Structure List

The document outlines the proposed reconstruction and new installations of culverts along the Wardha-Sevagram-Samudrapur-Girad-Umed Road (SH-326) and Hamadpur Road Junction to Wardha Hinggan Road (SH 328). It details specific chainages, types of culverts, their dimensions, and the status of each site, indicating whether they are available for work, under construction, or to be retained. The document serves as a comprehensive plan for infrastructure improvements over a total length of approximately 42.213 km.

Uploaded by

acmeinfracon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views12 pages

Structure List

The document outlines the proposed reconstruction and new installations of culverts along the Wardha-Sevagram-Samudrapur-Girad-Umed Road (SH-326) and Hamadpur Road Junction to Wardha Hinggan Road (SH 328). It details specific chainages, types of culverts, their dimensions, and the status of each site, indicating whether they are available for work, under construction, or to be retained. The document serves as a comprehensive plan for infrastructure improvements over a total length of approximately 42.213 km.

Uploaded by

acmeinfracon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Spans/

Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
Wardha-Sevagram-Samudrapur-Girad-Umed Rd.(SH-326) length 42.213 Km.
A including Hamadpur Road Junction to Wardha Higgan Road (SH 328)
A-1 Duttapur Chowk to Gandhi Chowk (From Km 0+000 to 5+250)
1 0+647 Pipe Pipe 1*1.2 Reconstruction NA Available 2 row (pipe) WE can widen
2 1+020 Pipe Pipe 1*1.2 Reconstruction NA Available 2 row (pipe) We can cancel (17.5) Width
3 1+160 Pipe Pipe 1*1.2 Reconstruction NA Available Single Row
4 1+715 Pipe BOX 1*6.0*3.0 Reconstruction NA Available Box
5 2+440 BOX BOX 1*3.0*2.0 Reconstruction NA Available Box
6 2.260 Pipe 1*0.9 10.0 2.260 Pipe 1*1.2 Reconstruction Available NA Available
7 2.807 Pipe 1*1.2 7.0 2.807 Pipe 1*1.2 Reconstruction Available NA NA
9 3.520 Pipe 1*0.9 7.0 3.520 Pipe 1*1.2 Reconstruction Available NA NA
10 4.090 Pipe 2*1.2 7.0 4.090 Box 1*6.0*3.0 Reconstruction Available NA NA
11 4.170 Pipe 3*1.0 7.0 4.170 Box 1*3.0*2.0 Reconstruction Available NA NA
12 4.220 Pipe 2*1.2 7.0 Pipe Widen Available NA NA
13 4.598 Pipe 2*1.2 7.0 Pipe Widen Available NA NA
A-2 Gandhi Chowk to Sakhra Phata (SH 326 Km 2+000 to 20+850)
1 2.000 Pipe 1*0.9 10.50 2.000 Pipe 1*1.2 Reconstruction
2 2.148 Slab 1*0.5 10.50 2.148 Box 1*2.0*1.5 Reconstruction
3 2+84 2.84 Pipe 1*1.2 NEW
4 3+150 HPC 1*1.2 Pipe 1*1.2 Reconstruction
5 3.860 Pipe 1*0.6 10.60 3.860 Pipe 1*1.2 Reconstruction
6 4+97 Pipe 1*1.2 4.970 PIPE 1*1.2 Reconstruction
7 5+31 Pipe 1*1.2 5.310 PIPE 1*1.2 Reconstruction
8 6+205 Pipe 1*1.2 6.205 PIPE 1*1.2 Reconstruction
9 6.480 Pipe 2*0.9 9.70 6.480 Pipe 2*1.2 Reconstruction
10 8.270 Pipe 1*0.9 9.70 8.270 Pipe 1*1.2 Reconstruction
11 9+050 Pipe 2*1.2 9.050 PIPE 2*1.2 NEW
12 9.4050 Slab 1*5.4 11.00 9.405 Box 1*6.0*2.0 Reconstruction
13 9.4800 Pipe 2*0.9 8.50 9.480 Pipe 2*1.2 Reconstruction
14 10+412 10.412 PIPE 2*1.2 NEW
15 10+865 10.865 PIPE 1*1.2 NEW
16 10.955 Pipe 2*0.6 11.00 10.955 Pipe 2*1.2 Reconstruction
17 11.045 Pipe 1*1.2 10.00 11.045 Pipe 1*1.2 Reconstruction
18 11.398 Pipe 4*1.2 10.00 11.398 Box 1*4.0*1.5 Reconstruction
19 11+460 HPC
20 11.540 Pipe 2*1.2 11.00 11.540 Box 1*3.0*1.5 Reconstruction
21 11.750 Pipe 1*0.6 11.00 11.750 Pipe 1*1.2 Reconstruction
22 12+053 MNB 3*4 Retain
23 12.160 Pipe 1*0.4 7.70 12.160 Pipe 1*1.2 Reconstruction
24 12.465 Pipe 2*0.9 11.00 12.465 Box 1*2.0*1.5 Reconstruction
25 12.760 Pipe 1.04 11.00 12.760 Pipe 1*1.2 Reconstruction
26 13.108 Pipe 2*1.2 10.50 Pipe Widen
27 13+197 HPC Pipe
28 13.240 Slab 1*5.0 11.10 SLAB Retain
29 13.375 Pipe 1*0.5 10.00 13.375 Pipe 1*1.2 Reconstruction
30 13.487 Pipe 1*0.5 10.50 13.487 Pipe 1*1.2 Reconstruction
31 13.740 PIPE 1*1.2 NEW
32 13+950 hpc 1*1.2 Pipe Reconstruction
33 14+030 HPC Pipe
34 14+400 MNB 6*8.0 Reconstruction
35 14.790 BOX 1*2.0*1.5 NEW
Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
36 14.860 BOX 1*2.0*1.5 NEW
37 15.216 Pipe 1*1.2 10.40 Pipe Widen
38 15.337 Pipe 1*1.2 10.40 Pipe Widen
39 15.550 Pipe 1*0.9 11.00 15.550 Pipe 1*1.2 Reconstruction
40 16+020 MNB 2*7 Reconstruction
41 16.230 Pipe 1*0.9 10.90 16.230 Box 1*2.0*1.5 Reconstruction
42 16.400 PIPE 1*1.2 NEW
43 16.510 Pipe 1*0.9 11.00 16.510 Pipe 1*1.2 Reconstruction
44 16.727 Pipe 1*1.2 10.50 Widen
45 16+920 Pipe 1*1.2 11.00 Widen
46 17.030 BOX 1*2.0*1.5 NEW
47 17.180 BOX 1*2.0*1.5 NEW
48 17+550 MNB 4*7 Reconstruction
49 17.765 BOX 1*2.0*1.5 NEW
50 17.930 BOX 1*2.0*1.5 NEW
51 18.150 BOX 1*2.0*1.5 NEW
52 18+194 HPC
53 18.480 BOX 1*2.0*1.5 NEW
54 18.630 BOX 1*2.0*1.5 NEW
55 18.994 Pipe 1*1.2 10.50 Widen
56 19.295 Pipe 1*0.6 10.40 19.295 Pipe 1*1.2 Reconstruction
57 19.765 Pipe 3*0.9 10.50 19.765 Box 1*4.0*1.5 Reconstruction
58 20+085 MNB 3*7 Reconstruction
59 20.310 Pipe 1*1.0 12.80 Retain
60 20.600 Pipe 1*1.0 12.70 Retain

A-3 Sakhara Phata to Shedgaon Phata currently under construction by PWD ( From km 20+850 to km 37+950 )
Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
1 34+120 MNB 4*7.0 22.00 32+350 MNB 4*7.0 Reconstruction
A-5 Hamadpur Road Junction to Wardha Hinggan Ghat Road ( SH 328 from Km 4+550 to Km 19+050)
1 5+620 Pipe 1*1.2 5+620 pipe 1*1.2 NEW
6+345 Pipe 2*1.2 PIPE 2*1.2 Reconstruction
2 6.632 Pipe 2*0.9 7.40 6.632 Pipe 2*1.2 Reconstruction
3 6.98 pipe 1*1.2 NEW
4 7.055 Pipe 2*1.2 7.00 7.055 Pipe 2*1.2 Reconstruction
5 7.167 Pipe 5*1.2 10.10 7.167 BOX 1*5.0*2.0 Reconstruction
7+260 MNB 2*6.5 Retain
6 7.855 Pipe 1*0.9 9.00 7.855 Pipe 1*1.2 Reconstruction
7 8.380 Pipe 5*1.0 7.00 8.380 BOX 1*5.0*2.0 Reconstruction
8 8.665 Pipe 2*1.2 7.00 8.665 BOX 1*3.0*1.5 Reconstruction
9 9.035 Pipe 1*0.9 7.00 9.035 Pipe 1*1.2 Reconstruction
10 9.195 pipe 1*1.2 NEW
11 9.555 pipe 1*1.2 NEW
12 9.585 Pipe 1*0.9 7.00 9.585 Pipe 1*1.2 Reconstruction
13 9.640 Pipe 2*1.2 7.00 9.640 BOX 1*6.0*3.0 Reconstruction
14 10.260 BOX 1*2.0*1.5 NEW
15 11.075 Pipe 1*0.9 8.00 11.075 Pipe 1*1.2 Reconstruction
16 11.750 Pipe 1*0.9 9.00 11.750 Pipe 1*1.2 Reconstruction
17 12.355 Pipe 1*0.9 9.00 12.355 Pipe 1*1.2 Reconstruction
18 13.32 Pipe 1*1.0 9.00 13.320 Pipe 1*1.2 Reconstruction
19 14.160 BOX 1*2.0*1.5 NEW
20 14.700 Pipe 2*1.2 10.00 14.700 BOX 1*2.0*1.5 Reconstruction
21 15.360 BOX 1*2.0*1.5 NEW
22 15.685 Slab Retain
23 15.763 Pipe 2*1.0 7.10 15.763 Pipe 2*1.2 Reconstruction
24 15.980 Pipe 1*1.2 9.10 15.980 Pipe 1*1.2 Reconstruction
25 16.120 BOX 1*2.0*1.5 NEW
26 16.410 BOX 1*2.0*1.5 NEW
27 16.548 Pipe 1*0.9 9.10 16.548 Pipe 1*1.2 Reconstruction
28 16.870 Pipe 1*0.9 8.40 16.870 Pipe 1*1.2 Reconstruction
29 17.320 Pipe 1*0.9 7.50 17.320 Pipe 1*1.2 Reconstruction
30 18.050 BOX 1*2.0*1.5 NEW
31 18.555 PIPE 1*1.2 NEW
32 18.940 PIPE 1*1.2 NEW
A-6 Wardha South Bypass (0+000 to 3+258 )
1 0.600 Pipe 1*1.2 NEW
2 0.987 BOX 1*6.0*3.0 NEW
3 1.031 BOX 1*2.0*1.5 NEW
4 1.274 Pipe 1*1.2 NEW
5 2.054 BOX 1*6.0*3.0 NEW
6 2.350 BOX 1*2.0*1.5 NEW
7 3.021 Pipe 1*1.2 NEW
8 3.098 Pipe 1*1.2 NEW
Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
B Improvement of roads connecting the Tourist Destination in Wardha District ( Bor Dharan ) Km. 0+000 to Km 7+800
B-1 Bor Dharan ( From Km 0+000 to Km 5+900 )
1 0.222 BOX 1*2.0*1.5 NEW
2 0.352 Pipe 1*0.9 5.80 0.352 Pipe 1*1.2 Reconstruction
3 0.618 Pipe 1*0.9 7.30 0.618 Pipe 1*1.2 Reconstruction
4 0.720 Pipe 1*0.9 7.30 0.720 Pipe 1*1.2 Reconstruction
5 0.950 BOX 1*2.0*1.5 NEW
6 1.074 SLAB 1*1.2 7.50 1.074 BOX 1*2.0*1.5 Reconstruction
1+110 MNB 1*9.6 Retain
7 1.285 Pipe 7.50 1.285 Pipe 1*1.2 Reconstruction
8 1.450 Pipe 1*0.6 12.00 1.450 Pipe 1*1.2 Reconstruction
9 1.680 Pipe 3*0.4 6.60 1.680 BOX 1*6.0*3.0 Reconstruction
10 1.842 Pipe 7.50 1.842 Pipe 1*1.2 Reconstruction
11 1.9 BOX 1*2.0*1.5 NEW
12 2.14 BOX 1*2.0*1.5 NEW
13 2.245 Pipe 2*0.9+1*0.6 7.00 2.245 BOX 1*5.0*2.0 Reconstruction
14 2.39 BOX 1*2.0*1.5 NEW
15 2.505 Pipe 1.09 11.00 2.505 BOX 1*3.0*1.5 Reconstruction
16 2.655 Pipe 2*0.9 7.30 2.655 Pipe 2*1.2 Reconstruction
17 2.95 BOX 1*2.0*1.5 NEW
18 3.4 BOX 1*2.0*1.5 NEW
19 4.08 BOX 1*2.0*1.5 NEW
20 4.48 BOX 1*2.0*1.5 NEW
4+645 MNB 2*6.4 Retain
21 4.97 BOX 1*2.0*1.5 NEW
22 5.33 BOX 1*2.0*1.5 NEW
5+480 MNB 4*6.0 Retain
23 5.770 Pipe 7.50 5.770 Pipe 1*1.2 Reconstruction
B-2 Safari Road ( from Km 0+000 to 1+900 )
1 0.023 Pipe 1*0.8 3.30 0.023 Pipe 1*1.2 Reconstruction
2 0.052 Pipe 1*0.8 3.30 0.052 Pipe 1*1.2 Reconstruction
3 0.39 BOX 1*2.0*1.5 NEW
4 0.515 Pipe 3*0.3 7.60 0.515 Multiple Pipes 40*1.2 Reconstruction
5 0.9 BOX 1*2.0*1.5 NEW
6 1.07 BOX 1*2.0*1.5 NEW
7 1.49 BOX 1*2.0*1.5 NEW
Spans/Opening With
Sr. Existing Type Of Proposed
Span Length Width (m)
No. Chainage Culvert Chainage
(mm)

Wardha-Sevagram-Samudrapur-Girad-Umed Rd.(SH-326) length 42.213 Km.


A including Hamadpur Road Junction to Wardha Higgan Road (SH 328)

A-1 Duttapur Chowk to Gandhi Chowk (From Km 0+000 to 5+250)


1 4.220 Pipe 2*1.2 7.0
2 4.598 Pipe 2*1.2 7.0
A-2 Gandhi Chowk to Sakhra Phata (SH 326 Km 2+000 to 20+850)
1 13.108 Pipe 2*1.2 10.50
2 15+216 Pipe 1*1.2 10.40
3 15+333 Pipe 1*1.2 10.40
4 16.727 Pipe 1*1.2 10.50
5 16+920 Pipe 1*1.2 11.00
6 18.994 Pipe 1*1.2 10.50
A-4 Shedgaon Phata to Mngrud (SH 326 from Km 37+950 to Km 38+300)
1 38+128 Pipe 1*1.2 8.00
Type Of
Remarks Plan & profile
Culvert

d Rd.(SH-326) length 42.213 Km.


Wardha Higgan Road (SH 328)

From Km 0+000 to 5+250)


Pipe Widen
Pipe Widen
326 Km 2+000 to 20+850)
Pipe Widen 13+115
Pipe
Pipe
Pipe Widen 16+698
Pipe Widen 16+920
Pipe Widen
om Km 37+950 to Km 38+300)
Pipe Widen
Additional New Culverts Shall be Constructed as per the details given in the below

Sr. Span / Opening


Design Chainage Type of Culvert
No. (No. of Dia of Pipe/Span)
Wardha-Sevagram-Samudrapur-Girad-Umed Rd.(SH-326) length 42.213 Km.
A including Hamadpur Road Junction to Wardha hinggan Ghat Road (SH 328)
A-2 Gandhi Chowk to Sakhara Phata (SH 326 fom Km 2+000 to 20+850)
1 2.840 PIPE 1*1.2
2 4.970 PIPE 1*1.2
3 5.310 PIPE 1*1.2
4 6.205 PIPE 1*1.2
5 9.050 PIPE 2*1.2
6 10.412 PIPE 2*1.2
7 10.865 PIPE 1*1.2
8 13.740 PIPE 1*1.2
9 14.790 BOX 1*2.0*1.5
10 14.860 BOX 1*2.0*1.5
11 16.400 PIPE 1*1.2
12 17.030 BOX 1*2.0*1.5
13 17.180 BOX 1*2.0*1.5
14 17.765 BOX 1*2.0*1.5
15 17.930 BOX 1*2.0*1.5
16 18.150 BOX 1*2.0*1.5
17 18.480 BOX 1*2.0*1.5
18 18.630 BOX 1*2.0*1.5
Hamadpur Road Junction to Wardha Hinggan Ghat Road
A-5 (SH 328 Km 4+550 to Km 19+050)
1 5.620 PIPE 1*1.2
2 6.980 PIPE 1*1.2
3 9.195 PIPE 1*1.2
4 9.555 PIPE 1*1.2
5 10.260 BOX 1*2.0*1.5
6 14.160 BOX 1*2.0*1.5
7 15.360 BOX 1*2.0*1.5
8 16.120 BOX 1*2.0*1.5
9 16.410 BOX 1*2.0*1.5
10 18.050 BOX 1*2.0*1.5
11 18.550 PIPE 1*1.2
12 18.940 PIPE 1*1.2
A-6 Wardha South Bypass ( From 0+000 to Km 3+258)
1 0.600 PIPE 1*1.2
2 0.987 BOX 1*6.0*3.0
3 1.031 BOX 1*2.0*1.5
4 1.274 PIPE 1*1.2
5 2.054 BOX 1*6.0*3.0
6 2.350 BOX 1*2.0*1.5
7 3.021 PIPE 1*1.2
8 3.098 PIPE 1*1.2
Improvement of roads connecting the Tourist Destination in WardhaDistrict (Bor
B Dharan) Km. 0+000 to Km 7+800
B-1 Bor Dharn ( From Km 0+000 to 5+9000)
1 0.222 BOX 1*2.0*1.5
2 0.950 BOX 1*2.0*1.5
3 1.900 BOX 1*2.0*1.5
4 2.140 BOX 1*2.0*1.5
5 2.390 BOX 1*2.0*1.5
6 2.950 BOX 1*2.0*1.5
7 3.400 BOX 1*2.0*1.5
8 4.080 BOX 1*2.0*1.5
9 4.480 BOX 1*2.0*1.5
10 4.970 BOX 1*2.0*1.5
11 5.330 BOX 1*2.0*1.5
B-2 Safari Road ( From 0+000 to Km 1+900 )
1 0.390 BOX 1*2.0*1.5
2 0.900 BOX 1*2.0*1.5
3 1.070 BOX 1*3.0*1.2
4 1.490 BOX 1*2.0*1.5
Sr. Sr. Existing Design Clear Length between Width of MNB
No. No. Chainage Chainage Proposed Span inner faces of dirt wall (m)
of Proposed MNB(m)

A-2 A-2 Gandhi Chowk to Sakhara Phata (SH 326 from Km 2+000 to 20+850)
1 12+050 12+050 3*4.0 8.4
1 2 14+400 14+400 6*8.0 48.0 14.0
2 3 16+020 16+020 2*7.0 14.0 14.0
3 4 17+550 17+550 4*7.0 28.0 14.0
5 20+090 20+090 3*7.0 8.5

A-3 Sakhara phata to Shedgaon phata currently under construction by PWD (From km 20+850 to km 37+950)*
1 34+120 32+350 4*7.0 22 14
A-5 Hamadpur Road Junction to Wardha Hinggan ghat Road (SH 328 from 4+550 to km 19+050)
1 7+260 7+260 2*6.5 8.1

B Improvement of roads connecting the Tourist Destination in wardha District (Bor Dharan) km. 0+000 to 7+800
1 1+110 1+110 1*9.6 7.7
2 4+645 4+645 2*6.4 8
3 5+480 5+480 4*6.0 8
Rearks

+850)
Retain
Reconstrution
Reconstrution
Reconstrution
Retain

m 20+850 to km 37+950)*
Reconstrution
50 to km 19+050)
Retain

haran) km. 0+000 to 7+800


Retain
Retain
Retain
RHS LHS FRL Width RHS LHS
269.063 268.45 268.834 8.5 -0.229 0.384
269.051 268.416 268.844 8.5 -0.207 0.428
269.081 268.422 268.854 8.5 -0.227 0.432
269.005 268.519 268.864 8.5 -0.141 0.345
268.707 268.27 268.873 8.5 0.166 0.603
268.958 268.117 268.883 8.5 -0.075 0.766
268.97 268.583 268.893 8.5 -0.077 0.31
268.723 268.364 268.899 8.5 0.176 0.535
269.032 268.759 268.881 8.5 -0.151 0.122
269.057 268.509 268.84 8.5 -0.217 0.331
269.015 268.706 268.777 8.5 -0.238 0.071
268.869 268.3 268.692 8.5 -0.177 0.392
268.798 268.28 268.585 8.5 -0.213 0.305
C. RHS C. LHS
-2.69% 4.52%
-2.44% 5.04%
-2.67% 5.08%
-1.66% 4.06%
1.95% 7.09%
-0.88% 9.01%
-0.91% 3.65%
2.07% 6.29%
-1.78% 1.44%
-2.55% 3.89%
-2.80% 0.84%
-2.08% 4.61%
-2.51% 3.59%