DETAILED PROJECT REPORT (DPR)
For: 40 MW Gas-Based Power Plant
1. Executive Summary
      Project overview
      Location
      Capacity: 40 MW
      Fuel: Natural Gas / LNG / CNG
      Estimated cost
      Promoters
      Timeline
2. Project Background & Justification
      Energy demand and supply gap
      Strategic importance of gas-based plants
      Environmental advantages over coal
      Grid integration potential
3. Technical Details
3.1 Plant Configuration
      Open cycle or combined cycle
      Single or multiple units (e.g., 2 x 20 MW)
      Gas turbine model and make (e.g., Siemens, GE, Mitsubishi)
3.2 Fuel Supply
      Source of natural gas (pipeline, LNG terminal, local gas fields)
      Daily and annual consumption
      Fuel agreement details
3.3 Water Requirements
      Source (river, borewell, municipal)
      Quantity required
      Water treatment facility
3.4 Land Requirements
      Total land area (typically 5–10 acres)
      Ownership/lease/acquisition status
3.5 Infrastructure
      Grid connectivity: substation, transmission lines
      Internal roads, drainage, admin building
4. Project Cost Estimate