0% found this document useful (0 votes)
44 views9 pages

Abutment

The document provides detailed specifications and calculations for the design of a bridge abutment, including dimensions, material properties, and loading conditions. It outlines the dead and live loads, wind and seismic forces, and the resulting shear and moment calculations. Additionally, it includes the design of the abutment wall thickness and reinforcement requirements based on structural analysis.

Uploaded by

Aldi Perdana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views9 pages

Abutment

The document provides detailed specifications and calculations for the design of a bridge abutment, including dimensions, material properties, and loading conditions. It outlines the dead and live loads, wind and seismic forces, and the resulting shear and moment calculations. Additionally, it includes the design of the abutment wall thickness and reinforcement requirements based on structural analysis.

Uploaded by

Aldi Perdana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

BAB IX

ABUTMENT (KEPALA JEMBATAN)

DATA UMUM PERENCANAAN


Dari perencanaan bangunan atas jembatan diketahui
Tebal lantai beton = 20 cm
Tebal lapisan aspal =5 cm
Tebal trotoar = 30 cm
Bentang jembatan = 52 m
Lebar jembatan = 8,5 m = 850 cm
Lebar Trotoar = 2 x 0,6 m
Jarak Gelagar Melintang = 5,2 m , jadi jumlah λ = 10
Jarak Gelagar memanjang = 158 cm
Profil Gelagar Melintang = WF 700 x 300 x 13 x 24
Profil Gelagar Memanjang = WF 350 x 350 x 12 x 19
Mutu baja = BJ 44
Mutu Beton = fc’ = 35 Mpa
fy = 390 Mpa
Zona Gempa =4
Letak jembatan > 5 KM dari pantai

DATA TEKNIK JEMBATAN


Jarak antar Gelagar Memanjang = 1,58 m
Jarak antar Gelagar Melintang = 5,2 m
Gelagar Memanjang = WF 350 x 350 x 12 x 19 ; q = 136 kg/m
Gelagar Melintang = WF 700 x 300 x 13 x 24 ; q = 185 kg/m
Rangka Utama
Batang Horizontal atas = WF 400 x 400 x 20 x 35 ; q = 283 kg/m
Batang Horizontal bawah = WF 400 x 400 x 20 x 35 ; q = 283 kg/m
Batang diagonal tepi = WF 400 x 400 x 11 x 18 ; q = 147 kg/m
Batang diagonal tengah = WF 400 x 400 x 11 x 18 ; q = 147 kg/m
Ikatan angin atas = L 75 x 75 x 7 ; q = 7,94 kg/m
Ikatan angin bawah = L 110 x 110 x 10 ; q = 16,6 kg/m
Tebal dari perletakan ke muka aspal = 70 + 20 + 5 + 9,7 = 105 cm
PEMBEBANAN :
▪ Beban mati
Pelat beton = 0,2 . 8,3 . 52 . 2400 = 207.168 kg
Kerb = 2 . 0,30 . 0,6 . 52 . 2400 = 44.928 kg
Aspal = 0,05 . 7,1 . 52 .2200 = 40.612 kg
Gelagar memanjang = 6 . 136 . 52 = 42.432 kg
Gelagar melintang = 11 . 185 . 8,5 = 17.298 kg
Ikatan angin atas = 18 . 6,72. 2 . 7,94 = 1. 921 kg
Ikatan angin bawah = 20. 9,96. 2 . 16,6 = 6.613 kg
Rangka Horizontal Atas = 2 . 46,8. 283 = 26.489 kg
Rangka Horizontal Bawah = 2 . 52 . 283 = 29.432 kg
Rangka Diagonal = 2 . 20 . 7 . 147 = 41.160 kg
Beban Total = 458052,58 kg

Sambungan Plat simpul = 10% . 165344,58


= 16534,46 kg
Jadi beban mati total : Pmati = ( 970933,78 + 70817,78 ) / 0,25
= 118646,76 kg

▪ Beban Mati
Beban hidup ( UDL + KEL ) = VA ( p+q )....dari perhitungan UDL+KEL
dengan beban “D”
= 650,16 x 10 KN
= 650160 kg
Jadi beban hidup total = Phidup = 650160 x 0,5
= 325080 kg
▪ Beban Angin
Beban angin = 5 Wb...... dari perhitungan perletakan rangka utama ikatan
angin
= 5 x 1205
Wangin = 6025 kg

▪ Beban Gempa
Koefisien geser dasar C
Dimensi Pilar taksiran = 1,6 x 9 x 9
WTP = Wtotal + 0,5 Wpilar
= 2 . Pmati + 0,5 Wpilar
= 2 . 118646,8 + 0,5 . 2400 ( 1,60 x 9 x 9 )
= 392813,52 kg
= 39281,35 N = 39,3 KN

E = 4700 . 35 = 27805,5750 Kg/cm2 , f’c = 35 Mpa


I1 = I Longitudinal
I2 = I Lateral
I1 = 60% . 1/12 . b h3
= 60% . 0,083 . 9 . 1,23
= 0,78 m4
I2 = 60% . 1/12 . b h3
= 60% . 0,083 . 1,2 . 93
= 43,74 m4

a. Arah Memanjang ( Berdasarkan BMS 2.4.7.1 ( 2.10 )


3.E.I1 3.278055750 .0,78
Kp = = = 889778,40 Kg/m
L3 93
= 90.7012 KN/m

WTP 392813,52
Tmj = 2π = 2π = 1,333 detik
g.Kp 9,81.889778 ,4

Dimana :
Tmj = waktu getar arah memanjang ( dalam detik )
g = percepatan gravitasi ( m/dt )
WTP = berat total nominal bangunan atas termasuk beban
Mati ditambah ½ berat pilar ( kg )
Kp = Kekakuan gabungan sebagai gaya horisontal yang
Diperlukan untuk menimbulkan satu-satuan lendutan
Pada bagian atas ( Kg/m )

Untuk arah memanjang : Tmj = 1,333 detik


Zona gempa 4 (dari soal )
Dari gambar 2.14 – on page 2-47 BMS Sec 2, didapatkan : C = 0,10
b. Arah Melintang ( Berdasarkan BMS 2.4.7.1 ( 2.10 )
3.E.I1 3.2780557 x43,74
Kp = = = 50050035 Kg/m
L3 93
= 5101,94 KN/m

WTP 392813 ,52


Tmj = 2π = 2π = 0,178 detik
g.Kp 9,81.50050035
Untuk arah memanjang : Tmj = 0,178 detik
Zona gempa 4 (dari soal )
Dari gambar 2.14 – on page 2-47 BMS Sec 2, didapatkan : C = 0,15
Faktor type bangunan ‘S’
( Berdasarkan BMS pasal 2.4.7.3 tabel 2.14 – on page 2-51 )
Digunakan Type A4 = yaitu jembatan dengan daerah sendi beton/baja :
S = 1,0 F
F = 1,25 sampai 0,025 n < 1
Dengan n = Jumlah sendi plastis yang menahan deformasi arah lateral
Pada masing-masing bagian yang monolit dari jembatan
( misal : bagian yang dipisahkan untuk expantion joint Yang memberikan
keleluasaan bergerak )
S=F
= 1,0

Faktor Kepentingan ‘I’


( Berdasarkan BMS pasal 2.4.7.3 tabel 2.13 – on page 2-01 )
Digunakan I = 1,2 ; yaitu : jembatan memuat lebih dari 2000
kendaraan/hari
Jembatan pada jalan raya utama atau arteri dan jembatan dimana tidak
ada rute alternatif.

Perhitungan Gaya Geser Total


( Berdasarkan BMS pasal 2.4.7.1 on page 2-45 )
IEQ = Kh. I . Wt
Dimana : Kh = C.S
TEQ = C . S . I . 2. Pmati
Dengan :
C = Koefisien dasar geser gempa
S = faktor tipe bangunan
I = faktor keutamaan
Wt = berat total nominal bangunan
IEQ = gaya geser dasar untuk arah yang ditinjau

Gaya Geser Total arah memanjang :


TEQ = C . S . I . 2. Pmati
= 0,1 . 1,0 . 1,2 . 2 . 118646,76
= 28475,22 kg = 28,48 ton
F(x)Q =0,5 . TEQ = 0,5 ( 28,48 ) = 14,24 ton
Gaya Geser Total arah melintang :
TEQ = C . S . I . 2. Pmati
= 0,15 . 1,0 . 1,2 . 2 . 118646,7608
= 42712,83 kg = 42,71 ton
F(x)Q = 0,5 . TEQ = 0,5 ( 42,71 ) = 21,36 ton

Kombinasi beban Vertikal dan Horizontal

1. Kombinasi beban vertikal, yaitu :


Vmax = 1. Pmati + 1 . Phidup + 1,2 Wangin
= 1. 118646,8 + 1. 325080 + 1,2 . 6025
= 450956,761 kg = 451,0 ton = 4510 KN
2. Kombinasi beban horisontal terbesar arah memanjang, yaitu :
Ha = Pgempa longitudinal
= F(x)Q
= 14,2376 ton = 142,3761 KN
3. Kombinasi beban horisontal terbesar arah melintang, yaitu :
Hb = Pgempa tranversal
= F(y)Q
= 21,3564 ton = 213,564 KN
PERENCANAAN ABUTMEN
Tanah urug diasumsikan :
 tan ah = 1,722 t/m3
 sat = 1,86 t/m3

W = 1 t/m3

' = 0,863 t/m3


Φ = 00
c = 0,597 t/m2
Ka = tg2 ( 45 – Φ/2)
= tg2 ( 45 – 0 )
=1
σv' = z

σha = Ka* σv' – 2c Ka untuk c=0 σha = Ka* σv'


q = beban Lalulintas yang diasumsikan tanah urug setebal 200 cm
= 2,00  tan ah

= 3,444 t/m2

Akibat beban tanah


Level z h σv' Ka c σha
1 0,05 0,05 3,44 1,00 0,60 2,25
2 1,95 1,900 6,54 1,00 0,60 5,35
3 9,0 7,050 12,80 1,00 0,60 11,61
Gaya tekanan tanah aktif per satuan lebar dinding
Ea = Luas diagram tekanan aktif = σhai . hi
Ea1 = 2,25 . 8,950 = 20,14 t/m’
Ea2 = 0,5 . 5,35 . 1,900 = 5,08 t/m’
Ea3 = 5,35 . 7,050 = 37,71 t/m’
Ea4 = 0,5 . 6,26 . 7,050 = 22,06 t/m’
= 85,00 t/m’
Letak resultan gaya tekanan tanah dari O
z = 20,14 . 4,50 + 5,08 . 7,70 + 37,71 . 3,53 + 22,06 . 2,35
85,00
= 3,70 m dari O

Momen pada titik O


Mo = Σ ( Eai . yi )
= Ea1 . 0,5 . H + Ea2 . h2 + h1/3 + Ea3 . 0,5. h2 + Ea4 . h2/3 + Ea5 .
h2/3
= 20,1375 . 4,475 + 5,08 . 7,683 + 37,71 . 3,525 + 22,0647 . 2,35
= 313,959 tm/m’

PERKIRAAN TEBAL DINDING ABUTMEN BERDASARKAN TULANGAN UTAMA


ρmin = 1,4 = 1,4 = 0,003590
fy 390
tebal dinding = 160 cm
MU = 313,96 tm/m’
Diameter tulangan : 30 mm
Diameter sengkang : 12 mm
Selimut beton : 7,5 cm
b = 1000 mm ( diambil per 1 meter )
dx = t – selimut beton – 0,5 . Φutama – Φsengkang
= 160 – 7,5 – 0,5 . 3 – 1,2
= 149,8 cm
= 1498 mm
Mu' 3079938965 ,96 Nmm
Rn = = = 1,6147 Mpa ( N/mm2 )
 .b.dx 2
0,85.1000 .1498 2

fy 390
m = = = 13,11
0,85. f ' c 0,85.35
1 2.m.Rn 
ρ perlu = 1 − 1 − 
m  fy 

1  2.13,11.1,6147 
= 1 − 1 − 

13,11  390 

= 0,004259
ρ perlu = 0,0043 > ρmin = 0,00359
jadi dipakai ρ perlu = 0,0043

Digunakan tebal dinding abutmen sebesar = 1,60 m


As perlu = ρ . b . dx
= 0,0043 . 1000 . 1498
= 6380,34 mm2
Digunakan tulangn D 30 – 100 mm ( As = 7068,58 mm2 )

PERKIRAAN TEBAL DINDING ABUTMEN BERDASARKAN TULANGAN GESER


L = 900 cm
V = M = 3.079.938,97 N
Nu = 4.510.000.00 N
Vn = 213.564.00 N

Direncanakan :
tabutmen = 1.600 mm = 1,60 m
Asumsi digunakan tulangan sengkang = 12 mm
Asumsi digunakan tulangan utama = 29 mm
d = tabutmen - Φsengkang – 0,5 Φutama – selimut beton
= 1.600 – 12 – 0,5 . 29 – 75
= 1.498,50 mm

1  Nu 
ΦVc = Φ. fc . tabutmen . d 1 +  ... SK – SNI 3.4.3.1-2
6  14,00 As 
Dimana, As = tabutmen . Panjang abutmen
= 1.600,00 . 9.000
= 14.400.000,00 mm2
Φ = 0,60

1  4.510 .000,00 
ΦVc = 0,60. 35 . 1.600 . 1.498,50 1 + 
6  14,00(14.400 .000,00) 
ΦVc = 1.450.171,24 N
0,5 ΦVc = 725.085,62 N

0,5 ΦVc > Vu


725.085,62 > 213.564,00 .....tidak perlu tulangan geser minimum

Tebal dinding abutmen sebesar 1,60 m