0% found this document useful (0 votes)
18 views3 pages

Fence Temporary & Site Storage

The document outlines the details for the construction of a temporary fence and site storage for the 'Pembangunan Ekstensi IBT 3' project at GitET 500kV Ngimbang. It includes information on the project owner, contract number, and the consortium involved. The original issue date is noted as April 17, 2025, with preparation and checking by individuals named Iwan and Aziz.

Uploaded by

kerjaonline14040
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views3 pages

Fence Temporary & Site Storage

The document outlines the details for the construction of a temporary fence and site storage for the 'Pembangunan Ekstensi IBT 3' project at GitET 500kV Ngimbang. It includes information on the project owner, contract number, and the consortium involved. The original issue date is noted as April 17, 2025, with preparation and checking by individuals named Iwan and Aziz.

Uploaded by

kerjaonline14040
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14

NOTES :

A A

B B

C C

D D

E E

F F

G G

0 ORIGINAL ISSUE 17/04/2025 IWAN AZIZ

REV. MODIFICATION DATE PREPARED CHECKED

OWNER :

- FENCE TEMPORARY DETAIL


PT. PLN (PERSERO) UNIT INDUK TRANSMISI JBM
JALAN SUNINGRAT NO.45, KETAGEN, SIDOARJO
JAWA TIMUR 61257

H H
CONTRACT NO : 043.PJ/DAN.01.03/F34000000/2024 DATE : 30-DES-2024

PROJECT :

PEMBANGUNAN EKSTENSI IBT 3


GITET 500kV NGIMBANG

TITLE :
FENCE TEMPORARY & SITE STORAGE

I CITICON CONSORTIUM :
I

PT. CITICON ADHINUGRAHA PT. INDO KARYA ELEKTRIK MANDIRI

DWG No : - - -

DATE SIGNATURE PAGES :

DRAWN IWAN
J 01/03 J
CHECKED AZIZ

APPROVED AZIZ REV. -


1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

NOTES :

A A

B B

A B
C C

D D

E E

B B

F F

G G

2 0 ORIGINAL ISSUE 17/04/2025 IWAN AZIZ

REV. MODIFICATION DATE PREPARED CHECKED

OWNER :

PT. PLN (PERSERO) UNIT INDUK TRANSMISI JBM


JALAN SUNINGRAT NO.45, KETAGEN, SIDOARJO
JAWA TIMUR 61257

H H
CONTRACT NO : 043.PJ/DAN.01.03/F34000000/2024 DATE : 30-DES-2024
A A PROJECT :

PEMBANGUNAN EKSTENSI IBT 3


GITET 500kV NGIMBANG
- DENAH SITE STORAGE - ATAP SITE STORAGE
TITLE :
FENCE TEMPORARY & SITE STORAGE

I CITICON CONSORTIUM :
I

PT. CITICON ADHINUGRAHA PT. INDO KARYA ELEKTRIK MANDIRI

DWG No : - - -

DATE SIGNATURE PAGES :

DRAWN IWAN
J 02/03 J
CHECKED AZIZ

APPROVED AZIZ REV. -


1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

NOTES :

A A

B B

- DETAIL RANGKA ATAP

C C

D D

E E

F F
2 - VIEW - B 1

G G

0 ORIGINAL ISSUE 17/04/2025 IWAN AZIZ

REV. MODIFICATION DATE PREPARED CHECKED

OWNER :

PT. PLN (PERSERO) UNIT INDUK TRANSMISI JBM


JALAN SUNINGRAT NO.45, KETAGEN, SIDOARJO
JAWA TIMUR 61257

H H
CONTRACT NO : 043.PJ/DAN.01.03/F34000000/2024 DATE : 30-DES-2024

PROJECT :

PEMBANGUNAN EKSTENSI IBT 3


GITET 500kV NGIMBANG

TITLE :
FENCE TEMPORARY & SITE STORAGE

I CITICON CONSORTIUM :
I

PT. CITICON ADHINUGRAHA PT. INDO KARYA ELEKTRIK MANDIRI

DWG No : - - -

DATE SIGNATURE PAGES :

DRAWN IWAN
J A B 03/03 J
- VIEW - A CHECKED AZIZ

APPROVED AZIZ REV. -


1 2 3 4 5 6 7 8 9 10 11 12 13 14

You might also like