0% found this document useful (0 votes)
19 views24 pages

APPENDIX A - Hein Htet Zaw

The document outlines a project for a two-storey reinforced concrete building as part of the Pearson BTEC Level 5 Higher National Diploma in Construction and the Built Environment. It includes detailed architectural drawings, plans, and specifications for various components such as the ground floor, first floor, footings, and roofing. The project is supervised by Daw Khin Gantgor and completed by student Hein Htet Zaw, with a focus on energy-efficient construction solutions.

Uploaded by

cmfelix379
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views24 pages

APPENDIX A - Hein Htet Zaw

The document outlines a project for a two-storey reinforced concrete building as part of the Pearson BTEC Level 5 Higher National Diploma in Construction and the Built Environment. It includes detailed architectural drawings, plans, and specifications for various components such as the ground floor, first floor, footings, and roofing. The project is supervised by Daw Khin Gantgor and completed by student Hein Htet Zaw, with a focus on energy-efficient construction solutions.

Uploaded by

cmfelix379
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

CHINDWIN TU INTERNATIONAL COLLEGE

UNIT 1: INDIVIDUAL PROJECT

UNIT CODE - K/615/1387


Title: The Need for Energy Efficient Construction Solutions
(Two RC Building)
Pearson BTEC Level 5 Higher National DIploma in Construction and the Built Environment
(Civil Engineering)

Appendix A - Project's Drawings

Lecturer: Daw Khin Gantgor


Student: Hein Htet Zaw
Student ID: HND CE 0700123
A B C D

B
38'-0"

8'-0" 15'-0" 15'-0"

F.L F.L W1 W1 W1 W1
1 PROJECT
W1 W1
KITCHEN &
TWO STOREY RC BUILDING
15'-0" DINNING ROOM BEDROOM 1
DATE : 1/1/2024
W1 W1

2 D1 D1 SUBJECT
D1 F.L 5'-0"
A D2
BATH & W/C A GROUND FLOOR PLAN
15'-0" F.L 1
W2 48'-0"
UP 10'-0" SUPERVISED BY
F.L 1

3 LIVING AREA
D1
DAW KHIN GANTGOR

W1 ARCHITECTURE
18'-0" GARAGE 7'-6"
W2
HEIN HTET ZAW
W1

4 M.D
B

GROUND FLOOR PLAN


A B C D

38'-0"

8'-0" 15'-0" 15'-0"

W1 W1 W1 W1

1 PROJECT
W1 W1
TWO STOREY RC BUILDING
15'-0" SHRINE ROOM BEDROOM 2
VERANDAH 2 DATE : 1/1/2024
W1 W1

2 D1
D1 D1 SUBJECT
D2 F.L
BATH & W/C
FIRST FLOOR PLAN
15'-0" F.L 1
W2 HALL DOWN
51'-0" SUPERVISED BY
F.L 1

3 D1
W4
DAW KHIN GANTGOR
F.L
BATH & W/C
D2
D3
ARCHITECTURE
18'-0" VERANDAH 1
W2 W2
HEIN HTET ZAW

MASTER
BEDROOM
4 3'-0" F.L 2 F.L 2

W3

FIRST FLOOR PLAN


A B C D

38'-0"

8'-0" 15'-0" 15'-0"

1 PROJECT

TWO STOREY RC BUILDING


15'-0"
DATE : 1/1/2024

2 SUBJECT

FOOTING PLAN
15'-0"
48'-0"
SUPERVISED BY

3 DAW KHIN GANTGOR

ARCHITECTURE
18'-0"
HEIN HTET ZAW

FOOTING PLAN
PROJECT
4 nos of 12 mm dia STEEL BAR
16 mm dia @ 6" C/C (mesh) TWO STOREY RC BUILDING
0'-3"
DATE : 1/1/2024

SUBJECT

5' C1 (12" x 12")


FOOTING DETAIL PLAN

SUPERVISED BY

DAW KHIN GANTGOR

5' ARCHITECTURE

FOOTING DETAIL PLAN HEIN HTET ZAW


10 mm dia @ 6" C/C

12 mm dia @ 6" C/C


GROUND FLOOR LEVEL PROJECT
P.L
TWO STOREY RC BUILDING
2'
N.G.L DATE : 1/1/2024

SUBJECT
7'-0"
4' FOOTING SECTION

6'-3" 16 mm dia @ 6" C/C


SUPERVISED BY
1'
DAW KHIN GANTGOR
3" 3"
6" THICK (1:3:6) LEAN CONCRETE ARCHITECTURE
9" THICK HARDCORE WITH SAND FILLING
HEIN HTET ZAW
4'-6"
5'
FOOTING SECTION
A B C D

38'-0"

8'-0" 15'-0" 15'-0"

1 PROJECT

TWO STOREY RC BUILDING


15'-0"
DATE : 1/1/2024

2 SUBJECT

RETAINING WALL PLAN


15'-0"
48'-0"
SUPERVISED BY

3 DAW KHIN GANTGOR

ARCHITECTURE
18'-0"
HEIN HTET ZAW

RETAINING WALL PLAN


PLINTH BEAM 1 21 " THICK (1:2:4) CEMENT CONCRETE
4 21 " THICK (1:3:6) CONCRETE SLAB
GROUND FLOOR LEVEL
P.L 18" THICK SAND FILLING
2' PROJECT
N.G.L TWO STOREY RC BUILDING

DATE : 1/1/2024
4'-4"
9" THICK RETAINING WALL SUBJECT
4'-0"
RETAINING WALL SECTION

6" THICK (1:3:6) LEAN CONCRETE SUPERVISED BY

DAW KHIN GANTGOR


2'-6"
ARCHITECTURE
RETAINING WALL SECTION
HEIN HTET ZAW
A B C D

38'-0"

8'-0" 15'-0" 15'-0"

1 PROJECT

TWO STOREY RC BUILDING


15'-0"
DATE : 1/1/2024

2 SUBJECT

PLINTH BEAM PLAN


15'-0"
48'-0"
SUPERVISED BY

3 DAW KHIN GANTGOR

ARCHITECTURE
18'-0"
HEIN HTET ZAW

PLINTH BEAM PLAN


A B C D

38'-0"

8'-0" 15'-0" 15'-0"

1 PROJECT

TWO STOREY RC BUILDING


15'-0"
DATE : 1/1/2024

2 SUBJECT

FIRST FLOOR BEAM PLAN


15'-0"
48'-0"
SUPERVISED BY

3 DAW KHIN GANTGOR

ARCHITECTURE
18'-0"
HEIN HTET ZAW

4 3'-0"

1st FLOOR BEAM PLAN


PROJECT
2 x10 mm dia

1'-2" 8 mm dia @ 6" C/C TWO STOREY RC BUILDING


2 x12 mm dia
DATE : 1/1/2024
1'
FIRST FLOOR BEAM SUBJECT
(1FB)
BEAM DETAILS

2 x10 mm dia SUPERVISED BY


1'-2" 8 mm dia @ 6" C/C
DAW KHIN GANTGOR
2 x12 mm dia
ARCHITECTURE
1'
PLINTH BEAM (PB) HEIN HTET ZAW
Solar Panels

PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024
36'-0"

SUBJECT

ROOF PLAN
56'-10.5"

SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW

ROOF PLAN
21'-0"
2'-0"

5'-0"

17'-6"
2'-0"
PROJECT

ROOF 1 5'-0" ROOF 2 TWO STOREY RC BUILDING

PURLIN - 10 PURLIN - 9 DATE : 1/1/2024


RAFTER - 11 RAFTER - 7 SUBJECT
56'-10.5"
36'-0"
PURLIN & RAFTER DETAIL
PLAN
SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE
ROOF 2
HEIN HTET ZAW

ROOF 1

PURLIN & RAFTER DETAIL PLAN


PROJECT
2'-6"
TWO STOREY RC BUILDING
24'-3"
DATE : 1/1/2024
8'-5"
8'-3" 18'-2" SUBJECT
4'-1" 7'-1"
3'-7" ROOF TRUSS DETAILS
30° 1'-8" 15°
SUPERVISED BY

15'-3" 15'-0" DAW KHIN GANTGOR


2'-6"
ARCHITECTURE

HEIN HTET ZAW

ROOF TRUSS DETAILS


GROUND FLOOR LEVEL
P.L
1'
2' 6"
N.G.L PROJECT

TWO STOREY RC BUILDING


9" THICK RETAINING WALL
4' DATE : 1/1/2024

SUBJECT
6" THICK (1:3:6) LEAN CONCRETE

STAIR DETAILS
CROSS-SECTION FOR STAIR
SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW


3'

10'

PLAN FOR STAIR


13'

FIRST FLOOR
PROJECT
Tread - 9"
Rise - 6" TWO STOREY RC BUILDING

DATE : 1/1/2024

SUBJECT
10 mm dia @ 6" C/C
6" THICK LANDING STAIR DESIGN

SUPERVISED BY

DAW KHIN GANTGOR


4'
6'
ARCHITECTURE
10'-4"
HEIN HTET ZAW
GROUND FLOOR

STAIR DESIGN
9'-3"

PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024
11'-0"

SUBJECT

FRONT ELEVATION

SUPERVISED BY

12'-0" DAW KHIN GANTGOR

ARCHITECTURE

2'-0" HEIN HTET ZAW

FRONT ELEVATION
PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024

SUBJECT

RIGHT ELEVATION

SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW

RIGHT ELEVATION
PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024

SUBJECT

LEFT ELEVATION

SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW

LEFT ELEVATION
PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024

SUBJECT

BACK ELEVATION

SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW

BACK ELEVATION
PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024

SUBJECT

CROSS-SECTION A-A

SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW

CROSS-SECTION A-A
PROJECT

TWO STOREY RC BUILDING

DATE : 1/1/2024

SUBJECT

CROSS-SECTION B-B

SUPERVISED BY

DAW KHIN GANTGOR

ARCHITECTURE

HEIN HTET ZAW

CROSS-SECTION B-B
6'-0"
10'-0"
1'-0" 1'-6" 1'-6"
1'-6" 4'-0" 2'-0"
7'-0"
7'-0" F.L W5
F.L 2 F.L 1
M.D
3'-0" 2'-6"
6'-0" 4'-0"
PROJECT

5'-0" 5'-0" 6'-6" 6'-6" TWO STOREY RC BUILDING

DATE : 1/1/2024
W2 W1 D1, D3 D2
SUBJECT

DOOR & WINDOW DETAILS


14'-0" 12'-0"
SUPERVISED BY

7'-0" 7'-0" DAW KHIN GANTGOR

ARCHITECTURE
W3 W4
HEIN HTET ZAW

DOOR & WINDOW DETAILS


ISOMETRIC VIEW

You might also like