Omar Ali Sr.
Technical Commercial Engineer
About me: -
I have worked as a Civil Engineer, in the Construction, Technical and Commercial fields, at construction
companies for 9 years, that previous period, I have achieved a greet goals, so I hope to find a suitable
company, that we can achieve more successes together, so kindly if my mentioned services in the CV
has compatible with your requirements, I will be happy if you contact me on my mobile number or Email
ID.
EDUCATION
: UAE-Dubai Bachelor of Civil Engineering. Master in Civil Engineering
: +97150-2931771 Department: Civil - Structure. (In Progress).
: Al-Shrouk Academy (2008 – 2013) Department: Project Management.
Engr.omarali.uae@gmail.com
: Omar Ali Graduation Project: Structures Design. Ain Shams University
Project Grade: Excellent.
WORK EXPERIENCE
Work Skiles
Position: Sr. Technical Commercial Engineer
Monitoring
At: Kamal Khawaja Building Contracting Company
Motivation
From 1st Oct. 2019 Until date (UAE-Dubai)
Presentation
AL KAITOOB BUILDING CONTRACTING COMPANY
Communication
From 11th April 2016 to 30th Sep. 2019 (UAE-Dubai)
Innovation
Creativity JOB DESCRIPTION:
Teamwork A- Technical:
Negotiation Building Information Modelling: Managing & Coordinating and Muddling Architectural & structural
disciplines.
Engineering Software Shop Drawing: Developing all (Structural & Architectural) shop drawing through Revit in LOD 400.
Office RFI’s: Processing the RFI’s ahead on construction, to increase the stability of project engineering scop.
Auto Cad Coordination: Handling the relation between project construction disciplines (Structural & Architectural
Revit
&ID and MEP), Coordinating between Project Sub. Contractors to collect/reviewing/discussing the
related engineering scope, to be as per project Specifications and consultant requirement.
PlanSwift
Change Order: tracking/study the change order received from client/consultant with highlighting the
Sketchup
impact.
Primavera
Variation: Prepare the variation expected list, providing the related supported documents.
SAP
Engineering Document: issue the needed documents to construction team in a timely manner
ETABS according to the project work schedule.
SAFE Technical Queries: providing a suitable reply on the construction team technical queries in a convenient
CsiCol time.
As Built: providing as built drawing in 2D & 3D (LOD 500), all as per site condition, as per client
Language requirements.
Arabic Engineering Quality Control: providing system showing the monthly engineering performance
English comparing with the planning program, controlling the quality of the engineering submissions through
making regular (reports, meeting, audit, compliance statement, etc.).
Value Engineering: providing systematic method of improving the value of a product that a project
produces. It is used to analyse a service, system, or product to determine the best way to manage the
important functions while reducing the cost.
B- Commercial:
Procurement: Provide an engineering study/analysis comparison on the market offers for each item in
the project, this to obtaining the best deals (Price & Specs & Payment terms & work period).
Contracts: preparing all contract levels with all subcontractors (LOA & Agreement & LPO & …)
Tendring/Estimation: providing accurate estimation on the market tenders, Based on the
engineering/procurement background.
QS: Extracting project quantities, Creating the project Breakdown accordingly, items/category/phase
wise, for company main invoices, as per all parts requirements.
1|Page
ACHIEVEMENT
2. DUBAI – JABAL ALI, AL
1. DUBAI – AL BADAA FERJAN
- Residential apartment - Residential apartment
- Project Value: 100 M - Project Value: 2,100 M
- G+6+ROOF+TOP ROOF - 30 building
- Dubai Municipality (G+6+ROOF+TOP ROOF)
- Client: ABD ALLAH AL HABAI - Dubai Municipality
/ Meraas - Client: ABD ALLAH AL HABAI
- Consultant: MAKS / Meraas
- Consultant: MAKS
3. DUBAI – AL QUSAIS
4. DUBAI – PALM JUMERA
- Residential apartment
- Residential apartment
- Project Value: 120 M
- Project Value: 115 M
- G+12+ROOF+TOP ROOF
- B+G+12
- Dubai Municipality
- Trakhees Dubai
- Client: ABD ALLAH AL HABAI
- Client: AZIZI
/ Meraas
- Consultant: AZIZI &360⁰
- Consultant: MAKS
6. DUBAI – AL BARSHA –
5. DUBAI – AL BADAA – SHIKH ZAYED ROAD
SHIKH ZAYED ROAD - Residential apartment
- Residential apartment - Project Value: 88 M
- Project Value: 60 M - B+G+2Pd+12
- 2B+G+9 - Dubai Municipality
- Dubai Municipality - Client: ABD ALLAH AL HABAI
- Client: Meraas/North 25 / Meraas
- Consultant: DEWAN - Consultant: 4U
CONSULTANT ENGINEERING
7. DUBAI – JABAL ALI, AL 8. DUBAI – JABAL ALI, AL
FERJAN, AFC ZONE FERJAN, AFC ZONE
- Residential apartment - Residential apartment
- Project Value: 65 M - Project Value: 55 M
- B+G+2Pd+7 - B+G+2Pd+7
- Trakhees Dubai - Trakhees Dubai
- Client: AZIZI - Client: AZIZI
- Consultant: CIVITC - Consultant: CIVITC
9. DUBAI – JABAL ALI, AL 10. DUBAI – JABAL ALI, AL
FERJAN, AFRA ZONE FERJAN, AFRA ZONE
- Residential apartment - Residential apartment
- Project Value: 56 M - Project Value: 75 M
- B+G+2Pd+10 - B+G+2Pd+10
- Trakhees Dubai - Trakhees Dubai
- Client: AZIZI - Client: AZIZI
- Consultant: CIVITC - Consultant: CIVITC
2|Page
POSITION: PROJECTS ENGINEER. POSITION: SITE ENGINEER.
M/s REBOU AL EMIRATE CONTRACTING COMPANY M/s AL RAWASY CONTRACTING COMPANY
From 15-SEP-2015 From 1-Jun-2015
To 30-MARCH-2016 To 10-Sep-2015
(UAE-Sharjah City) (UAE-Dubai, Sharjah City)
A- RESPONSIBILITY DESCRIPTION A- RESPONSIBILITY DESCRIPTION
1. Quantity Surveying. 1. Quantity Surveying.
2. Project Estimation 2. Supervising Concrete.
3. Supervising all projects. 3. Supervising Finishing.
4. Procurement. 4. Reviewing Sub. Cont. Payment.
5. Authority handover 5. Authority handover
B- ACHIEVEMENTS: B- ACHIEVEMENTS:
Hand Over 6 Vella (G+2FL) Hand Over 5 Vella (G+2FL)
POSITION: Str. Designer & Site Inspector POSITION: Site Engineer.
M/s MIDDLE EAST CONTRACTING COMPANY): M/s NASER GLAL CONTRACTING COMPANY:
From 1-Jul-2014 From 1-Jun-2013
To 10-May-2015 To 30-Jun-2014
(Egypt-El Shrouk City) (Egypt-Cairo Future City)
A- RESPONSIBILITY DESCRIPTION A- RESPONSIBILITY DESCRIPTION
1. Design. 1. Supervising Concrete.
2. Supervising Concrete / Finishing. 2. Supervising Finishing.
3. Reviewing Sub. Cont. Payment. 3. Reviewing Sub. Cont. Payment.
4. Authority handover. 4. Authority handover.
5. Procurement. 5. Procurement.
B- ACHIEVEMENTS: B- ACHIEVEMENTS:
Hand Over 4 Building (G+4FL) Hand Over 2 Building (G+6FL)
Bader University Mall Landscape Work
3|Page