Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
Wardha-Sevagram-Samudrapur-Girad-Umed Rd.(SH-326) length 42.213 Km.
A including Hamadpur Road Junction to Wardha Higgan Road (SH 328)
A-1 Duttapur Chowk to Gandhi Chowk (From Km 0+000 to 5+250)
1 0+647 Pipe Pipe 1*1.2 Reconstruction NA Available 2 row (pipe) WE can widen
2 1+020 Pipe Pipe 1*1.2 Reconstruction NA Available 2 row (pipe) We can cancel (17.5) Width
3 1+160 Pipe Pipe 1*1.2 Reconstruction NA Available Single Row
4 1+715 Pipe BOX 1*6.0*3.0 Reconstruction NA Available Box
5 2+440 BOX BOX 1*3.0*2.0 Reconstruction NA Available Box
6 2.260 Pipe 1*0.9 10.0 2.260 Pipe 1*1.2 Reconstruction Available NA Available
7 2.807 Pipe 1*1.2 7.0 2.807 Pipe 1*1.2 Reconstruction Available NA NA
9 3.520 Pipe 1*0.9 7.0 3.520 Pipe 1*1.2 Reconstruction Available NA NA
10 4.090 Pipe 2*1.2 7.0 4.090 Box 1*6.0*3.0 Reconstruction Available NA NA
11 4.170 Pipe 3*1.0 7.0 4.170 Box 1*3.0*2.0 Reconstruction Available NA NA
12 4.220 Pipe 2*1.2 7.0 Pipe Widen Available NA NA
13 4.598 Pipe 2*1.2 7.0 Pipe Widen Available NA NA
A-2 Gandhi Chowk to Sakhra Phata (SH 326 Km 2+000 to 20+850)
1 2.000 Pipe 1*0.9 10.50 2.000 Pipe 1*1.2 Reconstruction
2 2.148 Slab 1*0.5 10.50 2.148 Box 1*2.0*1.5 Reconstruction
3 2+84 2.84 Pipe 1*1.2 NEW
4 3+150 HPC 1*1.2 Pipe 1*1.2 Reconstruction
5 3.860 Pipe 1*0.6 10.60 3.860 Pipe 1*1.2 Reconstruction
6 4+97 Pipe 1*1.2 4.970 PIPE 1*1.2 Reconstruction
7 5+31 Pipe 1*1.2 5.310 PIPE 1*1.2 Reconstruction
8 6+205 Pipe 1*1.2 6.205 PIPE 1*1.2 Reconstruction
9 6.480 Pipe 2*0.9 9.70 6.480 Pipe 2*1.2 Reconstruction
10 8.270 Pipe 1*0.9 9.70 8.270 Pipe 1*1.2 Reconstruction
11 9+050 Pipe 2*1.2 9.050 PIPE 2*1.2 NEW
12 9.4050 Slab 1*5.4 11.00 9.405 Box 1*6.0*2.0 Reconstruction
13 9.4800 Pipe 2*0.9 8.50 9.480 Pipe 2*1.2 Reconstruction
14 10+412 10.412 PIPE 2*1.2 NEW
15 10+865 10.865 PIPE 1*1.2 NEW
16 10.955 Pipe 2*0.6 11.00 10.955 Pipe 2*1.2 Reconstruction
17 11.045 Pipe 1*1.2 10.00 11.045 Pipe 1*1.2 Reconstruction
18 11.398 Pipe 4*1.2 10.00 11.398 Box 1*4.0*1.5 Reconstruction
19 11+460 HPC
20 11.540 Pipe 2*1.2 11.00 11.540 Box 1*3.0*1.5 Reconstruction
21 11.750 Pipe 1*0.6 11.00 11.750 Pipe 1*1.2 Reconstruction
22 12+053 MNB 3*4 Retain
23 12.160 Pipe 1*0.4 7.70 12.160 Pipe 1*1.2 Reconstruction
24 12.465 Pipe 2*0.9 11.00 12.465 Box 1*2.0*1.5 Reconstruction
25 12.760 Pipe 1.04 11.00 12.760 Pipe 1*1.2 Reconstruction
26 13.108 Pipe 2*1.2 10.50 Pipe Widen
27 13+197 HPC Pipe
28 13.240 Slab 1*5.0 11.10 SLAB Retain
29 13.375 Pipe 1*0.5 10.00 13.375 Pipe 1*1.2 Reconstruction
30 13.487 Pipe 1*0.5 10.50 13.487 Pipe 1*1.2 Reconstruction
31 13.740 PIPE 1*1.2 NEW
32 13+950 hpc 1*1.2 Pipe Reconstruction
33 14+030 HPC Pipe
34 14+400 MNB 6*8.0 Reconstruction
35 14.790 BOX 1*2.0*1.5 NEW
Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
36 14.860 BOX 1*2.0*1.5 NEW
37 15.216 Pipe 1*1.2 10.40 Pipe Widen
38 15.337 Pipe 1*1.2 10.40 Pipe Widen
39 15.550 Pipe 1*0.9 11.00 15.550 Pipe 1*1.2 Reconstruction
40 16+020 MNB 2*7 Reconstruction
41 16.230 Pipe 1*0.9 10.90 16.230 Box 1*2.0*1.5 Reconstruction
42 16.400 PIPE 1*1.2 NEW
43 16.510 Pipe 1*0.9 11.00 16.510 Pipe 1*1.2 Reconstruction
44 16.727 Pipe 1*1.2 10.50 Widen
45 16+920 Pipe 1*1.2 11.00 Widen
46 17.030 BOX 1*2.0*1.5 NEW
47 17.180 BOX 1*2.0*1.5 NEW
48 17+550 MNB 4*7 Reconstruction
49 17.765 BOX 1*2.0*1.5 NEW
50 17.930 BOX 1*2.0*1.5 NEW
51 18.150 BOX 1*2.0*1.5 NEW
52 18+194 HPC
53 18.480 BOX 1*2.0*1.5 NEW
54 18.630 BOX 1*2.0*1.5 NEW
55 18.994 Pipe 1*1.2 10.50 Widen
56 19.295 Pipe 1*0.6 10.40 19.295 Pipe 1*1.2 Reconstruction
57 19.765 Pipe 3*0.9 10.50 19.765 Box 1*4.0*1.5 Reconstruction
58 20+085 MNB 3*7 Reconstruction
59 20.310 Pipe 1*1.0 12.80 Retain
60 20.600 Pipe 1*1.0 12.70 Retain
A-3 Sakhara Phata to Shedgaon Phata currently under construction by PWD ( From km 20+850 to km 37+950 )
Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
1 34+120 MNB 4*7.0 22.00 32+350 MNB 4*7.0 Reconstruction
A-5 Hamadpur Road Junction to Wardha Hinggan Ghat Road ( SH 328 from Km 4+550 to Km 19+050)
1 5+620 Pipe 1*1.2 5+620 pipe 1*1.2 NEW
6+345 Pipe 2*1.2 PIPE 2*1.2 Reconstruction
2 6.632 Pipe 2*0.9 7.40 6.632 Pipe 2*1.2 Reconstruction
3 6.98 pipe 1*1.2 NEW
4 7.055 Pipe 2*1.2 7.00 7.055 Pipe 2*1.2 Reconstruction
5 7.167 Pipe 5*1.2 10.10 7.167 BOX 1*5.0*2.0 Reconstruction
7+260 MNB 2*6.5 Retain
6 7.855 Pipe 1*0.9 9.00 7.855 Pipe 1*1.2 Reconstruction
7 8.380 Pipe 5*1.0 7.00 8.380 BOX 1*5.0*2.0 Reconstruction
8 8.665 Pipe 2*1.2 7.00 8.665 BOX 1*3.0*1.5 Reconstruction
9 9.035 Pipe 1*0.9 7.00 9.035 Pipe 1*1.2 Reconstruction
10 9.195 pipe 1*1.2 NEW
11 9.555 pipe 1*1.2 NEW
12 9.585 Pipe 1*0.9 7.00 9.585 Pipe 1*1.2 Reconstruction
13 9.640 Pipe 2*1.2 7.00 9.640 BOX 1*6.0*3.0 Reconstruction
14 10.260 BOX 1*2.0*1.5 NEW
15 11.075 Pipe 1*0.9 8.00 11.075 Pipe 1*1.2 Reconstruction
16 11.750 Pipe 1*0.9 9.00 11.750 Pipe 1*1.2 Reconstruction
17 12.355 Pipe 1*0.9 9.00 12.355 Pipe 1*1.2 Reconstruction
18 13.32 Pipe 1*1.0 9.00 13.320 Pipe 1*1.2 Reconstruction
19 14.160 BOX 1*2.0*1.5 NEW
20 14.700 Pipe 2*1.2 10.00 14.700 BOX 1*2.0*1.5 Reconstruction
21 15.360 BOX 1*2.0*1.5 NEW
22 15.685 Slab Retain
23 15.763 Pipe 2*1.0 7.10 15.763 Pipe 2*1.2 Reconstruction
24 15.980 Pipe 1*1.2 9.10 15.980 Pipe 1*1.2 Reconstruction
25 16.120 BOX 1*2.0*1.5 NEW
26 16.410 BOX 1*2.0*1.5 NEW
27 16.548 Pipe 1*0.9 9.10 16.548 Pipe 1*1.2 Reconstruction
28 16.870 Pipe 1*0.9 8.40 16.870 Pipe 1*1.2 Reconstruction
29 17.320 Pipe 1*0.9 7.50 17.320 Pipe 1*1.2 Reconstruction
30 18.050 BOX 1*2.0*1.5 NEW
31 18.555 PIPE 1*1.2 NEW
32 18.940 PIPE 1*1.2 NEW
A-6 Wardha South Bypass (0+000 to 3+258 )
1 0.600 Pipe 1*1.2 NEW
2 0.987 BOX 1*6.0*3.0 NEW
3 1.031 BOX 1*2.0*1.5 NEW
4 1.274 Pipe 1*1.2 NEW
5 2.054 BOX 1*6.0*3.0 NEW
6 2.350 BOX 1*2.0*1.5 NEW
7 3.021 Pipe 1*1.2 NEW
8 3.098 Pipe 1*1.2 NEW
Spans/
Opening Spans/Opening
Sr. Existing Type Of Proposed Type Of
With Span Width (m) With Span Length Remarks Chainage Difference Schedule B Plan & profile Site Status Remarks
No. Chainage Culvert Chainage Culvert
Length (mm)
(mm)
B Improvement of roads connecting the Tourist Destination in Wardha District ( Bor Dharan ) Km. 0+000 to Km 7+800
B-1 Bor Dharan ( From Km 0+000 to Km 5+900 )
1 0.222 BOX 1*2.0*1.5 NEW
2 0.352 Pipe 1*0.9 5.80 0.352 Pipe 1*1.2 Reconstruction
3 0.618 Pipe 1*0.9 7.30 0.618 Pipe 1*1.2 Reconstruction
4 0.720 Pipe 1*0.9 7.30 0.720 Pipe 1*1.2 Reconstruction
5 0.950 BOX 1*2.0*1.5 NEW
6 1.074 SLAB 1*1.2 7.50 1.074 BOX 1*2.0*1.5 Reconstruction
1+110 MNB 1*9.6 Retain
7 1.285 Pipe 7.50 1.285 Pipe 1*1.2 Reconstruction
8 1.450 Pipe 1*0.6 12.00 1.450 Pipe 1*1.2 Reconstruction
9 1.680 Pipe 3*0.4 6.60 1.680 BOX 1*6.0*3.0 Reconstruction
10 1.842 Pipe 7.50 1.842 Pipe 1*1.2 Reconstruction
11 1.9 BOX 1*2.0*1.5 NEW
12 2.14 BOX 1*2.0*1.5 NEW
13 2.245 Pipe 2*0.9+1*0.6 7.00 2.245 BOX 1*5.0*2.0 Reconstruction
14 2.39 BOX 1*2.0*1.5 NEW
15 2.505 Pipe 1.09 11.00 2.505 BOX 1*3.0*1.5 Reconstruction
16 2.655 Pipe 2*0.9 7.30 2.655 Pipe 2*1.2 Reconstruction
17 2.95 BOX 1*2.0*1.5 NEW
18 3.4 BOX 1*2.0*1.5 NEW
19 4.08 BOX 1*2.0*1.5 NEW
20 4.48 BOX 1*2.0*1.5 NEW
4+645 MNB 2*6.4 Retain
21 4.97 BOX 1*2.0*1.5 NEW
22 5.33 BOX 1*2.0*1.5 NEW
5+480 MNB 4*6.0 Retain
23 5.770 Pipe 7.50 5.770 Pipe 1*1.2 Reconstruction
B-2 Safari Road ( from Km 0+000 to 1+900 )
1 0.023 Pipe 1*0.8 3.30 0.023 Pipe 1*1.2 Reconstruction
2 0.052 Pipe 1*0.8 3.30 0.052 Pipe 1*1.2 Reconstruction
3 0.39 BOX 1*2.0*1.5 NEW
4 0.515 Pipe 3*0.3 7.60 0.515 Multiple Pipes 40*1.2 Reconstruction
5 0.9 BOX 1*2.0*1.5 NEW
6 1.07 BOX 1*2.0*1.5 NEW
7 1.49 BOX 1*2.0*1.5 NEW
Spans/Opening With
Sr. Existing Type Of Proposed
Span Length Width (m)
No. Chainage Culvert Chainage
(mm)
Wardha-Sevagram-Samudrapur-Girad-Umed Rd.(SH-326) length 42.213 Km.
A including Hamadpur Road Junction to Wardha Higgan Road (SH 328)
A-1 Duttapur Chowk to Gandhi Chowk (From Km 0+000 to 5+250)
1 4.220 Pipe 2*1.2 7.0
2 4.598 Pipe 2*1.2 7.0
A-2 Gandhi Chowk to Sakhra Phata (SH 326 Km 2+000 to 20+850)
1 13.108 Pipe 2*1.2 10.50
2 15+216 Pipe 1*1.2 10.40
3 15+333 Pipe 1*1.2 10.40
4 16.727 Pipe 1*1.2 10.50
5 16+920 Pipe 1*1.2 11.00
6 18.994 Pipe 1*1.2 10.50
A-4 Shedgaon Phata to Mngrud (SH 326 from Km 37+950 to Km 38+300)
1 38+128 Pipe 1*1.2 8.00
Type Of
Remarks Plan & profile
Culvert
d Rd.(SH-326) length 42.213 Km.
Wardha Higgan Road (SH 328)
From Km 0+000 to 5+250)
Pipe Widen
Pipe Widen
326 Km 2+000 to 20+850)
Pipe Widen 13+115
Pipe
Pipe
Pipe Widen 16+698
Pipe Widen 16+920
Pipe Widen
om Km 37+950 to Km 38+300)
Pipe Widen
Additional New Culverts Shall be Constructed as per the details given in the below
Sr. Span / Opening
Design Chainage Type of Culvert
No. (No. of Dia of Pipe/Span)
Wardha-Sevagram-Samudrapur-Girad-Umed Rd.(SH-326) length 42.213 Km.
A including Hamadpur Road Junction to Wardha hinggan Ghat Road (SH 328)
A-2 Gandhi Chowk to Sakhara Phata (SH 326 fom Km 2+000 to 20+850)
1 2.840 PIPE 1*1.2
2 4.970 PIPE 1*1.2
3 5.310 PIPE 1*1.2
4 6.205 PIPE 1*1.2
5 9.050 PIPE 2*1.2
6 10.412 PIPE 2*1.2
7 10.865 PIPE 1*1.2
8 13.740 PIPE 1*1.2
9 14.790 BOX 1*2.0*1.5
10 14.860 BOX 1*2.0*1.5
11 16.400 PIPE 1*1.2
12 17.030 BOX 1*2.0*1.5
13 17.180 BOX 1*2.0*1.5
14 17.765 BOX 1*2.0*1.5
15 17.930 BOX 1*2.0*1.5
16 18.150 BOX 1*2.0*1.5
17 18.480 BOX 1*2.0*1.5
18 18.630 BOX 1*2.0*1.5
Hamadpur Road Junction to Wardha Hinggan Ghat Road
A-5 (SH 328 Km 4+550 to Km 19+050)
1 5.620 PIPE 1*1.2
2 6.980 PIPE 1*1.2
3 9.195 PIPE 1*1.2
4 9.555 PIPE 1*1.2
5 10.260 BOX 1*2.0*1.5
6 14.160 BOX 1*2.0*1.5
7 15.360 BOX 1*2.0*1.5
8 16.120 BOX 1*2.0*1.5
9 16.410 BOX 1*2.0*1.5
10 18.050 BOX 1*2.0*1.5
11 18.550 PIPE 1*1.2
12 18.940 PIPE 1*1.2
A-6 Wardha South Bypass ( From 0+000 to Km 3+258)
1 0.600 PIPE 1*1.2
2 0.987 BOX 1*6.0*3.0
3 1.031 BOX 1*2.0*1.5
4 1.274 PIPE 1*1.2
5 2.054 BOX 1*6.0*3.0
6 2.350 BOX 1*2.0*1.5
7 3.021 PIPE 1*1.2
8 3.098 PIPE 1*1.2
Improvement of roads connecting the Tourist Destination in WardhaDistrict (Bor
B Dharan) Km. 0+000 to Km 7+800
B-1 Bor Dharn ( From Km 0+000 to 5+9000)
1 0.222 BOX 1*2.0*1.5
2 0.950 BOX 1*2.0*1.5
3 1.900 BOX 1*2.0*1.5
4 2.140 BOX 1*2.0*1.5
5 2.390 BOX 1*2.0*1.5
6 2.950 BOX 1*2.0*1.5
7 3.400 BOX 1*2.0*1.5
8 4.080 BOX 1*2.0*1.5
9 4.480 BOX 1*2.0*1.5
10 4.970 BOX 1*2.0*1.5
11 5.330 BOX 1*2.0*1.5
B-2 Safari Road ( From 0+000 to Km 1+900 )
1 0.390 BOX 1*2.0*1.5
2 0.900 BOX 1*2.0*1.5
3 1.070 BOX 1*3.0*1.2
4 1.490 BOX 1*2.0*1.5
Sr. Sr. Existing Design Clear Length between Width of MNB
No. No. Chainage Chainage Proposed Span inner faces of dirt wall (m)
of Proposed MNB(m)
A-2 A-2 Gandhi Chowk to Sakhara Phata (SH 326 from Km 2+000 to 20+850)
1 12+050 12+050 3*4.0 8.4
1 2 14+400 14+400 6*8.0 48.0 14.0
2 3 16+020 16+020 2*7.0 14.0 14.0
3 4 17+550 17+550 4*7.0 28.0 14.0
5 20+090 20+090 3*7.0 8.5
A-3 Sakhara phata to Shedgaon phata currently under construction by PWD (From km 20+850 to km 37+950)*
1 34+120 32+350 4*7.0 22 14
A-5 Hamadpur Road Junction to Wardha Hinggan ghat Road (SH 328 from 4+550 to km 19+050)
1 7+260 7+260 2*6.5 8.1
B Improvement of roads connecting the Tourist Destination in wardha District (Bor Dharan) km. 0+000 to 7+800
1 1+110 1+110 1*9.6 7.7
2 4+645 4+645 2*6.4 8
3 5+480 5+480 4*6.0 8
Rearks
+850)
Retain
Reconstrution
Reconstrution
Reconstrution
Retain
m 20+850 to km 37+950)*
Reconstrution
50 to km 19+050)
Retain
haran) km. 0+000 to 7+800
Retain
Retain
Retain
RHS LHS FRL Width RHS LHS
269.063 268.45 268.834 8.5 -0.229 0.384
269.051 268.416 268.844 8.5 -0.207 0.428
269.081 268.422 268.854 8.5 -0.227 0.432
269.005 268.519 268.864 8.5 -0.141 0.345
268.707 268.27 268.873 8.5 0.166 0.603
268.958 268.117 268.883 8.5 -0.075 0.766
268.97 268.583 268.893 8.5 -0.077 0.31
268.723 268.364 268.899 8.5 0.176 0.535
269.032 268.759 268.881 8.5 -0.151 0.122
269.057 268.509 268.84 8.5 -0.217 0.331
269.015 268.706 268.777 8.5 -0.238 0.071
268.869 268.3 268.692 8.5 -0.177 0.392
268.798 268.28 268.585 8.5 -0.213 0.305
C. RHS C. LHS
-2.69% 4.52%
-2.44% 5.04%
-2.67% 5.08%
-1.66% 4.06%
1.95% 7.09%
-0.88% 9.01%
-0.91% 3.65%
2.07% 6.29%
-1.78% 1.44%
-2.55% 3.89%
-2.80% 0.84%
-2.08% 4.61%
-2.51% 3.59%