Detailed Project Report (DPR) : For: 40 MW Gas-Based Power Plant

The document is a Detailed Project Report (DPR) for a 40 MW gas-based power plant, outlining key aspects such as project overview, location, capacity, and estimated costs. It discusses the energy demand-supply gap, the strategic importance of gas-based plants, and technical details including plant configuration, fuel supply, water requirements, land requirements, and infrastructure. Additionally, it emphasizes the environmental advantages of gas over coal and the potential for grid integration.

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views2 pages

Detailed Project Report (DPR) : For: 40 MW Gas-Based Power Plant

The document is a Detailed Project Report (DPR) for a 40 MW gas-based power plant, outlining key aspects such as project overview, location, capacity, and estimated costs. It discusses the energy demand-supply gap, the strategic importance of gas-based plants, and technical details including plant configuration, fuel supply, water requirements, land requirements, and infrastructure. Additionally, it emphasizes the environmental advantages of gas over coal and the potential for grid integration.

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DETAILED PROJECT REPORT (DPR)

For: 40 MW Gas-Based Power Plant

1. Executive Summary

 Project overview

 Location

 Capacity: 40 MW

 Fuel: Natural Gas / LNG / CNG

 Estimated cost

 Promoters

 Timeline

2. Project Background & Justification

 Energy demand and supply gap

 Strategic importance of gas-based plants

 Environmental advantages over coal

 Grid integration potential

3. Technical Details

3.1 Plant Configuration


 Open cycle or combined cycle

 Single or multiple units (e.g., 2 x 20 MW)

 Gas turbine model and make (e.g., Siemens, GE, Mitsubishi)

3.2 Fuel Supply

 Source of natural gas (pipeline, LNG terminal, local gas fields)

 Daily and annual consumption

 Fuel agreement details

3.3 Water Requirements

 Source (river, borewell, municipal)

 Quantity required

 Water treatment facility

3.4 Land Requirements

 Total land area (typically 5–10 acres)

 Ownership/lease/acquisition status

3.5 Infrastructure

 Grid connectivity: substation, transmission lines

 Internal roads, drainage, admin building

4. Project Cost Estimate