that the financial statements included so many material misstatements
that we disagree with practically all the amounts and disclosures in the financial statements.
Effectively, the information in financial statements with an adverse audit opinion is not useful and
cannot be used to make decisions, as it is not credible. In our audit reports, we report to oversight
structures and other users of the financial statements that the information cannot be trusted.
In 2023-24, six municipalities received an adverse audit opinion. They received R0,98 billion in equitable
share and R0,53 billion from other grants, and collectively managed an expenditure budget of
R2,73 billion. There is little transparency or accountability in how these municipalities used their funds.
Amathole DM Emakhazeni LM
Kou Kamma LM
3 North West
1 Gauteng
Mamusa LM
2 KwaZulu-Natal
uMzinyathi DM
1 Western Cape
Umzumbe LM
Laingsburg LM
2 2 2 4
Repeat adverse Regressed to Improved from Improved from Municipality
audit opinion adverse audit disclaimed to adverse adverse audit under
(3 years) opinion in 2023-24 audit opinion in 2023-24 opinion in 2020-21 intervention
The main areas that were misstated in the financial statements of municipalities that received modified
audit opinions in 2023-24 were the following:
• Receivables: 62 municipalities (25%) did not know the correct amounts owed to them and whether
they were still entitled to receive those amounts. In some cases, the amounts recorded were
incomplete. In most instances (68%), these municipalities did not provide supporting evidence to
substantiate the value of the receivables they disclosed in their financial statements.
• Property, plant and equipment: 61 municipalities (25%) could not properly account for their assets
because they had not updated their asset registers with the assets that they had bought, were
busy building or had disposed of, or that had been stolen or vandalised. Most of the instances
(64%) related to a lack of evidence to substantiate the values disclosed in the financial statements.
• Irregular expenditure: 60 municipalities (24%) did not report all the irregular expenditure they
incurred in their financial statements. In some cases, the irregular expenditure amount reported
was incorrect.
• Revenue from services provided: 60 municipalities (24%) did not have adequate evidence to
support the revenue amounts that they disclosed in their financial statements, did not disclose all
the revenue that they should have, or recorded the amounts billed for services rendered incorrectly.
• Expenditure: 53 municipalities (21%) did not have adequate evidence to support the expenditure
amounts, did not record all the expenditure that they should have, or did not properly classify the
expenditure in their financial statements.
When we express modified audit opinions on the financial statements, this has wider implications for
decision-making and could have an impact on service delivery. For example:
• Poor revenue management systems with inaccurate billing affect revenue collection from
consumers of municipal services, which then reduces the funds available for municipalities to
operate and deliver services.
• If a municipality does not know the true state of its assets (property, plant and equipment), it cannot
adequately budget for maintenance. This can lead to dilapidated assets in the long run, affecting
the municipality’s ability to deliver services at the required level.
The pervasiveness of modified audit opinions and the poor quality of in-year financial reporting have
significant negative effects on governance, service delivery and public trust. This lack of reliable
financial information hinders effective decision-making and oversight, leading to mismanagement
and inefficiencies.
While the main causes listed in this section are not new, they have not been receiving the required
attention.
Vacancies and lack of financial management skills remain the biggest contributing factor to financial
units not delivering credible financial reports and not implementing good preventative financial controls.
Municipalities should have finance units that are capacitated, competent and led by experienced
chief financial officers who can provide stability and direction and can lead financial reporting. At
the 2023-24 year-end, municipal finance units had an average vacancy rate of 19% – slightly higher
than the 18% reported in 2020-21. Over the same period, the vacancy rate for chief financial officers
had worsened, with 50 municipalities (20%) having vacancies in this position compared to 37 (15%) in
2020-21. At the municipalities with disclaimed audit opinions, the vacancy rate was even higher, at
18%; and their chief financial officers had held their positions for an average of only 39 months by the
2023-24 year-end.
High finance unit vacancy rates lead to modified audit opinions on the financial statements. The
107 municipalities (43%) with modified audit opinions had an average vacancy rate of 22% in their
finance units and 29% among their senior management. Vacancies in finance units and a lack of
skills lead to increased reliance on financial reporting consultants, often without obtaining the desired
benefits (as detailed in section 3.3).
In 2023-24, 219 municipalities (2020-21: 222) used financial reporting consultants at a cost of R1,47 billion
(2020-21: R1,39 billion). At 111 of these municipalities (51%), consultants were used to provide skills that
their finance units did not have. At 92 municipalities (42%), consultants were hired to bridge a skills and
vacancy gap, while 16 municipalities (7%) used consultants purely to compensate for vacancies.
The total consultant cost was spent mostly on asset management services (34%), the preparation or
review of financial statements (32%) and tax services (20%).
We found that these municipalities appoint consultants year after year without ensuring that these skills
are transferred to municipal staff. In 2023-24, 191 municipalities (87%) reappointed the consultants used
in the previous year; in 2020-21, this was the case at 173 municipalities (78%).
We have been reporting on the use of financial reporting consultants to address skills and vacancy
gaps over multiple administrations. Our 2013-14 general report shows that a decade ago, consultants
were also widely used (at 82% of municipalities), with 71% having used consultants in the previous year.
The percentages of municipalities using consultants to address vacancies, skills or both were almost
similar to 2023-24.
Basic financial management processes and controls in municipalities – including accounting practices,
record-keeping, independent reviews and reporting – are not working effectively.
Proper record
74 (30%) 99 (40%) 74 (30%)
keeping
Again, little has changed over the past decade, with the status of these key financial management
controls being very similar to what we had published in our 2013-14 general report.
Action plans
Over the years, we have advocated for the use of audit action plans to prevent a repeat of the
misstatements we identified during our audits. However, municipalities often do not ensure that these
action plans address the root causes of the misstatements and focus on strengthening the control
environment. Overall, we found that 106 (99%) of the 107 municipalities that received a modified
audit opinion either did not have adequate action plans in place or had not fully implemented their
action plans.
Information technology
All municipalities use information technology (IT) systems to manage their finances and enable financial
reporting, but IT governance is weak, and systems are not used to their full potential. This was mostly due
to a lack of skills; overreliance (with limited oversight) on software providers; and little focus at municipal
manager and council level on the benefits, risks and costs in the IT environment.
IT controls are an integral part of a municipality’s control environment. Over the years, we have identified
significant control weaknesses in local government’s IT environment, which compromise the accuracy
of financial records, interrupt service delivery, and make municipalities vulnerable to intentional and
unintentional manual override and manipulation.
In 2023-24, our assessment of IT controls related to financial reporting found that only 120 municipalities
(49%) had effective governance processes and only 96 (39%) had good information system controls.
Internal audit units and audit committees have legislated responsibilities in terms of sections 165 and
166 of the Municipal Finance Management Act. Internal audit units must prepare risk-based audit plans
and report to the municipal manager, and audit committees must report on the execution of the plans
and their findings. These plans include reviews of accounting practices and internal controls. Audit
committees must review the financial statements to provide the council with a credible view of the
municipality’s financial performance.
While most internal audit units – 220 (93%) – and audit committees – 218 (94%) – performed their legislated
functions, we found that less than half of them – 105 internal audit units (43%) and 109 audit committees
(44%) – performed these functions effectively. At municipalities that received modified audit opinions,
these numbers were significantly worse, with 86% of internal audit units and 85% of audit committees
not performing effectively and providing the required level of assurance, as detailed in section 1.
This lack of effectiveness meant that the work of these assurance structures had minimal impact, mainly
due to inadequate risk assessments and/or working on a rotational plan, differences in the scope of
work performed, and internal audit units not having the capacity to complete all the planned work.
The high number of municipalities that submitted poor-quality financial statements and have inadequate
financial controls shows that audit committees and internal audit units are not providing the value
that they should to improve financial discipline and processes. This is often because the municipal
administration and council do not heed the risks they identify or implement the recommendations they
make, and because there are no consequences for non-responsiveness by the administration. We
provide more detail on our observations at metros in section 4.
The Public Audit Act requires us to annually audit the performance reports of municipalities to provide
users of the reports with some assurance that the information in the report is a true reflection of the
municipality’s performance against its planned objectives. This mandate, given to us by Parliament, is
testament to the importance of performance reporting – placing it on the same level as the financial
statements.
We do not audit, evaluate or conclude on a municipality’s performance – this remains the role of the
council, the minister and members of the executive councils responsible for local government, the
provincial legislatures and Parliament (oversight). Our responsibility is to provide assurance to these
roleplayers and to the public that the information they use to evaluate performance is useful and
reliable.
The annual audit that we conduct is also not a performance audit that has the objective of reporting
on the economy, efficiency and effectiveness of the municipality’s processes. Rather, every year, we
audit selected planned objectives and specific performance indicators that are aligned to the service
In our audit reports, we report those findings that are material enough to be brought to the attention of
users of the performance report.
We express audit opinions or conclusions on selected planned objectives in the management reports
of auditees with a high service delivery impact. In 2023-24, these auditees comprised 145 municipalities
and six municipal entities. For the remaining 101 municipalities and 10 municipal entities that had a
lower service delivery impact in 2023-24, we reported on the extent of material findings only.
We also assess municipalities’ compliance with legislation on strategic planning and performance
management processes.
In 2022-23, four municipalities in the Northern Cape had not prepared performance reports for at least
two consecutive years, namely Renosterberg, Siyancuma, Siyathemba and Ubuntu local municipalities.
We notified the accounting officers of these municipalities that not submitting performance reports
significantly harms the accountability processes and constitutes an MI. In response, all the municipalities
except Renosterberg submitted their performance reports for auditing in 2023-24.
Renosterberg Local Municipality (Northern Cape) has not submitted a performance report
for the past 15 years. The municipality also did not have an approved service delivery
and budget implementation plan, which meant that budgets were not aligned to service
delivery objectives that consider the needs of communities. The municipality has adopted
an unfunded budget for nine years and has not allocated performance management
responsibilities to specific officials. It has a 100% vacancy rate at senior management level,
and a weak control environment. In April 2024, we notified the accounting officer that failure
to prepare a performance report constitutes an MI. The accounting officer did not take
appropriate action to resolve the matter and we included recommendations in the audit
report, which should be implemented by May 2025.
52%
49%
47%
65 64
63
If we had not allowed municipalities to correct the misstatements that we identified in their submitted
performance reports, only 64 (26%) of the performance reports used for oversight purposes by the
council and the public would have been credible, rather than the 127 reports (52%) that were ultimately
published. The adjustments are usually to the reported achievements (and not to the already-approved
indicators and targets in the performance plan that cannot be adjusted). It is not sustainable to rely on
the audit process to identify misstatements for municipalities to correct during the audit – this is costly
and causes delays in finalising audits.
The poorly prepared performance reports and significant activity required to make corrections
in response to our audits also raise questions about the credibility of the in-year reporting and the
effectiveness of performance monitoring throughout the year. If municipalities do not properly monitor
their performance throughout the year and take corrective action when needed, they cannot achieve
their performance targets or reliably report on their performance. The mayor and the council use the
mid-year performance report for in-year monitoring purposes and to make important financial and
service delivery decisions, which they cannot do effectively without reliable information.
The audit opinions and conclusions and the extent of material findings provide a view of the
pervasiveness of findings and the level of improvement since 2020-21. Normally, we audit and give
a separate opinion or conclusion on more than one objective in the performance report, but for
comparison purposes we show only the worst opinion or conclusion.
The performance reports of the 32 municipalities and three municipal entities (13%) that received
adverse or disclaimed audit opinions were so bad that they cannot be used for oversight purposes –
the reported information was either materially incorrect or we could not find evidence for what was
reported. These auditees were responsible for delivering services to 4 463 626 households (15%), and
are mostly in the Northen Cape and the Free State.
We include further detail on the audit opinions, conclusions and findings on performance reports for
each province in section 7.
Nature of findings
A performance report should include information that is useful to determine if the municipality delivered
on its core mandated functions (such as delivering basic services) and is on track to deliver on the
integrated development plan. The reported achievements must also be reliable.
37%
28%
24%
18%
90
16%
12% 11% 68
10% 60
9%
44
38
29 25 28
21
The table that follows provides information on the findings on the usefulness and reliability of the
reported performance information that we reported in the audit and management reports, as well as
the impact of these findings.
Description Impact
Not reliable
2022-23 93 (38%)
2023-24 88 (36%)
When a municipality’s reported performance When reported achievements are not reliable, the
achievements are not reliable, it means that either lack of transparency means that the performance
we had proof that the achievement as reported report is of little use to the council – it cannot
was not correct, or we could not find evidence to assess the municipality’s performance for the year
support it. or its progress towards achieving its integrated
development plan. The council can also not make
decisions in response to underachievement.
Not measurable
2021-22 83 (34%)
2022-23 61 (25%)
2023-24 60 (24%)
When a municipality receives a measurability finding, A performance indicator that is not well defined and
this means that its performance plans included: targets that are not specific, measurable or time
bound are not useful for measuring and reporting
• performance indicators that were not well
on municipal performance. This makes it difficult for
defined (i.e. there was no clear definition of
the council and the public to determine the progress
what the indicator measures); and/or
made by the municipality to achieve a planned
• targets that were not specific, measurable and/ objective.
or time bound.
If there are no verifiable processes and methods to
measure achievements, it generally results in the
It can also mean that verifiable processes and reported achievements being unreliable as it will not
methods were not in place to measure be possible to determine the accuracy of what is
achievements. reported.
Not consistent
2021-22 47 (19%)
2022-23 32 (13%)
2023-24 39 (16%)
When a municipality receives a consistency finding, The performance report cannot be used by the
this means that: council and the public to determine if commitments
made during planning have been achieved.
• the performance indicators and/or targets
reported in its performance report differed from Unapproved changes undermine transparency and
those committed to in its performance plan; accountability.
2022-23 39 (16%)
2023-24 47 (19%)
Not relevant
2021-22 34 (14%)
2022-23 53 (22%)
2023-24 36 (15%)
When a municipality receives a relevance finding, Irrelevant performance indicators and targets are
this means that its performance plan included: not useful for measuring and monitoring municipal
performance.
• performance indicators that measure an
achievement that is not related to the When indicators are not relevant, it becomes
municipality’s mandate or to what the planned difficult to accurately measure the efficiency and
objective is intended to achieve; and/or effectiveness of municipal services, and it can lead
to the misallocation of resources.
• targets that are unrelated to what the
performance indicators are measuring.
Missing indicators
2021-22 26 (11%)
2022-23 45 (19%)
2023-24 21 (9%)
When a municipality has missing indicators, this When performance indicators that measure key
means that its performance documents excluded service delivery achievements are excluded from
indicators that measure its performance on the performance plans and reports, it means that the
functions that it is mandated to perform. This includes achievement was not planned or budgeted for,
some that relate to basic services, in accordance which is likely to result in it not being delivered.
with legislation or through duties assigned to it
If delivery on the function is not reported, this also
by national or provincial government, without
undermines transparency, which weakens not only
appropriate and verifiable reasons.
municipal accountability processes, but also the
From 2023-24, we reported these as material findings ability of national and provincial government to
in the audit report. monitor and make decisions about government-
wide deliverables based on complete and reliable
(audited) information.
• Performance management systems and related controls were not maintained or were
inadequate.
• Service delivery and budget implementation plans did not include prescribed monthly financial
projections.
• Key performance indicators and measurable performance targets were not included in plans.
MI
Lack of proper performance records
Between 2016 and 2023, Richtersveld Local Municipality (Northern Cape) failed to reliably
report on its performance information due to a lack of proper records to support the
achievements reported in its performance reports. We notified the accounting officer of the
MI in February 2024. During 2023-24, the accounting officer implemented a new performance
management module to ensure that evidence is compiled to support reported performance
achievements. Further action is being taken to fully resolve the MI.
In May 2024, we notified the accounting officer of an MI due to the municipality’s failure to
reliably report on its performance information because of the lack of proper systems and
records to support the achievements reported in the performance report.
In 2023-24, we again could not determine if the reported achievements were reliable due to
a lack of evidence. For example, there was one indicator that related to the much-needed
upgrading of six water pump stations. The municipality reported that the six water pump
stations had been upgraded, but could not provide evidence of the achievement. Based on
our site visits, we confirmed that the municipality did not adequately maintain four of these
pump stations, which had totally collapsed and had not been operational for several years.
The lack of reliable information on the state of the water pump stations contributed to the
lack of planning and monitoring of the upgrading process.
At Ugu District Municipality (KwaZulu-Natal), indicators and targets were not clearly defined
and easy to understand, as there was no clear definition of what the indicators measured.
For example, the description of the indicator and the method of calculation included in
the planning documents for the indicator, Malangeni – percentage progress of work done
on construction of 2ML/day reinforce concrete reservoir refers to ‘number of connected
households’ when it is intended to measure the progress of work done on the construction
of the concrete reservoir. As a result, the indicator and related targets were not useful for
measuring and monitoring progress against the municipality’s planned objectives.
We raised a material finding on compliance with key legislation because of the municipality’s
inadequate management of performance planning, monitoring, measurement, review and
reporting.
The institutional capability required to consistently produce transparent and credible performance
reporting is not in place in local government. This is evident from the findings on the performance
reports. These findings also demonstrate that the legislated system of performance planning,
budgeting, monitoring and reporting, as detailed in section 1.2, is not implemented as designed.
The main causes of poor performance planning and reporting are not new, but have not been
receiving the required attention.
Internal controls
Municipalities do not have adequate systems, processes and controls to collate, record, measure
and report on their performance. Processes are manual and prone to error.
Proper record
96 (39%) 78 (32%) 72 (29%)
keeping
While municipal managers prepared and mayors tabled the mid-year performance reports
needed for in-year monitoring at 235 municipalities (95%), the reporting had little impact due to
a combination of unreliable information and lack of diligence and impactful decision-making by
mayors and councils.
The lack of standardised performance indicators for core municipal functions (electricity, housing,
roads, water and sanitation) places the burden of developing indicators and relevant targets on
municipalities. The National Treasury and the Department of Cooperative Governance introduced
common performance indicators through Circular 88, which aims to streamline planning and
reporting, while improving the completeness, measurability and relevance of indicators and
targets.
To reduce scrutiny and accountability, some municipalities report on different indicators and
targets than those they committed to when planning, set targets that are too low (or even zero)
and leave important information out of their performance reports. This is often done to create the
perception that the municipality is performing well, and that services are being delivered.
Officials, senior management and accounting officers do not properly apply performance
management and reporting requirements because they do not properly understand or appreciate
them, pointing to a lack of appropriate skills and capacity. Because mayors and council and
committee members are not fully capacitated, they do not thoroughly review performance plans
to ensure that they cover all the key functions of the municipality, that they are aligned to the
integrated development plan, and that the performance indicators and targets are relevant and
measurable to achieve the desired results.
Lack of consequences
Municipal managers and officials face limited consequences when they provide unreliable
information in their performance reports or underachieve on their targets.
Performance audit committees and internal audit units have legislated responsibilities to provide
assurance on the performance management system and performance results of municipalities, as
detailed in section 1. Most internal audit units – 218 (92%) – and most audit committees – 214 (92%)
– performed their legislated function of evaluating the reliability of municipalities’ performance
information. However, in our assessment, only 110 internal audit units (45%) and 116 audit committees
(47%) did so effectively.
As was the case with financial reporting, minimal impact was achieved in improving performance
planning and reporting due to differences in the scope of work performed, inadequate capacitation
of internal audit units, and management not responding to findings and recommendations. We provide
more detail on our observations at metros in section 4.
• Expenditure management
• Consequence management
• Asset management
• Revenue management
In our audit reports, we report findings that are material enough to be brought to the attention of the
council, the provincial legislature and the public. A finding is material if there were multiple instances of
non-compliance, or if the non-compliance had a significant impact.
86%
83% 83%
17% 17%
14%
41 34 41
Municipalities with material findings on compliance Municipalities with no material findings on compliance
In 2023-24, 65 municipalities (26%) received an unqualified audit opinion but did not achieve a clean
audit outcome due only to findings on compliance.
The main areas in which municipalities had material compliance findings have remained largely
unchanged since 2020-21, with little movement in most areas. The exception is findings on compliance
with expenditure management, which was much lower in 2020-21 because legislative requirements for
payments to be made within 30 days were relaxed during the covid-19 period.
The following figure shows the level of compliance by municipalities with specific legislation. We did not
audit all areas at all municipalities – the number of applicable municipalities where we audited each
area is included in the audit fact sheet at the end of this report.
138 (56%)
Consequence management 14 (6%)
124 (50%)
84 (34%)
Asset management 3 (1%)
81 (33%)
80 (32%)
Revenue management 8 (3%)
72 (29%)
43 (17%)
Utilisation of conditional grants 1 (1%)
44 (18%)
2020-21 2023-24
Movement
Improvement Unchanged Slight improvement Slight regression Regression
from 2020-21
Section 3 covers the impact on government finances and service delivery of non-compliance
with legislation on expenditure management (including unauthorised, irregular, and fruitless
and wasteful expenditure); procurement and contracts; utilisation of conditional grants; and
environmental and consequence management.
• A total of 218 municipalities (88%) did not have basic controls in place to review and monitor
compliance, compared to 219 (89%) in 2020-21. Weak controls are often due to the leadership
tone set by the council, the mayor and municipal management. In our assessment, effective
leadership that is based on a culture of honesty, ethical practices and good governance was
evident at only 102 municipalities (41%) in 2023-24.
• As with financial and performance reporting, internal audit units and audit committees had little
impact on the high levels of non-compliance. In our assessment, only 102 internal audit units (41%)
and 108 audit committees (44%) performed their functions effectively in this area. A general lack
of responsiveness to their findings and recommendations weakened the effectiveness of these
structures.
• A culture of accountability is essential in ensuring compliance with legislation. When officials face
consequences for their actions, it will deter others from disregarding legislation. This culture is not
evident at many municipalities, as detailed in section 3.4.
We pay specific attention to the municipalities with disclaimed audit opinions as this is the worst
possible audit outcome. The lack of transparency in how these municipalities use public funds
and deliver services significantly weakens accountability, which often leads to their communities
being deprived of service delivery and being harmed by their actions or inaction.
In our previous general reports and engagements, we specifically focused on the urgent
intervention and support that municipalities with a history of disclaimed audit opinions need
from national and provincial government. We placed the spotlight on the serious financial
management failures at these municipalities and the impact that poor administration has on
the communities. We also used our enforcement mandate to accelerate change at these
municipalities by issuing MI notifications. Overall, government has responded positively by
committing to eradicate disclaimed audit opinions.
Makana LM Kareeberg LM
(disclaimed for six years)
Kgatelopele LM (2022-23)
Sundays River Valley LM
(disclaimed for six years) Renosterberg LM (2022-23)
!Kheis LM
4 Free State
10 North West
Kopanong LM
Maluti-a-Phofung LM Ditsobotla LM
(outstanding for four years) (disclaimed for eight years)
Madibeng LM (2022-23)
4 KwaZulu-Natal Mamusa LM (2023-24)
Maquassi Hills LM (2023-24)
Endumeni LM
Naledi LM (2022-23)
Inkosi Langalibalele LM (2021-22)
Ramotshere Moiloa LM (2021-22)
Nquthu LM (2021-22)
Ratlou LM
uMkhanyakude DM (2022-23) (disclaimed for six years)
Thabazimbi LM
3 Mpumalanga
Dipaleseng LM (2021-22)
Dr JS Moroka LM (2021-22)
Lekwa LM (2022-23)
7 4 4 20 Improved in
Repeat Regressed to Outstanding Improved 2021-22 – 9 Material
disclaimed disclaimed audit in 2023-24 from disclaimed 2022-23 – 8 irregularity
audit opinion opinion in 2023-24 audit opinion 2023-24 – 3 issued
Joe Morolong Local Municipality (Northern Cape) received a disclaimed audit opinion for
eight consecutive years from 2015-16 to 2022-23. In 2023-24, the municipality improved to a
qualified audit opinion because it addressed most of the limitations that we had identified in
prior years. The municipality implemented our recommendations to enhance recordkeeping
practices and develop an impactful action plan to address prior-year findings.
The appointment of a municipal manager who was fully committed to supporting the
audit process contributed to the increased responsiveness to audit findings and requests
for information. The municipality also acquired a digital system to facilitate the scanning,
storage and retrieval of payment vouchers. The system has been designed to link vouchers
to the appropriate creditor account. The provincial cooperative governance department
supported the system implementation, while the provincial treasury appointed consultants to
resolve technical issues.
The four municipalities that regressed to a disclaimed opinion in 2023-24 did not have embedded
processes, controls and capacity to ensure that credible financial reporting continued even in the
event of system changes, instability or vacancies in key positions.
Kareeberg Local Municipality (Northern Cape) regressed from an unqualified audit opinion
with findings in 2020-21 to a disclaimed audit opinion in 2023-24 after it migrated to a new
financial system that was not effectively managed, resulting in inaccurate and incomplete
data being transferred from the old system. The municipality was unable to generate
key information (such as creditor reconciliations) from the new system and the financial
statements contained multiple errors due to incorrect or incomplete data being extracted
from the new system.
The municipality also had a high vacancy rate at senior manager level, and two senior
officials resigned during the period. While the municipality relies on consultants to prepare
its financial statements, they are often appointed late and the challenges caused by the
financial system hinder their effectiveness. Additionally, the municipality submitted its
2023-24 financial statements late and the audit was completed only in June 2024. As a result,
there was not enough time for the municipality to prepare and implement an action plan to
address the audit findings before the 2023-24 financial statements were due.
These municipalities managed an overall expenditure budget of R3,48 billion in 2023-24, including
R0,78 billion in equitable share and R0,42 billion in conditional grants. They have not been properly
accounting for these funds and have been making decisions based on unreliable financial and
performance information.
• A lack of basic financial controls and proper records management was the main reason for
continuing financial reporting failures. These weaknesses were not addressed due to instability
in key positions, high vacancy rates, and audit action plans that were not appropriate to
address prior-year findings and whose implementation was not monitored. Almost all of the
municipalities continued to rely on consultants for financial reporting but did not realise the
expected benefits from their use because they did not maintain proper accounting records
and supporting documents throughout the year.
• Control weaknesses were evident in the management of IT systems. Our IT audits focused on
procurement and payment systems and identified a lack of integration between financial and
banking transactions at six municipalities, resulting in manual workarounds and increased risk
of errors and fraud. Adequate approval processes and/or segregation of duties for adding
or amending supplier data on the systems were not in place at three municipalities, creating
opportunities for making payments to fictitious suppliers or making unauthorised changes to
bank account details. We provided recommendations to accounting officers to address these
control weaknesses to mitigate the risk of fraud.
The lack of records and credible financial reporting resulted in six of the seven municipalities
(excluding Ratlou) being classified as financially distressed. In 2023-24, these six municipalities
disclosed (or were required to disclose) in their financial statements that there is significant doubt
about their ability to continue operating based on their financial position. We issued MI notifications
to all seven accounting officers on the lack of full and proper records, which caused the poor
financial state in which these municipalities find themselves. While four municipalities have financial
recovery plans, the mayors, councils and provincial treasuries do not effectively monitor their
implementation to ensure that the financial viability of these municipalities improve.
The seven municipalities are responsible for delivering services to 182 207 households, with five being
water providers and six being electricity providers. The lack of records and poor management
controls was prevalent in the planning, management and reporting on service delivery. In
2023-24, we reported material findings on the performance reports of all seven municipalities.
The municipalities that received the worst opinions or conclusions on their performance reports
were Ditsobotla (disclaimed), Sundays River Valley (adverse) and Kannaland (pervasive material
findings).
We have also been reporting material findings on compliance with key legislation at all seven
repeatedly disclaimed municipalities every year since 2021-22. We reported material non-
compliance with legislation on procurement and contract management, strategic planning and
performance management, revenue management and human resource management at all
seven municipalities.
The poor controls and lack of records were particularly evident in the area of procurement and
contract management, with the most common findings being:
• Contractor performance not monitored monthly (Makana, Sundays River Valley, Nketoana,
Lekwa-Teemane, Ratlou and Kannaland).
• Competitive bids not invited – deviations not justified (Makana, Nketoana, Lekwa-Teemane,
Ratlou and Kannaland).
• Three quotations not obtained and/or deviations not justified (Nketoana, Lekwa-Teemane,
Ratlou and Kannaland).
The most common findings on human resource management were the following:
• Policies and procedures were not established to define how staff performance would
be assessed, measured and managed (Makana, Sundays River Valley, Nketoana and
Lekwa-Teemane).
• An approved organisational structure or staff establishment was not in place (Kannaland and
Ratlou).
There are also few consequences for transgressions, financial losses and poor performance,
as evidenced by our material findings on the lack of consequence management at these
municipalities.
The table that follows provides further information on the non-responsiveness of the municipalities
and their institutional capacity.
Kannaland
Nketoana
Ditsobotla
Teemane
Makana
Sundays
Lekwa-
Valley
Ratlou
River
Non-responsiveness
Mayor ensures
response to our
No No No No No No No
findings (MFMA
S131(1))
Status of action
plans by municipal
managers
Adequate No No No No No No
No action
plan
Implemented No No No Yes No No
MIs in further
action stage – No MIs 1 (20%) 3 (60%) 1 (100%) 1 (17%) 1 (100%) No MIs
number and %
Implementation
Not
of financial Yes No No No Yes Yes
applicable
recovery plan
Implementation of
municipal support Yes No No No Yes No Yes
intervention plan
Irregular
expenditure R359,22m R689,11m R549m R241,54m R409,32m R247,08m R144,26m
closing balance
Vacancy rate in
25% 16% 38% 4% 25% 34% 38%
finance units
Total financial
reporting costs
The provincial treasury is monitoring the implementation of the financial recovery plan. The outcomes
have been presented to provincial leadership, and the premier has committed to conducting
oversight visits with municipal leadership to focus on the deficiencies that are preventing the
municipality from improving its audit outcome.
Provincial treasury representatives support the municipality to address audit findings, attend audit
steering committee meetings during the audit process, and supervise and monitor the audit action
plan. Management does not implement all the inputs received from the provincial treasury. The
provincial portfolio committee on local government visited the municipality and requested the
municipal council and accounting officer to provide commitments to address the root causes
of the identified deficiencies, but no progress has been made to address these root causes.
The outcomes have been presented to provincial leadership, and the premier has committed
to conducting oversight visits with the municipal leadership to focus on the deficiencies that are
preventing the municipality from improving its audit outcome.
The provincial treasury holds monthly interactions with the municipality to follow up on progress in
implementing recommendations, and matters are escalated to the mayor and speaker; however,
progress is slow. To strengthen their oversight, the premier and the members of the executive
councils for finance and for local government have committed to have focused interactions with
the political leadership. The provincial treasury and cooperative governance department have
committed to continue with their initiatives and monitoring processes, and to provide feedback
on the success of these initiatives to the municipal public accounts committee. The provincial
legislature has committed to overseeing the municipality to determine the reasons for failures.
The provincial cooperative governance department evaluated the adequacy of the post-audit
action plan to determine if it addressed all the findings and recommendations. The department
performed a skills assessment, but by the end of November 2024 the report had not yet been
communicated to the municipality. Despite this municipality being under serious financial pressure,
the provincial treasury did not help it develop a financial recovery plan or provide training and
technical support. The recommendations made by the provincial treasury on the unfunded budget
will not assist the municipality in the absence of a proper financial recovery plan. The member
of the executive council for local government has committed to collaborate with the South
African Local Government Association to design and lead professionalisation initiatives for local
government in the province, and to assess the capacity and ability of councillors to contribute to
clean governance. However, these are province-wide initiatives and are not focused at the local
government level.
The municipality has faced significant political and administrative challenges that have negatively
affected its governance, institutional capacity, financial management and service delivery. As
a result, the provincial executive council placed the municipality under mandatory intervention
and appointed a representative to monitor the implementation of its financial recovery plan.
Additionally, the provincial treasury, in collaboration with the national and provincial cooperative
governance departments, deployed an intervention team to support the representative and
help strengthen the municipality’s capacity to implement the financial recovery plan. Due to the
instability at the accounting officer and management levels, progress on the financial recovery
plan is slow. With the support of the intervention team, the municipality managed to submit all
outstanding financial statements for auditing in August 2024. The member of the executive council
for finance has committed to assess and enhance how the financial recovery plan is tracked.
The provincial cooperative governance department conducted a skills audit and shared the
findings and recommendations with the municipality in November 2024, and the provincial treasury
assisted with the review of the 2023-24 draft financial statements. However, these initiatives did not
have a positive impact on the audit outcomes, as the municipality still did not provide supporting
documents for the amounts disclosed in its financial statements.
The provincial treasury hosted financial statement workshops, but only junior staff attended. The
provincial treasury’s municipality-wide assistance with policy, delegation and review capacitation
of supply chain management officials and other officials on procurement and contract
management processes did not have a positive impact on the audit outcomes. In 2023-24, the
South African Local Government Association appointed a consultant to assist the municipality,
but this too had only minimal impact. The municipality was placed under the municipal debt-relief
programme from 30 August 2023 after engagements with the National Treasury, and has been
under provincial intervention since November 2024 when council approval was obtained.
Some of the municipalities that have repeatedly received disclaimed audit opinions have systemic
issues that will take multiple years to fix, but we have assessed that four of these municipalities
(57%) have the potential to move out of the disclaimed category before the end of the current
administration.
Overall, the provincial treasuries and cooperative governance departments have heeded our
call to support the municipalities with disclaimed audit opinions, and a number of interventions
are already in place to do so. Even with this support, political and administrative commitment is
needed to fully eradicate disclaimed audit opinions.
2.6 CONCLUSION
The outcomes in the three areas that we audit every year show that municipalities do not have the
institutional capability to produce credible and useful financial and performance reports, nor do they
have the institutional integrity to ensure that municipal leadership and officials consistently behave
ethically, comply with legislation and act in the best interest of the municipality and its residents.
Roleplayers in national, provincial and local government must continue to work together to fully
eradicate disclaimed audit opinions to improve transparency in the use of public funds and the delivery
of services and to strengthen accountability.
While we do not review the performance of local government, our work provides insight into weaknesses
that could prevent service delivery goals from being achieved if they are not decisively addressed by
the administration and the council. This section deals with four of these risks to service delivery in the
context of the audit work that we have done, namely:
The basic services that citizens are entitled to receive cannot be delivered without quality infrastructure
that is properly maintained and remains in good working condition throughout its lifespan. The country’s
municipal infrastructure has not kept pace with the growing service delivery demands, resulting in a
backlog in building new, and maintaining existing, infrastructure.
Government has responded to these needs with significant infrastructure investment programmes.
According to the National Treasury’s budget review report, government budgeted R68,4 billion in 2023-
24 (2022-23: R64,7 billion) for infrastructure spending in local government.
As part of our annual regularity audit, we audit selected infrastructure projects and report our findings
to senior management and accounting officers. We emphasise the money being lost due to poor
contract management and limited maintenance, as well as the impact that infrastructure neglect has
on local communities. Our reports include what we observed to be causing the weaknesses and our
recommendations to address these. Despite this, we see limited improvement from year to year, and
this report reiterates similar findings to those included in our previous general reports.
We selected projects located across 52 municipalities (eight metros, eight district municipalities,
22 intermediate cities and 14 local municipalities) and three municipal entities. Our focus was on
projects intended to deliver critical electricity, housing, road, sanitation and water infrastructure and
services to the public.
These audits are conducted by our performance audit teams, who specialise in infrastructure and
include experts such as engineers, quantity surveyors, environmental specialists and a professional
construction project manager. They use an infrastructure project delivery model as part of their audits.
PLANNING
• Needs assessment
• Feasibility studies
• Budget
• Designs IMPLEMENTATION
• Professional services
• Monitoring
MANAGEMENT • Supervision
• Time
• Cost
• Quality COMMISSIONING
• Used for intended purpose
• Used optimally
The average delay across the projects was 21 months. Reasons for the delays included changes in
scope, changes to designs because thorough feasibility studies and needs assessments were not
conducted, contractors abandoning sites due to cash-flow challenges, municipalities not paying
contractor invoices on time, weaknesses in procurement processes and a lack of effective contract
administration by project managers.
The work performed by contractors continued to show quality deficiencies, indicating that previously
identified defects had not been addressed. These issues should have been detected by the
consultants that were appointed by municipalities as experts in their respective fields to oversee and
manage construction activities and that were expected to perform their duties with the necessary
diligence and care. Municipalities did not always have adequate governance, oversight and
monitoring mechanisms in place to hold these consultants accountable for poor performance.
Some projects were completed without addressing end-user needs, such as connecting electricity to
completed houses, due to poor project planning and implementation.
We reported infrastructure project findings across the basic service delivery areas to accounting
officers.
5 13 1 1 1 0
9
(56%) months (11%) (11%) (11%) (0%)
Electricity
9 18 1 4 4 2
14
(64%) months (7%) (29%) (29%) (14%)
Housing
9 21 2 7 6 1
22
(41%) months (9%) (32%) (27%) (5%)
Roads
11 31 3 4 4 0
20
(55%) months (15%) (20%) (20%) (0%)
Sanitation
25 23 2 18 4 4
48
(52%) months (4%) (38%) (8%) (8%)
Water
Overall
59 average: 9 34 19 7
Total 113
(52%) 21 (8%) (30%) (17%) (6%)
months
Poor-quality construction can cause harm to members of the public or municipal officials and
lead to increased costs to fix defects. Late commissioning delays the public’s access to new
infrastructure and related services, and can result in unoccupied buildings being vandalised and
equipment and supplies being stolen.
MI
Construction of sewer pipelines
The almost five-year delay in completion was due to municipal project managers not properly
overseeing and monitoring the project, which had a negative impact on the water and
sanitation needs of the growing community in the surrounding areas.
MI
Upgrade of wastewater treatment works
In May 2019, eThekwini Metro (KwaZulu-Natal) began the R100 million Namibia housing project
in Inanda to provide 343 new housing units to qualifying beneficiaries by May 2021. On our
site visit in September 2024, we found that only 29 units (8%) had been completed, while
the project cost had increased by R43,74 million and the projected completion date had
been revised to December 2024 – which the metro was unlikely to achieve given the rate of
progress at that stage. The delays were due to the metro failing to secure land for the project
and because newly erected informal dwellings obstructed access to the construction site.
We found that 68 beneficiaries and their families who were living in transit camps while
awaiting permanent housing did not have adequate access to water and sanitation, with
raw sewage flowing into the transit camps, posing health risks. They also did not have access
to electricity and resorted to illegal electrical connections. This posed a safety hazard and
two fire incidents had been reported by residents at the time of the site visit.
Infrastructure maintenance
The condition of municipal infrastructure is mainly influenced by the allocation of appropriate
maintenance budgets, as well as the development and implementation of effective maintenance
systems, policies and processes.
In 2023-24, the estimated value of property, plant and equipment (which includes infrastructure
assets that local government should maintain and protect) totalled R738,82 billion, based on the
values disclosed by municipalities in their financial statements. Municipalities need to budget
for repairing and maintaining these assets based on their annual asset maintenance plan. The
National Treasury recommends that they budget at least 8% of the value of their property, plant
and equipment for this purpose. However, municipalities do not prioritise maintenance during their
budget process, and many allocate less than the recommended 8% because they do not have
the funds required due to poor financial management, as outlined in section 3.3.
In total, the 247 municipalities that we audited spent R24,48 billion on repairing and maintaining
assets, which equates to roughly 3% of the total value of these assets – the same as the percentage
spent last year. A total of 55 municipalities (22%) spent 1% or less.
When municipalities do not maintain and expand their infrastructure assets, the impact can be
seen in lower service-level standards (such as poorer water quality), increased water and electricity
losses (as detailed in section 3.3), excessive costs for replacing or upgrading infrastructure and
equipment, and an increased risk of mechanical breakdowns. It also poses a risk to the health of
communities and can harm the environment, as detailed at the end of this subsection.
• Lack of institutional capability in key infrastructure positions and project management units
negatively affects project planning, implementation and management. Project managers are
also often allocated too many projects to be able to monitor all of them effectively.
• Lack of effective project governance and continuous oversight throughout the project life cycle,
together with standard operating procedures for project management that do not exist, are
incomplete or are not implemented, leads to inconsistent and unsuccessful delivery.
• Ineffective planning, including risk management, project monitoring, cost control and time
management, results in budget overruns and project delays.
• Lack of accountability for poor performance due to weak contract management and non-
enforcement of penalty clauses results in continued poor performance by contractors.
• Lack of regular and proper proactive maintenance of infrastructure due to inadequate budget
allocation for repairs and maintenance results in the deterioration of infrastructure and
increased costs to upgrade or replace the infrastructure.
We also assessed solid waste management plans, landfill site operation licences and the monitoring
of illegal dumping and infrastructure maintenance to prevent environmental pollution. None of the
13 municipalities appropriately managed their landfill sites in terms of their waste management
licence or the minimum requirements on waste management. Eight municipalities (62%) did not
take reasonable measures to prevent pollution or degradation of the adjacent environment, and
four municipalities (31%) did not establish processes to control the dumping of illegal waste.
The likely substantial harm to the general public caused by contaminated water sources or land
pollution meets the definition of an MI. To resolve these environmental MIs, municipalities must stop
pollution, repair infrastructure or correct landfill site practices, put measures in place to ensure that
future harm is prevented, and – where applicable – remedy the impact of the pollution. Overall, we
have issued 56 MI notifications for pollution of water sources, and 20 for landfill site mismanagement.
Some of these MIs have been, or are in the process of being, referred to the relevant public bodies
for follow-up and enforcement where necessary.
MI
Poor environmental practices at landfill site
On our site visit to the Southern landfill site in Mangaung Metro (Free State) in July 2022,
and our follow-up visit in October 2024, we found that the metro did not operate the site in
compliance with its licence conditions and the minimum legislative requirements for waste
disposal in terms of the National Environmental Management: Waste Act. Shortcomings
included a lack of proper access control and the inadequate separation of disposed waste.
We notified the accounting officer of the MI in November 2022 due to the likely substantial
harm to the surrounding community and the environment. The accounting officer did not
take appropriate action to resolve the matter and, in March 2024, we referred it to the
Department of Forestry, Fisheries and the Environment. In May 2024, the department referred
the matter to the responsible provincial department (Free State Department of Economic,
Small Business Development, Tourism and Environmental Affairs). The investigation is currently
in progress.
The Constitution envisions supply chain management systems that are fair, equitable, transparent,
competitive and cost-effective to derive the best possible value from the use of public funds and
to ensure that suppliers have equal opportunity to participate in government business. These
principles are commonly referred to as the ‘five pillars of procurement’. Various pieces of legislation
outline the processes that municipalities must follow to adhere to these constitutional principles,
the flexibility that they are allowed and the documentation that they are required to have.
In line with this legislation, and to ensure that they uphold the five pillars of procurement, municipalities
have to pay careful attention to contract management and must have strong payment-control
mechanisms in place to ensure that payments are made only after verifying that the supplier has
delivered on time, at the agreed price and according to specified quality standards.
We could not audit 110 awards (contracts awarded for competitive bids or quotations) worth a
combined R517,38 million at 33 municipalities because of missing or incomplete information. At 12
municipalities (5%), the limitation was material and we reported it in the audit report. There was no
evidence that these municipalities had followed a fair and competitive process for these awards,
which resulted in weakened transparency and accountability.
Of the 110 awards we could not audit, Kareeberg Local Municipality (Northern Cape) had the most
instances: 27 awards worth a total of R2,18 million.
Missing information at the following three municipalities accounted for 72% of the value of all
limitations:
• Dr Ruth Segomotsi Mompati District Municipality (North West) – 36% of overall value
• Missing information: bid documentation pertaining to water-related services
• Number of awards affected: three
• Total value of awards affected: R186,97 million
The level of non-compliance with procurement and contract management legislation was slightly
lower than in 2020-21.
33
13% Municipalities with no findings
59
Municipalities with non-material findings
24%
155
Municipalities with material findings
63%
The audit results and further work done by our specialists to identity fraud risk indicators highlight
four main areas of risk:
• Conflicts of interest
We reported findings on uncompetitive and unfair procurement at 187 municipalities (76%), with these
findings being material at 130 municipalities (53%). Less competition often leads to higher prices being
paid for goods and services.
The most common findings were that quotation and competitive bidding processes were not applied
at 144 municipalities (58%), the preference point system was not applied or was incorrectly applied at
93 municipalities (38%), and the evaluation process was not fairly applied at 71 municipalities (29%).
At 26 municipalities (11%), we reported contract deficiencies such as contracts that were not
signed, contracts that were not prepared in accordance with National Treasury prescripts, and
goods or services specified in contracts that differed from those specified in the bidding documents.
Inadequate contract management can expose the state to significant losses when contracts are
not correctly drafted and adhered to or when performance is not properly monitored. It can also
lead to delayed projects and quality issues with a negative impact on service delivery, as detailed
in section 3.1.
We have notified accounting officers of 81 MIs dealing with payments made for goods or services
not received (57), without any derived benefit (12), not in line with the contract (seven), and of
poor quality (five).
MI
Losses due to inadequate management of suppliers and contracts
Between October 2019 and November 2020, Fetakgomo Tubatse Local Municipality
(Limpopo) paid R4,94 million to a service provider for work on the Mogotwaneng access
bridge that had not been verified as complete. We notified the accounting officer of the MI
in March 2023. In August 2023, the municipality appointed a service provider to investigate
the matter. The investigation was completed in October 2024 and found three officials to
be responsible. The municipality is still in the process of recovering the overpayment and
implementing disciplinary action against the responsible officials. Controls have been
strengthened, with the contract engineer now certifying the work of contractors and the
project manager doing onsite verification of the work before any payment can be processed.
Further action is being taken to fully resolve the MI.
The Municipal Supply Chain Management Regulations prohibit municipalities from awarding
contracts to and accepting quotations from employees, councillors or other state officials (or
entities owned or managed by them) if they are in the service of the municipality or any other
state institution. They also prohibit councillors from being involved in a municipality’s procurement
processes. This is intended to prevent conflicts of interest.
The regulations require prospective suppliers to declare whether they are in the service of the state
or, if the supplier is not a natural person, if any of its directors, members, principal shareholders or
stakeholders are in the service of the state. Not disclosing this information constitutes a fraudulent
act that should be investigated and dealt with in line with the measures outlined in the regulations
and the municipality’s supply chain management policy. This could include cancelling the contract
with the provider.
The municipal supply chain management code of ethics also requires employees and councillors
to declare their interest in suppliers. This is usually done through the annual declarations required
by the codes of conduct for councillors and for municipal staff members in terms of the Municipal
Systems Act.
At 12 municipalities (5%), 40 prohibited awards worth a combined R1,68 million were made to
suppliers owned or managed by employees or councillors.
Three municipalities were responsible for R1,18 million (87%) of the value of the awards to suppliers
owned or managed by employees:
We found that awards of R0,32 million had been made at three municipalities to suppliers owned
or managed by councillors:
Municipalities could have identified the potential conflicts through a simple process of checking
information on the directors and owners of the suppliers against the municipality’s own payroll,
which is the process that we followed and have recommended before.
We found that 462 prohibited awards worth a combined R285,36 million were made to suppliers
owned or managed by other state officials at 73 municipalities (30%).
• Rand West City Local Municipality (Gauteng) – three awards worth R76,18 million
The officials benefitting from these awards at the listed municipalities were employed at various
state institutions, including state-owned enterprises (such as Eskom, Transnet and the South African
Broadcasting Corporation), other listed public entities (such as the South African Revenue Service),
national departments (such as the South African Police Service), provincial departments, water
boards and municipalities.
Based on the value of these prohibited awards to other state officials, two-thirds (awards worth
R191,14 million) resulted from false declarations made by 163 suppliers at 35 municipalities. At six
municipalities, 21 suppliers did not submit declarations relating to other state officials for awards
worth R18,59 million.
Although there is no legislation that prohibits municipalities from making awards to suppliers in
which close family members or business associates of employees or councillors have an interest,
such awards might create conflicts of interest for these employees or councillors and/or their close
family members or business associates. The possibility of undue influence cannot be discounted,
especially if the person could have influenced the procurement processes for these awards,
potentially creating opportunities for irregularities. To ensure transparency, legislation requires
municipalities to disclose any such awards worth more than R2 000 in their financial statements.
We found that 423 awards worth R1 329,47 million were made to suppliers with such ties to close
family members or business associates at 67 municipalities (27%). We reported the following
specific findings:
• For R1 188,53 million worth of awards – 222 employees at 21 municipalities failed to declare an
interest and/or participated in the procurement process.
• For R29,11 million worth of awards – 65 suppliers at 24 municipalities made false declarations.
• For R12,94 million worth of awards – nine municipalities did not disclose the awards in their
financial statements.
• For R0,35 million worth of awards – seven suppliers at two municipalities did not submit
declarations at all.
We reported the findings on conflicts of interest and the non-compliance identified to the relevant
accounting officers for investigation. Where such instances resulted in irregular expenditure, they
would also require the attention of the council through its municipal public accounts committee,
as detailed in section 3.4.
Weaknesses in procurement and contract management processes create opportunities for fraud.
As part of our audits, we assessed whether fraud risk indicators were present and, if they were, we
reported them to the relevant accounting officers for investigation.
In 2023-24, we reported the following instances of indicators of possible fraud or improper conduct
in supply chain management processes to accounting officers for investigation:
• False declarations of interest – 358 suppliers declared that no state officials had an interest
in the supplier, but our audits identified such interests. If the suppliers had submitted correct
declarations, municipalities could have considered any potential conflicts of interest before
making the awards. False declarations amount to misrepresentation and should have led to
the suppliers being disqualified
• Failure to declare interest – 174 employees failed to declare interests in suppliers doing business
with the state
Section 3.4 details how accounting officers responded in 2023-24 to the indicators of possible fraud
or improper conduct in supply chain management processes that we had reported to them last
year.
When suspected fraud results in financial loss, it is an MI. We use the MI tool to ensure that
accounting officers deal with suspected fraud in the procurement and contract management
processes swiftly and effectively and that they put controls in place to prevent similar instances
from happening again.
MI
Losses due to suspected fraud in procurement processes
Between May 2018 and January 2020, eThekwini Metro (KwaZulu-Natal) paid a service
provider for consultation services without evidence that the services had been received,
resulting in an estimated loss of R21,04 million. We notified the accounting officer of the MI
in November 2021. In April 2022, the provincial premier’s office submitted an investigation
report to the mayor, which found the former accounting officer and three other officials
liable and recommended that the matter be referred to the South African Police Service and
that civil litigation be considered. Disciplinary processes could not be instituted against one
official or the former accounting officer as they had resigned in February 2021 and July 2022,
respectively. The other two officials were referred to the metro’s financial misconduct board,
which found them not liable in May 2023. In May 2024, the new accounting officer filed a
civil claim summons at the High Court, and the matter is still in progress. The new accounting
officer also plans to file criminal cases with the South African Police Service after obtaining
affidavits from the forensic investigators. We will follow up on the planned actions during our
next audit. The MI has been resolved.
We have referred 13 MIs with indicators of suspected fraud relating to procurement and contract
management at nine municipalities to the Special Investigating Unit, the Directorate for Priority
Crime Investigation (the Hawks) and the Public Protector South Africa. Four investigations have been
completed, four remain in progress, while we only recently referred five of the MIs for investigation.
Irregular expenditure
Since 2021-22, municipalities have incurred irregular expenditure totalling R87,03 billion. The total
amount could be even higher, as 40% of municipalities either were qualified on the completeness
of irregular expenditure reported in their financial statements or disclosed that they were still
investigating these amounts to determine whether they had been irregularly spent.
Non-compliance with procurement and contract management legislation was the biggest
contributor to this expenditure, making up almost the full combined irregular expenditure balance.
R18,48bn
Procurement
without competitive
bidding or
R30,47bn R28,94bn quotation process
R27,62bn
R87,03bn
R55,35bn
Non-compliance with
procurement process
requirements
R12,61bn
Non-compliance with
2021-22 2022-23 2023-24 legislation on contracts
We assessed the nature of irregular expenditure incurred in 2023-24 and found that R27,39 billion
of such expenditure was due to breaches of the five pillars of procurement. Procurement that was
not fair, transparent, competitive and cost-effective accounted for R26,13 billion of this amount,
while the remaining R1,26 billion related to procurement that was not equitable, such as where
municipalities did not apply the preference point system correctly.
In cases where municipalities incurred irregular expenditure, we assessed whether they received
value for the money spent. If not, we either notified accounting officers of MIs or are busy assessing
the matters as potential MIs. Overall, we identified spending of R75,06 million where the prices paid
for goods and services were above market value, employees were overpaid or goods and services
were paid for but not received.
Impact
Apart from resulting in irregular expenditure, non-compliance with procurement and contract
management legislation also gives rise to the following:
• Uncompetitive and uneconomical procurement practices result in, or are likely to result in, financial
losses, as appointed suppliers may not deliver. If municipalities follow proper procurement processes
and adequately test market prices, they can potentially obtain goods and services at lower prices.
Our previous general report highlighted various weaknesses in municipal financial management,
including poor financial planning, revenue deficiencies and financial losses. We also highlighted
the lack of careful spending, reduced revenue and funding, and inadequate grant management.
In 2023-24, we continued to identify such poor financial performance practices, which are causing
financial distress at municipalities.
Section 4.1 deals with the financial performance of metros, which were responsible for 53% of the
local government expenditure budget for 2023-24. In this section, we reflect on overall trends and
lapses in financial performance across local government by focusing on the following:
Municipal budgets make provision for items that do not involve actual cash inflow or outflow. These
are termed ‘non-cash items’ and include accounting entries that reduce the value at which assets,
such as infrastructure or consumer debt, are reflected in the financial statements (impairments),
and that provide for other types of potential financial losses. This is not actual expenditure, but
rather an accounting estimate that enables municipalities to assess the true value of their assets –
for example, whether debt is recoverable (in other words, whether debtors will pay) or determine
the level of deterioration of an infrastructure asset to plan for its replacement.
Under-budgeting for non-cash items such as the impairment of consumer debt may lead to cashflow
shortages, while under-budgeting for asset impairments may lead to the use of deteriorating assets
that have reached the end of their useful life, without having enough reserves built up to fund their
replacement, which will affect the availability and quality of services provided to communities.
Before the mayor tables the budget in the council, it is assessed by either the National Treasury
(for metros and some intermediate cities) or the relevant provincial treasury, as provided for in
section 5(2) of the Municipal Finance Management Act (MFMA). One of the key tests that the
treasuries conduct during this assessment is determining whether the budget is funded – in other
words, whether the available funds and revenue that will be generated or received via grants and
equitable share allocations will be enough to cover the projected spending.
The treasuries specifically consider whether the revenue projections (the money the municipality
expects to receive) are reasonable and whether the municipality is likely to be able to collect this
revenue. If a budget is unfunded, the treasury advises the accounting officer and mayor to correct
the budget before it is tabled and adopted in the council. Those that ignore this advice and adopt
unfunded budgets are requested to correct this position during the adjustments budget period in
February of the following year.
Despite the advice received from the treasuries, 113 municipalities (44%) adopted unfunded
adjustments budgets in 2023-24, up from 108 municipalities (42%) in the previous year. Of these,
86 municipalities (76%) have repeatedly adopted unfunded budgets for the past three years with
no signs of improvement.
The most common reasons for municipalities adopting unfunded budgets are that they struggle
to balance their expenses with their expected revenue, and overestimate the amount of property
rates and service charges that they will collect from residents.
Unauthorised expenditure is expenditure that is not in line with the approved budget or the
conditions of a grant. Municipalities must disclose any amount that they overspend or do not
spend in line with their budgets as unauthorised expenditure. Since 2021-22, municipalities have
disclosed a total of R81,59 billion in unauthorised expenditure.
Spending not in line with budget R25,15 billion R24,17 billion R31,59 billion
Spending not in accordance with R0,25 billion R0,23 billion R0,2 billion
grant conditions
Cash R12,38 billion (49%) R14,64 billion (60%) R13,35 billion (42%)
Non-cash R13,02 billion (51%) R9,76 billion (40%) R18,44 billion (58%)
Of the 113 municipalities that adopted unfunded budgets in 2023-24, 91 (81%) incurred unauthorised
expenditure. Of the 91 municipalities for which the audits had been completed by the cut-off date for
this report, 53 (58%) incurred deficits over the financial year.
The total deficit in local government for 2023-24 was R11,29 billion, with 90 municipalities (39%) spending
more than they generated in revenue. This was most prevalent in the Free State, Mpumalanga and the
Northern Cape, as detailed in section 7.
In 2023-24, almost a quarter of municipalities (24%) did not have available cash at year-end to cover
even one month of fixed monthly operating expenses because they had spent money that they did
not have throughout the year. These municipalities typically operate from month to month, paying
what is possible and favouring the payment of salaries.
While this cycle is likely to continue, unless municipalities increase their revenue and reduce their
spending, there are also significant weaknesses in how they manage revenue, grants and expenditure.
• Consumers are not billed, or receive free basic services to which they are not entitled.
43
75
142 162 (27%)
water electricity
(53%) service service
providers 60 providers
(42%) 112
(69%)
Water losses not disclosed Water losses below/equal to 30% norm Water losses above 30% norm
Electricity losses not disclosed Electricity losses below/equal to 10% norm Electricity losses above 10% norm
As in previous years, our audits identified consumers that were not billed. As detailed in section 2.2, there
were 64 municipalities (26%) that had material misstatements in the revenue disclosed in their financial
statements because they did not bill all the revenue due to them, they did not have adequate audit
evidence for the amounts shown as billed, or the amounts were recorded incorrectly. A quarter of
municipalities (25%) also materially misstated the receivable amount (how much consumers owed at
year-end) because they did not know the correct amounts owed to them and whether they were still
entitled to receive those amounts. In some cases, the amounts recorded were not accurate.
In 2023-24, we continued to focus on the free basic services delivered to indigent households
at the 220 municipalities that provided basic services. The mismanagement of services provided
to indigent households causes further financial distress and negatively affects some of the most
vulnerable communities.
Some municipalities provided free services to households that did not meet, or no longer met, the
indigent criteria as set by the municipality. Our findings included households that received free
basic services where:
• the registered indigent person was deceased – services to the value of R143,88 million at 62
municipalities (28%)
• the registered indigent person and/or their spouse(s) was employed by the state or had an interest
in business with government – services to the value of R7,74 million at 54 municipalities (25%).
MI
Poor management of indigent households
Alfred Duma Local Municipality (KwaZulu-Natal) did not regularly monitor its indigent household
database and provided free basic electricity worth an estimated R5,45 million to consumers
that had not been approved. We notified the accounting officer of the MI in January 2023. In
January 2024, the municipality concluded the vetting of indigent applications, which is now
also a standard practice for new applications. The MI has been resolved.
We also identified municipalities that did not effectively use the equitable share allocation that they
received from the National Treasury to fund free basic services for indigent households.
The National Treasury determines the basic services component of the equitable share allocation by
estimating the number of poor households in the area based on information from the Statistics South
Africa census. However, municipal budgets are based on only the number of registered indigent
households, which results in significant differences in the amounts received and paid out.
In 2023-24, the National Treasury allocated R68,05 billion to fund free basic services for 10 777 241 indigent
households. However, 42% of these households (4 481 647) were not registered at municipalities and
were therefore not budgeted for. As a result, only R27,16 billion (40%) of the total amount received by
municipalities was budgeted to fund free basic services to indigent households. For example:
• Sol Plaatje Local Municipality (Northern Cape) received an equitable share allocation of
R252,99 million intended to support 39 908 indigent households, but budgeted only R61,16 million
(24%) for 11 633 indigent households (29%). The municipality also budgeted less per indigent
household than was allocated by the National Treasury.
• Mangaung Metro (Free State) received an equitable share allocation of R1,04 billion intended
to support 163 684 indigent households, but budgeted only R0,46 billion (44%) for 65 417 indigent
households (40%).
In total, 37 municipalities (17%) did not have properly functioning processes to ensure that community
members were aware of and able to apply for indigent status. In addition, 10% of indigent registers
were not updated every year. The weaknesses we identified in these processes make it more difficult
for vulnerable households to effectively access the free basic services that they are entitled to receive.
Some consumers (including government institutions) do not always pay municipalities what they owe
them for services – a longstanding trend that has worsened with the continuing economic downturn.
So, while a municipality’s revenue might look healthy on paper, the money does not reach the bank.
On average, municipalities estimated that they would be able to recover only 32% (R129,46 billion) of
their 2023-24 revenue.
Emfuleni Local Municipality (Gauteng) has adopted an unfunded budget for the past three
years and, in 2023-24, it had a deficit of R987 million. The municipality owes Eskom R2,2 billion
and has enrolled in the Eskom debt-relief programme. However, it did not fully comply with
the programme requirements in 2023-24 due to financial constraints, largely because it could
not collect the debt owed to it. The municipality has written down 91% of its outstanding debt
and is still struggling financially, despite implementing a mandatory financial recovery plan.
We have identified 39 MIs at 24 municipalities and two municipal entities related to revenue not billed,
receipts not deposited or debt not recovered.
MI
Revenue not billed and debt not recovered
• In 2020-21, Ba-Phalaborwa Local Municipality (Limpopo) did not bill some of its customers
for the water they consumed, resulting in an estimated revenue loss of R35,73 million. We
notified the accounting officer of the MI in November 2022. In March 2023, the system was
configured to calculate estimates where meters could not be read. We did not identify any
non-billing issues in our 2023-24 audit. Further action is being taken to fully resolve the MI.
Although municipalities are highly dependent on these grants to finance their infrastructure projects,
they often do not spend all the funds that they receive. Municipalities can apply to roll over any unspent
funds but, if this is not approved, the unspent grant funding is returned to the department that had
provided the grant.
In 2023-24, municipalities received R39,61 billion relating to these five grants and spent 94% of the
amount that they received (R37,23 billion), compared to 91% in the previous year. Underspending by
more than 10% was most common at municipalities in the Northern Cape (14 municipalities) and the
Free State (13 municipalities).
One of the main reasons for underspending was that municipalities did not always have the institutional
capability to carry out infrastructure projects, as detailed in section 3.1.
When grants are underspent due to poor project management, this contributes to delays in completing
infrastructure projects aimed at improving service delivery to communities, such as access to water
and sanitation, housing and public transport. However, it is acceptable for a municipality to make a
deliberate decision not to spend grant funding if it cannot be spent wisely.
We audited the use of various conditional grants and raised findings on compliance with legislation
due to grants not being spent in accordance with the applicable frameworks. In 2023-24, the
non-compliance was material at 19 municipalities.
We identified 13 municipalities that did not spend the five infrastructure-related grants that they
received in accordance with legislation – in some cases, for more than one grant. This included 10
municipalities that received municipal infrastructure grant funding, six that received water services
infrastructure grant funding, two that received regional bulk infrastructure grant funding, and one
that received funding via the urban settlements development grant. At Xhariep District Municipality
(Free State), the non-compliance with spending on the municipal infrastructure grant was material.
At all 13 municipalities, management could not provide evidence on how all the infrastructure grants
had been spent, while six spent the money received from one or more of the grants on operational
costs or otherwise not in line with the relevant business plan.
Local government is losing billions of rand each year because of poor decisions, neglect or inefficiencies.
Since 2021-22, municipalities have incurred a total of R17,65 billion in fruitless and wasteful expenditure.
R7,46bn
R4,92bn R5,27bn
This amount could be even higher, as 21 municipalities (9%) were qualified on the value of the fruitless
and wasteful expenditure that they disclosed. These municipalities did not report all the fruitless and
wasteful expenditure in their financial statements that they should have and/or incorrectly reported
the amount.
Two of the main reasons for money being lost are weaknesses in project management (as detailed in
section 3.1) and uncompetitive and uneconomical procurement practices (as detailed in section 3.2).
• No or limited benefit received for money spent – including the ineffective use of consultants.
Municipalities must actively manage the contracts awarded to suppliers to ensure that the suppliers
deliver at the right time, price and quality before any payments are made. Municipalities must also
pay their bills on time to avoid interest and penalties, and avoid making payments to employees or
other beneficiaries that are not valid. Such requirements are not only standard financial management
practices, but are included in the MFMA, which makes accounting officers responsible for ensuring that
the required processes and controls are implemented.
Although municipalities are required by law to pay their creditors within 30 days of receiving an
invoice or statement, widespread non-compliance with this requirement continued. In 2023-24,
117 municipalities (47%) failed to pay their suppliers within the required 30 days, and it took municipalities
an average of 286 days to pay their creditors. Since 2021-22, municipalities have incurred interest and
penalties totalling R14,58 billion due to late payment.
Payments were not always made in accordance with contract requirements, or were made for
goods and services that were not received or that were of poor quality. Payments were also made to
employees who were not eligible to receive salaries or wages.
We have issued notifications to the accounting officers of 74 municipalities and two municipal entities
for 147 MIs relating to poor payment practices – 75 for late payments and the remainder for payments
made for goods or services that were not received (57), of poor quality (five), not in line with the contract
(seven), or to ineligible beneficiaries (three), which resulted in (or are likely to result in) financial losses.
MI
Poor payment practices
• Between June 2023 and June 2024, Msunduzi Local Municipality (KwaZulu-Natal) paid
scarce skills allowances to employees without applying any policy or procedure that
defines eligibility, resulting in a loss of R6 million. We notified the accounting officer of the
MI in November 2024. During 2024-25, the municipality stopped making the payments,
and a standard operating procedure to objectively inform the adjudication and approval
of scarce skills allowances was developed and submitted to the council. Further action is
being taken to fully resolve the MI.
• Between April and June 2019, Polokwane Local Municipality (Limpopo) paid
R16,68 million for four buses that were not received. We notified the accounting officer
of the MI in December 2022 and, in January 2023, the municipality appointed a service
provider to investigate the matter. The investigation was completed in March 2023 and
identified four officials to be responsible. In 2023-24, the municipality referred the matter
to court to recover the overpayment from the supplier, which had been placed under
business rescue in August 2021. In September 2024, the accounting officer also issued
letters of demand to recover the funds from the four responsible officials, three of whom
had resigned. Disciplinary processes to deal with the transgression are still underway for
the remaining official. Further action is being taken to fully resolve the MI.
Local government loses billions of rand each year in interest charges due to late payments. By
year-end, municipalities owed R55,4 billion in arrears (including interest) to Eskom and R21,24 billion
to water boards.
We have notified accounting officers of 34 MIs at 30 municipalities dealing with late payments to
Eskom and water boards.
The Eskom debt-relief programme, managed by the National Treasury, aims to empower
municipalities to build financial resilience and improve their capacity to generate sustainable
revenue, fostering a culture of paying for services rendered.
The programme allows municipalities to apply for debt relief over rolling 12-month cycles. To qualify,
municipalities that had overdue Eskom debt at 31 March 2023 must submit a written application,
supported by a council resolution, to the National Treasury. The National Treasury then evaluates
applications individually. Approved municipalities must adhere to specific conditions for 24 months
to qualify for an annual write-off of one-third of their Eskom debt over three years, and are exempt
from repaying the amounts in arrears, interest or penalties at 31 March 2023. The conditions include
the municipality implementing proper budget, expenditure and revenue management processes
by paying Eskom within 30 days of receiving invoices for current billing, having a funded budget
and cost-reflective tariffs, issuing consumers with monthly consolidated municipal bills, maintaining
minimum average collections of property rates and service charges, and ensuring that billing is
complete (meaning that the billing system must agree to the approved valuation roll).
Those that do not comply with these conditions may be removed from the programme; be
compelled to repay their Eskom arrears, interest and penalties; and be subjected to stricter re-
application requirements. Eskom may also take legal action against them, including freezing
municipal bank accounts.
To date, 63 municipalities with Eskom debt have joined the debt-relief programme, but 53 of them
(84%) are not complying with the programme requirements. Non-compliance undermines the
programme’s goal of promoting good financial management practices, which leads to ongoing
mismanagement and negatively affects service delivery. It may also result in the financial position
of these municipalities worsening if Eskom removes them from the programme.
One of the key responsibilities of accounting officers and senior managers is to implement and
maintain effective and efficient systems of internal control to support accountability and prevent
fraud.
Section 3.2 outlines the fraud risks relating to procurement that we identified during our audits.
We also did focused work on fraud risk and controls at metros and municipalities with disclaimed
audit opinions. At some of these municipalities, the lack of basic controls – including those relating
to good record-keeping, payment approvals and information technology systems – created an
environment in which it was easy to commit fraud.
MI
Losses due to suspected fraud
Since 2017-18, Madibeng Local Municipality (North West) has made unauthorised payments to
accounts of private individuals, resulting in a loss of R19,68 million. We notified the accounting
officer of the MI in December 2023. The accounting officer did not take appropriate action to
address the MI and we referred the matter to the Directorate for Priority Crime Investigation
(the Hawks) for investigation in April 2025.
With the limited funds available, municipalities must ensure that they get the best value from every rand
spent. However, they have continued to procure goods or services that they either did not use or did
not use in full, or for which they did not receive the full value for the money spent, which resulted in (or
is likely to result in) financial losses.
We have notified accounting officers at 30 municipalities and one municipal entity of 38 MIs relating
to such losses.
MI
No or limited benefit received for money spent
In 2021-22, Mopani District Municipality (Limpopo) paid R7,77 million to a contractor to rectify
poor work done on the Mametja-Sekororo regional water scheme project by the previous
contractor, whose contract was terminated in June 2019. We notified the accounting officer
of the MI in May 2023. The accounting officer concluded an investigation in September 2024
and tabled the findings in the council in October 2024. The council referred the matter to the
municipality’s internal legal services unit. Further action is being taken to fully resolve the MI.
In 2023-24, 219 municipalities (89%) used financial reporting consultants at a cost of R1,47 billion,
compared to 222 municipalities that spent R1,39 billion on such consultants in 2020-21.
R253,71m (21)
North West R211,65m (20)
R344,41m (21)
R280,32m (27)
Limpopo R279,87m (27)
R286,79m (27)
R204,45m (50)
KwaZulu-Natal R252,81m (50)
R222,63m (47)
R133,08m (16)
Mpumalanga R187,67m (18)
R169,43m (18)
R116,94m (25)
Northern Cape R142,99m (27)
R150,51m (28)
R155,98m (34)
Eastern Cape R150,17m (32)
R142,40m (29)
R50,29m (16)
Free State R51,01m (14)
R66,54m (14)
R148,67m (5)
Gauteng R49,96m (7)
R51,48m (8)
R43,11m (28)
Western Cape R42,48m (27)
R37,37m (27)
Despite the amount that municipalities spent on consultants to ensure good-quality financial statements,
the expected benefits were not always evident. The financial statements submitted for auditing by 130
of the municipalities that used consultants (59%) had material misstatements in the areas in which the
consultants did work. Even after we allowed corrections to be made, 101 municipalities (46%) that used
consultants received modified audit opinions.
R51,19m R30,21m
(33 municipalities) (5 municipalities)
R571,51m R60,19m
(85 municipalities) (10 municipalities)
39%
52% R758,45m
(86 municipalities)
In 98% of cases, the municipalities – and not the consultants – were responsible for not receiving the full
benefit of the appointments: they appointed the consultants too late, did not adequately review the
consultants’ work, could not make the required financial records and documentation available to the
consultants, or managed consultant contracts poorly.
3%
11%
81 9
Work of consultants not Poor project management
7% adequately reviewed
2%
19 14
Records and documentation Consultants appointed too late
inadequate or lacking
15%
3 4
62% Consultants did not deliver Other auditee ineffectiveness
We have been reporting on the ineffective or inefficient use of consultants for financial reporting for
many years. To encourage municipalities to use consultants responsibly, we have notified accounting
officers of 34 MIs relating to the use of consultants.
In 2021-22, City of Tshwane Metro (Gauteng) awarded a R617 million contract to consultants
to prepare an immovable asset register, but did not institute adequate controls to review the
consultants’ work. This resulted in material misstatements in the areas for which the consultants
were appointed not being detected and corrected, and in payments being made to the
consultants for work that was not done. We notified the accounting officer of the MI in April 2023.
In September 2024, the accounting officer finalised a value-for-money audit, which determined
that the consultants did not perform work to the value of R26,08 million. The accounting officer
has since withheld R12,32 million owed to the consultants and is in the process of recovering the
remaining R13,76 million. Further action is being taken to fully resolve the MI.
The financial position of 49 of the 247 municipalities (20%) where we completed our audits was so dire
that they had to disclose significant doubt about their ability to continue to operate fully. Of these, 36
municipalities (73%) have made this disclosure for three years or more. This means that because of their
financial position, they have not been fully operational for many years.
Kareeberg LM (1 year)
Tsantsabane LM (2 years)
3 Free State
Ditsobotla LM (5 years)
JB Marks LM (1 year)
City of Tshwane MM (4 years) Kgetlengrivier LM (>5 years)
Merafong City LM (3 years) Lekwa-Teemane LM (>5 years)
Rand West City LM (>5 years) Madibeng LM (1 year)
Sedibeng DM (>5 years) Mamusa LM (>5 years)
West Rand DM (>5 years) Maquassi Hills LM (>5 years)
Rustenburg LM (2 years)
Endumeni LM (2 years)
Theewaterskloof LM (1 year)
4 Limpopo
Bela-Bela LM (3 years)
Emalahleni Local Municipality (Mpumalanga) has adopted an unfunded budget for the past
three years and ended 2023-24 with a deficit of R1,14 billion. The municipality has written down
92% of the debt owed to it by consumers, while also owing Eskom R9,1 billion. It has enrolled
in the Eskom debt-relief programme, but is not meeting the programme requirements due to
cashflow and debt-collection challenges. The municipality has had a mandatory financial
recovery plan in place for more than six years (since 2018), but this has had minimal impact
on its financial health.
Ramotshere Moiloa Local Municipality (North West) has adopted an unfunded budget for
the past three years. Due to its financial crisis, the municipality is currently under provincial
intervention and is implementing a mandatory financial recovery plan. The provincial treasury
appointed a provincial executive representative to oversee the execution of the financial
recovery plan. The representative was able to increase the municipality’s collection rate by
5% by intensifying credit-control activities and helping the municipality to consistently pay
its Eskom current account during the financial year. As a result, the municipality transitioned
from an unfunded budget in 2023-24 to a funded budget for 2024-25.
• Disregard for proper budgeting principles by mayors, municipal managers and councils, which
adopt unfunded budgets; and a lack of diligence and impactful decision-making by mayors
(relating to monthly budget statements) and councils (relating to quarterly budget implementation
and financial affair reports) to prevent unauthorised expenditure.
As a result, the financial position of municipalities continues to deteriorate year after year, with a
significant number of them experiencing going concern uncertainties and financial distress. Despite
this, money continues to be lost through the poor quality of spending. Grant funding is also not always
used effectively.
This has a negative impact on service delivery, as the resulting limited funds is not enough to be
directed to all municipal areas where spending is required, which leads to service delivery backlogs
that negatively affect residents. Unpaid creditors face cashflow challenges, which can cause some
businesses to cease trading. Water and energy interruptions due to a lack of infrastructure maintenance
increase the cost of alternative supplies and of doing business, all of which have a ripple effect on the
local economy.
Each year since 2021-22, we have reported that one of the root causes of continued transgressions and
non-performance is the lack of a culture of accountability and consequences.
An accountability culture is embodied by officials accounting for how they have performed and taking
responsibility for their actions and decisions. An essential element that strengthens such a culture is that
those who do wrong (transgress), do nothing (fail to act) or perform poorly should face consequences
for their actions.
‘Consequence management’ refers to the processes and controls that should be in place at a
municipality to ensure that it consistently and timeously complies with its legislated responsibilities.
When officials face consequences for their actions, this helps municipalities to both recover the losses
caused by those officials and deter others from disregarding legislation and perpetuating a culture in
which they get paid their salaries without fulfilling their responsibilities.
There are specific steps that accounting officers need to follow when they become aware of an
irregularity; an allegation of fraud or financial misconduct; or unauthorised, irregular, and fruitless and
wasteful expenditure. The steps are laid out in the Municipal Finance Management Act (MFMA) and
the Municipal Systems Act (MSA), together with their accompanying regulations, the National Treasury’s
Consequence Management and Accountability Framework, and the policies of each municipality.
The National Treasury may condone non-compliance with the MFMA on good grounds shown by the
municipality and thereby condone irregular expenditure due to non-compliance with the act.
Section 170 of the MFMA
The council may condone non-compliance with council policies or by-laws and thereby condone
any resultant irregular expenditure.
Section 1 of the MFMA – paragraph (d) of irregular expenditure definition
The municipality (i.e. the accounting officer) must recover the expenditure from the liable official.
Section 32(2) of the MFMA
The council may certify unauthorised, irregular, and fruitless and wasteful expenditure to be
irrecoverable and write it off based on the outcome of the investigation.
Section 32(2) of the MFMA
Dealing with financial misconduct, fraud and other improper conduct relating to
supply chain management
The council must establish a disciplinary board to investigate allegations of financial misconduct and
monitor disciplinary proceedings.
Regulation 4(1) of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
The mayor or accounting officer must, within seven days of receiving an allegation, and if reasonably
satisfied that the financial misconduct did occur, refer it to the disciplinary board for preliminary
investigation.
• If the allegation is unfounded, the investigation must be terminated.
• If the allegation is founded, a full investigation must be conducted by the disciplinary board or,
based on the seriousness, by a specialist investigator and/or independent team of investigators
appointed by the council.
Regulations 3(2) and 5 of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
Regulation 5(2) of the Disciplinary Regulations for Senior Managers
Dealing with financial misconduct, fraud and other improper conduct relating to
supply chain management (continued)
If the municipality fails to investigate the allegation, the national or provincial treasury may intervene
or direct that the allegation be investigated.
Regulations 5, 6(2), 6(7) and 19 of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
After completing a full investigation, the investigator/investigating team must submit a report to the
mayor or accounting officer with any findings, recommendations or disciplinary steps to be taken.
Regulation 6(3) of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
The accounting officer must take reasonable steps to institute disciplinary or criminal proceedings
against any official who has allegedly committed financial misconduct or a financial offence; and
report indicators of fraud, corruption or other criminal conduct to the South African Police Service.
Section 62(1)(e) of the MFMA
Regulations 3(4) and 10(1) of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
Section 34 of the Prevention and Combating of Corrupt Activities Act
The council must, by way of resolution, institute disciplinary proceedings if recommended by the
investigation.
• Proceedings for accounting officers or senior managers are governed by the Disciplinary
Regulations for Senior Managers issued in terms of the MSA.
• Proceedings for any other officials are governed by the South African Local Government
Association’s main collective bargaining agreement.
Regulation 6(8) of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
In section 5, we explain that an accounting officer must follow the same legislated process outlined
above when we notify them of an MI. Section 5.4 highlights that the resolution of MIs is often held
up due to delays in performing investigations and taking steps against officials through disciplinary
processes as required by legislation.
Little has changed since the end of the previous administration’s term, and we continue to observe the
same weaknesses in consequence management. This observation is based on:
• evaluating municipalities’ responsiveness to our findings on transgressions and possible fraud that
we highlight for investigation.
As detailed in section 3.2, the lack of consequences is also evident in how municipalities deal with non-
performing suppliers and contractors.
115
Municipalities with no findings
50% 47% 8
Municipalities with findings
124
Municipalities with material findings
3%
The most common compliance findings in this area involved councils not investigating and/or not
properly dealing with unauthorised, irregular, and fruitless and wasteful expenditure. This means that
they did not take sufficient steps to recover, write off, approve or condone such expenditure. In
2023-24, 113 municipalities (46%) did not investigate the previous year’s irregular expenditure, while 99
(40%) failed to do so for fruitless and wasteful expenditure, and 96 (39%) for unauthorised expenditure.
By the end of 2023-24, the balance of irregular expenditure that had accumulated over many years
totalled R137,03 billion due to the inaction of councils.
How councils dealt with prior-year irregular expenditure balance over three years
R11,51bn
(10%) R22,76bn R27,38bn
(17%) (20%)
R0,71bn
(1%) R0,02bn
(<1%)
R107,59bn
(90%) R112,67bn R109,63bn
(82%) (80%)
In 2023-24, six municipalities did not comply with the legislated requirement to write off irregular
expenditure only if the council, after investigating, certifies that the money is not recoverable. The
combined total of R4,75 billion of these write-offs represented 17% of the total amount of irregular
expenditure written off during the year. The biggest contributor to this amount was uMkhanyakude
District Municipality in KwaZulu-Natal, which wrote off R3,78 billion.
• Council approval was not obtained for the write-off: Collins Chabane Local Municipality (Limpopo),
Renosterberg Local Municipality (Northern Cape) and uMkhanyakude District Municipality
(KwaZulu-Natal). At uMkhanyakude, the council did not pursue the results of the investigation,
which determined that certain officials were liable for the expenditure.
• The write-off was not based on the results of investigations: Ga-Segonyana Local Municipality
(Northern Cape), Nelson Mandela Bay Metro (Eastern Cape) and Renosterberg Local Municipality
(Northern Cape).
• The required investigation was not done properly: uThukela District Municipality (KwaZulu-Natal).
When we identify fraud risks, we report these to accounting officers, and we expect them to conduct
a forensic investigation into the matter. If the investigation confirms that there was fraud, the matter
must be reported to the South African Police Service and disciplinary action must be taken against any
implicated officials. The accounting officers must also establish or improve internal controls to prevent
such occurrences in future.
Last year, we reported indicators of fraud or improper conduct in supply chain management processes
at 94 municipalities for follow-up. These are the fraud indicators referred to in section 3.2. However, 37 of
these municipalities (39%) did not take any action to investigate the findings.
Overall status
43
Municipalities 40 (70%)
investigated all resolved all findings
findings reported
14
57 11 (19%)
resolved some findings
39% Municipalities
46% investigated some 6 (11%)
findings reported did not resolve findings
37
15% Municipalities
investigated no
findings reported
Payment despite
poor delivery by 3 (100%)
supplier (3)
Payment to
possible fictitious 1 (20%) 4 (80%)
supplier (5)
As outlined in section 3.2, accounting officers should swiftly complete the investigations into both the
allegations that had previously been reported and those that we reported to them in 2023-24, so that
potentially fraudulent activities can be stopped, the necessary criminal investigations can start, further
transgressions can be prevented and any financial losses can be recovered.
• As highlighted earlier in the legislated process and responsibilities table, council committees
(usually municipal public accounts committees) have a key role to play in investigating
instances of unauthorised, irregular, and fruitless and wasteful expenditure. They should also
make recommendations on how councils should deal with such expenditure or any other
matters referred to them or that they investigate. Despite this, these committees were not
effectively executing their roles or mandates at 88 municipalities (36%).
• Councils, mayors and accounting officers did not consistently set an ethical leadership tone
to ensure that there was accountability for transgressions. This is also evident from the slow
response to MIs.
• At 59 municipalities (24%), policies and procedures to monitor, measure and evaluate staff
performance were not in place, resulting in a lack of accountability for transgressions and non-
performance.
3.5 CONCLUSION
Throughout this section, various risks to service delivery have been highlighted: from weaknesses
in infrastructure management, procurement and finance processes to a lack of consequences.
Accounting officers, mayors and councils should decisively deal with these risks to enable the
delivery of key government priorities that are intended to improve the lives of South Africans.
Metropolitan municipalities, commonly known as ‘metros’, play a significant role in the local
government sphere. Metros are large urban areas with populations of typically more than one
million people. They are strategically located across the country’s various economic hubs, serve a
vast number of people in various cities across South Africa and are entrusted with correspondingly
substantial budgets for service delivery.
In 2023-24, metros and their municipal entities were responsible for service delivery to 8,9 million
households (46% of all households in the country) and managed 57% of the estimated local
government expenditure budget.
Metros at a glance
Movement
Improvement Unchanged Regression
from 2020-21
Movement
Unchanged Regression
from 2020-21
Movement from
Metropolitan municipalities 2020-21
2020-21 1 5 2 0 0 0
8 1 3
2023-24 1 3 4 0 0 0
Municipal entities
2020-21 1 12 1 0 0 0
14 3 0
2023-24 3 11 0 0 0 0
This section provides an overall view of metros’ performance, the level of transparency in their financial
and performance reporting, the institutional integrity that we have observed, and the strength of the
institutional capability and accountability mechanisms that they have in place.
4.1 PERFORMANCE
Metros should demonstrate their commitment to improving the lived realities of their residents by
delivering on their legislated mandate, aligning their strategic objectives to community needs, being
financially sustainable and avoiding harm to the public. While we do not audit metros’ performance,
our work on their financial statements and performance reports, as well as on infrastructure and
environmental management, highlights areas in which their financial and service delivery performance
might be at risk.
Financial performance
City of Tshwane and Mangaung have both disclosed significant doubt about their ability to continue
operating fully as a going concern for four years or more. We also assessed their financial position as
requiring immediate attention because of the material unfavourable financial indicators. We assessed
the financial position of all other metros, except City of Cape Town, as concerning.
In 2023-24, Mangaung disclosed significant doubt in its financial statements about its ability to
continue operating. The metro spent 81% of the total cash it received from its customers on
employee-related costs totalling R1,96 billion, leaving it with little to spend on service delivery.
The metro should have processes in place to ensure that it efficiently uses the limited funds
it has. However, in 2023-24, the metro incurred R1,34 billion in unauthorised expenditure and
R122,52 million in fruitless and wasteful expenditure. It also did not manage its grant funding
appropriately. We raised a material finding on compliance with the grant framework because
the grant funding was not spent for its intended purpose, and R194 million in grant funding
went unspent in 2023-24. The National Treasury also withheld R297 million in grant funding that
had not been spent in 2022-23 due to slow project implementation.
The metro has been under national intervention since December 2019 and the finance
minister approved a mandatory financial recovery plan in September 2023. Although the
plan has been in place for more than a year, the metro’s financial situation has not improved,
resulting in service delivery disruptions by frustrated residents.
Credit-rating agencies use financial statements as a tool to help them determine how much risk there
is in lending money to a municipality. The credit rating assigned to a municipality can affect both its
ability to borrow money and the cost of it doing so, particularly at metros with listed debt instruments (a
form of debt used to raise capital).
Poor budgeting processes resulted in unfunded budgets being approved by councils and financial
recovery plans not yielding the desired results. City of Ekurhuleni and City of Tshwane adopted
unfunded adjustments budgets – City of Tshwane has been adopting an unfunded adjustments
budget for the past three years.
Some metros participated in the National Treasury’s budget workshops to enable them to pass
funded budgets. For example, City of Johannesburg initially tabled an unfunded budget to the
council, which was not approved. The National Treasury supported the metro to address the
concerns and eventually a funded budget was adopted.
As a result of the poor budget-monitoring processes, metros have disclosed a total of R14,62 billion
in unauthorised expenditure since 2021-22, all of which related to overspending.
Unauthorised 4 4 6
(50%) (50%) (75%)
expenditure amount
and number of metros
R3,16bn R2,97bn R8,49bn
Metros continued to display poor revenue management and struggled to collect debt, which
were the main reasons for their financial health concerns. By year-end, metros had written down
a combined R118,64 billion in consumer debt, which they estimate they will not be able recover –
70% of the total municipal debtors’ book of R168,74 billion.
• At Buffalo City, the revenue-collection rate declined due to factors such as high poverty
and unemployment, poor billing practices, lack of debt-collection mechanisms and a
culture of non-payment that was worsened by residents being unsatisfied with the quality
of the services that they received. The metro had a debt-collection period of 151 days
and has written down 65% of its debt as it may not be fully recoverable.
• City of Tshwane had a funding shortfall mainly due to insufficient revenue collection.
This was driven by historically poor budgeting and financial management practices,
particularly when it came to managing collections and creditor payments. The metro
had a debt-collection period of 55 days and has written down 72% of its debt as it may
not be fully recoverable. As a result, it also had an average creditor-payment period of
243 days.
As in previous years, we again identified consumers that were not billed correctly. At Buffalo City,
the revenue disclosed in the financial statements was materially misstated because revenue from
sewerage and sanitation services was incorrectly billed, resulting in revenue and receivables being
overstated by R51,93 million.
Buffalo City, eThekwini and Nelson Mandela Bay depended heavily on estimated water and
electricity meter readings, often leading to billing inaccuracies. At eThekwini, for example, this
stemmed from the lack of automated functionality to identify unread meters and the reliance on
manual reporting of meter readings. More than 50% of customer service calls at all metros, except
City of Cape Town, were not attended to promptly, resulting in unresolved billing disputes and
inefficiencies.
Metros lose a significant amount of revenue through water and electricity losses, putting further strain
on their financial position. In 2023-24, the estimated water losses for the eight metros totalled R8,64
billon, while electricity losses were estimated at R14,52 billion. The average water losses incurred
were 37% while the average electricity losses were 18%. These losses were due to inadequate
infrastructure maintenance, as detailed in section 3.1, as well as illegal connections.
Losses Losses
above above
Amount Amount
30% 10%
norm norm
Metro
Metros received conditional grants of R13,27 billion in 2023-24 to finance their infrastructure projects.
• Metros have a higher population density and a greater need for integrated, efficient public
transport systems compared to other municipalities. More than 75% of the public transport network
grant was allocated to metros to support financially sustainable municipal public transport
networks, which they underspent by 11% overall. Mangaung underspent this grant by more than
50% due to delays in the completion of grant-funded projects caused by community unrest,
termination and re-appointment of service providers, delayed approval of time extensions, and
delayed payments to contractors.
• The urban settlements development grant is specifically geared towards metros to support their
unique responsibilities and the challenges they face in managing large-scale urban development
and infrastructure projects. Nelson Mandela Bay underspent this grant by 9%, while Mangaung
did not spend this grant in accordance with the grant framework.
Metros are underspending these grants because of a lack of institutional capability to plan and
execute infrastructure projects as well as ineffective project management processes.
Despite their constrained financial position, metros continued to incur financial losses through fruitless
and wasteful expenditure, poor payment practices, overspending on projects, and water and
electricity losses.
Metros incurred fruitless and wasteful expenditure of R941,92 million in 2023-24, bringing the total of
such expenditure since 2021-22 to R3,85 billion, with 57% of this amount being due to interest and
penalties.
Total fruitless
2023-24 fruitless and wasteful
and wasteful Movement from expenditure over
Metro expenditure previous year three years
We have issued 21 material irregularity (MI) notifications at six metros and one municipal entity relating
to poor payment practices, such as late payments (eight) and payments for goods or services that
were not received (nine), of poor quality (two), not in line with the contract (one), or to ineligible
beneficiaries (one), which resulted in (or are likely to result in) financial losses.
MI
Poor payment practices resulting in financial loss
• From April 2021, the South African Local Authorities Pension Fund increased employer
contributions on pensionable salary from 20,78% to 22,78%. However, Mangaung continued
to contribute at the previous rate, resulting in estimated interest of R3,79 million being charged
on arrear employer contributions between April 2021 and October 2024. We notified the
accounting officer of the MI in November 2024, but they did not take appropriate action. We
are deciding on the further action to be taken.
• Between June 2019 and September 2021, the Johannesburg Development Agency, a
municipal entity of City of Johannesburg, paid an estimated R2,1 million to a contractor for
refurbishment work that was not performed. We notified the accounting officer of the MI in July
2023. The accounting officer identified three officials as being responsible – two had resigned
in 2021-22, while the third was suspended in August 2023 pending and investigation. In April
2024, the entity finalised the investigation and, in June 2024, the implicated official pleaded
guilty in disciplinary proceedings and was issued with a final written warning and suspended
for 10 working days without pay. In August 2023, the municipal entity also strengthened its
controls and instituted progress updates on projects during project performance meetings.
Legal proceedings to recover the payments made to the contractor for work not done were
instituted in October 2023 and are in progress. The MI has been resolved.
None of the metros budgeted sufficiently for repairing and maintaining their assets, and all eight
spent less than the National Treasury norm of 8% of the value of property, plant and equipment on
repairs and maintenance. City of Johannesburg had the lowest spend (less than 1%), followed by
Buffalo City and City of Tshwane (both less than 2%).
Effective preventative maintenance can be achieved only by regularly assessing the condition of
infrastructure. However, this was not the case at all metros and we found the following.
The absence of condition assessments results in insufficient planning and budgeting, with resources
being allocated as needed, based on emergency requirements. As a result, priority projects may
be overlooked and the overall condition of critical assets may deteriorate due to neglect. The poor
planning for wastewater and solid waste has contributed to ageing infrastructure, breakdowns and,
ultimately, service disruptions and delivery failures.
On our September 2024 site visit to Tembisa in City of Ekurhuleni, we identified poorly
maintained residential roads and potholes, illegal electricity connections, rubbish obstructing
drains, and sewage overflowing onto the roads. The metro indicated that, due to a limited
road maintenance budget, it focused mainly on major roads and registered complaints.
While it repaired the potholes in October 2024 after we had raised an audit finding, it has not
yet resolved the other issues.
Infrastructure neglect and non-compliance with environmental management at metros often result
in harm to the public. We have issued 15 MI notifications at five metros and three municipal entities
relating to the poor management of wastewater treatment works and landfill sites.
MI
Infrastructure neglect
• The Waterval wastewater treatment works managed by Ekurhuleni Water Care Company,
an entity of City of Ekurhuleni, has not been functional since 2021 due to neglected
maintenance. This has resulted in untreated wastewater being discharged into the Klip
River and surrounding areas. We notified the accounting officer of the MI in May 2024. The
entity completed a feasibility study in June 2024 and concluded that the plant required
refurbishments and upgrades. The accounting officer allocated R10,3 million in the draft
capital budget for refurbishing and upgrading wastewater treatment works from 2024-25 to
2026-27. Further action is being taken to fully resolve the MI.
• In October 2023, we identified that Mangaung did not ensure that access controls, site
operations, treatment processes and disposal activities at its Northern waste landfill site
complied with all licence conditions, resulting in likely harm to the public and the environment.
We notified the accounting officer of the MI in January 2024. The accounting officer did not
take appropriate action to resolve the MI, and we referred the matter to the Department of
Forestry, Fisheries and the Environment in April 2025 for further investigation.
Section 1 describes the importance of, and legislated responsibilities for, in-year monitoring and year-
end reporting. Adherence to these legislated processes is critical in the complex environment of
metros to ensure robust monitoring, action to rectify deviations and sound decision-making.
The poor quality of the financial statements and performance reports submitted for auditing brings
into question the credibility of metros’ in-year reporting processes to the councils. This includes
quarterly budget implementation reports, mid-year budget and performance assessment reports,
and biannual performance measurement reports. It means that decisions, analyses and monitoring
of key financial and performance matters could be based on unreliable information.
Movement
Improvement Unchanged Regression
from 2020-21
Even though we informed metros of the misstatements we identified during our audits, Buffalo City,
City of Tshwane, Mangaung and Nelson Mandela Bay received qualified audit opinions on their
financial statements because they were unable to make corrections to financial statement line items
such as property, plant and equipment; receivables; expenditure; and employee-related costs.
• At Buffalo City, the information recorded in the financial statements relating to property,
plant and equipment was not reliable due to inadequate asset management practices
and a lack of standard operating procedures for managing asset-related transactions.
As a result, the metro recorded assets as work-in-progress when they were completed
projects. Long-outstanding or slow-moving projects were not assessed for impairment
(asset write-downs). The metro did not apply its revaluation methodology consistently
and appropriately, as some assets had negative revaluation balances instead of being
impaired. The landfill site asset was also not correctly accounted for when it was first put
into use, resulting in incorrect depreciation being recognised over the years. In addition,
the metro continued to provide free basic services to consumers who did not meet the
qualifying criteria for indigent support, which led to free basic subsidies and bad debt
write-offs of approximately R28,5 million being granted to ineligible indigent debtors during
2023-24. This represents revenue that would otherwise have been billed and collected,
and contributed to the financial losses sustained by the metro due to the lack of credible
financial reporting.
• Mangaung did not ensure credible in-year and year-end financial and performance
reporting. The metro processes a significant number of prior-period adjustments each
year, indicating that its internal controls for detecting and correcting or preventing errors
are not adequate. The controls to ensure that overtime, shift and standby hours were
both required and actually worked, and that claims were supported by evidence, were
also inadequate. The metro failed to accurately adjust its financial statements and was
qualified on employee-related costs.
Metros did not properly plan for and report on their performance. Some indicators were not
measurable, or the systems needed to collect the data required for reporting were not in place,
which resulted in material findings on the performance reports.
In some instances, we were limited in determining whether reported performance was reliable. For
example, at City of Tshwane, the indicator for the number of dwellings provided with connections
to the main electricity supply could not be determined because the supporting evidence and the
processes for measuring whether the indicator and related target were achieved were inadequate.
Mangaung removed a key service delivery indicator relating to the extension of the Thaba
Nchu wastewater treatment works from its service delivery and budget implementation
plan, resulting in the achievement of this project not being planned for or measured. The
project was significantly delayed and did not comply with either the environmental or asset
management requirements of the National Environmental Management: Waste Act and the
Municipal Finance Management Act. The project was significantly impaired (by R6,04 million)
due to inadequate maintenance and safeguarding, which led to vandalism. This was not
reflected or recorded in the financial statements.
We notified the accounting officer of an MI in March 2024, as the municipality did not
take reasonable measures to prevent pollution by completing the project, as evidenced
by the continued discharge of untreated sewage into the Sephane River and surrounding
groundwater. This is likely to cause substantial harm to the communities that depend on the
water sources – which are now contaminated. The accounting officer did not take appropriate
action to resolve the MI and, in April 2025, we referred the matter to the Department of Water
and Sanitation for further investigation.
As detailed in section 3.2, to prevent conflicts of interest, legislation prohibits all municipalities from
awarding contracts to or accepting quotations from employees, councillors or other state officials (or
suppliers that they own or manage) if they are serving the municipality or any other state institution.
In 2023-24, Buffalo City, eThekwini and Nelson Mandela Bay made 30 prohibited awards worth
R0,62 million through the quotation process to suppliers owned or managed by employees.
The following metros made prohibited awards worth R14,11 million to suppliers owned or managed
by other state officials:
1
City of Johannesburg R13,34 million (supplier did not
submit declaration)
4
eThekwini R0,64 million (suppliers did not
submit declarations)
4
Buffalo City R0,13 million (suppliers did not
submit declarations)
As detailed in section 3.2, the awards to suppliers in which close family members or business
associates of employees or councillors have an interest are not prohibited, but such awards might
create conflicts of interest and municipalities must disclose any such awards exceeding R2 000 in
their financial statements.
Nelson Mandela Bay did not disclose awards to close family members of R9,61 million in its financial
statements, while City of Cape Town did not do so for awards worth R0,50 million.
A total of 19 suppliers made false declarations for awards of R21,30 million at the following metros:
Similar to last year, all metros, except City of Cape Town, failed to materially comply with key
legislation in 2023-24. The following were the most common areas of non-compliance:
• Prevention of unauthorised, irregular, and fruitless and wasteful expenditure – six metros (75%)
Metros have incurred a total of R33,29 billion in irregular expenditure since 2021-22, with almost
all of this amount being due to non-compliance with legislation on procurement and contract
management.
R6,59bn
Procurement without competitive
R12,55bn bidding or quotation process
R10,43bn R10,31bn
R33,29bn R17,74bn
Non-compliance with procurement
process requirements
R8,95bn
Non-compliance with legislation on
contracts
2021-22 2022-23 2023-24
Metros accounted for 38% of all municipal irregular expenditure since 2020-21, with the biggest
contributors over this period being Buffalo City (R9,55 billion), City of Tshwane (R7,48 billion) and
eThekwini (R5,52 billion).
2 6
Leadership
City of Cape Town Buffalo City eThekwini
City of Ekurhuleni City of Johannesburg Mangaung
City of Tshwane Nelson Mandela Bay
3 2 3
Governance
City of Cape Town City of Johannesburg Buffalo City
City of Ekurhuleni Nelson Mandela Bay City of Tshwane
eThekwini Mangaung
2 3 3
Effective leadership culture
City of Cape Town Buffalo City City of Tshwane
City of Ekurhuleni City of Johannesburg Mangaung
eThekwini Nelson Mandela Bay
1 1 6
Oversight responsibility
City of City of Buffalo City eThekwini
Cape Town Ekurhuleni City of Johannesburg Mangaung
City of Tshwane Nelson Mandela Bay
Human resource 2 2 4
management City of Cape Town Buffalo City City of Johannesburg Mangaung
City of Ekurhuleni eThekwini City of Tshwane Nelson Mandela Bay
2 2 4
Policies and procedures
City of Cape Town eThekwini Buffalo City City of Tshwane
City of Ekurhuleni Nelson Mandela Bay City of Johannesburg Mangaung
2 1 5
Action plans
City of Cape Town City of Buffalo City Mangaung
City of Ekurhuleni Johannesburg City of Tshwane Nelson Mandela Bay
eThekwini
Information technology 2 4 2
governance City of Cape Town Buffalo City City of Tshwane Mangaung
City of Ekurhuleni City of Johannesburg eThekwini Nelson Mandela Bay
2 1 5
Proper record keeping
City of Cape Town Nelson Buffalo City eThekwini
City of Ekurhuleni Mandela Bay City of Johannesburg Mangaung
City of Tshwane
2 1 5
Daily and monthly controls
City of Cape Town eThekwini Buffalo City Mangaung
City of Ekurhuleni City of Johannesburg Nelson Mandela Bay
City of Tshwane
Information technology 6 2
system controls Buffalo City City of Tshwane City of Johannesburg
City of Cape Town eThekwini Mangaung
City of Ekurhuleni Nelson Mandela Bay
3 2 3
Risk management
City of Cape Town City of Johannesburg Buffalo City
City of Ekurhuleni Nelson Mandela Bay City of Tshwane
eThekwini Mangaung
A key element of internal control is developing and monitoring the implementation of action plans
to address identified internal control deficiencies. This is the responsibility of the municipal manager
and the senior management team. Audit action plans should address all three areas of audit
outcomes, namely financial statements, performance reporting and compliance with legislation.
Integrated planning
All departments within a metro should plan and work together to fulfil the metro’s mandate in
an integrated manner. Metros should also collaborate effectively with their entities as necessary.
However, at City of Johannesburg, eThekwini and Mangaung, functions within metros and/or
between metros and their municipal entities were poorly coordinated.
• City of Johannesburg did not coordinate effectively with its entities, which resulted in the
duplication of effort in collecting the evidence required for financial and performance
reporting. This was due to misalignment between the metro and its entities on expectations
and plans, obligations, budgets and timelines for the successful delivery of key projects. The
metro and its entities responded reactively to repairs and maintenance for infrastructure
and did not respond to all repair needs, which impeded the city’s service delivery
commitments. Key clauses from their service delivery agreements were also not enforced to
foster a culture of transparency, oversight, accountability and integrated, comprehensive
planning. Effective coordination and integration will assist in achieving quality reporting for
decision-making.
• eThekwini directed most of the budget for the Namibia Stop 8 housing project towards
infrastructure development, including roads, stormwater management, and water
and sanitation facilities. While the housing unit had the necessary skills and capacity to
fulfil its mandate, there was a lack of coordination among the metro’s service delivery
units, including water, sanitation and roads. As a result, the project was delayed due to
lengthy planning processes, site obstructions from informal settlements and limited land for
development. Improved coordination and resource sharing within the metro could help
streamline efforts and enhance project efficiency.
• At Mangaung, there was no coordination or alignment between the municipal finance unit
and the infrastructure unit, and the two units did not collectively determine and manage
their budgets. Officials worked in silos and there was a lack of policies and procedures to
govern collaborative relations. This resulted in infrastructure projects being delayed and
funds being re-prioritised to other projects.
Human resources
Legislation requires councils to determine the staff establishment (the number of approved
posts) necessary to perform municipal functions. At the start of the administrative term, municipal
managers reviewed and councils approved the staff establishments of the metros.
The number of people metros employ ranges from between 6 000 and 8 000 at the smaller metros
to between 20 000 and 35 000 in the larger metros. Metros such as City of Johannesburg have a
much larger establishment considering the posts in their municipal entities.
In 2023-24, metros had an average overall vacancy rate of 22% at year-end, slightly higher than
the 18% reported in 2020-21. The average senior management vacancy rate has worsened to 25%
from the 15% reported in 2020-21. Mangaung had the highest overall vacancy rate at 61%, while
Nelson Mandela Bay had the highest senior manager vacancy rate at 67%.
Instability in key leadership positions has a big impact on the operations of a metro.
Incumbents
Incumbents
Incumbents
incumbent)
incumbent)
incumbent)
over past 3
over past 3
over past 3
over past 3
Months in
Months in
Months in
(current
(current
(current
position
position
position
years
years
years
years
Metro Outcome
Qualified with
2 4 15 4 56 1 39
findings
Buffalo City
Unqualified
with no
1 1 74 1 148 2 3
City of findings
Cape Town (clean)
Unqualified
3 1 91 1 61 1 60
City of with findings
Ekurhuleni
Unqualified
2 2 17 2 17 1 36
City of with findings
Johannesburg
Qualified with
3 2 22 3 7 1 77
City of findings
Tshwane
Unqualified
2 2 21 1 35 3 132
with findings
eThekwini
Of the five metros that submitted poor-quality financial statements for auditing, three used
consultants:
• Buffalo City spent R8,93 million on consultants for asset management support due to a lack
of skills, but the financial statements still included material misstatements on assets because
of a lack of supporting evidence for the disclosed amounts. The work of the consultants was
not effective due to the lack of records and the metro was again qualified on its financial
statements.
• City of Tshwane spent R5,87 million on consultants to assist with preparing financial statements
to compensate for a 23% vacancy rate in its finance unit and the resultant lack of skills. Due
to insufficient review of and direction to the consultants, the metro was again qualified on its
financial statements.
• Mangaung spent R15,04 million on consultants to assist with a variety of financial reporting and
accounting services. The metro had the highest vacancy rate of all metro finance units at
48%. Due to a lack of records and documents, the metro was again qualified on its financial
statements in the areas in which consultants did work.
The vacancy rate in the technical departments tasked with electricity, water, wastewater and solid
waste services also had an impact on service delivery.
• eThekwini had insufficient technical staff in the infrastructure section of the water and
sanitation unit due to a 58% vacancy rate, which affected the unit’s operations and
projects. Critical maintenance was not performed regularly, which had a negative
impact on water provision. The delay in appointing key personnel resulted in project
delays, changes to project designs and scope, and project managers who were
overburdened as they had to manage more projects than was possible given the limited
time and resources at their disposal.
• Buffalo City has an overall vacancy rate of 15% across its key service delivery departments,
with some key positions being vacant for multiple years. In particular, the district engineer
position in the electricity department was vacant for 80 months, while the same position
in the sanitation, solid waste and refuse removal department was vacant for 24 months.
The shortage of staff with the requisite skills and knowledge significantly hindered the
quality and efficiency of essential services such as water, electricity, sanitation, housing
and waste management.
Due to a lack of internal capacity, municipalities spent R298,6 million on professional service
providers (consulting engineers) at the 20 projects funded by infrastructure grants that we assessed.
Between May and June 2023, Mangaung paid a contractor an estimated R3,6 million for
extension-of-time claims due to delays in the construction of a community hall in Thaba Nchu, as
consultants were not available for quantity surveying, structural engineering and architecture. The
contractor could not proceed until consultants had been appointed to perform the necessary
functions, which delayed the other phases of the project. We notified the accounting officer of
the MI in June 2024. The accounting officer did not take appropriate action to resolve the MI. We
also included recommendations in the audit report, which should be implemented by July 2025.
Municipal performance management systems must clarify the roles and responsibilities of each
roleplayer in the system and provide for measuring performance at least once a year. Municipalities
must develop and adopt appropriate systems and procedures to monitor, measure and evaluate
staff performance and establish policies and procedures that define how performance will be
assessed, measured and managed. Buffalo City and Mangaung did not have the required policies
and procedures in place – we reported this as material non-compliance with legislation.
Information systems
There is an urgent need to modernise and fortify information technology (IT) systems to enhance
the capacity of local government – especially at the metros. Technology is the cornerstone of
this undertaking, acting as a catalyst for efficiency, transparency and resilience in public services.
Implementing robust control measures, ensuring stringent protection of sensitive information and
maintaining continuity in service delivery are paramount.
Every year, we increase our audit efforts and expand our scope to assess metros’ progress in this
area. In recent years, we have focused on cybersecurity and key modernisation projects.
• Five metros (63%) did not have adequate IT strategies that support overall metro objectives.
• At two metros (25%), strategic initiatives were hampered by delays caused by limited funding,
institutional capability constraints, leadership instability and poor management practices.
• At four metros (50%), the decentralisation of the IT budget and expenditure complicated the
understanding of overall resource allocation and spending.
The lack of prioritisation of the IT function is evident from the lack of capability and inadequate
investment in infrastructure.
The high vacancy rate at five metros (63%) significantly hindered the capability of their IT units to
deliver services and meet objectives. Three metros (38%) did not have dedicated personnel in the
roles of chief information security officer and project management officer.
IT systems and infrastructure did not always support service delivery. Six metros (75%) continued to
invest in maintaining legacy systems rather than adopting modern IT solutions. This leads to higher
long-term costs due to expensive maintenance, frequent system failures and reduced operational
efficiency. Four metros also lacked the modernised IT infrastructure required to improve operational
stability and cybersecurity.
A lack of strategic IT governance and long-term planning has led to misaligned IT investments,
keeping the metros dependent on outdated systems. Weak disaster recovery and IT continuity
planning increases the risk of prolonged service disruptions, further demonstrating a lack of holistic
IT governance and infrastructure modernisation strategies.
Where IT projects are undertaken, they are not always successful, and poor service-level monitoring
of IT service providers prevents metros from realising the full benefit of their investments.
• At Mangaung, service providers were paid to develop disaster recovery and business continuity
plans that were not completed.
• At City of Johannesburg, IT service-level targets were not effectively managed for key IT contracts.
• City of Johannesburg and City of Tshwane delayed rolling out strategic IT projects.
• Buffalo City and City of Johannesburg lacked adequate governance structures, project
management offices and frameworks to enable all IT projects to be adequately tracked.
• Nelson Mandela Bay did not adopt the automated tools developed to streamline documentation
and approval processes, leading to purchased software licences not being used.
• The performance of IT consultants was not monitored, which resulted in expenditure being
incurred, while the weaknesses in the control environment remained. The performance
reporting tool had system configuration limitations, preventing service providers from being
properly monitored.
• Service-level agreements did not stipulate the performance monitoring measures against
which service providers would be measured.
• Key project management positions were vacant, which resulted in weak project management
processes and a lack of project management skills.
• Not all systems could be rolled out because the required hardware was not available.
• There was a lack of clear communication and buy-in when new systems were developed.
We notified the accounting officers of City of Johannesburg, City of Tshwane and Nelson Mandela
Bay of MIs due to unused software licences. All three MIs have been resolved.
MI
Payment for software licences not used or not used optimally
• In September 2019 and December 2020, City of Tshwane procured software licences
that were not used, resulting in an estimated financial loss of R98,5 million. We notified the
accounting officer of the MI in November 2022. The accounting officer terminated the
licences that were not being used and negotiated a new maintenance fee for existing
licences, which prevented losses of R11 million. In December 2022, the service provider issued
a credit note of R22,3 million to the municipality to be used for future maintenance costs. No
official was found liable as the procurement was informed by a needs analysis. The MI has
been resolved.
• Nelson Mandela Bay procured software licences that exceeded the number of users in
the metro, resulting in payments for unused licences between July 2020 and June 2022.
We notified the accounting officer of the MI in November 2022. In January 2023, the
accounting officer entered into a new licence contract and reduced the number of users.
The matter was investigated by the municipal public accounts committee and referred to
the council in December 2023. The council resolved to write off the estimated financial loss of
R34,11 million, as the investigation did not find any person liable. The MI has been resolved.
Buffalo City
City of Ekurhuleni
City of Johannesburg
City of Tshwane
eThekwini
Mangaung
As part of assessing security controls, we also considered cybersecurity governance, information risk
management, operations and technology, legal and compliance matters, and crisis management.
Metros continue to be prime targets for ransomware and data breaches.
• Four metros (50%) had no cybersecurity strategies, had inadequate cybersecurity skills and
human resources, and did not provide training to cybersecurity staff. Vulnerability management
and threat intelligence were poor or non-existent, and there were no data classification and
loss prevention processes and strategies. There was also no cybersecurity incident response
playbook to define key processes.
• Seven metros (88%) relied on outdated infrastructure and all metros had insecure configurations
on the infrastructure that hosted in-scope applications.
MI
Cybersecurity weaknesses
Mangaung did not adequately maintain and safeguard its IT assets, resulting in a cyberattack
and a breach on the IT network in October 2023. This rendered each of the metro’s IT applications
inoperable, including its financial, human resource management and communications systems.
The cyberattack disrupted the metro’s operations and caused substantial harm to both the
metro and the public as it was unable to provide services to communities. The metro fully
restored its systems only in January 2024. We notified the accounting officer of the MI in July
2024. The accounting officer did not take appropriate action to resolve the MI. We also included
recommendations in the audit report which should be implemented by July 2025.
In our assessment, internal audit units and audit committees had been established and were
operational at all metros. By year-end, the head of internal audit unit position had been filled
at all metros, except City of Ekurhuleni. Except at two metros (Buffalo City and Mangaung), the
internal audit units and audit committees performed all the functions required by legislation,
including evaluating the reliability of financial and performance information and compliance with
procurement legislation.
At Mangaung, the internal audit unit assessed performance information by evaluating whether
deviations from planned targets were documented, but did not adequately evaluate the usefulness
and reliability of the performance information. The metro’s audit committee did not review its draft
service delivery and budget implementation plan, and no supporting documentation was provided
to show that it had advised the municipal council and the accounting officer on matters relating
to setting key performance indicators and targets. The audit committee also did not evaluate the
metro’s financial information. At Buffalo City, the internal audit unit did not evaluate the metro’s
compliance with supply chain management legislation.
When internal audit units and audit committees do not evaluate key risk areas, municipal managers
remain unaware of control weaknesses within the metro until our next audit, leaving the metros
unable to address these matters before they can have a significant impact.
Internal audit units and audit committees are a big investment for municipalities – the professionals
who are employed as internal auditors and those who serve as members of the audit committees
are expensive. In 2023-24, metros spent R347,88 million on their internal audit functions (including
outsourced cost), with City of Ekurhuleni and eThekwini accounting for more than half (58%) of
this amount. However, the value that these structures can bring to financial and performance
management is not fully realised – their influence will always depend on how municipal managers
and senior management respond to their findings and recommendations.
The reasons for these governance structures having a minimal impact at metros are as follows:
• Internal audit units were inadequately capacitated at all metros. Four metros had vacancy rates
of 20% or higher, while two metros (City of Tshwane and Mangaung) had vacancy rates above
50%. This prevented some internal audit units from implementing their internal audit plans.
• There were differences in the legislated responsibilities, scope of work and methodology
applied by these structures compared to ours. For example, internal audit units at three metros
(38%) did not carry out work on all significant financial audit areas, while vacancies at City of
Johannesburg and Nelson Mandela Bay meant that these units did not fully execute what they
had planned to assess.
• The audit committees’ terms of reference focus mainly on finance matters, which led to their
reviews of performance reports being inadequate. This was prevalent at City of Johannesburg
and City of Tshwane.
• Management did not address internal audit findings and audit committee recommendations
due to a lack of consequence management and ineffective accountability measures. For
example, internal audit units at all metros assessed compliance with legislation and, at all metros,
except City of Cape Town, identified instances of non-compliance. However, management
did not take their recommendations seriously. The intended value of the investment in these
governance structures and their contribution in the areas of internal control and risk mitigation
are not fully realised when metros do not implement their recommendations.
• Municipal public accounts committees did not always support the work of the audit committees.
At Buffalo City and Mangaung, the municipal public accounts committee did not evaluate the
extent to which management had implemented the recommendations of the audit committee.
4.5 ACCOUNTABILITY
Accountability is a value that starts with the leaders – if the right tone is set at leadership level, officials
will also recognise and embrace being accountable in their daily operations. Being accountable
means being responsible to the public, oversight structures and other stakeholders by reporting
on whether and how mandated responsibilities have been fulfilled, and on the actions taken and
decisions made to ensure swift consequences for transgressions and poor performance.
Metros that did not investigate unauthorised, irregular, and fruitless and wasteful expenditure over
three years
Fruitless and
Unauthorised Irregular wasteful
Metro expenditure expenditure expenditure
2 years
Buffalo City - 3 years (2021-22 &
2022-23)
2 years
1 year
City of Tshwane 3 years (2022-23 &
(2021-22)
2023-24)
As a result, the year-end balances of these types of unwanted expenditure remain high. By
2023-24, the balance of irregular expenditure that metros had accumulated over many years totalled
R62,43 billion, while the balance for unauthorised expenditure stood at R16,59 billion and for fruitless
and wasteful expenditure at R4,39 billion.
Metros and their entities have started paying attention to irregular and fruitless and wasteful
expenditure over the past two years, but councils and boards have been more inclined to write off
the financial losses and the money irregularly spent than to take steps to address the root causes.
R3,86bn R0,31bn
R0,02bn (8%) R0,75bn
(7%) R9,91bn R12,61bn (1%) (14%)
(15%) (19%)
R0,14bn
(4%)
R0,71bn
(1%) R0,01bn R0,35bn
(<1%) (7%)
R49,45bn R2,39bn
(93%) R54,19bn (99%) R3,48bn
R55,00bn R4,12bn
(84%) (81%) (88%) (79%)
The slow progress in addressing unauthorised, irregular, and fruitless and wasteful expenditure is partly
due to municipal public accounts committees not carrying out their responsibilities effectively. City
of Tshwane and Mangaung did not have implementation timeframes for overall recommendations;
recommendations dealing with unauthorised, irregular, and fruitless and wasteful expenditure
investigations; or following up on recommendations for dealing with MIs or from disciplinary boards.
As detailed in section 3.4, the National Treasury’s Consequence Management and Accountability
Framework is a valuable tool that municipalities can use to effectively deal with consequence
management. City of Tshwane and Mangaung did not implement the framework, while the provincial
treasuries did not assess the implementation of this framework at Buffalo City and Mangaung.
• City of Tshwane was slow to investigate irregular expenditure, fruitless and wasteful
expenditure and allegations of financial misconduct, mainly due to capacity constraints
within its investigations unit. This resulted in material non-compliance with key legislation
continuing, including not investigating irregular expenditure and fruitless and wasteful
expenditure to determine if anyone was liable for the expenditure.
• Buffalo City did not have a dedicated unit to investigate unauthorised, irregular, and
fruitless and wasteful expenditure. This resulted in a repeated material finding on
compliance, as irregular expenditure was not investigated to determine if anyone was
liable. An investigation in 2023-24 resulted in irregular expenditure of R60,20 million being
written off on the basis of it being prescribed, but no appropriate action was taken
against the officials responsible for the expenditure.
All metros, except Mangaung, had disciplinary boards in place. However, at Buffalo City, City
of Johannesburg and Nelson Mandela Bay, these boards did not perform their legislated role of
investigating financial misconduct allegations. The board at City of Johannesburg also did not
monitor the disciplinary proceedings at the metro.
Mayors at four metros (City of Johannesburg, City of Tshwane, eThekwini and Mangaung) did not
ensure that the issues that we had raised in our audit report were addressed. At Mangaung, the
mayor did not ensure that the performance agreements of the municipal manager and other senior
managers were linked to the objectives in the service delivery and budget implementation plan.
In 2023-24, instability continued to affect the ability of councils at City of Ekurhuleni and Mangaung
to provide effective monitoring, support, strategic direction and oversight. Councils at five metros
(Buffalo City, City of Tshwane, eThekwini, Mangaung and Nelson Mandela Bay) did not monitor audit
action plans or hold officials accountable for timelines on the action plan.
Municipal public accounts committees were established at all metros; however, only the committees
at City of Cape Town and City of Ekurhuleni effectively discharged their responsibilities.
• In eThekwini, the council did not oversee significant audit areas and service delivery. This
was evident through stagnant audit outcomes and constant calls from the public and
media to address service delivery challenges within the metro. The council was also slow
to implement key audit recommendations and hold the city manager accountable for
not addressing prior-year issues. Additionally, there was no evidence that councillors had
been trained on the consequence management framework or updates on legislation,
which resulted in council oversight not being fully effective.
• Councils in City of Ekurhuleni and City of Tshwane did not adequately oversee the
budgets prepared by municipal managers and approved unfunded budgets, resulting
in additional pressure being placed on the metros’ financial position.
Section 154 of the Constitution stipulates that national and provincial government must support and
strengthen the capacity of municipalities to manage their own affairs, exercise their powers and
perform their duties. Section 34 of the MFMA also requires national and provincial government to help
municipalities build capacity to support efficient, effective and transparent financial management.
National Treasury Circular 20 expands on the accountability ecosystem for metros. The finance
minister has delegated certain responsibilities to the provincial members of the executive council
for finance relating to support, oversight and municipal administrative procedures. The National
Treasury retained the monitoring and administrative oversight role of the largest municipalities in
each province, including all metros and nine intermediate cities – referred to as ‘non-delegated’
municipalities. If the non-delegated municipalities embrace the MFMA and the associated reforms,
the National Treasury’s objective of addressing most of the challenges in local government would
have been achieved.
The National Treasury has also implemented various other initiatives to support metros, including the
following:
• Conducting annual budget assessments, providing budget support and recommendations, and
performing mid-year budget and performance assessments and reporting any findings from
these assessments.
Metros have not taken full advantage of these initiatives, as can be seen from their limited
improvement.
The legislative role of national and provincial government to oversee and monitor metros, and
intervene when necessary, has also not been having the intended impact in all instances.
The member of the executive council for local government must assess all financial statements,
audit reports and responses to audit reports to determine whether municipalities have adequately
addressed any issues raised by the auditor-general in audit reports, and must report to the legislature
any omission by a municipality to adequately address those issues within 60 days.
Section 131(2) of the MFMA
What we found:
Members of the executive council for local government in all five provinces with metros performed
the assessment and reported to their respective provincial legislatures.
The member of the executive council for local government must monitor whether all municipal
managers in the province submitted the annual report and all oversight reports on those annual
reports within seven days after the council has adopted the oversight report.
Section 132(2) and (3) of the MFMA
What we found:
The municipal managers of all metros, except Mangaung, submitted the annual report and oversight
reports to the legislature within seven days of being adopted by the council.
The member of the executive council for local government must annually compile a consolidated
report on the performance of municipalities in the province – identifying municipalities that under-
performed and proposing remedial action to be taken – and must submit the report to provincial
legislatures, the National Council of Provinces and the cooperative governance minister.
Section 47 of the MSA
What we found:
Reports were submitted to the provincial legislatures for all metros, except Mangaung.
Remedial action was proposed and implemented at City of Johannesburg and City of Tshwane.
No remedial action was proposed for the other five metros.
The provincial legislature may deal with the annual report and oversight reports in accordance with
its constitutional powers.
Section 132(4) of the MFMA
What we found:
Three of the five provincial legislatures responsible for metros (Eastern Cape, Free State and
Gauteng) did not deal with the annual reports of their metros.
Intervention
The member of the executive council for local government must assess the seriousness of financial
problems and determine if the municipality requires provincial intervention; and if required, take
appropriate steps for mandatory or discretionary provincial intervention.
Section 136 of the MFMA
The provincial executive must promptly, if a municipality is in a crisis in its financial affairs, or is in
serious breach of its obligations to provide basic services or to meet its financial commitments,
request that the municipal financial recovery service (a unit within the National Treasury):
• determine the reasons for the crisis
• assess the municipality’s financial state
• prepare an appropriate recovery plan for the municipality
• recommend appropriate changes to the municipality’s budget and revenue-raising measures
that will give effect to the recovery plan
• submit the determination and assessment and the recovery plan and recommendations to the
member of the executive council for finance.
Section 139 of the MFMA
The national executive must intervene in accordance with section 139(7) of the Constitution, where
the conditions of section 139(4) or (5) of the Constitution are met, but the provincial executive does
not exercise its powers.
Section 150 of the MFMA
What we found:
The national Department of Cooperative Governance and the provincial cooperative governance
department provided monitoring and support to Nelson Mandela Bay Metro.
The National Treasury provided support to City of Tshwane to enable the preparation of credible
financial statements and the implementation of a plan to improve financial health.
The National Treasury’s oversight of the voluntary financial recovery plan at Buffalo City had minimal
impact. The metro was also downgraded by its rating agency.
Mangaung is the only metro under national intervention. However, the implementation of the
financial recovery plan has not improved the financial state of the metro, which has been slow to
deal with its financial difficulties, leading to service delivery disruptions.
These interventions are intended to support and strengthen the capacity of metros to manage their
own affairs, exercise their powers and perform their functions. Overall, the intended benefit of these
interventions has not been realised as there has not been significant improvement at metros.
4.6 CONCLUSION
The level of performance, accountability, transparency, institutional integrity and institutional
capability of metros differs, but they all face significant challenges, except City of Cape Town.
Metros that are still struggling with the basics are Buffalo City, City of Tshwane, Mangaung and Nelson
Mandela Bay. City of Ekurhuleni, City of Johannesburg and its municipal entities, and eThekwini have
better institutional capability, but are not performing optimally – still allowing significant lapses in
institutional integrity and accountability.
The ministers and members of the executive councils responsible for finance and for local government,
together with Parliament and the provincial legislatures, should enhance their intervention
and oversight at metros to achieve tangible improvements. The impact that fully functional,
well-performing metros will have on the majority of South African citizens and businesses is substantial
and well worth working towards.
When the Public Audit Act was amended in April 2019, it gave us the mandate to identify and report on
material irregularities (MIs) and take action if accounting officers do not deal with them appropriately.
The overall aim of the amendments was to promote better accountability, improve the protection of
resources, enhance public sector performance and encourage an ethical culture, enable effective
oversight and, ultimately, strengthen public sector institutions to better serve the people of South Africa.
• Through the MI process, we identify and highlight the most important irregularities for them to pay
attention to – those that have had a material impact on the finances, performance and service
delivery of an auditee or that caused harm to the general public.
• In the audit reports of auditees, our general and special reports, and briefings to the councils and
provincial legislatures, we report in detail on each MI and how the accounting officer is – or is not
– addressing the matter.
• We also escalate MIs that are not being appropriately dealt with to mayors and provincial
leadership, who can support the process by monitoring the status of MIs, following up on delays
and overcoming the stumbling blocks encountered in resolving them. Through these processes,
accounting officers can be held accountable for failing to appropriately address the MIs.
• Through our transparent reporting processes, information on MIs is also made available to the
public and civil society organisations.
As set out in section 3.4, accounting officers have a legislated obligation to prevent irregularities
and, if they had occurred, to deal with them appropriately. The mayor and the council, through the
municipal public accounts and audit committees, have a further responsibility to monitor and support
the process.
Where accounting officers, supported by their political leadership, met their legislated responsibilities
and committed to taking swift action when we notified them of an MI, we did not have to exercise our
expanded powers. However, where they did not deal with MIs with the required seriousness, we did not
hesitate to use these powers.
The rest of this section provides information on the number, nature and status of the MIs that have been
identified since 2019. It also illustrates the impact that the MI process has had, discusses the stumbling
blocks to resolving MIs, examines how we have used our expanded powers and recommends
optimising the MI process to enhance oversight.
Misuse of material
2 public resource due to 2
under-utilisation
2 Municipal infrastructure 2
• prevent fraud
• complete infrastructure projects on time, at the required quality and within budget
• effectively and efficiently use the resources of the state to get value for the money spent and
deliver the intended services
• effectively manage human resource management processes and obligations towards employees,
including paying over contributions to pension funds and the South African Revenue Service in a
timely manner
We identified the MIs through irregularities that came to our attention during our normal audit
processes. As we do not audit all the transactions and activities of our auditees, it is likely that there
are many more similar MIs in local government.
We have highlighted all these areas of vulnerability to accounting officers and in our general and
special reports many times before, as preventing MIs is more effective than having to deal with
them once they have already occurred.
The MIs are spread across all provinces, with the highest number being raised in the Free State, the
Eastern Cape, KwaZulu-Natal and North West.
Throughout this report, we include examples of MIs to show just how harmful their impact can be.
217 71
49% 16%
107 10 7
24% 2% 1%
Appropriate action not Appropriate action not Not pursued further
taken – invoked our taken – decision on invoking
powers powers in process
12 22
3% 5%
Notification response Notified and awaiting
received – assessment response
in process
We are still assessing the actions being taken to address 34 of the 446 MIs, as either we had only recently
notified accounting officers of the MIs and their responses were not yet due, or we were still evaluating
the responses to the newly identified MIs. We are also assessing whether to invoke our powers for 10 MIs
where appropriate action has not been taken.
This means that we have evaluated and can report on the status of 402 MIs – those that have been
resolved, those where appropriate action is being taken, those that we are not pursuing further and
those where appropriate action was not taken and we invoked our powers.
Of the 217 resolved MIs, 115 were resolved in 2023-24 and 102 were resolved in prior years. The resolution
of MIs contributed to the prevention and recovery of financial losses, implementation of consequences,
institution of criminal proceedings and implementation of controls to prevent a similar MI from recurring.
We include examples of these resolved MIs and their impact in section 5.3.
We have also observed that, while accounting officers often respond by improving controls related to
a specific MI, they do not improve the overall control environment to prevent further MIs from being
raised.
Different MIs need different actions (and sometimes a combination of actions) to be resolved. Some
require financial losses to be recovered, while others also require further financial losses to be prevented.
Some require consequences to be implemented against responsible officials, while others also require
fraud or criminal investigations to be conducted, the outcomes of which must be reported to the South
African Police Service if fraud is identified.
Although the 71 MIs where appropriate action is being taken have not yet been fully resolved,
accounting officers have made progress in implementing their planned actions.
The main actions that still need to be taken to fully resolve these MIs are recovering any financial losses
and finalising the investigations and subsequent disciplinary processes against the responsible officials
as part of the consequence management process. In completing these actions, accounting officers
often encounter stumbling blocks, as set out in section 5.4.
A lack of responsiveness by accounting officers and limited involvement by the council to ensure that
MIs are addressed resulted in an increase in the number of MIs in this category. Last year, we reported
on 78 MIs with this status.
Recommendations in audit
Further action taken as
20 report as accounting officer
took little or no action to 9 remedial action was not
implemented
address MI
Emthanjeni LM – 2 Emakhazeni LM
Renosterberg LM – 2
Phokwane LM North West – 1
61 Referral to public bodies for
further investigation
Siyathemba LM Ratlou LM
1
Emalahleni LM
Nketoana LM
Referral and remedial
action
Northern Cape – 1
North West – 3
Joe Morolong LM
City of Matlosana LM – 3
Free State – 1
Mangaung MM
Eastern Cape – 1
Inxuba Yethembe LM
Notice of
1 certificate-of-debt
process
North West – 1
Ngaka Modiri Molema DM
• Recovery: Steps that should be taken to recover financial and public resource losses or to recover
from harm.
• Prevention: Steps that should be taken to strengthen internal controls to prevent further losses and
harm.
• Consequences: Steps that should be taken to impose consequences for wrongdoing, including
disciplinary processes and, if applicable, handing the matter over to a law-enforcement agency.
If an accounting officer does not implement our recommendations, we take remedial action that
covers the same areas of recovery, prevention and consequences. Remedial action is a binding
(obligatory) instruction taken by the auditor-general that outlines the action that an auditee must take
to address the MI.
If the MI caused a financial loss to the state, the remedial action also includes a directive to quantify
and recover the financial loss. If the directive is not implemented by the stipulated date, we can
commence with a certificate-of-debt process to recover the loss from the accounting officer.
If an accounting officer does not implement the remedial action other than the directive, we can take
further action as provided for in the Public Audit Act, including escalating the matter to the broader
accountability ecosystem, issuing a special report or taking legal action. The MIs are typically escalated
to the mayor, council, chair of the municipal audit committee, premier of the province, and members
of the executive councils for local government and finance.
Section 5.5 provides further details on the status of the MIs where we invoked our powers.
Since 2019, accounting officers have taken action to prevent or recover financial losses and prevent
harm through the MI process. These actions have included the following:
• Making payment arrangements or negotiating with suppliers that are charging interest and
penalties on late payments.
• Improving systems, processes and controls and protecting assets to prevent any further harm and
financial losses.
• Making optimal use of resources that were previously either unused or underutilised.
28 30 14
The progress made in preventing and/or recovering financial loss has been slow. This lacklustre approach
to dealing with actual and potential financial losses is also evident in how irregular expenditure and
fruitless and wasteful expenditure are dealt with, as set out in section 3.4. The status of the total estimated
loss of R8,74 billion is as follows:
• R1,32 billion has been recovered, prevented or is being recovered due to the MI process.
• R3,63 billion has not yet been dealt with appropriately and is at risk of being lost.
• R3,62 billion has not yet been written off as non-recoverable, but in our assessment, it is unlikely to
be recoverable.
The following examples clearly show that resolving an MI has a positive impact on a municipality.
The examples include MIs that have been fully resolved or are being resolved by accounting officers
responding to our MI notifications. This positive impact is also reflected in other examples throughout
this report.
Loss recovered and further loss prevented: City of Johannesburg Metro (Gauteng)
In July 2019, the metro entered into an agreement for software licences and subsequently
paid maintenance costs for some of the licences that were not used, resulting in a financial
loss of R458,87 million. We notified the accounting officer of the MI in November 2022. In
September 2023, a new contract with the same service provider was entered into in which
the metro was required to pay only for maintenance and support on the software licences
in use, resulting in an estimated saving of R177,4 million over three years. In July 2024, the
accounting officer also recovered R228,36 million from the service provider and received a
credit note of R53,11 million for use on future software licensing fees and maintenance costs.
The MI has been resolved.
Loss prevented and controls strengthened: Phokwane Local Municipality (Northern Cape)
In 2020-21, the municipality did not charge interest on outstanding consumer debts, which
resulted in an estimated financial loss of R9,22 million. We notified the accounting officer
of the MI in February 2023. In March 2023, the accounting officer concluded a preliminary
investigation, which determined that the irregularity had been caused by the improper
configuration of the new system. The issue was corrected and consumers have been billed
correctly since March 2023. During 2023-24, we confirmed that interest was being charged on
overdue accounts and interest for 2020-21 to 2022-23 was billed to consumers retrospectively
in June 2024. The MI has been resolved.
In October 2023, we identified several shortcomings at the Rebone landfill site, including
inadequate access controls and deficiencies in site operations, resulting in non-compliance
with the site’s permit conditions. We notified the accounting officer of the MI in April 2024.
The municipality appointed a service provider to manage and maintain the landfill site.
Adequate fencing has since been installed, and the service provider and project manager
use a monthly schedule of activities to ensure compliance with the permit conditions. Further
action is being taken to fully resolve the MI.
The municipal entity did not bill some customers for electricity consumption in 2021-22, resulting
in an estimated financial loss of R44,35 million. We notified the accounting officer of the MI in April
2023. The accounting officer finalised a verification process of all customers in June 2023 and
identified meters that were illegally connected to the electricity network. All customers were
billed from November 2023. From June 2023, the entity also strengthened its controls around
new meter connections to ensure that customers are connected only upon confirmation of a
valid connection number. The MI has been resolved.
Supplier contracts stopped where money was being lost: Nkomazi Local Municipality
(Mpumalanga)
In September 2021, the municipality prepared a consultancy reduction plan for value-added
tax (VAT) services. However, it failed to fill vacant positions in the finance unit to perform
these services in-house and continued to rely on consultants, resulting in an estimated loss of
R3,37 million. We notified the accounting officer of the MI in April 2023. The accounting officer
cancelled the consultant contract in May 2023 and used a reporting manager as an interim
measure to prepare the VAT returns. Between August 2023 and December 2023, the accounting
officer filled the vacant positions responsible for VAT services. The MI has been resolved.
How long it takes to resolve an MI depends on its complexity and how many delays there are in taking
the necessary action. Generally, it takes longer to recover financial losses than to implement other
actions, as the matter first needs to be investigated, and it takes time to establish liability and submit civil
claims. Some MIs can be resolved relatively quickly, while others require municipalities and municipal
entities to correct deep-rooted weaknesses or quantify a financial loss that occurred across multiple
years, which will take much longer to address. Not all delays are avoidable and, where we assess them
to be reasonable, we do not invoke our powers.
The most common stumbling blocks that we came across in resolving MIs are as follows.
• In 2019-20, Ditsobotla Local Municipality (North West) did not keep full and proper
records of its financial affairs, resulting in a repeat disclaimed audit opinion. We notified
the accounting officer of the MI in June 2021. The municipality has been struggling with
instability in the accounting officer position. At one point, the municipality had two
acting accounting officers, two speakers and two councils at the same time due to
political instability. In October 2022, the council was dissolved and the municipality was
placed under intervention. During 2023-24, the North West Department of Cooperative
Governance and Traditional Affairs seconded an accounting officer to the municipality.
In July 2024, a permanent accounting officer was appointed for a fixed three-year term
but was subsequently dismissed by the council due to allegedly having been appointed
unlawfully. The dismissal is currently being challenged in the Labour Court and an acting
accounting officer was appointed in January 2025 pending court proceedings. Currently,
both the acting accounting officer and the dismissed accounting officer are occupying
the accounting officer position, as the dismissed accounting officer has not accepted the
dismissal. The persistent instability at the municipality has resulted in appropriate action not
being taken to resolve the MI and has contributed to continued disclaimed audit opinions
and a lack of accountability and consequence management. In June 2024, we requested
intervention from the council and provincial leadership to address the accounting officers’
failure to implement the remedial action.
During our audits, accounting officers were often slow to respond to our audit recommendations. We
experienced similar delayed responses to both implementing our MI recommendations and remedial
action, and responding to MI notifications and requests for information on the status of actions being
taken. Such delays affect the overall MI process.
Nketoana Local Municipality (Free State) did not ensure that proper records of its financial
affairs for 2019-20 were kept, resulting in a repeat disclaimed audit opinion. We notified the
accounting officer of the MI in February 2022. The accounting officer did not take appropriate
action to address the MI and, in November 2023, we included recommendations in the
audit report that had to be implemented by June 2024. We followed up repeatedly with the
accounting officer on the submission of a final response but they remained unresponsive. In
February 2025, we took remedial action, which must be implemented by August 2025. The
municipality has continued to receive disclaimed audit opinions over the past six years.
• Difficulties experienced by public bodies in obtaining statements from various roleplayers who may
not be available during the investigation, and supporting documents not being available.
• Scope changes during investigations due to the identification of new risks that might affect the
investigation outcome.
• Dependencies on expert witnesses and legal counsel, court processes and other law-enforcement
agencies and public bodies.
Prolonged investigations
• Between April 2017 and June 2019, Matjhabeng Local Municipality (Free State) made
payments estimated at R7,21 million for an attenuation (flood-protection) dam, which was
not built despite having been certified as complete. We notified the accounting officer of
the MI in May 2020. The accounting officer did not take appropriate action to address the
MI and, in June 2021, we referred the MI to the Directorate for Priority Crime Investigation
(the Hawks) for further investigation. The investigation was completed and the matter was
handed over to the National Prosecuting Authority, leading to the arrest of one official from
the municipality and two individuals from the service provider. Their first court appearance
was in July 2023 and the case has been postponed several times. The trial was set to
commence in May 2025 but was provisionally withdrawn from the court roll to consider
and consult on further evidence.
• Between July 2020 and June 2021, Chris Hani District Municipality (Eastern Cape) paid
an estimated R19,95 million for extension-of-time claims on water services projects without
receiving any value. We notified the accounting officer of the MI in October 2021. The
accounting officer did not take appropriate action to address the MI and, in July 2022,
we referred the MI to the Special Investigating Unit for further investigation. In November
2024, after the Department of Justice and Constitutional Development had completed its
assessment of the merits of the matter, the president issued a proclamation to investigate
the matter. The investigation is currently underway.
Often, officials resign before they can be disciplined, causing further delays because different steps
must then be activated, such as referrals to other accounting officers or public bodies to implement
corrective action if the officials are still employed in government.
Between 2018 and 2020, Ngaka Modiri Molema District Municipality (North West) overpaid a
service provider for water tankering services. We notified the accounting officer of the MI in
November 2019. An investigation instituted by the accounting officer, which was completed
in April 2022, identified the chief financial officer, a senior manager and two other officials as
being responsible. The disciplinary processes at council level were delayed and the contract
of the chief financial officer had already come to an end before steps could be taken
against them. The North West Department of Cooperative Governance and Traditional
Affairs conducted a follow-up investigation and identified the same officials as the initial
investigation as well as the accounting officer as being responsible for the overpayment. In
February 2023, the accounting officer issued written warning letters to the other two officials
as recommended by the disciplinary committee. The council has not taken action against
the accounting officer and the senior manager. The accounting officer did not implement
the remedial action and, in March 2025, we notified the accounting officer of our intention to
pursue a certificate-of-debt process.
In many cases, councils do not adequately fulfil their role of ensuring that they implement
consequence management as required due to a lack of structures, processes and monitoring. This
is set out in more detail in section 6.
Auditees are provided with a specific date by which recommendations and remedial action should
be implemented. If an accounting officer requests additional time for implementation, this is granted
only after due consideration based on evidence that progress has been made and that the reasons
for delays are valid. The tables below include the latest implementation dates, taking into account any
extensions provided.
Recommendations
We included recommendations on 22 MIs in the audit reports of 15 auditees.
Final implementation
Status as at
Auditee Material irregularity date for
5 May 2025
recommendation
Payments
Renosterberg
Local Overpayment of employee Follow-up
Municipality 30 June 2025
remuneration not yet due
(Northern Cape)
Emakhazeni
Local Late payments to Eskom, resulting in Follow-up
Municipality 29 June 2025
interest not yet due
(Mpumalanga)
Emthanjeni Local
Municipality Late payments to Eskom, resulting in Follow-up
31 May 2025
interest not yet due
(Northern Cape)
Mangaung
Metro Late payments to a contractor, Follow-up
4 July 2025
resulting in interest not yet due
(Free State)
Mangaung
Metro Failure to manage fuel inventory, Follow-up
4 July 2025
resulting in fuel losses not yet due
(Free State)
Siyathemba
Local Money received from consumers not
Follow-up
Municipality banked and remained unaccounted 30 June 2025
not yet due
for
(Northern Cape)
Maluti-a-
Phofung Local Lack of proper performance Follow-up
Municipality 3 July 2025
management system and records not yet due
(Free State)
Ngwathe Local
Municipality Lack of proper performance Follow-up
20 June 2025
management system and records not yet due
(Free State)
Phokwane Local
Municipality Lack of proper performance Follow-up
3 July 2025
management system and records not yet due
(Northern Cape)
Ratlou Local
Municipality Full and proper financial records not Follow-up
31 May 2025
kept (2022-23) not yet due
(North West)
Renosterberg
Local Performance report not prepared Follow-up
Municipality 30 June 2025
(2022-23) not yet due
(Northern Cape)
Sundays River
Valley Local Lack of proper performance Follow-up
Municipality 30 June 2025
management system and records not yet due
(Eastern Cape)
Final implementation
Status as at
Auditee Material irregularity date for
24 April 2025
remedial action
Payments
Inxuba
Yethemba Local Late payments to Eskom, resulting in Follow-up
Municipality 25 August 2025
interest not yet due
(Eastern Cape)
Letsemeng Local
Municipality Late payments to Eskom, resulting in Follow-up
24 October 2025
interest not yet due
(Free State)
Moqhaka Local
Municipality Late payments to Eskom, resulting in Follow-up
25 August 2025
interest not yet due
(Free State)
Revenue management
City of
Matlosana Local Money owed by fresh produce market Follow-up
Municipality 24 August 2025
from 2017-18 not collected not yet due
(North West)
uMkhanyakude
District Failure to collect long-outstanding Decision-making
Municipality 1 July 2024
debts in process
(KwaZulu-Natal)
For nine MIs, the accounting officers did not implement remedial action by the stipulated date and
we requested intervention from provincial leadership, councils and audit committees to oversee and
monitor such implementation, as provided for in the MI Regulations. These MIs were raised at five
municipalities in North West, three in the Free State and one in the Northern Cape, as shown in the
table.
Status as at
Auditee Material irregularity Date escalated
24 April 2025
Consolidated
Lekwa- progress report on
Teemane Local Full and proper records not kept
actions taken by all
Municipality (2019-20), causing substantial harm to 25 June 2024
parties requested
municipality
(North West) from premier was not
received by October
Madibeng Local 2024 as requested
Full and proper records not kept
Municipality (2019-20), causing substantial harm to 25 June 2024 Follow-up letters
(North West) municipality were sent in February
2025
Mamusa Local Full and proper records not kept
Municipality (2019-20), causing substantial harm to 25 June 2024
(North West) municipality
Consolidated
Naledi Local progress report on
Full and proper records not kept
Municipality actions taken by all
(2019-20), causing substantial harm to 24 April 2025
parties requested
(North West) municipality
from premier is due
by July 2025
Maluti-a- Consolidated
Phofung Local Full and proper records not kept progress report on
Municipality (2018-19), causing substantial harm to 25 June 2024 actions taken by all
municipality parties requested
(Free State)
from premier was not
received by October
Tokologo Local 2024 as requested
Full and proper records not kept
Municipality (2018-19), causing substantial harm to 25 June 2024 Follow-up letters
(Free State) municipality were sent in February
2025
Consolidated
Masilonyana progress report on
Local Full and proper records not kept
actions taken by all
Municipality (2017-18), causing substantial harm to 24 April 2025
parties requested
municipality
(Free State) from premier is due
by July 2025
Consolidated
progress report on
actions taken by all
parties requested
Kai !Garib Local Full and proper records not kept from premier was not
Municipality (2019-20), causing substantial harm to 12 June 2024 received by October
(Northern Cape) municipality 2024 as requested
Follow-up letters
were sent in February
2025
ln 2023-24, the certificate-of-debt process was underway for one MI on the overpayment for water
tankering services at Ngaka Modiri Molema District Municipality (North West). As set out in the example
on delays in disciplining officials in section 5.4, the municipality’s accounting officer did not take
appropriate action to implement the remedial action and directive, as they failed to recover the
financial loss from the supplier. On 13 March 2025, the auditor-general notified the accounting officer of
her intention to pursue a certificate of debt and, in line with the MI Regulations, invited the accounting
officer to submit a written representation on why she should not proceed to issue a certificate of debt.
At the time of this report, the written representation was not yet due.
Referrals
The auditor-general can approve the referral of an MI to a public body for investigation. Such referral is
most often made if the public body’s mandate, investigative powers and remedial or punitive powers
make it better suited to deal with the MI than the auditor-general or the accounting officer. This power
is often employed if the MI requires a fraud or other criminal investigation based on the fraud risk
indicators that had been identified.
The public body then regularly reports to the auditor-general on its progress until the investigation is
completed.
By 30 April 2025 we had referred or were in the process of referring 64 MIs at 25 auditees for investigation
to the six public bodies outlined in the table.
Status as at
Auditee Material irregularity Referral date
30 April 2025
Bushbuckridge
Local Payment to contractor for work not Referral being
Municipality done on paving of streets at Lillydale 6 August 2024 considered by public
Phase 1 body
(Mpumalanga)
Procurement of generators at
Investigation
excessive prices (Boikhutsong pump
7 July 2023 completed – further
Ngaka Modiri stations), resulting in overpricing of
steps in progress
Molema District procured goods and services
Municipality
Procurement of generators at
(North West) Investigation
excessive prices (Boitshepegi),
7 July 2023 completed – further
resulting in overpricing of procured
steps in progress
goods and services
Siyathemba
Local Referral being
Unauthorised debit order payments,
Municipality 9 April 2025 considered by public
resulting in loss
body
(Northern Cape)
Emalahleni Local
Municipality Investigation in
Unfair disqualification of bidder 21 November 2022
progress
(Mpumalanga)
Mangaung
Metro Inadequate safeguarding of zoo Investigation in
18 March 2024
animals, resulting in impairment progress
(Free State)
City of
Matlosana Local Pollution of water resource (Orkney Referral being
Municipality wastewater treatment works), resulting 14 April 2025 considered by public
in harm to public body
(North West)
(North West)
Pollution of water resources (Letlhabile
Investigation in
wastewater treatment plant), resulting 30 June 2023
progress
in harm to public
Masilonyana
Local Pollution of water resource (Winburg
Investigation in
Municipality wastewater treatment works), resulting 27 February 2024
progress
in harm to public
(Free State)
Thaba
Chweu Local Pollution of water resource (Mashishing Referral being
Municipality Extension 8 wastewater treatment 14 April 2025 considered by public
works), resulting in harm to public body
(Mpumalanga)
Thabazimbi
Local Pollution of water resource Referral being
Municipality (Thabazimbi wastewater treatment 14 April 2025 considered by public
works), resulting in harm to public body
(Limpopo)
Referral being
Poor management of Balfour waste
14 April 2025 considered by public
landfill site, resulting in harm to public
body
Dipaleseng
Local Poor management of Greylingstad Referral being
Municipality waste landfill site, resulting in harm to 14 April 2025 considered by public
public body
(Mpumalanga)
Referral being
Poor management of Grootvlei waste
14 April 2025 considered by public
landfill site, resulting in harm to public
body
Referral being
Thabazimbi Poor management of Rooiberg waste
14 April 2025 considered by public
Local landfill site, resulting in harm to public
body
Municipality
Free State Department of Economic, Small Business Development, Tourism and Environmental
Affairs – sub-referral from Department of Forestry, Fisheries and the Environment
Mangaung
Metro Poor management of Southern waste Investigation in
14 May 2024
landfill site, resulting in harm to public progress
(Free State)
Metsimaholo
Local Poor management of Sasolburg waste Investigation in
Municipality 14 May 2024
landfill site, resulting in harm to public progress
(Free State)
Ngwathe Local
Municipality Poor management of Vredefort waste Investigation in
14 May 2024
landfill site, resulting in harm to public progress
(Free State)
Everyone in the accountability ecosystem has a crucial role to play in optimising the impact of the MI
process. Some roleplayers have mandates and powers similar to – or more comprehensive than – ours,
which they should use to ensure that irregularities are dealt with swiftly and that similar instances are
prevented.
Improvement in institutional integrity will significantly improve the value obtained from the MI process. In
addition, the following recommendations are aimed at the broader accountability ecosystem:
• Accounting officers, supported by senior management, are responsible for preventing and
resolving MIs. When we issue an MI notification, we effectively ask the accounting officer to use
their powers and responsibilities in terms of legislation and policies to deal with the matter swiftly.
The positive impact of the MI process results from accounting officers doing what they are required
to do. Rather than only resolving MIs, accounting officers should focus on implementing and
improving preventative controls to avert the MI process by institutionalising a culture of ethical
discipline and accountability.
• Audit committees and internal audit units should provide an independent view of the effectiveness
of controls and processes. These governance structures are responsible for helping accounting
officers carry out their monitoring responsibilities and make informed decisions. They need to
monitor the resolution of MIs and advise the accounting officers on the implementation of internal
controls that can prevent recurrences.
• Councils and municipal public accounts committees should support, monitor and oversee the
resolution of MIs by requesting quarterly reports on the progress that accounting officers make in
resolving them and, where there are any unreasonable delays, hold them to account.
• Provincial leadership and legislatures should request regular reports from municipalities on the
resolution of MIs.
• Investigative public bodies should respond promptly when MIs are referred to them to ensure that
investigations progress satisfactorily. They should collaborate effectively with other stakeholders
involved in the MI process and be held accountable for any delays in investigations.
In our previous general report and through our engagements with national, provincial and municipal
leadership across the country, we called on all roleplayers in the local government accountability
ecosystem to work deliberately and with urgency towards a culture of performance, accountability,
transparency and institutional integrity.
Now, only a year remains for mayors, speakers and council members of municipalities to leave a legacy
of improved governance and service delivery, and there is still much to be done to address the root
causes that are holding back progress.
Through our audits, and as demonstrated in the various sections of this report, we reconfirmed the root
causes of poor audit outcomes to be:
• governance failures
The roleplayers in the accountability ecosystem all have different but complementary roles to play to
address these identified root causes, based on their functions, responsibilities and mandates.
Municipal
Municipal public accounts
council committee
Treasuries
Internal audit unit Parliament/ Cooperative
provincial governance
Audit committee legislatures and departments
Mayor and oversight Premiers’ offices
speaker committees
Accounting
Senior officer Coordinating
management institutions
Provincial
Officials leadership
Influence
Active citizenry
The recommendations that we have made in prior years to address these root causes remain largely
unchanged:
1. Build capable institutions with intergovernmental support: Support from all spheres of government –
through coordinated and collaborative efforts in partnership with municipal leadership – is needed
to promote strong governance within municipalities.
2. Professionalise and capacitate local government: Skills and capacity gaps can be addressed
through a concerted effort to support and implement local government professionalisation
initiatives and by paying attention to improving municipal human resource management practices.
Professionals want to work in a professional and ethical environment in which their expertise
can be fully applied with limited disruptions and interference. They need competitive salaries,
developmental opportunities and prospects for career progression. In pursuing professionalisation,
municipal managers, councils and provincial leadership should strive towards a future in which
local government is a career of choice for professionals and where scarce skills are retained.
We also have a direct call to action to the political leadership in all three spheres of government and
the elected representatives of the citizens in councils, provincial legislatures and Parliament.
• Managing financial administration, assets and liabilities, revenue, expenditure and the transfer of
funds.
• Ensuring compliance with supply chain management legislation, as well as monitoring and
enforcing contracts.
• Implementing the approved budget and the service delivery and budget implementation plan.
As part of our audits, we made recommendations to accounting officers and their senior management
on filling vacancies, capacitating officials, institutionalising internal controls (with a focus on preventative
controls), establishing good policies and procedures, and protecting and improving their systems. We
also identified – and notified them of – MIs that they must appropriately deal with.
Legislation, including the Municipal Finance Management Act (MFMA) and the Municipal Systems Act
(MSA), is very clear that the mayor and the council are fully responsible for this governance function.
We detail some of their key responsibilities in section 1.
In our audits, we identified that they are either not doing what legislation requires of them or are not
effective in performing these duties.
Budget preparation
Requirements:
1. The mayor (assisted by the municipal manager) should coordinate the budget preparation
process, which includes consulting districts and the national or provincial treasury.
Sections 21, 53 and 68 of the MFMA
2. The National Treasury may review the budgets of metros and intermediate cities, while
provincial treasuries review the budgets of other municipalities (as delegated).
Section 5(2) of the MFMA
3. The council approves the budget and revenue-raising measures (e.g. tariffs) after considering
the views of communities, treasuries or others in national and provincial government.
Section 23(1) of the MFMA
4. The mayor approves the service delivery and budget implementation plan after the council has
approved the budget.
Section 53(1)(c)(ii) of the MFMA
Requirements:
1. The mayor uses the monthly budget statements and the mid-year performance report prepared
by the municipal manager to check how the budget and the service delivery and budget
implementation plan are being implemented, and to identify any financial problems, and
submits a mid-year report to the council.
Sections 54(1) and 71(1) of the MFMA
3. In the case of serious financial problems, the mayor takes the required actions proposed by the
municipal manager and alerts the council and the member of the executive council for local
government.
Section 54(2)of the MFMA
Requirements:
1. The mayor tables an annual report to the council.
Section 127(2) of the MFMA
2. The council considers the annual report and adopts an oversight report, which is made public.
Section 129 of the MFMA
Requirements:
The mayor ensures that the municipality addresses any issues raised in its audit report.
Section 131(1) of the MFMA
Requirements:
Municipal councils must establish a disciplinary board to investigate allegations of financial
misconduct* and to monitor whether disciplinary proceedings are instituted against alleged
transgressors.
Regulation 4(1) of the Municipal Regulations on
Financial Misconduct Procedures and Criminal Proceedings
* In terms of sections 171 and 172 of the MFMA, financial misconduct refers to a deliberate or
negligent act that includes non-compliance with legislation, making or permitting unauthorised,
irregular or fruitless and wasteful expenditure, or providing incorrect or misleading information in any
document required to be made public or submitted to the mayor, the council, the national audit
office, the National Treasury or an organ of state.
Why is this important?
Without a disciplinary board, the council does not have the means to deal effectively with
allegations of financial misconduct against the accounting officer, senior managers or any other
municipal officials.
Requirements:
The municipality must recover unauthorised, irregular, and fruitless and wasteful expenditure from
a liable official unless, after an investigation by a council committee (usually the municipal public
accounts committee), the council certifies that the expenditure is irrecoverable and either writes it
off or, for unauthorised expenditure, authorises it in an adjustments budget.
Section 32(2) of the MFMA
Requirements:
1. The member of the executive council for local government monitors the submission of annual
and oversight reports by municipal managers to the provincial legislature.
Section 132(3) of the MFMA
2. The provincial legislature may deal with the annual and oversight reports that had been
submitted by municipalities.
Section 132(4) of the MFMA
3. The member of the executive council for local government assesses all financial statements of
municipalities in the province, our audit reports and any responses by municipalities thereto;
and determines if municipalities had adequately addressed the audit report issues. A report is
submitted to the provincial legislature on any omissions by municipalities to adequately address
those issues.
Section 131(2) of the MFMA
4. The member of the executive council for local government compiles and submits to the
provincial legislature and the National Council of Provinces a consolidated report of municipal
performance in the province, which identifies those municipalities that had underperformed
and proposes the remedial action to be taken.
Section 47 of the MSA
The recommendations in this section are directed mostly to the mayors; the executives in national
and provincial government; and the members and committees of councils, Parliament and the
provincial legislatures that were elected to direct and oversee the local government administration.
We call on all others in the accountability ecosystem to also fulfil their designated roles and play
their part effectively, without fear or favour, to promote a culture of performance, accountability,
transparency and institutional integrity that will improve service delivery and create tangible
prospects for a better life for the citizens of South Africa.
The first part of this section provides an overview of key audit results and the material irregularity (MI)
information detailed in sections 2 to 5 of this report per province. The province-specific overviews in
the second part summarise the main insights from our audits and highlight how we have used our
enhanced mandate. We also reflect on what should be done, and by whom, to improve the situation;
and the commitments made by those with whom we had engaged before the tabling of this report.
Our website provides comprehensive information on each municipality (including the metros) in the
country, rolled up to district and provincial level.
All of this information aims to enable the premiers, members of executive councils for finance and for
local government and legislatures in each province to identify key focus areas for targeted interventions
and stronger oversight.
7.1 OVERVIEW
Audit outcomes
Overall, the audit outcomes of municipalities in the different provinces have shown limited improvement
since 2020-21 and the trend of poor outcomes persists.
Gauteng KwaZulu-Natal
2020-21 2 7 1 1 0 0 2020-21 3 35 13 0 3 0
2023-24 2 6 3 0 0 0 2023-24 7 36 7 2 1 1
Budget: R159,47bn (29%) Budget: R116,49bn (21%)
3 3 15 6
Households: 5 951 770 (32%) Households: 3 236 175 (17%)
Limpopo Mpumalanga
2020-21 1 16 8 0 2 0 2020-21 4 7 5 1 3 0
2023-24 2 14 10 0 1 0 2023-24 2 8 9 0 0 1
Budget: R33,11bn (6%) Budget: R33,50bn (6%)
6 5 6 3
Households: 1 805 954 (9%) Households: 1 454 676 (7%)
Western Cape
2020-21 22 5 3 0 0 0
2023-24 20 6 2 1 1 0
Budget: R92,69bn (16%)
1 5
Households: 2 225 374 (11%)
The number of municipalities with clean audits has decreased from 2020-21 in Mpumalanga, the
Northern Cape and the Western Cape. The Free State and North West had no clean audits over this
period. Most of the 41 municipalities with clean audits in 2023-24 were in the Western Cape (49%),
KwaZulu-Natal (17%) and the Eastern Cape (15%).
The provinces with the worst outcomes (most disclaimed and adverse audit opinions or outstanding
audits) were again the Free State and North West.
Financial statements
As detailed in section 2.2, 13 municipalities (5%) submitted their 2023-24 financial statements late or not
at all, and only 63 municipalities (26%) submitted good-quality financial statements for auditing.
39 9 20
Eastern Cape
(100%) (23%) (51%)
18 0 6
Free State
(78%) (0%) (35%)
11 4 8
Gauteng
(100%) (36%) (73%)
54 16 43
KwaZulu-Natal
(100%) (30%) (81%)
25 2 16
Limpopo
(93%) (7%) (59%)
19 3 10
Mpumalanga
(95%) (16%) (53%)
29 4 8
Northern Cape
(94%) (13%) (27%)
20 1 3
North West
(91%) (5%) (14%)
29 24 26
Western Cape
(97%) (80%) (87%)
Movement
Improvement Unchanged Slight improvement Slight regression Regression
from 2020-21
Limpopo (33%), Mpumalanga (32%) and KwaZulu-Natal (30%) are the provinces in which the highest
percentage of municipalities have obtained an unqualified audit opinion each year since 2020-21 by
correcting the material misstatements that we had identified.
Performance reports
As detailed in section 2.3, the submission of performance reports for auditing has improved from
2020-21, but the quality of submitted performance reports has remained poor.
39 13 25
Eastern Cape
(100%) (33%) (64%)
17 1 4
Free State
(100%) (6%) (24%)
11 3 4
Gauteng
(100%) (27%) (36%)
53 14 31
KwaZulu-Natal
(100%) (26%) (58%)
27 4 14
Limpopo
(100%) (15%) (52%)
19 3 12
Mpumalanga
(100%) (16%) (63%)
29 4 8
Northern Cape
(97%) (14%) (28%)
21 3 3
North West
(100%) (14%) (14%)
30 19 26
Western Cape
(100%) (63%) (87%)
Movement
Improvement Unchanged Slight improvement Slight regression Regression
from 2020-21
The municipalities in the Free State, the Northen Cape and North West had the worst outcomes
on performance reporting in 2023-24, and none of these provinces have shown improvement since
2020-21.
We reported material findings on non-compliance with legislation on the quality of submitted financial
statements and the prevention of unauthorised, irregular, and fruitless and wasteful expenditure at
more than 50% of municipalities in all the provinces, except the Western Cape.
4 (10%)
Eastern Cape
6 (15%)
0 (0%)
Free State
0 (0%)
2 (18%)
Gauteng
2 (18%)
3 (6%)
KwaZulu-Natal
7 (13%)
1 (4%)
Limpopo
2 (7%)
4 (21%)
Mpumalanga
2 (11%)
5 (17%)
Northern Cape
2 (7%)
0 (0%)
North West
0 (0%)
22 (73%)
Western Cape 20 (67%)
2020-21 2023-24
Movement
Improvement Unchanged Slight improvement Regression
from 2020-21
In 2023-24, all municipalities in the Free State, the Northern Cape and North West had findings on
compliance with legislation on procurement and contract management. These findings were material
at all municipalities in the Free State and North West, except for one municipality in each province that
had non-material findings.
KwaZulu-Natal, Limpopo and Mpumalanga showed improvement in the number of municipalities with
no findings compared to 2020-21.
Non-material
No findings findings Material findings
8 5 26
Eastern Cape
(20%) (13%) (67%)
0 1 16
Free State
(0%) (6%) (94%)
1 1 9
Gauteng
(9%) (9%) (82%)
8 15 30
KwaZulu-Natal
(15%) (28%) (57%)
5 9 13
Limpopo
(19%) (33%) (48%)
5 4 10
Mpumalanga
(26%) (21%) (53%)
0 6 24
Northern Cape
(0%) (20%) (80%)
0 1 20
North West
(0%) (5%) (95%)
6 17 7
Western Cape
(20%) (57%) (23%)
Movement
Improvement Unchanged Slight improvement Slight regression Regression
from 2020-21
As detailed in section 3.2, municipalities have incurred R87,03 billion in irregular expenditure since
2021-22.
2023-24
percentage of municipal Total irregular
2023-24 expenditure budget expenditure
irregular expenditure irregularly spent over three years
Movement
Improvement Unchanged Slight improvement Slight regression Regression
from 2022-23
The percentage of municipal expenditure budgets that were irregularly spent was highest in North
West and the Eastern Cape.
As detailed in section 3.4, how municipalities respond to the irregular expenditure incurred reflects
poor levels of consequence management and commitment to recovering losses.
Breakdown of irregular
expenditure
Irregular
2023-24 2022-23 Irregular Recovered expenditure
closing closing expenditure or in process not dealt
balance balance dealt with of recovery Written off with
R4,40bn R31,96bn
Eastern Cape R37,45bn R36,36bn R10 500 R4 406 599 673
(12%) (88%)
R0,23bn R12,39
Free State R12,52bn R12,61bn R3 285 988 R222 853 620
(2%) (98%)
R3,31bn R21,97bn
Gauteng R27,52bn R25,28bn R8 228 901 R3 301 831 435
(13%) (87%)
R12,23bn R2,53bn
KwaZulu-Natal R8,27bn R14,76bn R4 402 448 R12 221 678 362
(83%) (17%)
R2,86bn R2,65bn
Limpopo R4,67bn R5,52bn R4 000 R2 865 874 038
(52%) (48%)
R2,57bn R3,05bn
Mpumalanga R5,70bn R5,62bn - R2 573 086 342
(46%) (54%)
R0,55bn R2,88bn
Northern Cape R3,67bn R3,43bn R934 595 R544 642 147
(16%) (84%)
R0,90bn R31,41bn
North West R34,64bn R32,31bn - R898 512 052
(3%) (97%)
R0,35bn R0,79bn
Western Cape R2,58bn R1,14bn R69 770 R346 840 652
(31%) (70%)
R27,40bn R109,63bn
TOTAL R137,02bn R137,03bn R16 936 202 R27 381 918 321
(20%) (80%)
The closing balance of irregular expenditure not dealt with by municipalities in KwaZulu-Natal has
decreased by 77% from R11,09 billion in 2020-21 to R2,53 billion in 2023-24, mostly due to write-offs.
The 2023-24 closing balance of irregular expenditure increased from the previous year in all
provinces except the Free State, KwaZulu-Natal and Limpopo. This means that municipalities in
most provinces continued to incur irregular expenditure at a greater rate than they were able to
deal with the existing irregular expenditure balances. The Eastern Cape, Gauteng and North West
were responsible for R99,61 billion (73%) of the total balance.
As detailed in section 3.3, municipalities in all the provinces continued to show signs of significant
financial difficulty, including going concern uncertainties.
9 14 15 12 12 8
Eastern Cape
(23%) (39%) (42%) (33%) (33%) (22%)
3 11 14 8 10 11
Free State
(18%) (69%) (88%) (50%) (63%) (69%)
5 5 9 4 8 6
Gauteng
(45%) (45%) (82%) (36%) (73%) (55%)
5 13 13 17 17 8
KwaZulu-Natal
(9%) (26%) (26%) (34%) (34%) (16%)
4 6 10 13 10 6
Limpopo
(15%) (23%) (38%) (50%) (38%) (23%)
6 12 13 10 14 9
Mpumalanga
(32%) (63%) (68%) (53%) (74%) (47%)
2 16 20 15 20 15
Northern Cape
(7%) (57%) (71%) (54%) (71%) (54%)
12 9 10 12 12 8
North West
(57%) (56%) (63%) (75%) (75%) (50%)
3 4 1 4 4 11
Western Cape
(10%) (14%) (4%) (14%) (14%) (39%)
49 90 105 95 107 82
TOTAL
(20%) (39%) (46%) (41%) (47%) (36%)
In 2023-24, the Free State, Mpumalanga and the Northern Cape had the highest percentages of
municipalities that ended the financial year with a deficit. In all provinces, more than 80% of debt was
irrecoverable in at least 10% of municipalities, while current liabilities were more than current assets
at more than 70% of municipalities in Gauteng, Mpumalanga, the Northern Cape and North West.
More than 50% of municipalities in the Free State, Gauteng and the Northern Cape spent less than
10% of their total expenditure on capital expenditure.
These financial health challenges affect the ability of municipalities to deliver services and honour
their commitments.
Unfunded budgets
2023-24 Total unauthorised
Number of Expenditure budget unauthorised expenditure over
municipalities unfunded expenditure three years
8
Eastern Cape R7,93 billion R3,31 billion R7,06 billion
(21%)
16
Free State R16,02 billion R4,22 billion R14,21 billion
(94%)
9
Gauteng R120,63 billion R8,46 billion R17,99 billion
(82%)
13
KwaZulu-Natal R10,09 billion R3,79 billion R9,34 billion
(25%)
10
Limpopo R10,34 billion R2,19 billion R7,53 billion
(37%)
12
Mpumalanga R23,53 billion R4,61 billion R11,24 billion
(63%)
22
Northern Cape R6,77 billion R1,36 billion R3,57 billion
(73%)
16
North West R26,72 billion R3,56 billion R8,76 billion
(76%)
7
Western Cape R4,37 billion R0,29 billion R1,89 billion
(23%)
113
TOTAL R226,40 billion R31,79 billion R81,59 billion
(44%)
Movement
Improvement Regression
from 2022-23
In most provinces, unauthorised expenditure increased from last year. We include further details on
the extent and impact of the unauthorised expenditure incurred in section 3.3.
Municipalities in all provinces continued to incur fruitless and wasteful expenditure. Fruitless and
wasteful expenditure incurred has decreased from R7,47 billion in 2022-23 to R5,27 billion in 2023-24,
with all provinces showing a decrease of 5% or more.
Movement
Improvement Unchanged Slight improvement
from 2022-23
As detailed in section 3.3, water and electricity losses contributed to lost revenue across all provinces.
Water Electricity
losses Water Electricity losses Electricity
Water loss above losses not loss above losses not
amount 30% disclosed amount 10% disclosed
7 1 16
Eastern Cape R1,12bn R2,18bn -
(50%) (7%) (76%)
7 10
Free State R0,78bn - R0,59bn -
(54%) (77%)
7 8
Gauteng R6,90bn - R11,79bn -
(78%) (89%)
13 17
KwaZulu-Natal R3,47bn - R2,70bn -
(93%) (71%)
3 11 4
Limpopo R0,83bn - R0,51bn
(30%) (58%) (21%)
9 12
Mpumalanga R0,62bn - R1,93bn -
(56%) (92%)
15 1 19 1
Northern Cape R0,23bn R0,46bn
(60%) (4%) (76%) (4%)
6 5 9 2
North West R0,74bn R1,31bn
(40%) (33%) (69%) (15%)
8 10
Western Cape R0,22bn - R0,90bn -
(31%) (40%)
75 7 112 7
TOTAL R14,91bn R22,37bn
(53%) (5%) (69%) (4%)
Gauteng accounted for 53% of the total electricity losses and 46% of the total water losses.
In six provinces, at least half of the water service providers that disclosed losses had water losses
above the 30% norm. In all provinces, except the Western Cape, most electricity service providers
had electricity losses above the 10% norm.
Kareeberg Local Municipality in the Northern Cape did not disclose any water or electricity losses as
required.
The Free State, Mpumalanga and North West were the slowest to act in response to our MI notifications,
and were responsible for 78% of the MIs where we had to take further action.
64 31 Resolved 80 31 Resolved
33 Unresolved 49 Unresolved
19 2 3 4 2 2 0 1 0 0 0 3 1 0 1 9 24 1 6 1 3 0
Gauteng KwaZulu-Natal
38 Resolved
54 33 Resolved 60 1 Not pursued further
21 Unresolved 21 Unresolved
11 0 3 7 0 0 0 0 0 0 0 13 0 0 1 1 5 0 1 0 0 0
Limpopo Mpumalanga
40 24 Resolved 45 23 Resolved
16 Unresolved 22 Unresolved
12 0 0 1 0 3 0 0 0 0 0 3 2 1 1 1 12 1 1 0 0 0
8 1 2 0 6 1 0 1 0 1 0 2 3 2 7 1 14 0 3 0 5 1
Western Cape
5 3 Resolved
2 Unresolved
0 1 1 0 0 0 0 0 0 0 0
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 4 16 14 1 4 0 13 8
2023-24 6 14 16 1 2 0
Last year, we advised councils to enforce strong financial management, ensure revenue collection,
spend wisely and prevent or promptly address losses. Provincial leadership committed to implement
consequence management measures and enhance accountability systems for financial
management.
The audit outcomes improved from 2020-21, with an increase in the number of municipalities with
clean audits. These improvements are attributed to stable leadership, well-capacitated finance units,
active oversight and a robust control environment. Alfred Nzo District Municipality and Kouga and
Umzimvubu local municipalities moved into this category in 2023-24, while Winnie Madikizela-Mandela
Local Municipality regressed from a clean outcome to an unqualified audit opinion with findings.
The number of municipalities with disclaimed opinions has decreased from four to two since 2020-21,
with Chris Hani District Municipality and Walter Sisulu Local Municipality moving out of this category in
2021-22. Amathole District Municipality received a disclaimed opinion from 2021-22 and subsequently
improved to a qualified opinion in 2023-24 by filling key vacancies, implementing audit committee
recommendations and using the technical support offered by the coordinating institutions. Even after
using consultants and receiving support from the provincial treasury and cooperative governance
department, Makana and Sundays River Valley local municipalities have received disclaimed
audit opinions for six consecutive years, indicating ongoing failures in financial management and
accountability.
Despite the progress that has been made, the most common audit outcome was a qualified audit
opinion – received by 16 municipalities (41%) in 2023-24. Nelson Mandela Bay Metro regressed into this
Poor budgeting remained a critical issue, with 22 municipalities (56%) incurring R3,31 billion in unauthorised
expenditure in 2023-24. Eight municipalities had unfunded budgets that were approved by the council,
five of which also expressed going concern uncertainty as to whether they would be able to continue
operating. The provincial treasury intervened by pre-assessing budgets to identify excessive spending,
unrealistic revenue projections and debt that cannot be collected and by holding monitoring sessions
to track the implementation of recommendations. Efforts to enhance financial stability and budgeting
failed, as the number of municipalities with unfunded budgets rose from six last year to eight in
2023-24. Coordinating institutions should monitor municipalities and ensure that they have cash-backed
budgets that are used for their intended purpose.
Inefficient payment practices led to R197 million in interest and penalties, which accounted for almost
two-thirds of the R298 million in fruitless and wasteful expenditure, and underscored the systemic poor
financial management in the province. The highest contributors to fruitless and wasteful expenditure
were Dr Beyers Naudé (R55,58 million) and Enoch Mgijima (R50,99 million) local municipalities. The poor
financial management processes at these municipalities led to us notifying their accounting officers of
MIs on substantial harm to the public due to the late payment of pension fund contributions (Dr Beyers
Naudé) and payments to an incorrect supplier (Enoch Mgijima).
There was some improvement in service delivery planning and reporting but controls over these
processes were still inadequate, leading to unreliable reporting and ineffective planning. Overall,
26 municipalities (67%) submitted poor-quality performance reports in 2023-24, slightly fewer than the
30 (77%) that did so last year. After making audit adjustments, 12 of these 26 municipalities were able
to publish good-quality performance reports, while 14 (36%) reported performance information that
was not useful and/or not reliable. To improve reporting on service delivery performance, accounting
officers must insist on strengthening internal review processes, enhance accountability and invest in
capacity-building efforts.
The province continued to struggle with infrastructure delivery. Some of the water and sanitation
infrastructure was old and in need of rehabilitation, while reactive maintenance rather than preventive
measures has led to untreated wastewater being discharged into the environment. We notified the
accounting officer of Makana Local Municipality of an MI due to failure to prevent pollution of a water
resource at the Mayfield wastewater treatment works. At Buffalo City Metro, the construction contract
for the Zwelitsha wastewater treatment works was terminated in November 2021, and the 2023–24
audit revealed submerged pumps, clogged sludge and a non-functional pump station. At Nelson
Mandela Bay Metro’s Motherwell NU30 housing project, houses were approved for handover despite
having defects and being without electricity.
We have issued 64 material irregularity notifications in the province, with a combined estimated
financial loss of R733 million. Some of these MIs related to the inadequate management of
landfill sites that has led to significant environmental risks – including at Makana, Sundays
River Valley and Amahlathi local municipalities. We invoked our powers at Chris Hani District
Municipality where an MI relating to consultant services rendered without value was referred
Overall, 33 municipalities (85%) had material findings on compliance with legislation, with common
issues including those relating to weak procurement practices; not preventing unauthorised, irregular,
and fruitless and wasteful expenditure; lack of consequences; material misstatements in financial
statements; and poor asset management. Consequence management was not adequately
implemented at 17 municipalities (44%). These municipalities did not investigate allegations of financial
misconduct; did not have properly constituted disciplinary boards; and did not address unauthorised,
irregular, and fruitless and wasteful expenditure.
While mayors and municipal managers met reporting requirements to councils and the provincial
treasury, cooperative governance department and legislature, this has not translated into improved
audit outcomes and service delivery because of a lack of proper scrutiny and consequences for
poor performance by councils. Five municipalities (13%) were under provincial intervention and had
financial recovery plans, but these interventions were not effective due to the slow implementation of
the plans, and an overall lack of accountability and consequences by councils.
To enhance accountability and service delivery, councils must instil a performance-driven culture by
ensuring that all staff sign performance agreements that are aligned to municipal service delivery
objectives and that performance evaluations are conducted regularly. Municipal public accounts
committees must thoroughly investigate unauthorised, irregular, and fruitless and wasteful expenditure
to ensure better governance and financial responsibility within municipalities.
The premier has pledged to enforce consequence management, strengthen accountability and
intervene at the repeatedly disclaimed municipalities (Makana and Sundays River Valley local
municipalities). The provincial treasury committed to focus on managing spending at financially
distressed municipalities. The provincial cooperative governance department committed to
strengthen municipal performance management and monitoring tools. The provincial legislature
committed to oversee the implementation of our recommendations and ensure that action is taken
against non-compliant municipalities.
Urgent action is required to cement an ethical culture and accountability that will
improve service delivery
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 0 6 13 0 3 1 1 1
2023-24 0 6 10 0 1 6
Since the start of the administrative term in 2021-22, we have urged all roleplayers in the accountability
ecosystem to demonstrate ethical and accountable conduct to improve governance, shift the local
government culture and improve service delivery.
Municipalities heeded our call to submit their financial statements on time, with 19 municipalities
(83%) doing so last year – up from 12 municipalities (52%) in 2020-21. This was largely due to the
impact of our influence and enforcement of accountability. However, this progress was not sustained
in 2023-24, as six municipalities (26%) did not submit financial statements in 2023-24 – an increase
from four (17%) last year. Political and administrative leadership must act decisively and implement
the necessary consequences to ensure that legislative timelines are consistently met. The audit of
Maluti-a-Phofung Local Municipality was finalised after the cut-off date for inclusion in this report
and the municipality again received a disclaimed audit outcome due to instability in political and
administrative leadership.
The overall audit outcomes have remained the same since 2020-21 due to councils’ lack of
commitment to improving them. Areas of significant concern include assets, revenue and debtors’
balances. This was because some municipalities did not have reliable asset registers, or lacked
accurate and complete records of billings, which resulted in poor infrastructure management and
weakened financial sustainability.
The delivery of critical infrastructure remained a challenge and some municipalities experienced
delays in building the infrastructure required to deliver basic services. This was due to inadequate
project monitoring because of high vacancy rates and a lack of basic controls such as standard
operating procedures. Mangaung Metro did not complete the extension of the Thaba Nchu
Despite the continued high spending on consultants for financial reporting, municipalities struggled
to submit credible financial statements, and material corrections were made to all submitted
financial statements in 2023-24. Consultant costs increased from R51,01 million last year to R66,54
million in 2023-24, but the expected benefits of using consultants were not always realised. This
was because accounting officers prioritised appointing consultants over building capacity
within their finance units and addressing basic control weaknesses. Some internal audit units and
audit committees provided limited assurance because they were not effective, as they were
not adequately capacitated or did not monitor the implementation of their recommendations.
Accounting officers, mayors and councils should ensure the adequate capacitation and
functioning of these key governance structures.
The province continued to struggle with performance reporting. In 2023-24, 13 municipalities (76%)
published performance reports that were not useful and/or reliable, hampering transparency
and accountability. The poor quality of the performance information raises concerns about the
reliability of the quarterly reporting to councils, potentially leading to misguided decisions on
service delivery. These issues stem from poor planning as councils are not setting clear performance
indicators and well-defined measurement criteria for achievements, inadequate processing and
reconciling controls, and weak recordkeeping systems. The premier urgently needs to prioritise
the relevant, reliable and timely reporting of performance information as this is crucial to making
informed decisions on service delivery.
Municipalities again did not comply with key legislation, and we have reported material
non-compliance at all municipalities every year since 2020-21. Non-compliance with procurement,
competitive bidding and quotation processes was the main contributor to the substantial increase in
the closing balance for irregular expenditure, which rose from R9,89 billion in 2020-21 to R12,52 billion
in 2023-24. The fruitless and wasteful expenditure balance grew from R3,71 billion to R5,32 billion over
the same period due to interest on late payments to suppliers. In 2023-24, progress on investigating
irregular expenditure and fruitless and wasteful expenditure was slow, as some municipal public
accounts committees did not establish timelines for such investigations, allowing the continued
misuse of state funds without any consequences.
Of the unresolved MIs, 22 relate to non-compliance with environmental legislation, which highlights
municipalities’ challenges with wastewater and solid waste management. None of these
MIs have been adequately addressed, and they have now been referred to public bodies for
further investigation. Inadequate cash management contributed to MIs being raised on the late
payment of suppliers and pension funds. For example, we raised MIs at Mafube and Mohokare
local municipalities as they did not pay over all employee contributions to the relevant pension
funds. The current culture of complacency will not change without a concerted effort by provincial
leadership.
We urge the premier to promote an ethical culture that enhances performance, accountability,
transparency and integrity. We are encouraged by the commitments made by the premier to
develop a coordination plan to ensure that service delivery is planned for in an integrated manner.
The provincial cooperative governance department, with support from the South African Local
Government Association, committed to help capacitate municipal public accounts committees
to perform adequate investigations. Councils should enhance the effectiveness of their oversight,
hold administrative leadership accountable for poor performance and inaction on MIs, and
implement consequences for transgressions.
The local government culture will shift once the key roleplayers in the accountability ecosystem
implement our recommendations to increase oversight, improve financial and performance
management controls, report credibly on their performance, deliver services to communities and
implement consequence management.
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 2 7 1 1 0 0 3 3
2023-24 2 6 3 0 0 0
Last year, we implored leadership to act with a sense of urgency to improve the audit outcomes, but
not enough progress has been made in improving the outcomes. Municipalities and municipal entities
continue to experience challenges with financial viability, compliance with legislation and service
delivery. We again call upon leadership to act swiftly in addressing these challenges.
Two municipalities and three municipal entities (21% of the auditees in the province) received clean
audits in 2023-24, compared to two municipalities and one municipal entity (13%) in 2020-21, while six
municipalities and 10 municipal entities (67%) received unqualified audit opinions with findings. Both
Midvaal Local Municipality and Johannesburg Market sustained their clean audits from last year, while
West Rand District Municipality, Ekurhuleni Water Care Company and Ekurhuleni Housing Company
improved to a clean audit status in 2023-24.
There were improvements in the audit outcomes of two municipalities, namely Merafong City Local
Municipality from a disclaimed to a qualified opinion and Mogale City Local Municipality from a
qualified to an unqualified opinion – because they implemented our recommendations on basic
financial controls and records management. Key municipal entities, such as Johannesburg Water, City
Power, PikitUp and Johannesburg Roads Agency, have retained their unqualified audit opinions with
findings from 2020-21. Although City of Tshwane Metro and Emfuleni Local Municipality both received
qualified opinions, there were fewer qualification areas. Leadership should continue to hold officials
accountable for not implementing basic preventative controls.
The quality of financial statements submitted for auditing is still a concern, with only 50% of submitted
financial statements being of good quality. Four municipalities and five municipal entities were able to
The quality of published performance reports is still a concern despite a slight improvement from 52%
in 2020-21 to 58% in 2023-24. The poor quality is due to a lack of adequate processes to ensure valid,
accurate and complete reporting and inadequate reviews by internal audit units and performance
audit committees. Good-quality performance reports enable leadership to understand and
effectively monitor the level of service delivery and take corrective action where and when required.
We again urge the internal audit units and performance audit committees to intensify their reviews
and the provincial cooperative governance department to effectively monitor the impact of the
initiatives implemented to improve the quality of performance information.
While municipalities continued to engage residents through public-participation sessions when setting
priorities, and the metros included the relevant performance indicators in their performance plans,
service delivery targets were not always achieved, which hampered the provision of basic services
to communities. Planned performance targets were also revised – and at times even removed from
planning documents – during the mid-year adjustments process, resulting in commitments to residents
not being honoured. We call on councils and mayors to improve performance accountability
by assessing the individual performance of accounting officers and senior management based
on how the municipalities have performed in line with pre-agreed priorities, and to apply stricter
consequences for a lack of organisational performance.
The financial health of municipalities continued to deteriorate, as five municipalities and two
municipal entities (29%) expressed going concern uncertainty – compared to six municipalities (25%)
in the previous year. Approved financial recovery plans have yet to yield the desired impact at City
of Tshwane Metro, City of Johannesburg Metro and Emfuleni Local Municipality due to inadequate
monitoring of the conditions imposed in the plans; while at Merafong City Local Municipality, the
plan was only approved late in the financial year.
Municipalities continued to struggle with collecting the money owed to them as evidenced by the
significant provision for bad-debt impairments. This ranged from 70% to 92% at the three metros, which
affected their ability to pay creditors timeously and invest in infrastructure programmes. Accounting
officers did not adequately perform budget planning and monitoring processes and there was a
lack of oversight by the executive authority, as eight municipalities (73%) incurred unauthorised
expenditure of R8,46 billion because they did not budget sufficiently for non-cash items. In addition,
nine municipalities adopted unfunded budgets. Fruitless and wasteful expenditure decreased from
The material irregularity process continued to gain traction as most accounting officers are taking
corrective steps to address the identified MIs. Such steps include improving internal controls,
upgrading and maintaining infrastructure, instituting disciplinary processes and recovering funds – with
R401,87 million of the total estimated financial loss of R1,35 billion having been recovered to date.
In response to being notified of MIs, accounting officers at Johannesburg Water and City Power are
now billing customers for all services rendered, which will assist with revenue generation. As a result
of the MIs we raised on deficient wastewater treatment works at Merafong City Local Municipality,
the Department of Water and Sanitation is assisting the municipality with funding to refurbish the
wastewater treatment works. We urge accounting officers to develop early warning systems and
implement controls to prevent material irregularities from occurring. We also encourage governance
structures and councils to continue to monitor the progress that accounting officers make in
implementing the actions that they commit to take.
The provincial leadership should foster a culture of good governance, strengthen financial
disciplines and see matters through so that their efforts yield real benefits for local government. The
premier, along with the members of the executive councils for finance and for local government,
implemented initiatives aimed at improving audit outcomes, but more needs to be done so that
tangible impact can be realised, while also strengthening oversight and building institutional integrity
within municipalities. The provincial legislature and portfolio committee on local government should
lift the legislative arm and interrogate with renewed rigour the accountability reports submitted by
municipalities and the provincial cooperative governance department. Where gaps are identified,
they should call these roleplayers to account. We urge administrative leadership to shift the culture
and move their focus towards critical issues, reinforcing internal control systems, boosting revenue
collection, establishing mechanisms to enhance the execution of infrastructure programmes and
improving service delivery.
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 3 35 13 0 3 0 15 6
2023-24 7 36 7 2 1 1
Last year, we recommended that councils and accounting officers, in collaboration with the
premier’s office, treasury, cooperative governance department and legislature in the province,
actively track audit action plans and key service delivery targets. We also advised them to prioritise
the recruitment of qualified and skilled staff, enforce strict accountability and strengthen oversight
to support continued improvements.
Audit outcomes improved slightly between 2022-23 and 2023-24. A bigger improvement is evident
from 2020-21, with 15 municipalities (28%) having improved their audit outcomes since then. The
number of clean audits also rose – from three (6%) in 2020-21 to seven (13%) in 2023-24. This
demonstrates that municipalities can improve their ability to produce credible and reliable reports
through greater discipline and accountability. Despite the progress made, many municipalities
are still slow to respond to our call for action to improve financial and performance management
controls, comply with legislation and meet key service delivery targets.
The three municipalities that received disclaimed audit opinions in 2020-21 have improved
their outcomes after municipal leadership worked with the provincial treasury and cooperative
Okhahlamba Local Municipality lost its clean audit status due to the slow response by management
to address supply chain management failures. Endumeni Local Municipality regressed to a
disclaimed opinion, mainly because senior management did not properly oversee financial
statement preparation and reporting, and the appointed consultants did not properly set up the
accounting system to support financial reporting. Umzumbe Local Municipality regressed to an
adverse opinion due to political instability and vacancies in key posts. Amidst these challenges,
progress is evident at some municipalities that have received unqualified audit opinions with
findings for many years, gradually decreasing the number of findings reported. However, these
municipalities must avoid complacency and expedite implementing audit recommendations and
the commitments made.
King Cetshwayo District Municipality, along with uMlalazi and City of uMhlathuze local
municipalities, sustained their clean audit status through the support of strong, dedicated and
accountable leaders who institutionalised internal controls and ensured stability in key positions.
Support from the provincial treasury and cooperative governance department helped Mpofana,
eMadlangeni and Jozini local municipalities to clear their qualification areas. Despite being placed
under intervention, uThukela District Municipality (qualified opinion) and both uMzinyathi District
Municipality and Umzumbe Local Municipality (adverse opinions) made limited progress due to
delays in appointing administrators and changes in leadership.
While the provincial cooperative governance department tabled a report on how to address
concerns raised in our audit reports in the provincial legislature, the implementation of
recommendations was slow and inconsistent. While some municipalities managed to improve
their outcomes, others struggled due to poor oversight by mayors and councils. The provincial
treasury and cooperative governance department need to focus on the persistent negative
audit outcomes, non-achievement of service delivery targets and ineffective interventions. In
some instances, municipal leadership also failed to act on recommendations from internal audit
units and audit committees, highlighting the need for closer cooperation with these governance
structures to unlock their full value.
The quality of submitted financial statements has improved slightly since 2020-21, with
16 municipalities (30%) producing financial statements that required no material adjustments in
2023-24, compared to 12 (25%) in 2020-21, largely due to the appointment of experienced
finance staff. Notably, 27 municipalities (51%) received unqualified audit opinions on their financial
statements only because we allowed them to make material adjustments. Consultant costs
decreased from R252,81 million last year to R222,63 million in 2023-24 but skills gaps persisted at
some municipalities, leading to continued reliance on consultants. Senior management was slow
to respond to our recommendations to improve controls over routine reviews and reconciliations.
All 10 municipalities that received modified audit opinions used consultants for financial reporting.
This was mainly because of inefficiencies at the municipalities to manage consultants, such as
poorly managing projects and appointing consultants without conducting a needs analysis. In
some instances, consultants did not transfer skills to finance officials. The main qualification areas
related to revenue and receivables, as well as disclosures relating to unauthorised, irregular, and
fruitless and wasteful expenditure. At Amajuba District Municipality, revenue qualifications stemmed
Municipalities that complied with key legislation increased from three (6%) in 2020-21 to seven (13%)
in 2023-24. The most common areas of non-compliance related to material misstatements in the
submitted financial statements and unauthorised, irregular, and fruitless and wasteful expenditure
not being prevented. Compliance with supply chain management legislation improved as senior
management trained officials on the legislation and implemented supply chain management
checklists. Compliance with consequence management legislation also improved as councils,
supported by the provincial cooperative governance department, investigated and subsequently
reduced the unresolved irregular expenditure from prior years from R14,39 billion in 2020-21 to
R8,27 billion in 2023-24. However, some councils did not conduct proper investigations before
writing off irregular expenditure or enforce consequences against responsible officials.
Some accounting officers actively investigated root causes, enforced consequence management
and resolved material irregularities. Of the 60 MIs that we have identified, accounting officers have
resolved 40 (67%). However, a lack of timely investigations (some of which took as long as 18 months
to complete) often delayed the resolution of some MIs (and, by implication, the harm caused).
For instance, the accounting officer of eThekwini Metro did not timeously address the pollution of
water resources at its Northern wastewater treatment works, resulting in raw sewage continuing to
be discharged into the Umhlangane and uMngeni rivers.
Municipalities struggled across all stages of the infrastructure project life cycle, from planning
to maintenance, causing delays, poor build quality, cost overruns and service interruptions.
This was largely due to municipal leadership and management being slow to implement audit
recommendations and hold non-performing contractors accountable. Municipalities often
allocated insufficient funding towards repairing and maintaining infrastructure assets. The poor
maintenance of infrastructure was the key contributor to the provincial water losses of R3,47 billion,
with eThekwini Metro accounting for R1,99 billion (58%).
Our site visits of water infrastructure revealed inadequate maintenance, non-compliance with
environmental legislation and safety risks. For example, at the City of uMhlathuze Local Municipality,
mechanical failures at the Empangeni wastewater treatment works caused water pollution. The
municipality received a clean audit, but this does not necessarily guarantee wholesale quality
service delivery and the municipality should focus on all areas of service delivery.
The financial health of municipalities remained poor and service delivery and operations were
affected by poor cash-flow and financial management. Five municipalities (9%) expressed going
concern uncertainty in 2023-24, compared to 10 (19%) last year. Municipalities continued to struggle
to collect debt, with 69% of all debt deemed irrecoverable. Thirteen municipalities (25%) tabled
unfunded budgets due to unrealistic revenue targets, as accounting officers did not adequately
The province’s outcomes highlight the need for strong internal controls, reliable information
technology systems, regular reviews and continuous monitoring. The provincial treasury and
cooperative governance department, with the oversight of the premier’s office, must fulfil their
commitment to developing tailored and sustainable turnaround plans for struggling municipalities
to better manage their finances and maintain their infrastructure. With support from the provincial
treasury and cooperative governance department, accounting officers and councils must enforce
accountability, strengthen governance and ensure that action plans are implemented effectively
and on time. Lastly, accounting officers must improve accountability, oversee infrastructure quality
and maintenance, and recover municipal debt to improve service delivery to their communities.
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 1 16 8 0 2 0 6 5
2023-24 2 14 10 0 1 0
Last year, we reported that audit outcomes in the province had remained largely unchanged
because of inadequate oversight and slow implementation of corrective action. This stagnation is
also evident when comparing the outcomes to those of 2020-21. Two municipalities had lost their
clean audit status last year, leaving the province with no clean audits. We highlighted that the
financial health of most municipalities remained under pressure because of poor revenue collection,
while the use of consultants increased despite there being a commitment by the premier to reduce
this reliance. Poor planning, budgeting, spending and project management practices contributed
to municipalities not achieving their targets. We reiterated our call to councils, the premier and
members of the executive councils for local government and for finance to prioritise oversight and
corrective action as determined by legislation.
Similarly, the 2023-24 audit outcomes show no notable improvement, except for Waterberg and
Capricorn district municipalities obtaining clean audits. While all municipalities developed and
approved audit action plans, some did not properly address prior-year findings, which meant that
audit outcomes remained largely unchanged compared to 2020-21. Thabazimbi Local Municipality
regressed to a disclaimed audit opinion due to political infighting, which led to significant instability in
the administration. The provincial government has since placed the municipality under intervention.
Seven municipalities have remained in the unqualified with findings category since 2020-21, which
further demonstrates that the audit action plans do not appropriately deal with root causes.
A total of 25 municipalities (93%) had material misstatements in their submitted financial statements,
and 14 municipalities (52%) relied on the audit process to eventually produce good-quality financial
statements. All municipalities used financial reporting consultants to cover the lack of skills and/
The quality of submitted performance reports remained poor, as municipalities continued to rely on
the audit process to publish credible performance reports. In 2023-24, only four municipalities (15%)
submitted credible performance reports for auditing, with 14 (52%) eventually publishing credible
reports after some made corrections based on the audit, compared to 10 (37%) in 2020-21. This
improvement did not translate into improved service delivery, as none of the municipalities managed
to achieve all the key targets contained in their service delivery and budget implementation plans.
In 2023-24, 10 auditees – two more than last year – adopted unfunded budgets because of poor
budgetary processes (such as unrealistic assumptions and inadequate budget reviews). Sixteen
municipalities incurred R2,19 billion in unauthorised expenditure. This was due to low estimates
of non-cash items during the budgeting process at 12 (75%) of these municipalities. Three local
municipalities (Bela-Bela, Modimolle-Mookgophong and Thabazimbi) that owe Eskom a combined
R454 million are at risk of being removed from the Eskom debt-relief programme because they are
not adhering to the programme conditions due to poor revenue collection.
The financial health of most municipalities remained under pressure as they struggled to collect
revenue and pay their creditors on time, and four municipalities (15%) disclosed going concern
uncertainty. Fruitless and wasteful expenditure of R149,54 million incurred during the year further
added to this unfavourable position. If this position is not addressed, municipalities will not be
able to sustain their operations and achieve key service delivery priorities, such as investing and
maintaining their infrastructure to deliver reliable water, electricity and sanitation services of
the required quality. We encourage councils, with the assistance of the provincial treasury and
cooperative governance department, to adopt and monitor financial recovery plans that will
enable municipalities to improve their financial health.
The province continued to face challenges with infrastructure projects not being completed on
time, as there was inadequate project supervision and no consequences for the officials responsible
for overseeing these projects. The culture of waiting for auditors to raise deficiencies must also be
addressed by improving project monitoring, including regular site visits.
The state of water provision remained concerning as critical water infrastructure projects were
delayed, depriving communities of an adequate water supply. For example, at Sekhukhune District
Last year, we reported on the Polokwane regional wastewater treatment plant project, which
was significantly delayed and had exceeded its budget. A year later, the project has still not
been completed, further delaying service delivery to the growing population of Polokwane.
Management failed to implement our recommendations and incurred standing-time payments of
R2,20 million because of poor planning, budgeting and coordination. As a result, we notified the
accounting officer of an MI in November 2024.
Of the 40 material irregularity notifications issued in the province, 34 related to financial losses
of an estimated at R1,43 billion. By 31 January 2025, R230,85 million of this amount had been
recovered and R3,61 million had been prevented. Overall, 24 of the 40 MIs have been resolved,
while accounting officers are taking appropriate action to address a further 12. Where MIs have
been resolved, internal controls were improved, preventative measures were put in place and
responsible officials faced consequences. Delays in completing investigations and disciplinary
processes, coupled with instability in accounting officer positions, delay the resolution of MIs.
To encourage the protection of the environment, we have issued six MI notifications relating to likely
substantial harm to the general public due to landfill site mismanagement and pollution of water
sources – and the impact of our expanded mandate is becoming more evident. For example, after
we notified the accounting officer of Bela-Bela Local Municipality of an MI because the Warmbaths
wastewater treatment works facility was not operated in accordance with legislation and is likely to
cause harm to the general public, the municipality took action to get the facility operational and
environmentally sound.
The member of the executive council for local government did not table the 2022-23 consolidated
report on municipal performance in the provincial legislature as required. The member did table
the report on those municipalities that had failed to adequately address our audit report findings,
but the provincial legislature has not yet made any resolutions based on the observations in the
report. For these oversight reports to have a bigger impact, the member of the executive council
must prioritise the tabling of the reports and the legislature should interrogate them in a timely
manner.
The province has the potential to improve the lived realities of its communities, but for this to happen,
it is critical that all roleplayers in the accountability ecosystem work together in realising this goal.
Municipal public accounts committees must expedite investigations into unauthorised, irregular,
and fruitless and wasteful expenditure. Councils must implement consequences against accounting
officers for continued transgressions and poor performance. The premier, in collaboration with
the provincial treasury and cooperative governance department, should conduct workshops to
capacitate chief financial officers and accounting officers to deal with the root causes of repeat
findings and take remedial action where repeat findings persist.
The member of the executive council for local government has committed to establish forums
to address internal control deficiencies, such as compiling quarterly financial statements, and to
engage audit committees and internal audit units to ensure that they are effective in providing
assurance and guidance to councillors. The role of these governance structures in reviewing the
quality of financial statements and performance reports is crucial to improving municipal audit
outcomes. The premier has committed to strengthen governance and improve service delivery by
focusing on local municipalities, which will directly benefit the people of the province.
Persistent weak control environments and lack of leadership accountability hinder the
necessary culture shift
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 4 7 5 1 3 0 6 3
2023-24 2 8 9 0 0 1
Since 2021-22, we have worked closely with municipal and provincial leadership, as well as other
key stakeholders in the local government accountability ecosystem, to identify sustainable solutions
in four critical areas: establishing an effective control environment, ensuring financial sustainability,
improving infrastructure project planning and management, and ensuring compliance with
legislation (particularly relating to procurement and contract management and consequence
management). We have also emphasised the importance of prioritising these critical areas at the
intermediate cities, given their central role in the success of the province.
Leadership engagement over this period showed some positive movement, with a more proactive
approach to addressing some of the challenges identified in our previous reports. This shift resulted
in some improvements, such as the eradication of disclaimed and adverse audit opinions.
While these steps are encouraging, the journey towards sustained improvement continues as
the four critical areas mentioned above have not been fully addressed. Both the political and
administrative leadership (comprising the premier, speaker of the legislature, members of the
executive councils for local government and for finance, municipal councils, accounting officers
and senior management) must prioritise these four areas, and drive high-quality service delivery
and capacity-building efforts.
The province’s overall audit outcomes improved, with two improvements from 2022-23. eMalahleni
Local Municipality improved from a seven-year qualified opinion to an unqualified opinion with
findings due to stable leadership and qualified personnel in key positions, which enabled the
implementation of a credible action plan. eMakhazeni Local Municipality improved from an
Since 2021-22, municipalities have consistently submitted their financial statements by the legislated
date. However, this year, Thaba Chweu Local Municipality did not submit its consolidated financial
statements because its entity, the Thaba Chweu Local Economic Development Agency, did not
submit its financial statements on time. As a result, we notified the entity’s accounting authority of
an MI.
The quality of financial reporting remained poor. Only three municipalities (16%) submitted reliable
financial statements, while the rest struggled due to weak financial management controls, a
shortage of skilled personnel and vacancies. The MIs that we identified in prior years contributed
to reduced consultant spending, from R187,67 million last year to R169,42 million in 2023-24. Despite
this, reliance on consultants remained high, with 18 municipalities (95%) using consulting services in
2023-24. Inadequate skills in finance units limited consultants’ effectiveness, as municipalities failed
to provide adequate records to the consultants or review their work. Strengthening internal financial
management capability is crucial for improving financial reporting. The provincial cooperative
governance department should offer support to enhance internal capacity through the effective
implementation of the integrated municipal support plan.
Municipalities continued to depend on the audit process to produce credible performance reports
because they lacked effective systems for collecting, monitoring and reporting performance
information. Unreliable performance reports undermine transparency, accountability and the
oversight role of mayors and council committees. Only three municipalities (16%) submitted
credible performance reports in 2023-24, while another nine (47%) (as was the case in 2020-21)
achieved good-quality reports after adjustments during the audit. Some municipalities failed to
meet key service delivery targets, particularly those relating to water infrastructure, causing delays
in the provision of water. To address this gap, mayors must rigorously review the legislated budget
and mid-year reports before tabling and hold accounting officers accountable for unachieved
targets and inaccurate reporting.
While municipalities spent most of their infrastructure grants, they failed to complete some projects
on time and within budget due to vacancies, skills shortages in project management units and weak
financial controls. As a result, the province continued to struggle with inadequate infrastructure,
including overburdened water treatment plants, resulting in water losses, poor-quality water and
health risks. In 2022-23, environmental audits at six municipalities (32%) revealed poorly maintained
infrastructure and ineffective environmental management, leading us to notify the accounting
officers at all six municipalities of MIs for likely harm to the public. Four of the municipalities have
not addressed the issues, and we have referred these matters to the Department of Water and
Sanitation and the Department of Forestry, Fisheries and the Environment for further action.
Municipalities remained in financial distress, with six expressing going concern uncertainty – the
same number as in 2020-21. Despite warnings from the national and provincial treasury on unfunded
budgets, 11 councils (58%) continued to approve them. Unauthorised expenditure grew from
R2,59 billion in 2020-21 to R4,61 billion in 2023-24, while operating deficits increased from R2,17 billion
to R3,24 billion over the same period. This may force municipalities to use future budgets to cover
expenses that have already been incurred, jeopardising future service delivery.
We have notified accounting officers in the province of 45 material irregularities due to non-
compliance resulting in financial losses as well as substantial harm to the general public, municipalities
and municipal entities. Since notifying the accounting officers of the MIs, we have identified
further losses of R1,63 billion. By 31 January 2025, the province had resolved just over half of the MIs
(23). This was driven by strengthened capacitation of finance units, regular reconciliations, proper
record-keeping and the implementation or revision of financial recovery plans.
Municipal public accounts committees and disciplinary boards must strengthen their role in
promptly concluding investigations and enforcing consequences for transgressions. In response to
the 2023-24 audit outcomes, municipal leadership and the provincial premier’s office, cooperative
governance department and treasury committed to strengthening local government by filling
key vacancies, implementing support plans and enhancing oversight, while the premier aims
to increase clean audits from two to eight by the end of the administrative term. We urge these
roleplayers to collaborate on sustainable solutions in the four critical areas mentioned earlier to bring
about the necessary culture shift by strengthening accountability, transparency and performance
for better service delivery to the people of Mpumalanga.
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 5 5 17 0 4 0 5 7
2023-24 2 6 20 0 2 1
Last year, our message focused on the need to stabilise local government, improve oversight by
tabling good-quality reports on time, improve the outcomes of municipalities that have modified
audit opinions, and align budgets and service delivery plans to be responsive to community needs.
We also highlighted the need for municipalities with unfunded budgets to be assisted to become
financially viable by improving their internal control environment.
This message went largely unheeded, as the provincial cooperative governance department
did not bring the necessary stability by assisting in making appointments in key vacant positions.
Most municipalities retained their modified audit opinions due to the continued weak state of their
internal controls. Mayors are legislatively required to ensure that the issues we had raised in audit
reports are addressed. This was not done by the mayors of 21 municipalities (70%), resulting in audit
recommendations not being implemented and the same findings being raised in 2023-24. This
continues to result in financial statements that are not credible to make informed decisions in the
best interest of municipalities.
Since 2020-21, only two municipalities (Frances Baard and Namakwa district municipalities) have
sustained their clean audit status, while two local municipalities (Kareeberg and Tsantsabane)
have regressed to disclaimed audit opinions. Kareeberg changed from a manual to an electronic
financial system after the previous chief operations officer and senior accountant left and the
municipality was unable to provide information on selected transactions, often due to skills and
capacity constraints in the finance unit. The regression at Tsantsabane resulted from the chief
financial officer and financial accountant resigning shortly before the financial statement submission
date and the remaining officials not being able to assist the auditors due to not having the required
After a long history of disclaimed audit opinions, Joe Morolong Local Municipality improved to a
qualified audit opinion in 2023-24. This improvement can be attributed to a strong commitment from
the mayor and the accounting officer to resolve prior-year matters, improved record keeping with
assistance from the provincial cooperative governance department, as well as quarterly meetings
with the audit team during which progress on the prior-year audit action plan was discussed. The
MI we raised in 2021 on the repeat disclaimers at the municipality was also resolved in 2024, after
the accounting officer implemented our recommendations.
In 2023-24, only four municipalities (13%) submitted credible financial statements, compared to
five (17%) in 2020-21, despite the province having spent R150,51 million on financial reporting
consultants. Four of the six municipalities (67%) that achieved an unqualified audit opinion with
findings could only do so after making material adjustments to their financial statements. Revenue
and current assets (including receivables) were the most common qualification areas. The financial
health of many municipalities suffered because they lacked the basic controls to bill all consumers,
resulting in less money being available for service delivery priorities.
The submission of financial statements improved from 2020-21, owing to the role played by the
member of the executive council for finance. While a good submission rate is important, more
attention needs to be paid to ensuring that municipalities submit credible financial statements as
this will contribute towards improved audit outcomes and accurate information on which to base
decisions. Internal audit units and audit committees should assist municipalities by reviewing their
financial statements before they are submitted for auditing. The provincial treasury should ensure
that municipalities submit credible interim financial statements for its review, which will assist with
the submission of good-quality financial statements at year-end.
Municipalities did not deliver on the infrastructure projects needed to reduce significant service
delivery backlogs and improve communities’ access to basic services. We identified shortcomings
in water and sanitation projects at five municipalities. Insufficient preventative maintenance was
prevalent, as municipalities spent only 2% of the value of their infrastructure assets on repairing and
maintaining those assets – far below the National Treasury norm of 8%. The lack of preventative
maintenance over many years has led to significant water and electricity distribution losses at most
municipalities, with Sol Plaatje Local Municipality incurring losses of R277,64 million. The municipality
lost approximately two-thirds (66%) of all the water it treated (more than double the National
Treasury norm of 30%) and almost a quarter (24%) of all the electricity it purchased (significantly
more than the National Treasury norm of 7% to 10%).
The province continued to struggle with performance reporting – 22 municipalities (73%) could not
publish credible performance reports, compared to 10 (33%) in 2020-21, and only four municipalities
(all of which were district municipalities) were able to produce credible performance reports that
did not require any adjustments. Nine municipalities did not plan for all service delivery indicators or
did not prioritise core functions. This was due to a lack of proper record-management systems and
inadequate skills and capacity in municipal performance units. These weaknesses must be urgently
addressed as credible performance reports are an essential tool in improving service delivery.
Accounting officers need to elevate the area of performance information by building capacity
and improving internal controls.
Compliance with legislation regressed: only two municipalities (7%) had no compliance findings
in 2023-24, compared to five (17%) in 2020-21. Non-compliance with supply chain management
legislation continued to be the main contributor to irregular expenditure. The irregular expenditure
closing balance remained high at R3,67 billion, of which only R0,93 million was in the process of
recovery. This was due to a lack of investigations to determine whether any official was liable for
the expenditure. The province’s unauthorised expenditure balance increased from R7,38 billion in
2020-21 to R8,13 billion in 2023-24. Municipal public accounts committees should urgently investigate
all identified instances of non-compliance to ensure that the irregular and unauthorised expenditure
closing balances are dealt with in line with legislation, and that consequence management is
swiftly implemented where appropriate.
Municipalities’ financial health continued to deteriorate as they still did not collect most of the
revenue owed to them, resulting in them struggling to pay their suppliers and third parties. At
Renosterberg Local Municipality, we issued an MI notification due to substantial harm caused by
the non-payment of pension fund contributions, and we are currently assessing action being taken
and planned by the accounting officer to resolve the MI. A total of 22 municipalities adopted
unfunded adjustments budgets based on projected revenue rather than expected receipts.
The National Treasury’s efforts to influence municipalities that adopted unfunded budgets to
take corrective action and make the required adjustments were not effective. The provincial
treasury’s initiative to review budgets and monitor financial recovery plans needs to be enhanced
to influence municipalities to improve their financial position through revenue-enhancement
strategies; improved debt collection; and participation in, and adherence to, the Eskom debt-
relief programme.
Overall, the lives of the people of the Northern Cape are negatively affected by municipalities’
inability to properly manage the resources that they control. We are calling on all provincial
roleplayers (provincial oversight and municipal leadership) to thoroughly and honestly reflect
on the initiatives implemented, and the effort they have put in to improve the current state of
municipalities.
It is vital that municipalities appoint skilled personnel and establish preventative controls.
Coordinating institutions should align to provide oversight support by adhering to key local
government legislation. We further recommend that the premier call municipalities to account
quarterly on the progress they have made on their audit action plans and follow up on compliance
with legislative requirements. Municipal leadership and oversight (mayors, councils and municipal
public account committees) will need to set an example in the accountability value chain by
implementing consequences to instil accountability in the province swiftly and consistently.
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 0 3 9 1 9 0 9 2
2023-24 0 3 13 2 3 1
Last year, we highlighted critical issues that required immediate attention in the province, including
instability in municipal leadership, weak control disciplines, lack of accountability and poor service
delivery. While some progress has been made, challenges continue to hinder the province’s ability
to provide high-quality services to its communities and urgent action is still needed to improve
municipal governance and service delivery.
Progress has mainly been driven by the collaborative efforts of the provincial treasury and
cooperative governance department. Notably, the province had successfully filled 81% of
municipal manager positions by the end of 2023-24. Provincial treasury intervention at Ditsobotla
Local Municipality helped to address the municipality’s financial statements backlog and the
financial statements of the past three years have now been prepared. Clearing this backlog will
allow the municipality to focus on rebuilding some of its financial records that had been destroyed.
While this is a positive step, the municipality still faces significant challenges, particularly around poor
records management, which continue to hinder effective financial reporting and accountability.
We notified the accounting officer of the municipality of an MI to compel improved record keeping
of supply chain management documents.
There has been a gradual improvement in audit outcomes since 2020-21, with nine municipalities
improving their outcomes. While this signals some commitment to addressing financial reporting
weaknesses, it has not yet translated into meaningful improvements in governance, compliance
and institutional performance. The nine improved municipalities embraced the support and
guidance offered by the provincial government, filled vacancies with qualified and capable
candidates, and heeded our call to action driven by our recommendations. The strong leadership
None of the municipalities were able to fully address persistent transgressions, especially in the
area of compliance, and to resolve the growing irregular expenditure balance. Similar to
2020-21, we raised material compliance findings at all municipalities. Most municipalities struggled
with planning and reporting on performance, and some did not timeously resolve MIs. These
challenges draw attention away from the improvements evident in the significant reduction of
disclaimed audit opinions, which decreased from nine in 2020-21 to three in 2023-24. This reduction
meant that qualified opinions increased over the same period, and the focus should now shift to
further strengthening internal controls and improving the use of governance structures such as
internal audit units and audit committees.
Not enough focus has been placed on strengthening information technology control environments,
which are crucial in ensuring reliable financial data, and some internal audit units lacked the
expertise required to monitor such environments. For example, at the three municipalities that
received disclaimed audit opinions, the accounting systems did not integrate with the banking
systems, leading to unexplained discrepancies. Weak controls around supplier master data and
payment processes also exposed financial data to manipulation. Accounting officers should
enhance their information technology governance by updating policies and tightening controls,
as well as empowering internal audit units to monitor these areas.
Of the 13 municipalities with going concern issues, Rustenburg and Ratlou local municipalities
did not have financial recovery plans. Meanwhile, at the 11 municipalities that did have such
plans, their implementation was slow. Compliance with regulatory reporting requirements,
such as the submission of monthly budget statements and mid-year budget and performance
assessments to mayors and the provincial treasury, has not translated into improved financial
management. In 2023-24, 19 municipalities (90%) incurred unauthorised expenditure totalling
R3,56 billion, thereby increasing the balance of unauthorised expenditure to R31,57 billion. A total of
16 municipalities continued to adopt unfunded budgets, putting further pressure on their financial
sustainability. Procurement practices also require attention, with 19 municipalities having engaged
in uncompetitive and unfair processes, raising serious transparency concerns.
The quality of performance reports remains a persistent challenge across municipalities. Similar
to 2020-21, 18 municipalities (86%) failed to meet performance management and reporting
requirements. Only Dr Kenneth Kaunda and Bojanala district municipalities submitted satisfactory
performance reports. Weak performance management units and poor oversight by councils,
council committees and mayors contributed to deteriorating municipal services. Key areas such as
water and sanitation were not effectively managed, particularly at Ngaka Modiri Molema District
Municipality.
Uncompetitive and unfair procurement processes, poor records management and a lack of
transparency continued to plague municipalities. Irregular expenditure continued to grow at
an alarming rate each year – in 2023-24, it grew by R3,36 billion to reach a cumulative balance
of R34,64 billion. Municipalities have not addressed inadequate procurement processes, such
as user departments procuring from their own preferred suppliers without involving supply chain
management departments. Municipalities should consider centralising their procurement processes
and records management to enforce both overall transparency and harsher consequences for
non-adherence.
The province has been slow to deal with material irregularities on non-compliance and suspected
fraud. Of the 60 MIs that we have identified, 73% have not yet been fully resolved. Although
municipalities have recovered losses of R22,04 million and are in the process of recovering further
losses of R40,07 million, potential losses of R942,33 million have not been adequately dealt with.
Improvements in service delivery will require urgent attention and intervention from municipal and
provincial leadership to address critical areas such as non-existent infrastructure management
and poor water and sanitation services. Municipalities must focus on performance management
systems and ensure that projects are properly managed and executed. There must be a
zero-tolerance approach towards unauthorised and irregular expenditure, and municipalities must
be held accountable for poor procurement practices and service delivery failures.
It is crucial to fill leadership gaps in oversight and financial roles, and to continue to build
capacity among municipal staff and councillors to improve municipal governance and ensure
that municipalities can deliver basic services. Professionalising local government to improve
audit outcomes and the lived experience of communities will require the provincial treasury and
cooperative governance department to offer support and training in line with the recommendations
from the latter department’s skills audit. Municipalities need to adopt strong financial management
practices, including better revenue collection and accurate billing, to boost their financial health.
This will require regular internal audits, credible financial reporting and strong consequence
management for poor financial practices.
Provincial leadership has already committed to several actions to support municipalities, including
quarterly assessments of provincial interventions and support for smart prepaid meter installations
to boost revenue. The provincial treasury will continue to monitor financial recovery plans and
compliance with financial regulations, while the provincial cooperative governance department
will focus on strengthening infrastructure management and enhancing governance skills at
municipal level.
Unqualified
with no
findings Unqualified
(clean) with findings Qualified Adverse Disclaimed Outstanding Movement from
2020-21
2020-21 22 5 3 0 0 0 1 5
2023-24 20 6 2 1 1 0
Last year, we reported that the province largely maintained its positive outcomes, except for a
slight regression in the number of municipalities with clean audits where municipal leadership did
not heed our call to intensify controls around compliance with legislation. We urged municipalities
to continue to lead by example and embed a culture of compliance and adherence to ensure that
consequences for accountability failures are implemented swiftly, particularly at poor-performing
municipalities.
When comparing the 2023-24 audit outcomes to those of 2020-21, a notable regression is evident,
with five municipalities regressing and one municipality improving. Central Karoo District Municipality
and Cederberg and Theewaterskloof local municipalities lost their clean audit status over this period.
Senior management instability at Central Karoo and Theewaterskloof, especially in the positions
of municipal manager and chief financial officer, hampered effective oversight of key internal
control processes. Cederberg did not effectively monitor its action plans to ensure that prior-year
findings were adequately addressed, resulting in the municipality receiving an unqualified opinion
with findings for the past three years.
Kannaland Local Municipality regressed from a qualified audit opinion in 2020-21 and has received
a disclaimed audit opinion every year since then due to inadequate record keeping. This led us to
issue an MI notification to the municipality’s accounting officer in 2023-24, who has not yet taken
appropriate action to address it. A key factor in the municipality’s poor outcomes is the lack of
leadership oversight due to a vacancy rate of 25% at senior management level and the absence of
a permanent municipal manager for nine months of the year. This hindered the municipality’s ability
to comply with the legislated reporting and oversight mechanisms provided for in the Municipal
Laingsburg Local Municipality regressed from a qualified opinion in 2020-21 to receiving an adverse
opinion every year since then. The municipality faced capacity challenges, including a lack
of skills and staff (for example, there was a 33% vacancy rate in the finance unit), and did not
effectively use consultants despite spending R1,56 million on them. The audit action plan was not
effective in dealing with previously reported matters, demonstrating a lack of accountability for
the poor outcomes. While having taken steps to improve its control environment, Beaufort West
Local Municipality again received a qualified opinion as it still needs to institutionalise the improved
processes. The shortcomings at Laingsburg and Beaufort West, which represent the largest towns
within the Central Karoo district, must be addressed urgently to enable the credible and transparent
reporting on public funds for sustainable service delivery throughout the district.
The municipalities that achieved clean audits in 2023-24 are led by municipal managers and chief
financial officers with the required skills and competence. Additionally, stability in these positions
is a main driving force behind the outcomes. At 10 of the municipalities with clean audits, the
municipal managers have been in their position for at least five years, while the chief financial
officers have been in their position for a similar period at eight municipalities.
The province continued to submit good-quality financial statements, and 24 municipalities (80%)
received an unqualified opinion without relying on the audit process, due in part to municipal
managers adhering to legislative requirements to prepare monthly budget statements and perform
mid-year budget and performance assessments.
City of Cape Town Metro improved from an unqualified opinion with findings in 2020-21 to
sustaining a clean audit each year since then. This can be attributed to the strong leadership tone
of accountability at the metro, as demonstrated by the low tolerance towards audit findings and
the strong commitment to maintaining good outcomes and improving the control environment
by implementing our recommended actions and closely monitoring progress. The audit and
performance audit committees regularly convened to perform their duties and had a positive
impact on the internal control environment through reviewing reports, raising concerns and driving
the implementation of sufficient and appropriate actions to resolve any issues identified through
the monitoring of action plans. The internal audit unit reviewed the metro’s reported performance
information and offered recommendations to enhance the control environment. There is still a
need to enhance the quality and availability of housing in informal settlements, where improving
the living conditions of residents will foster safer, healthier and more equitable communities.
The quality of performance reporting requires improvement. While only four municipalities (13%)
had material findings on their performance reports, seven (23%) required material adjustments
to their performance reports to avoid receiving any material findings, compared to four (13%) in
2020-21. At the municipalities where material findings were raised, the inaccurate accounting
and reporting of performance affected the municipalities’ monitoring and decision-making in
relation to service delivery areas such as electricity, water and sanitation, waste management and
indigent households. To improve service delivery to all provincial residents, the premier, through
the members of the executive councils for local government and for finance, must oversee the
Compliance with legislation remains an area of concern as 10 municipalities (33%) had material
compliance findings. Non-compliance was the main reason for municipalities not moving out of
the unqualified opinion with findings space. The most common findings were on the prevention
of unauthorised, irregular, and fruitless and wasteful expenditure, and on procurement and
consequence management. Since 2020-21, there has been an increase in both the annual irregular
expenditure incurred (from R1,23 billion in 2020-21 to R1,81 billion in 2023-24) and in the closing
balance of such expenditure (from R1,52 billion in 2020-21 to R2,58 billion in 2023-24). These are
significant increases that require focused attention. Municipalities should implement stronger controls
over procurement, and supply chain management units need to be capacitated and trained to
allow for improvement by addressing prior-year findings and prevent any further regressions. We
reiterate our call to embed a culture of compliance within the municipal environment to ensure
accountability, promote service delivery and rebuild public trust in municipalities.
The financial health of municipalities in the province declined, with the financial health of
14 municipalities (47%) being rated as concerning or worse, compared to 13 municipalities (43%)
in 2021-22. Seven of these municipalities (50%) also had unfunded budgets in 2023-24, indicating
that their revenue base cannot support their expenditure budget. The provincial treasury should
support these municipalities to develop better budget-funding plans and implement stricter cost-
containment measures to improve their financial situation and prevent unfunded budgets from
affecting their ability to deliver basic services.
The province has performed well overall, but the poor-performing municipalities require support
and further capacitation. The members of the executive councils for local government and for
finance have committed to oversee the support that the provincial treasury provides to municipal
managers and senior managers to develop, implement and monitor credible action plans; as
well as evaluate the internal control environment, identify deficiencies and improve controls. This
includes addressing the skills and capacitation gaps at municipalities. The member of the executive
council for local government, with the support of the premier, has committed to enhance oversight
of mayors to ensure that they effectively address prior-year audit findings. Intervention through the
measures allowed within the legislative framework is required at Kannaland and Laingsburg local
municipalities to stop the continued erosion of governance; and at Beaufort West, Knysna and
Theewaterskloof local municipalities to prevent further regressions.
The provincial parliament and the member of the executive council for, and portfolio committee
on, local government have committed to strengthen their legislated oversight responsibilities for the
reporting process through municipal oversight reports and the consolidated report on municipal
performance, especially for poor-performing municipalities.
While there are clear challenges that demand attention, the province’s overall performance
demonstrates that progress is possible when strong and stable leadership is prioritised within
a culture of accountability. By building on these strengths and providing targeted support to
struggling municipalities, the province can foster sustainable improvements that enhance service
delivery, strengthen public trust and create a more capable and resilient local government.
00
Municipal entities
63
320
LOCAL Municipalities
GOVERNMENT
AUDITEES
257
Municipal entities
Dormant 16 Audit results are
municipal shown in only
entities 12 some sections of
47
AUDITEES
273
AUDITEES
the report, where
relevant
NOT IN THIS IN THIS
REPORT REPORT
00
107
free basic water service electricity
services to providers service
indigent providers
35
households
11 8
Improvement
HOW WE SHOW MOVEMENT Unchanged
00
A financially unqualified opinion with no findings (clean audit) means the auditee:
A financially unqualified opinion with findings means the auditee was able to produce
good-quality financial statements that had no material misstatements, but struggled
to produce good-quality performance reports and/or comply with all relevant key
legislation.
A financially qualified opinion with findings means the auditee produced financial
statements that contained material misstatements that were not corrected before the
financial statements were published. The auditee also had challenges with the quality
of its performance report and/or compliance with key legislation.
An adverse opinion with findings means that the auditee’s financial statements
included so many material misstatements that we disagreed with virtually all the
amounts and disclosures in them.
A disclaimed opinion with findings means that we could not conclude or express an
opinion on the credibility of the auditee’s financial statements because there was no
evidence to support most of the amounts and disclosures in them.
Usually, auditees with adverse and disclaimed opinions also cannot provide
supporting documents for the achievements they report in their performance reports,
and do not comply with key legislation.
RP202/2025
ISBN: 978-1-77997-914-8
Scan to download
this report
Scan to access
the content on
our reports
website