Universiti Teknologi Mara: Faculty of Civil Engineering Industrial Training Report

This industrial training report by Nur Rasyidah Binti Abd Ghani details her experiences and tasks during her internship at the Civil Engineering department of UITM Cawangan Pulau Pinang. The report highlights her learning in communication, teamwork, and the working environment, along with recommendations for future interns and the organization. Acknowledgments are made to supervisors, colleagues, and family for their support throughout the training period.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views37 pages

Universiti Teknologi Mara: Faculty of Civil Engineering Industrial Training Report

This industrial training report by Nur Rasyidah Binti Abd Ghani details her experiences and tasks during her internship at the Civil Engineering department of UITM Cawangan Pulau Pinang. The report highlights her learning in communication, teamwork, and the working environment, along with recommendations for future interns and the organization. Acknowledgments are made to supervisors, colleagues, and family for their support throughout the training period.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

UNIVERSITI TEKNOLOGI MARA

FACULTY OF CIVIL ENGINEERING

INDUSTRIAL TRAINING REPORT

NUR RASYIDAH BINTI ABD GHANI


(2016583245)

UNIT FACILITY UITM CAWANGAN


PULAU PINANG KAMPUS PEMATANG
P AUH, KAMPUNG TOK EBOT 13500
PERMATANG PAUH, PULAU PINANG.

JULY 2019
ABSTRACT

This report represents the input that I got during the Industrial
Training. This report contains the task that I had assigned during internship in
department of Civil Engineering, Unit Pengurusan Fasiliti UITM Cawangan Pulau
Pinang Kampus Permatang Pauh(UITM PP).

During Industrial Training, I also learn how to communicate with other staffs
and the etiquette during a meeting with contractor. I also know new practical
members during this internship and manage to share knowledge with them.

I also know the environment of working area in engineering field when I do


the internship in Unit Pengurusan Fasiliti. Based on the experience that I have gain, I
was able to identify several recommendations that might be useful for university,
company and future interns.

I
ACKNOWLEDGEMENT

In the name of Allah, Most gracious, Most Merciful. Thanks to Allah for the
sake of His bounty that I can successfully implement this industrial training
according to the stipulated time.

First of all, I would like to express my deepest appreciation to all those who
provided me the possibility to complete the report. A special gratitude I give to my
Industrial Supervisor, Mr Mohd Firdaus Bin Mohd Akhbar, whose contribution in
stimulating suggestions and encouragement, helped me to coordinate my Industrial
Training.

In addition, this opportunity I would like to extend my gratitude to our


lectures and colleagues at UiTM Kampus Pasir Gudang for helping and giving
tutoring and sharing experiences during training. Also, do not forget to my beloved
family who has provided support and assistance during this Industrial Training.

Finally, I would also like to acknowledge with much appreciation to the all
Facility UITM PP staffs, which give me knowledge and gave the permission to
involve in every task that Unit facility assigned. I hope this report gets the blessings
from Him and hopefully all the information in this report will help students in the
future.

II
TABLE OF CONTENT

NO TITLE PAGE

1 Abstract I

Acknowledgement II

Table of content III

List of tables V

List of figures V

2 CHAPTER 1.0 : INTRODUCTION

1.1 - Introduction 2

1.2 - Background of the company 3

1.3 - Organizational structure 5

1.4 - Nature of the business 6

1.5 - Products 7

1.6 - Market strength 8

1.7 - Conclusion 9

3 CHAPTER 2.0: TRAINING ATTENDED

2.1 - Introduction 11

2.2 - Exposure level 11

2.3 - Conclusion 18

III
4 CHAPTER 3.0 : TECHNICAL REPORT

3.1 - Introduction 20

3.2 - Problem encountered and how overcome it 20

3.3 - Experience gained 22

3.4 - Conclusion 23

5 CHAPTER 4.0 : CONCLUSION

4.1 - Introduction 25

4.2 - Lessons learned 25

4.3 - Knowledge gained 25

4.4 - Suitability of organization 26

6 REFERENCES 28

7 APPENDICES 30

IV
List of tables

• Table I : financial report cleaning worker


• Table 2 : example Bill Of Quantity

List of figures

• Figure I : layout HEP office renovation


• Figure 2: plan and picture around project pedestrian for students UITM PP

V
CHi\PTER 1
INTRODUCTION