0% found this document useful (0 votes)
17 views1 page

STP 80 M /day: Pump Description Description

The document outlines a project for a wastewater treatment plant with a capacity of 80 m³/day. It includes sections for client information, drawing preparation, and approval signatures. The drawing status is noted as a shop drawing with a revision date of February 13, 2024.

Uploaded by

HERI COMPLIANCE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

STP 80 M /day: Pump Description Description

The document outlines a project for a wastewater treatment plant with a capacity of 80 m³/day. It includes sections for client information, drawing preparation, and approval signatures. The drawing status is noted as a shop drawing with a revision date of February 13, 2024.

Uploaded by

HERI COMPLIANCE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 6 7 8

A A

PROJECT:

STP 80 M³/DAY

NAME:

B PID B

DESCRIPTION
PUMP DESCRIPTION

C C

D D

COLOUR OF DESCRIPTION

E REVISION E
REV DATE DES

CLIENT: PREPARE BY: GLOBAL ENVIRO STATUS OF DRAWING


DRAWING BY: SIGNATURE: APPROVE: SIGNATURE: 1. shop drawing
AS
2. revisi
APPROVED BY: SIGNATURE: APPROVE: SIGNATURE:
date: scale:
EM
F 3. approved 13-02-2024 NTS F
PT UWU JUMP INDONESIA
AGREE BY: SIGNATURE: APPROVE: SIGNATURE: DWG NO: sheet no:
GLOBAL ENVIRO 4. as built draw.
AW PID-STP-GE 1/1

1 2 3 6 7 8

You might also like