0% found this document useful (0 votes)
13 views1 page

Ha 036759 001

The document contains a drawing and information that are the sole property of Saudi Aramco, prohibiting reproduction without written consent. It includes details about a proposed pipeline route, coordinates in UTM, and references to various facility plots and crossing schedules. Additionally, it outlines compliance requirements for underground pipelines and road crossings according to specific standards.

Uploaded by

sharaz.0777
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Ha 036759 001

The document contains a drawing and information that are the sole property of Saudi Aramco, prohibiting reproduction without written consent. It includes details about a proposed pipeline route, coordinates in UTM, and references to various facility plots and crossing schedules. Additionally, it outlines compliance requirements for underground pipelines and road crossings according to specific standards.

Uploaded by

sharaz.0777
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
K

E 390 000

E 392 000

E 393 000
NOTES:

E 391 000
K

K
K
K 1.COORDINATES ARE IN UTM AIN AL ABD 1970,
K

K K
K
ZONE 37 PROJECTION: UNIVERSAL TRANSVERSE
K
K

K
K
K K MERCATOR (UTM). ALL COORDINATES ARE IN METERS.
K
5

K K
5

5
2.THE PROPOSED PIPELINE ROUTE IS BASED ON
8
K 5

K K
5

5
GOOGLE EARTH AND PLANIMETRIC DATA PROVIDED
K

K
m

8 8
BY COMPANY PIPELINE
K
K

K 8

8
CENTERLINE IS SUBJECT TO UPDATE UPON
8 K
8
8$8
8K 8
8 m
8

K
K
TOPOGRAPHY SURVEY COMPLETION.
$8
8
8

N 2 943 000
K 8 P
$
8
K
P8 {
8
$
8$

8 8
8

8 m
8 K
5
3. FOR DETAILS OF PIPELINE START FACILITY, PIPELINE
8
8 8

K
8

8$ 8 8
8
END FACILITY AND MLIV'S REFER TO FACILITY PLOT
3
8$ 8
8 8
$
8
9
9
PLANS LISTED UNDER REFERENCE DRAWINGS TABLE.
8
8 8
9

PI-ROUTE LOCATION COORDINATES K


8
-

8$ 8
8

8
8

8
$8
3
8 4. DETAIL PIPELINES CROSSING LIST WILL BE SHOWN IN
8
8 8 8 8

SN. PI STATION N (m) E (m) 8


CROSSING SCHEDULE REPORT NO. HE-036889.
$ - 8
8
$
8 88 3

K $
8 8
m

1 0+000.00 2940988.370 393072.067 8


8
8
-
5. FOR PIPELINES LOCATION CLASS DISTRIBUTION
$ m
8$ 8
5 -

8-
8
8
3
8 3
m
REFER TO. HE-036890.
2 0+052.43 2941036.547 393092.751 -
--
8 --
- 8
m
m
-
- -
m

K m
$
K -
-

K
K
3 0+082.28 2941062.536 393107.449 8
6.ALL THE OHPL, UNDER GROUND EXISTING CABLE,
K
K
8$
m
-
-
UDNER GROUND PIPELINE CROSSING SHALL BE
K
K
4 0+354.99 2941312.768 393215.897 K
m
-
-

K
@
-
-
IN ACCORDANCE WITH SAES-B-064 REQUIREMENTS.
K

K
K
5 0+633.22 2941436.504 392928.675 7.ALL THE ROAD CROSSING SHALL BE COMPLIED
K
K
K
8

WITH SAES-L-460.
K
K
6 0+847.41 2941636.901 392844.439
8
K
K
5
8.FIBER OPTIC CABLE SHALL BE INSTALL ALONG
8 K
K
7 0+955.63 2941697.361 392752.996
K
K
K
WITH PIPELINE FOR DETAILS REFER THE
8 8
K
K
K

8 1+718.62 2941906.499 392019.027 m


INDEX-T DRAWINGS.
8 K
K 8 K
m
8
K m
m
K

K 8
K
9 1+806.53 2941975.371 391961.997
K
K

K 8
K

8
K
10 3+855.58 2942537.293 389989.935
K K
K K

m C

K
K
K 8

K
11 4+236.89 2942135.505 389880.127 m
m
5
m
K

K m
m K
K

K K
12 4+699.70 2941679.819 389970.585 K

K K
K m
m

9 K
13 4+766.23 2941632.926 390020.043
4+ K

00 K
m
m K

0 K
K

K
K
K

K -
K K

K K
K
m

0
K
m m

K m

00
K 5

K
K K

LEGEND

3+
m

K K
K
K
-
K
K
K
K m
K K K 9
PROPOSED 4" ECFFG-1 PIPELINE
K
K K

K
K
m K K

K
BGCS BOOSTER GAS COMPRESSION STATION
K K
K K
K
K
K
K
m
m K
K
K PI POINT OF INTERSECTION
K 5
m

m
K
K
4
K

K
SV SECTIONALIZING VALVE
N 2 942 000 K

EIV EMERGENCY ISOLATION VALVE

0
m
K

00
K

2+
K
K
MLIV MAIN LINE ISOLATION VALVE
K

K
K
m

K
K K
K STA STATION
O/H POWERLINE K
5 m

K
K

EGF ENCLOSED GROUND FLARE


K
4" ECFFG-1 PL K
K

K
K

K
8

K
K
E EAST
(GAS SUPPLY TO EASTERN O/H POWERLINE K
K

K
8

m
m
m

K K
8
m N NORTH
COAST FACTORY)
K K
K
K
8
.7 2
3
11
.5
13

3 K
5
7

\
8
1
4

K
9
9
8
3
2
N

K
E

1
81 9
3. 2
2.

9
91 0
7
41
9
89
2
3

K
N
GAT DE

E
WI
E

M
00
LK
7

0
.4 70

1.2

00
1
.

WA
7
9

10
K
70

.53 293
6
6

2
41

8
6
8

3 00

6
04
9

1
3.
9

ANCHOR

.6
38

9
2

6
9

E
OP
7

SL
1

OF

K
2
8
N

P
TO
389 4

9
41
00

9
E

9
9
2
4

38
0

ORY-

2
50

N
00

N
E
NCE

30
TEG
10

8
8.

4
FE

5
CA

940.7

PI # XXX
6

5
1

TOTAL LENGHTH: 4+766.23 KM


4
9

6
9
38
2

PI-POINT (REFER PI TABLE)


N

K K
E

K 9
256
6
42

2
.4

4
4
669

3
950.

8
1
4

0
98

9
9
38
2
0

0
00

N
.004

8
7.

E
4

2
0

49

3
7

.530
2.

K
7

6
41

904 9

8
+
6
9

1
89

6
2

4
3

9
N

9
38
2
E

COORDINATE
E

0
E
4

P
O
5

L
.3 20

S
7
.
2
3
91 8
6

K
41

K
9
9

8
C
8
2

A
3
N

&R

K
LE E
E

N
A

59 4
3

1+0
OT P

1. .9
O

8
T

2
66
PR

3
89 1

9
94

m
B

K
3
N
E

K K m
-
56 5
4
1. .6

K
EL
9
0
5
6

N
4
1
9

AD A
94

8 -
P
9

E
8
2
3

N
N

O
E

T TI

H
S
WI NI
H
IG

K
K
m 00+000
8
K
8 K
8
K
\ 8
K - m -
8 8 -
8
m -
K
8 8 K -
- 1 km
8
-
K
K 8

8
m KILOMETER ROUTE SEGMENT
8 K
- 1+000
- -
8 -
\{
-
8 -
K - -
K m
-
-
K -
5 9
8 - 8
8 -
K
8
m 8
8
-
K
8 K
m { 8
8 K

END POINT
K 8
K

8 K
K
K

C 8
C K
C
C{
REFERENCE DRAWINGS
AT (BARRED TEE) K K
K
m
-
K

8
DRAWING CONTROL FOR BI-49-20676-0002 HD-037108
DHAHRAN (ECFFG-1) K
K m
m
K

SCRAPER LAUNCHER FACILITY BA-285605.001


K 5
9

STA: 4+766.23
SN # 13 K
K PIPELINE START POINT K
9
SCRAPER RECEIVER FACILITY HA-036742.001
COORDINATE K
8 PIPELINE ALIGNMENT- DWG. INDEX HA-036744.001

N 2 941 632.926
K
K

K
\
AT (BARRED TEE) 9 K
9
OVERALL CABLE ROUTE LAYOUT HA-037000.001
K
K

E 3900 20.043
K

SN # 01 UTHMANIYAH (UBTG-3) 8
m K

COORDINATE

K
STA: 00+000 5
m
m

N 2 940 988.370 8

E 393 072.067
K

K
K
5 $

0+ NO
.H
A-
03
67
45
.00
1

DW
G
E

N 2 941 000
SE
N
.O
NT
CO

K
00 -
0
1
K 8
$
35
9.

m
77
9.

DR
AWI
26

NG
9.

LI
MI
T
84
9.

0
20

.5
9.

9
K m
-
N 2940971.
362

50
9.
$
9

FO

UECM
R

L
E
BL

CO

P/
CA
IC

NT
TR

GOV
EC

G
196
EL

.S

U/
$
G
U/

E
5

0
E
BL

PI

.0
CA

PI
IC
TR

9
NG
EC
EL M
00 G

8 8
U/ ER

PLAN
0. 50
9.
B
1 O
F
. M
T

K
T

8
O BER

DW
B

M
F

UECM
O

R
G
P

E
K
O
T

B
RM
BA-
E

F
BE
C

.O

M
28
8

RTU 407
N

EXISTING
R
UECM

T
E

E
55

T
F
F

B
90

O
.O
ROAD 8.

95

B
19

OF
.

TT
9

.00
NG

BO
I

P
ST

RM
0

T
I

BE
0.
EX

11.562

.OF
8
E

TT
C

8
N

BO
8
E

9.26

UTCM
21
F
9.

M
BER
K
AD
RO

LP
T
MI OF
LI

K
GE

F
NG 00 AD ED

O
I RO
AW 10. OF
DR

P
GE

O
ED

T
UTCM
0 K
09
9.
8

8
.0
10

P0
50
9.
8

UTCM
S1
8

1C
00
9.E
L
B
A
C

3-
.
.7 2

OM
3

C
5

E
87 3.

L
E
1

T
5

01
7

G
41

RM U/
BE
9
9
8

RM OF

10
.
3

BE
2

TT
OF BO
N

P RM
00
9. TO BE
E

D-
.OF
TT
BO
1

AD

-B
.8 29

RO
OF
.

9
1
2

D GE
0

3"
A ED
7

8
R
1
1
9
4

UTCM OF
9
9

E
8
2

$
DG
3

K
E

5
N
GA DE

E
WI
TE

K
M
00
LK
7

0
0

1.2

00
6. .7

WA
7
9

10
4
0

3
7

.5 29
6

2
1

6
8

.00
4

6
79 4
9

1
9

0
OR

.6
3
8

7
2

9
3

E
OP
SL
1

OF
2
CH

P
N

TO
4

m
1
00

9
E

94
AN

RM
89
8
2
-4

3
0

m
3

BE
2
50

N
RY
00

OF
GO

E
NCE

0
0. .73
10
TE

P
4
8
FE

TO
5
CA

7
6

RM
4

m
941

BE
9
8

K
2
3

F
.O
N
E

TT
T

BO

RM
MI

BE
6 LI
K

OF
BOTT.
625
8
2
.3 44

2
ING
4
.
4
9

K
6
6

0
5
941

AW
9

$
8

9
9

8
2
0

3
280

DR
.0 00

N
4
.
0

E
7

4
70

.5 49
3

0
.
7

63
2
941

69

8
4
9

0
1
8

61
2

9
4
3

9
N

ISSUED FOR CONSTRUCTION


8
2
E

3
N
E

O
P
E
K
5

8
.32720

00
0
SL
.

.0
3

9.
8

8
6

9
4
1
41

K
9
9

RAC
8
2
3
N

TL NE
E

&
A

4
E

3
P

.9

9
BO O

5
31. 8
2
6
PR

6
T

8
41

9
9
9
8
2
3
N

\{
E

$
5
.0 64
6
.

EL
5
41 9
65

M
PAN

RM
K
1

BER
9

M
4

BE
B ER
9
9

8
E
8
2
3

F
8

OF
N
N

.O
SHA

OF
O
E

TH TI

TT
T.

P
TO
WI NI

BO
3

BOT
960
9.
8.
IG

K
m
5 9
K
8
$
K
\
K 8
K
\
K

K
K

00
1
$
28-Oct-2024
K 45
.
5
67
K 03
.H
A- K
NO
G
DW

BERM
E

RM
SE

OF

BE
RM

T T.

OF
BE
N

BO
.O

P
.OF

TO
NT
0 100.0 200.0 300.0 400.0 500.0

TT
BO
CO
8
NORTH $ 8

00
m

9.
8
K

METERS
K

*
$

M
BER
BERM

OF
P
OF

TO
TT.
BO

00
1 : 5000M

9.
88
NORTH
5
m
$
SCALE:
K
8

0
.5

BERM
9
8

OF
<00F1>

P
TO
DR

RM
RM

BE
BE
$

OF

F
AW

.O
T.

TT
5

B OT

BO
6
.4
9

ING
4
9

0
.
9

10 .0
8
.6
9

LI
REVISION VALIDATION

.5 0
MI

10
K

T
* 0
.0
1
1

3
04
8
R2 3
70
82
HT

SCRAPER RECEIVER 1150


.
8
$ 8

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

4 M.DOUBLE
100
.
1

4
04 0

GATE
8 0
R2 3 50
70 0. 0
82 1

904
HT 55

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

9.

<00F1>

11"
0
00

NOTE "
FACILITY@ ECFFG-1
35

BURN
TIP
K 8
8
T
K
PI
$

COMPACTED MARL
RN
BU

49-20676-0002-004

0
CE

904
0
EN

15
F

9.
0
.8
9
V

00
-I
88

0
PE

8
4
TY
8
N 2940404.

B
831

OTT
4B

465
04

.O
8

F
R2 3
70

E 393200
B
82

E
TO

R
E 393135.

0
P

M
OF

.0
BE
RM

10
5
$
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
50
9.

N 2940450 8
K

*
*

(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)


K K
m ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
$
5
K
EUK MMA FYS AAA
K
10/20/24 10/20/24 10/20/24 10/20/24
K

$ 8
K 8
88
REV.NO. DATE REVISION DESCRIPTION
T
MI
K LI

DR
AW
ING
8 00 10/20/24 ISSUED FOR CONSTRUCTION
K $
K

K JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR

K
K 5
8
$
K
K

49-20676-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED


K

SCRAPER LAUNCHER
SAUDI ARABIAN OIL COMPANY
K

$
5
K
K

K K
FACILITY @ UBTG-3 K
8
K

DRAWING TYPE

8
$ 8 K OVERALL PROJECT LOCATION MAP FPP
K

GAS SUPPLY TO EASTERN COAST FACTORY


m K

K
$
K
m
K

4 ECFFG-1 PIPELINE
N 2 940 000 K
5

8
88
$
K

8
DHAHRAN SAUDI ARABIA
$
5

K
K
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
m

H09 A HA-036759 001 00


K 8
$
8

Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05

You might also like