1) Scope

The document outlines the project scope for the Rutgers International School located in Mivida Compound, New Cairo, emphasizing its purpose to provide international education. It details the construction works to be undertaken by REDCON Construction, including civil, architectural, and MEP works, while specifying what is in and out of scope. The project is managed by Turner Construction International Egypt and has a total area of 22,856.58 m² with a contract amount of 297,484,096 EGP.

Uploaded by

Shady Dokhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views12 pages

1) Scope

The document outlines the project scope for the Rutgers International School located in Mivida Compound, New Cairo, emphasizing its purpose to provide international education. It details the construction works to be undertaken by REDCON Construction, including civil, architectural, and MEP works, while specifying what is in and out of scope. The project is managed by Turner Construction International Egypt and has a total area of 22,856.58 m² with a contract amount of 297,484,096 EGP.

Uploaded by

Shady Dokhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Chapter 1 | Project Scope

(CH1)
PROJECT SCOPE

Rutgers International School


1
Chapter 1 | Project Scope

1.1) Project Location located in Mivida Compound Which is ideally located


close to the American University in New Cairo, just 20 minutes from
Cairo International Airport and within easy reach of 90th Street and
Suez-Sokhna Road

Fig (1) Mivida Compound Location

FIG (2) Rutgers International School 3D Shot

Rutgers International School


2
Chapter 1 | Project Scope

FIG (3) Rutgers International School Simple Plan

1.2) Project Purpose

The Purpose Of This Project is To Create An international


school that promotes international education, in an international
environment, either by adopting a curriculum such as that of
the international Baccalaureate , Edexcel, Cambridge Assessment
International Education or International Primary Curriculum, or by
following a national curriculum different from that of the school's
country of residence

Rutgers International School


3
Chapter 1 | Project Scope

1.3) Project Description


Rutgers International School is One of a Chain of Schools Around
World Wide Which Must Have The Same Specification. The School
Consists of 4 Main Buildings, 2 Playgrounds , Swimming Pool ,
Water Tank , Pumb Room , Infrastructure, Landscape , Substation
Building , Fences and Guard Rooms.

The Four Buildings Consist Of

• Ground Floor
• First Floor
• Second Floor
• Roof

FIG (4) Elevation Of Building A

Rutgers International School


4
Chapter 1 | Project Scope

1.4) Project Scope

REDCON Construction has been assigned for carrying out the


Works comprising the Carrying out, completion and guarantee of
Construction Package For Parcel 30-B (Rutgers International
School - MIVIDA).

➢ The construction of the building shall include without the


limitation to the following works:

• Civil and structural works.


• Architectural works and internal finishing.
• Exterior finishes.
• Mechanical, firefighting, electrical and plumbing (MEP) indoor
and outdoor.

➢ IN SCOPE : Building A,B,C And D ,Guard Rooms And Fences.

➢ OUT OF SCOPE : Infrastructure Works , Irrigation Works ,


Swimming Pool , Water Tank , Substation Building And
Landscape Works .

Rutgers International School


5
Chapter 1 | Project Scope

1.5) scope of work

Civil works
1.Site Construction works
2. Concrete skeleton
3. Masonry works
4. Metals FABRICATIONS
5. Thermal and Moisture Protection
• Cold applied bituminous emulsion paint
• Vapor Barrier
• Waterproofing
• Roofing insulation system

Architectural works

6.Wood, Plastics and Composites


( interior Architectural woodwork )
7.Openings works
8.Finishes works
• Plaster Works
• Gypsum board
• Ceramic Tiles

Rutgers International School


6
Chapter 1 | Project Scope

• Linoleum flooring
• Carpet
• Stone Works
• Epoxy flooring
• Skirting
• Painting
• Wallpaper
• Lavatories counters

9.Specialties
• Toilets Partitions
• Toilets Accessories
10.Conveying Equipment
• Electrical Elevators

MEP works

❖ MECHANICAL WORKS

▪ FIRE FIGHTING WORKS

• PIPING AND FITTING MATERIALS


• Fire Stand Pipe System
• Fire Extinguishers
• Fire Search

Rutgers International School


7
Chapter 1 | Project Scope

▪ HVAC WORKS

• DUCT THERMAL INSULATION


• DUCT THERMAL INSULATION
• DX-Split Room Air Conditioning System
• Ducted Concealed Air Conditioning System
• Roof Top FAN
• AIR OUTLETS

❖ ELECTRICAL WORKS
• LOW VOLTAGE SWITCHGEAR
• DISTRIBUTION PANEL BOARDS
• Low Voltage Cables
• STATIC UNINTERRUPTIBLE POWER SUPPLY UPS)
• Cable Tray
• RACEWAYS, BOXES AND FITTINGS
• Technical Lighting Outlets
• Lighting Switches Outlets
• Socket Outlets
• Disconnect Switch (Isolator)

❖ PLUMBING WORKS
• PLUMBING PIPING
• Drainage Specialties
• Electric Water Heaters

Rutgers International School


8
Chapter 1 | Project Scope

1.6) Project Stakeholders

➢ Project Owner
Emaar Misr for development

Company Achievements:
• Uptown international school
• Mivida in New Cairo

Rutgers International School


9
Chapter 1 | Project Scope

➢ The Project Manager


Turner Construction International Egypt
For project management

Company Achievements:
• Leuzinger High School in Lawndale, CA
• Coolidge Senior High School in Washington, DC
• Student Recreation Center in Storrs, CT

➢ The Civil Consultant

Company Achievements:
▪ German Internatinal School In Mivida
▪ Schools Complex in Mutrafiah District, KSA

Rutgers International School


10
Chapter 1 | Project Scope

➢ The Architectural Consultant

Distance Studio Consultants

Company Achievement:
▪ Rehab English National School
▪ International School Of Oman

➢ The Main Contractor

Redcon Construction Company

Company Achievements:
▪ American International School in New Cairo
▪ Korean School community in Cairo
▪ English Modern School in New Cairo

Rutgers International School


11
Chapter 1 | Project Scope

1.7) Type Of Contract: Lump Sum


1.8) Original Contract Amount : 297,484,09 6 EGP
1.9) Project Commencement Date : 1 November 2018
1.10) Original Duration : 24 Months
1.11) Project Finish Date : 27th October 2020
1.12) Achievement Percentage : 30 %
1.13 ) Project Delivery Method : Construction Management (PCM)
1.14) Project Area : 22,856.58 m²

-Total Area Percentages - Area Percentages of Buildings

Rutgers International School


12

You might also like