Wir 3

This document is a Work Inspection Request for the installation of lift steel structures at Villa 90 as part of the Proposed Six Villas project at Reef Island. The inspection is scheduled for November 5, 2024, and requires prior approval from the contractor's quality control. It outlines necessary procedures and notes regarding the submission and inspection process.

Uploaded by

Sathish Insmile
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Wir 3

This document is a Work Inspection Request for the installation of lift steel structures at Villa 90 as part of the Proposed Six Villas project at Reef Island. The inspection is scheduled for November 5, 2024, and requires prior approval from the contractor's quality control. It outlines necessary procedures and notes regarding the submission and inspection process.

Uploaded by

Sathish Insmile
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK INSPECTION REQUEST Form No.

: F15

PROJECT: Proposed Six Villas at Reef Island WIR ST No. : 3609


CLIENT: Lulu Tourism Company W.L.L. Date: 04-11-24
CONSULTANT: M/s. Arab Architects W.L.L.
Form No. F15
CONTRACTOR: M/s. Cyprus Cybarco Tabet JV W.L.L.
Brief Description of work
INSPECTION FOR MARKING OF STEEL FRAMES AND BASE PLATES PRIOR TO
Work Details
INSTALLATION OF LIFT STEEL STRUCTURE
Location of work VILLA 90
Attachment Ref. CCT/R1-LV86-91/AR/V90-LIFT-01
Date of Inspection : 05-11-24 Start time: 11:30 AM End time : 11:40 AM
RELATED TRADE STRUCTURAL ARCHITECTURAL MEP OTHERS
MEP SERVICES CLEARENCE
PLUMBING Sign
ELECTRICAL Sign
HVAC Sign
SWIMMING POOL Sign
LIFT Sign
OTHERS Sign
CONTRACTOR:
QUALITY CONTROL'S APPROVAL
PROJECT ENGINEER'S
NAME & SIGNATURE Approved

Received by AA Name : Sign : Date: Time:


CONSULTANT'S RECEIPT:
CONSULTANT'S COMMENTS

On Behalf Arab Architects Approved Approved as Noted Rejected


Signature : Signature :
Name : Mr.Mohamed Y.Elekhtyar Name : Trade:
Position : Project Manager Position :
Notes :
* This form should be send to the consultant's minimum 24 hours prior to the time of inspection .(Before 2:00 O'clock P.M)
* Copy of related final approved (Drawings /Shop drawings) to be attached highlighting inspected area
* Attached drawings just to indicate inspected items not to be reviewed/approved by Consultant
* Inspection does not relieve the contractor from compliance with the requirements of the drawings and specifications.
The office will be closed on all public holidays, Fridays and Saturdays. The representative at site shall keep one copy for the office file
Received by Contractor :
Date / Time:
Note: Work Inspection Request should not be submitted to Arab Architects without Contractor's Quality Control approval
FORM - 15 - WORK INSPECTION REQUEST